Text version
0011609141
Project: 243526, Repair Barracks Bldg. 827 ("K" Work), Camp Casey, AREA I, Korea
Pursuant to FAR 36.204 the estimated price range is betw een $1,000,000 and $5,000,000.
This is a NON-WORK PLAN TASK ORDER TO MATOC AREA I & II CONTRACTORS ONLY.
Contract Numbers W91QVN-18-D-0021, -0022, -0025, -0026, -0027, -0028, -0042, -0044, -0046 and -0050.
Site Visit: ALL MATOC offerors w ho intend to propose on this solicitation are strongly encouraged to attend the site visit. See site visit clause FAR 52.236-27 in Section L.
In the event a contractor is unable to submit an offer in response to this RFP, the contractor shall submit "No-Offer Letter" by closing date and time specified in the solicitation.
SSG LIM, MADISON D. 315-755-0647
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
03-May-2021
(RFP)
(IFB)
X
CALL:
Repair Barracks Bldg 827, Camp Casey
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________180 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section F
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________20 May 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
CONSTRUCTION & SUPPLY DIV, UNIT #15289
APO AP 96271
UNITED STATES
W91QVN
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
243526
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W91QVN21R0073 38
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W91QVN21R0073
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job K Work-Repair
FFP
Repair of Bldg 827, 4-story barracks including fire suppression system, Camp Casey.
The Contractor shall provide all labor, material, equipment and transportation to perform all work in accordance with the requirement specified in the attached Statement of Work (SOW) and related requirement documentation.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011609141
PSC CD: Z2FC
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 Lot War Hazard
FFP
Estimated Cost for War Hazard Losses is Zero(0).
FOB: Destination
PSC CD: Z2FC
NET AMT
Section C - Descriptions and Specifications
TECHNICAL PROVISIONS - I
STATEMENT OF WORK
PROJECT NO TITLE LOCATION
243526 Repair barracks, building No. 827 Camp Casey
1. DESCRIPTION: The work to be performed to repair barracks, building No. 827 is described below and executed by one or more of the groups.
1.1. Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications.
1.2. Work by In-House Labor: Not applicable to this project.
1.3. Work by Troop Labor: Not applicable to this project.
2. PRINCIPAL FEATURES: This project includes the following principal features:
2.1. Schedule #I, Repair (K): All work shall be in accordance with the attached drawings and specifications.
2.1.1. Civil Work
2.1.1.1. Replace sidewalk with new.
2.1.1.2. Replace concrete steps including handrail with new.
2.1.1.3. Replace ac surface course.
2.1.1.4. Paint 150mm thickness reflective white parking line.
2.1.1.5. Replace concrete curb with granite curb.
2.1.1.6. Replace barbeque kitchenette including shed with new.
2.1.1.7. Replace 20ea cherry blossom trees with new. Submit the certificate issued by a tree appraiser.
2.1.1.8. Remove fuel tank dike.
2.1.1.9. Restore solid sodding including top soil.
TP I-1
2.1.2. Architectural Work
2.1.2.1. Floor work
2.1.2.1.1. Replace existing floor tile and rubber tile with new Polyvinyl Chloride Tile (PVCT) including Vacuum Circuit Breaker (VCB) and Rubber Base (RB) as shown on new floor plan and interior finish schedule. The existing concrete flooring shall be smooth, true, level plane with all defects such as rough or scaling concrete, low spots, high spots, painting, and uneven surface shall have been corrected for new flooring. Provide leveling concrete for existing concrete slab with government approval.
2.1.2.1.2. Replace existing quarry tile including quarry tile base with new as shown on floor plans and interior finish schedule.
2.1.2.1.3. Replace existing Ceramic Mosaic Tile (CMT) with new including cement bond coat, waterproof membrane, mortar bed as shown on floor plans, section and details drawings.
2.1.2.1.4. Replace existing concrete slab at corridor, each bath rooms, toilet, laundry, and mud room on 1st floor for mechanical sewer line works as shown on floor plan and mechanical drawings.
2.1.2.1.5. Apply epoxy coating with non-slip grits on existing floors as shown on floor plan and interior finish schedule.
2.1.2.2. Interior and exterior wall work
2.1.2.2.1. Replace existing all Gypsum Wall Board (GWB) walls with new GWB walls (Normal, Water resistant or 'X' type) including metal studs as shown on floor plans, sections and detail drawings.
2.1.2.2.2. Paint all existing interior walls including Concrete Masonry Unit (CMU), metal, concrete surfaces, stairway, hand rails, guard rails as shown on floor plan, detail drawings interior finish schedule.
2.1.2.2.3. Paint all existing exterior walls including Exterior Insulation and Finish System (EIFS), CMU, metal, woods, concrete surfaces, stairwells, hand rails, guard rails, and other components (bicycle rack, trash bin) of exterior surface of the building as shown on floor plan, detail drawings and pictures.
2.1.2.2.4. Apply texture coating with plastering at multi-purpose room, dressing room and closet as shown on floor plans, elevations and interior finish schedule.
2.1.2.2.5. Replace existing Glazed Ceramic Wall Tile (GCWT, full height) with new including cement bond coats, water proof membrane, plastering w/metal lath and waterproof GWB as shown on floor plans and sections.
2.1.2.2.6. Replace existing pipe chases and pipe cover with new CMU, waterproof type GWB pipe chases and metal cover including access door in each rooms for new mechanical piping system as per floor plans, sections and detail drawing.
2.1.2.2.7. Remove existing Acoustical Wall Panels (AWP) and apply texture coat on new GWB in multi-purpose room, kitchen, lounge, and game room as shown on floor plan and interior finish schedule.
TP I-2
2.1.2.3. Interior and exterior ceiling and roof work
2.1.2.3.1. Replace existing ceiling with new acoustical ceiling tiles including metal suspension systems as shown on floor plans and interior finish schedule.
2.1.2.3.2. Replace existing ceiling with new GWB (Normal, Water resistant or 'X' type) ceiling including ceiling suspension system as shown on floor plans and finish schedule.
2.1.2.3.3. Paint all interior ceiling surfaces as shown on interior finish schedule and section.
2.1.2.3.4. Paint all existing exterior exposed metal, woods, fascia and soffit as shown on floor plan and elevations.
2.1.2.3.5. Apply acrylic fluid-applied waterproofing coating on existing roof as shown on floor plan and sections.
2.1.2.4. Miscellaneous work
2.1.2.4.1. Replace existing doors and door frames with new including hardware sets as shown on new floor plan and door schedule.
2.1.2.4.2. Replace existing windows including insect screen with new aluminum thermal breaker type windows including glass as shown on floor plans, elevations and window schedule.
2.1.2.4.3. Replace existing window horizontal mini blinds with new, fireproof type.
2.1.2.4.4. Replace existing wooden head, jam and sill for all windows with new as shown on door/window schedule. (Natural color, Oak)
2.1.2.4.5. Replace existing aluminum louver with new as shown on floor plans and louver schedule.
2.1.2.4.6. Replace existing Fire Extinguishers Cabinets (FEC) with new as shown on floor plans and detail drawing.
2.1.2.4.7. Replace existing all toilet accessories with new as shown on floor plans and detail drawings.
2.1.2.4.8. Replace existing all access doors on wall and ceiling with new as shown on floor plan and enlarged floor plan.
2.1.2.4.9. Replace existing kitchenette with new including base cabinet and upper cabinet as shown on floor plan, elevation and detail drawings.
2.1.2.4.10. Replace interior and exterior signages with new for all rooms as shown on floor plan, elevations and signage schedule.
2.1.2.4.11. Replace existing metal shelf with mop rack with new in janitor room.
2.1.2.4.12. Replace existing gravel bed and concrete curb with new 100mm deep gravel bed including granite curb around building as shown on floor plan and detail drawing.
2.1.2.4.13. Replace existing trench covers, hooks, and hose bib with new, and paint steel cover at mud room as shown on floor plan and detail drawing.
2.1.2.4.14. Replace existing al grating covers with new for each vest as shown on floor plan and detail drawing.
2.1.2.4.15. Replace existing counter top and Stainless Steel (SST) shelves with new at laundry as shown on floor plan and detail drawing.
2.1.2.4.16. Replace existing iron board cabinet with new as shown on floor plan and detail drawing.
2.1.2.4.17. Replace existing exterior and interior bulletin boards, card holder, and flexi info with new as shown on floor plan, detail drawing and signage schedule.
2.1.2.4.18. Replace existing aluminum louvers with new as shown on floor plans and detail drawings.
2.1.2.4.19. Replace wooden shelf, SST rod and drawer cabinet with new in each closet as shown on floor plan and details.
2.1.2.4.20. Replace existing fire rated access doors (1-1/2hrs) with new at laundry room and stairwell as shown on floor plans.
TP I-3
2.1.2.4.21. Replace existing wooden chair rails and wooden hanger rails at each bed room, kitchen, lounge and game room with new as shown on floor plans and detail drawings.
2.1.2.4.22. Replace existing vanity cabinets including wall hung cabinet with new in all dressing room as shown on new floor plans and detail drawing.
2.1.2.4.23. Replace existing concrete stoops with new as shown on floor plan.
2.1.2.4.24. Replace existing 18thk plywood shelves including plastic laminate at each storage bin as shown on floor plans and elevations.
2.1.2.4.25. Repair and block up damaged existing EIFS with new as necessaries.
2.1.2.4.26. Replace existing SST splash guards with new as shown on floor plans and exterior elevations.
2.1.3. Mechanical Work
2.1.3.1. Heating, Ventilating, and Air Conditioning (HVAC) system
2.1.3.1.1. Replace existing fan coil units, air conditioning units, room thermostat, control, accessories, and associated piping with new.
2.1.3.1.2. Replace existing supply air ducts, duct insulation, diffusers, registers, louvers dampers, grilles, and associated accessories with new.
2.1.3.1.3. Replace existing chilled and hot water circulation pump, air separator, expansion tank, chemical feeder, control system, and associated piping with new.
2.1.3.1.4. Replace existing all chilled and hot water main and branch-piping risers, insulation, ductwork, and accessories with new.
2.1.3.1.5. Replace all existing wall mounted exhaust fans, roof mounted exhaust fans, in-line exhaust fan, ceiling exhaust fans, control, and all associated ductwork with new.
2.1.3.1.6. Replace existing range hood, unit heaters, control, and all associated piping and ductwork with new.
2.1.3.1.7. Replace existing exhaust air ductwork, dryer vent, square diffusers, register, grilles, outside air intake louver, and outside air opening including motorized damper with new.
2.1.3.1.8. Perform Duct Air Leakage Test (DALT) and Testing, Adjusting, and Balancing (T.A.B) after construction to verify if the HVAC system works properly.
2.1.3.1.9. Pre-air leaking test is required prior to repair infiltration and sealing at mechanical room. Repair infiltration and seal air leaking portions including clearance between wall ceiling and penetrators (duct, water piping, conduct pipe, flue vent pipe) at mechanical room. Provide final-air leakage test report.
2.1.3.2. Plumbing system
2.1.3.2.1. Replace existing hot water storage tank, domestic hot water circulation pump, domestic hot water recirculation pump, control system, and associated piping with new.
2.1.3.2.2. Replace existing domestic cold and hot water main and branch piping riser, insulation, backflow preventer assembly, floor drains, floor cleanouts, sewer piping, vent piping, and temperature mixing valve including accessories with new.
2.1.3.2.3. Replace all existing plumbing fixtures, electric water cooler, water hammer arrests, washer valve boxes, and associated piping with new.
TP I-4
2.1.3.3. Fire protection
2.1.3.3.1. Replace existing automatic fire protection sprinkler system and all associated accessories for fire protection system with new.
2.1.4. Electrical Work
2.1.4.1. Replace existing lighting fixtures, exit lights, exterior lights, toggle switches, photocell controls, hand-off-auto selector switches, lighting contactor, 3-way switches, dimmer switches, wires and conduits with new.
2.1.4.2. Replace existing receptacles including cover plates, watthour meter, circuit breakers, and associated wiring and conduits with new.
2.1.4.3. Replace existing safety switch, combination type motor starter, magnetic motor starters, manual motor starter, junction boxes, control system, wires and conduits for HVAC system with new.
2.1.4.4. Replace fire alarm control system with new addressable fire alarm control and mass notification system panel, manual pull station, smoke detector and relay module, building transmitter, antenna, visual signal strobes (75 candela), microphone, speaker device and local operating consoles, and associated wiring and conduit.
2.1.4.5. Replace existing telephone outlets with new.
2.1.4.6. Replace existing CATV cabinets, pull boxes, CATV outlets, and associated wire and conduit with new.
2.1.4.7. Remove and reinstall existing CCTV system, dome cameras. Replace CCTV wiring and conduit with new.
2.2. Schedule #II, New Construction (L): All work shall be in accordance with the attached drawings and specifications.
None
TP I-5
TECHNICAL PROVISIONS - II
TECHNICAL DETAIL SPECIFICATIONS
GENERAL: The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea, Revision 1” (2014 OMA SPECS, REVISION 1), dated 20151030, located on the http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA- SPECS_REVISION-1.pdf. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader® software.
The Standard Technical Detail Specifications:
The work shall conform to the most current version of the listed standards/specifications below.
DIVISION 01 – GENERAL REQUIREMENTS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00.00 10 QUALITY CONTROL
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED
MATERIAL
02 65 00 UNDERGROUND STORAGE TANK REMOVAL
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS
MATERIALS
02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
02 83 19.00 10 LEAD BASED PAINT HAZARD ABATEMENT, TARGET
HOUSING & CHILD OCCUPIED FACILITIES
TP II-1
DIVISION 03 – CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 – MASONRY
04 20 00 MASONRY
DIVISION 05 – METALS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 14 00 FLUID-APPLIED WATERPROOFING
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
07 60 00 FLASHING AND SHEET METAL
07 92 00 JOINT SEALANTS
DIVISION 08 – OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL AND DOOR LOUVERS
DIVISION 09 – FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 22 36 LATH
09 29 00 GYPSUM BOARD
09 30 00 CERAMIC TILE, QUARRY TILE, AND PAVER TILE
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 90 00 PAINTS AND COATINGS
TP II-2
DIVISION 10 – SPECIALTIES
10 14 01 EXTERIOR SIGNAGE
10 14 02 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
DIVISION 12 – FURNISHINGS
12 21 00 WINDOW BLINDS
12 32 00 MANUFACTURED WOOD CASEWORK
12 36 00 COUNTERTOPS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 – PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS
23 52 00 HEATING BOILERS
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 26 – ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 – COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS
TP II-3
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 33.00 10 FIRE ALARM REPORTING SYSTEM, RADIO TYPE
28 31 49 CARBON MONOXIDE DETECTORS
28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 – EARTHWORK
31 00 00 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 16.17 COLD MILLING OF BITUMINOUS PAVEMENTS
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 11 BITUMINOUS SURFACE TREATMENT
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 92 23 SODDING
TP II-4
TECHNICAL PROVISIONS - III
SPECIAL CONDITIONS
1. Material Approval Submittal:
(1) The contractor shall submit a shop drawing submittal schedule and the material approval request with all supporting documents to the COR within 14 days after receipt of NTP.
(2) Attached list of materials in Appendix “B” shall be included in the shop drawing submittal schedule and material approval request.
2. The contractor shall have personnel on site for the sprinkler work and the fire alarm work upon Government's direction, who are certified by the National Institute for Certification in Engineering Technologies (NICET) Level III or equivalent. Equivalent Certificates in Korea are the followings which are issued by the Human Resource Development Service of Korea. If the contractor doesn’t have personnel who are certified by NICET, the contractor shall have two personnel that one is certified for (1) and the other for (2) below.
(1) Engineer Fire Fighting Facilities - Electrical (소방설비기사 -전기)
(2) Engineer Fire Fighting Facilities - Mechanical (소방설비기사 -기계)
3. Environmental Requirements in Contract
The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection. The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract. The Contractor is responsible for ensuring that the Contractor and any persons involved in the supervision or performance of the contract complete all required Environmental training.
In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective actions and notifying the Contracting Officer’s Representative (COR) and the Environmental Office. For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the Environmental Office.
TP III-1
All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the EMS Manager to arrange Environmental training for appropriate staff.
Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.
The responsibilities of all contractor personnel include:
(1) Comply with all applicable environmental laws, regulations and installation environmental policies.
(2) Control and prevent spills or hazardous substances releases IAW installation Spill Prevention Plan.
(3) Ensure dust, debris, materials, trash, etc., do not become air borne and travel off the project site.
(4) Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, topsoil and land forms without approval, except in areas indicated on the drawings or specified to be cleared.
(5) Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated.
(6) Open burning is prohibited on the Government premises IAW installation environmental policy.
(7) Participate in installation’s recycling program.
(8) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and the Environmental Office. Storage, describing, packaging, labeling, marking and placarding of hazardous waste and hazardous material IAW applicable environmental laws, regulations and local environmental policies. Transport hazardous waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.
(9) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling. Handling, storage, and disposal of solid waste must be conducted to prevent contamination. Transport solid waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.
(10) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must.
(11) When potential cultural or historic items are inadvertently found during construction activities, immediately cease activities in the vicinity of the discovery and report the findings to the Environmental Office.
(12) Participate in installation’s Integrated Pest Management (IPM) program whenever practicable.
(13) Minimize interference with disturbance to, and damage to fish, wildlife, and plants including their habitat.
TP III-2
4. CONTRACT REQUIREMENTS PACKAGE ANTITERRORISM/OPERATIONS SECURITY REVIEW
COVER SHEET
After Notice to process is issued, COR shall take following action, Section IV. Standard Contract Language/Contract Clause Applicability and/or Additional SOW Language.
A. AT Level I training. This standard language is for contractor employees with an area of performance within as Army controlled installation, facility or area. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled-access areas shall complete AT Level I awareness training within 30 calendar days after the contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 05 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil
B. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
B-a. For contractors that do not require CAC, but require access to a DoD facility or installation.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
C. iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 05 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
D. For contracts that require OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.
TP III-3
APPENDIX "A"
LIST OF APPLICABLE CONTRACT DRAWINGS
GENERAL: The work shall conform to the following contract drawings and OMA standard detail drawings, 2014 (dated 30 November 2015), issued by the Department of the Army, Installation Management Agency, Korea Region Office and located on http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/STANDARD- DETAIL-DRAWINGS-FOR-OMA-PROJECTS-KOREA_20151130.pdf, all of which form a part of the specifications.
Ring No. Sheet No. Description Date
1 T-1 TITLE SHEET-1 8 FEB 21
2 T-2 TITLE SHEET-2 8 FEB 21
CIVIL
3 C-1 LOCATION PLAN AND GENERAL NOTES 8 FEB 21
4 C-2 SITE LAYOUT PLAN AND SCOPE OF WORK 8 FEB 21
5 C-3 BARBEQUE KITCHENETTE SHED PLAN, SECTION AND
DETAILS
8 FEB 21
6 C-4 MISC. DETAILS - 1 8 FEB 21
7 C-5 MICS. DETAILS - 2 8 FEB 21
ARCHITECTURAL
8 A-1 1ST FLOOR PLAN AND GENERAL NOTES 8 FEB 21
9 A-2 2ND - 4TH FLOOR PLANS AND SCOPE OF WORKS 8 FEB 21
10 A-3 ELEVATIONS AND PICTURES 8 FEB 21
11 A-4 ELEVATIONS AND PICTURES 8 FEB 21
12 A-5 GENERAL SECTIONS 8 FEB 21
13 A-6 INTERIOR WALL SECTIONS-1 8 FEB 21
14 A-7 INTERIOR WALL SECTIONS-2 8 FEB 21
15 A-8 INTERIOR WALL SECTIONS-3 8 FEB 21
16 A-9 ENLARGED FLOOR PLANS AND FIRE RATED ACCESS
DOOR NOTES
8 FEB 21
17 A-10 INTERIOR ELEVATIONS-1 8 FEB 21
18 A-11 INTERIOR ELEVATIONS-2 8 FEB 21
A-1
19 A-12 CLOSET DETAILS 8 FEB 21
20 A-13 KITCHEN CABINET DETAILS & KITCHEN CABINET
NOTE
8 FEB 21
21 A-14 VANITY CABINET DETAILS, CHAIR RAIL DETAIL &
LAUNDRY COUNTER SECTION
8 FEB 21
22 A-15 DETAILS-1 8 FEB 21
23 A-16 DETAILS-2 8 FEB 21
24 A-17 DETAILS-3 8 FEB 21
25 A-18 DETAILS-4 8 FEB 21
26 A-19 DETAILS-5 8 FEB 21
27 A-20 INTERIOR, EXTERIOR FINISH SCHEDULE & FINISH
SCHEDULE NOTES
8 FEB 21
28 A-21 DOOR / WINDOW SCHEDULE, ELEVATIONS 8 FEB 21
29 A-22 HARDWARE SCHEDULE AND NOTES 8 FEB 21
30 A-23 SIGNAGES SCHEDULE 8 FEB 21
MECHANICAL
31 M-1 MECHANICAL MATERIAL INDICATIONS & SYMBOLS
AND ABBREVIATIONS
8 FEB 21
32 M-2 FIRE PROTECTION AND MECHANICAL GENERAL
NOTES, NOTES AND SCOPE OF WORK
8 FEB 21
33 M-3 EQUIPMENT SCHEDULE - 1 8 FEB 21
34 M-4 EQUIPMENT SCHEDULE - 2 8 FEB 21
35 M-5 HVAC PIPING PLAN (1ST FLOOR) AND NOTES 8 FEB 21
36 M-6 HVAC PIPING PLAN (2ND - 3RD FLOOR) AND NOTES 8 FEB 21
37 M-7 HVAC PIPING PLAN (4TH FLOOR) AND NOTES 8 FEB 21
38 M-8 HVAC PIPING SCHEMATIC DIAGRAM AND NOTES 8 FEB 21
39 M-9 MECH. ROOM PARTIAL PLAN AND NOTES 8 FEB 21
40 M-10 HVAC DUCT PLAN (1ST FLOOR) AND NOTES 8 FEB 21
41 M-11 HVAC DUCT PLAN (2ND-3RD FLOOR) AND NOTES 8 FEB 21
42 M-12 HVAC DUCT PLAN (4TH FLOOR) AND NOTES 8 FEB 21
43 M-13 MECH. ROOM DUCT PARTIAL PLAN, LAUNDRY ROOM
DUCT PARTIAL PLAN(1ST FL.) LINT FILTER DETAIL
AND NOTES
8 FEB 21
44 M-14 HOT/CHILLED WATER FLOW SYSTEM DIAGRAMN
AND AIR HANDLING UNIT SYSTEM CONTROL
DIAGRAM
8 FEB 21
45 M-15 HEAT/VENT SYSTEM CONTROL DIAGRAM 8 FEB 21
46 M-16 DOMESTIC HOT WATER SYSTEM CONTROL DIAGRAM 8 FEB 21
47 M-17 PLUMBING PIPING PLAN (1ST FLOOR) AND NOTE 8 FEB 21
48 M-18 PLUMBING PIPING PLAN (2ND FLOOR) AND NOTE 8 FEB 21
49 M-19 PLUMBING PIPING PLAN (3RD FLOOR) AND NOTE 8 FEB 21
50 M-20 PLUMBING PIPING PLAN (4TH FLOOR) AND NOTE 8 FEB 21
A-2
51 M-21 BATH. RM. PLUMBING PIPING PARTIAL PLAN AND
NOTE
8 FEB 21
52 M-22 LAUNDRY & MUD RM PLUMBING PIPING PARTIAL
PLAN AND NOTE
8 FEB 21
53 M-23 LAUNDRY & MUD RM PLUMBING PIPING ISOMETRIC
DIAGRAM AND NOTES
8 FEB 21
54 M-24 MECH ROOM AIR LEAKAGE TEST FLOW CHART, AIR
BARRIERS AND QUALIFICATION OF AIR LEAKAGE
TESTING
8 FEB 21
55 M-25 FIRE PROTECTION LEGEND & ABBREVIATION,
AUTOMATIC FIRE SUPPRESSION GENERAL NOTES,
SPRINKLER Q'TY LIST AND NOTE
8 FEB 21
56 M-26 MECH ROOM FIRE PROTECTION PIPING PARTIAL PLAN
AND FIRE PROTECTION REQUIREMENTS
8 FEB 21
57 M-27 1ST FL. FIRE PROTECTION PIPING PLAN, AND
GENERAL NOTES
8 FEB 21
58 M-28 2ND & 3RD FL. FIRE PROTECTION PIPING PLAN 8 FEB 21
59 M-29 4TH FL. FIRE PROTECTION PIPING PLAN, 8 FEB 21
60 M-30 DETAILS-1 8 FEB 21
61 M-31 DETAILS-2 8 FEB 21
62 M-32 DETAILS-3 8 FEB 21
63 M-33 DETAILS-4 8 FEB 21
64 M-34 DETAILS-5 8 FEB 21
65 M-35 DETAILS-6 8 FEB 21
ELECTRICAL
66 E-1 LEGEND, GENERAL NOTES AND SCOPE OF WORK 8 FEB 21
67 E-2 1ST FLOOR LIGHTING PLAN AND 2ND-4TH FLOOR
LIGHTING PLAN
8 FEB 21
68 E-3 LIGHTING FIXTURE DETAILS 8 FEB 21
69 E-4 LIGHTING FIXTURE SCHEDULE & PHOTOCELL
CONTROL DIAGRAM
8 FEB 21
70 E-5 1ST FLOOR POWER PLAN AND 2ND-4TH FLOOR
POWER PLAN
8 FEB 21
71 E-6 EXISTING PANELBOARD "A", "B", "C", "D", "E" & "F"
CONN. DIAGRAM
8 FEB 21
72 E-7 EXISTING PANELBOARD "G", "H", "I", "J" & "M" CONN.
DIAGRAM
8 FEB 21
73 E-8 POWER ONE LINE DIAGRAM 8 FEB 21
74 E-9 1ST FLOOR F/A & MNS PLAN AND 2ND-4TH FLOOR F/A
& MNS PLAN
8 FEB 21
75 E-10 NEW FIRE ALARM/MASS NOTIFICATION SYSTEM
DIAGRAM
8 FEB 21
A-3
76 E-11 1ST FLOOR TEL/TV PLAN AND 2ND-4TH FLOOR TEL/TV
PLAN
8 FEB 21
77 E-12 CATV SYSTEM RISER DIAGRAM 8 FEB 21
78 E-13 1ST FLOOR CCTV PLAN AND 2ND-4TH FLOOR CCTV
PLAN
8 FEB 21
79 E-14 CCTV SYSTEM DIAGRAM 8 FEB 21
80 E-15 TYPICAL MODULE ELEC. PLAN-A & B MECH. RM
PARTIAL POWER PLAN
8 FEB 21
A-4
APPENDIX "B"
List of materials for Material Approval Submittal
Submittal Identification
Description of Submittal
LC-1 Ready Mixed Conc. 240kg/cm2
LC-2 Steel Bar Reinforcing
LC-3 Base Course
LC-4 Hot mixed Asphalt Concrete #67
LC-5 #8-150x150 WWF
LC-6 Granite Curb
LC-7 CHERRY BLOSSOM TREE CERTIFICATE
LA-1 Concrete masonry block 8"
LA-2 Cement portland, 40KG
LA-3 Granite curb stone, 200Wx300Dx1,000L
LA-4 Ready mixed concrete, 210kg/CM, slump 12
LA-5 Joint sealant for expansion joint
LA-6 Wire welding fabric, 150x150, #8 x #8
LA-7 Vapor barrier, 0.1mm
LA-8 Metal lath
LA-9 Waterproofing wall & floor membrane
LA-10 Anodized AL blast door w/ AL frame & insulated glasses, HDW, 1714 x 2150
LA-11 Anodized AL door w/ AL frame & insulated glasses, HDW, 1714 x 2150
LA-12
Steel thermal insulated blast double door w/steel frame door size: 1,714 W X 2150 H X 44.5 Thk., 600 x 750 insulated glass
LA-13 Steel insulated thermal blast door with steel frame door size; 915W. X 2133H. X 44.5 Thk.
LA-14 Steel thermal insulated double door w/steel frame door size: 1,714 W X 2133 H X 44.5 Thk.
LA-15
Steel hollow core door, 1 hrs fire rate w/frame door size; 1066W. X 2133H. X 44.5 Thk. 100 X 600 insulated fire glass
LA-16 Steel hollow core door, 1 hrs fire rate w/frame door size; 1066W. X 2133H. X 44.5 Thk.
LA-17 Steel hollow core single door, 1/3 hrs fire door w/frame door size; 914W X 2133H. X 44.5 Thk.
LA-18
Wood solid core door w/frame door size; 914W X 2133H X 44.5 Thk. 1/3hrs fire rated & fixed steel window 600 x 750, fire rated glass
B-1
Description of Submittal
LA-19
Wood solid core double door w/frame door size; 1814W X 2133H X 44.5 Thk. 1/3hrs fire rated door W/600 X 750 fire rated glass
LA-20 Wood solid door, 20 Min fire rate door, w/frame door size; 714W. X 2133H. X 44.5 Thk.
LA-21 Wood solid door, 20 Min fire rate door, w/frame door size; 914W. X 2133H. X 44.5 Thk.
LA-22 Wood solid door, 20 Min fire rate door, w/frame door size; 915W. X 2133H. X 44.5 Thk.,STC door
LA-23 Wood solid core single door w/frame, 19mm under cut door size; 750W. X 2133H. X 44.5 Thk.
LA-24 Wood solid door w/frame door size; 664W. X 2133H. X 44.5 Thk.
LA-25 Wood solid double door, door size; 864W. X 2133H. X 34.9 Thk., 100x600 tempered glass
LA-26
Electronic card key lockset,HT-24 ONITY Co.,4ea card key, 3ea mechanical key, master key system including 4ea of battery
LA-27 Exit device, type 1, F-08, lever type
LA-28 Exit device, type 2, F-01, lever type
LA-29 Exit device, type 2, F-08, lever type
LA-30 Lockset, 1000-1, F-01, lever type
LA-31 Lockset, 1000-1, F-07, lever type
LA-32 Lockset, 1000-1, F-08, lever type
LA-33 Lockset, 4000-1, F-76
LA-34 Lockset, 4000-1, F-82
LA-35 Lockset, 4000-1, F-86
LA-36 Auxiliary dead lock, E0161
LA-37 Door coordinator, Type-21
LA-38 Floor Closer, C06041 with offset pivot
LA-39 Door closer, C02021
LA-40 Door closer, C02011
LA-41 Hinge, butt, A2111, 127 x 114 (NRP)
LA-42 Hinge, butt, A8111, 127 x 114 (NRP)
LA-43 Hinge, butt, A2133, 114 x 114 (NRP)
LA-44 Hinge, butt, A8111, 127 x 114
LA-45 Hinge, butt, A8111, 114 x 114
LA-46 Hinge, butt, A8112, 114 x 114
LA-47 Hinge, butt, A2112, 114 x 114
LA-48 Hinge, butt, A2133, 114 x 114
LA-49 Hinge, butt, A2133, 101 x 101
LA-50 Door stop and holder, Exterior type w/Conc, H9", 3"x3"
LA-51 Door stop , L02161
LA-52 Door stop , L02141
B-2
Description of Submittal
LA-53 Door stop , L02021
LA-54 Push plate, J302
LA-55 Pull plate, J405
LA-56 Automatic door bottom Roy 335
LA-57 Kick plate, J102
LA-58 Door viewer, L03221
LA-59 Auto flush bolt, Type 25
LA-60 Flush bolt, L04081
LA-61 Astragal
LA-62 Adjustable astragal
LA-63 Dustproof strike, L04011
LA-64 Threshold, aluminum, 150W, SGL
LA-65 Marble SSM threshold 150mm W
LA-66 Key box, E8351
LA-67
Aluminum blast window thermal break type, fixed & tilting window, 3000x1000, 26.75thk Low-e insulated glass, insect screen
LA-68
Aluminum blast window thermal break type, sliding window, 1200x1300, 26.75thk Low-e insulated glass, insect screen
LA-69
Aluminum blast window thermal break type, fixed & tilting window, 1200x1100, 26.75thk Low-e insulated glass, insect screen
LA-70 3/4hrs Fire rated steel fixed window, 1200 x 1100
LA-71
Aluminum thermal breaker pane glass, fixed window, 1000x1100, 10.75thkm laminated A/L sliding & fixed window
LA-72 Aluminum slidingWindow, 2000x1100, 18THK, tempered/laminated Glass
LA-73 Aluminum slidingWindow, 1200x1100, 18THK, tempered/laminated Glass
LA-74 AL louver with Insect Screen & Bird Screen
LA-75 Horizontal blinds, 1" aluminum slats
LA-76 Metal stud, 0.8 mm x 45 mm x various size W/expansion bolt
LA-77 Metal runner, 0.8 mm x 45 mm x various size W/expansion bolt
LA-78 Metal ceiling suspension system for GWB
LA-79 Acoustical ceiling suspension system, aluminum
LA-80 Gypsum board, 15mm thk x1,200 x2,400, normal
LA-81 Gypsum board, 15mm thk x1,200 x2,400, fire resistant or X
LA-82 Gypsum board, 12mm thk x1,200 x2,400, normal
LA-83 Gypsum board, 12mm thk x1,200 x2,400, water resistant or X
LA-84 Gypsum board, 12mm thk x1,200 x2,400, fire rated
LA-85 Acoustical tile, 600x600x16mm thk.
LA-86 PVC tile, KCC Neo Sense, 450 x 450 x 3Thk B-3
Description of Submittal
LA-87 Vinyl cove base w/adhesive
LA-88 Rubber stair treads, 480 x 1200 x 3THK
LA-89
Rubber tile, size 500mm x 500mm x 3 THK, I-BADKA rubber flooring
LA-90 Rubber Base, 2THK
LA-91 Rubber stringer & risers, 178mm H X 2 THK
LA-92 Adhesive for flooring
LA-93 Paint, MPI 57, varnish
LA-94 Paint, MPI 11, acrylic emulsion, exterior
LA-95 Paint, Anti-mold and mildew, latex, interior, KCC Supro home & wellbeing, EX8816
LA-96 Paint, MPI 47, enamel, interior
LA-97 Paint, MPI 94, enamel, exterior
LA-98 Paint, MPI 79, primer for metal
LA-99 Texture coat, terracotta 25kg w/finish coat
LA-100
Noroo Paint, MPI 77, Epoxy Epoxy Paint Include Surface Preparation Base, Cleanpoxy3100, MPI77, 0.175L/M2 Mid, Cleanpoxy3100, MPI77,0.15L/M2 Top, Cleanpoxy3100, MPI77,0.15L/M2
LA-101 Toilet partition 1600 x 900
LA-102 Toilet tissue dispenser, Double Roll, Horizontal Type
LA-103 Paper towel dispenser
LA-104 Towel bar
LA-105 Soap holder, recessed type
LA-106 Mirror, 1050 x 850 with plywood back board
LA-107 Shower curtain with rod, 1,800W Curtain
LA-108 Medicine cabinet with mirror, 410MMx510MM
LA-109 Soap dispenser, liquid, wall type, SST
LA-110 Mop rack with STS shelf
LA-111 SST metal shelf for laundry room
LA-112 Laundry counter, 600 x 1000
LA-113 S.M.L.D (Shelf Metal Light Duty)
LA-114 Brass hook, STS & Wood, 3450mm LG, 8 Hooks
LA-115 Signage, interior
LA-116 Signage, exterior
LA-117 Card holder, AL, 125 x 125
LA-118 Plexi-info holder, acrylic case, 224 x 287 x 6THK w/double emulsion form tape
LA-119 Bulletin board, 1200 x 900, oak trim, tan nucork
LA-120
Bulletin board, 1800 x 1100, Fixed type w/AL trim, light fixture and sliding glass
B-4
Description of Submittal
LA-121 Kitchen Cabinet base & top, SSM Counter Top W/Plastic Laminate Finish
LA-122 Vanity cabinet, 700x650MM size, laminated counter top
LA-123 Wall hung cabinet, laminated
LA-124 Wooden shelf w/STS hanging rod, 450W x1,160 for closet
LA-125 Window trim, oak, 110W x 90W x 18Thk
LA-126 Wooden hanging rail, oak, 100W x 40Thk
LA-127 Wooden chair rail, oak, 90W x 20Thk
LA-128 Fire extinguish cabinet
LA-129 Access door
LA-130 Plywood 18T with plastic laminate
LA-131 Aluminum grating cover
OA-1 Wood solid door, 45 Min Fire Rate Door, door size; 915W. X 2133H. X 44.5 Thk., 100x600 fire glass
OA-2 Electro Magnetic door holer, C00011 (wall mount type)
OA-3 Electro Magnetic door holer, C00021 (floor mount type w/water resisant hosuing)
OA-4 Weather proof seal R0Y165 for head and jamb.
OA-5 Weather proof seal R0Y435 for bottom
OA-6 Soundproof seal R0E154 for head and jamb.
OA-7 Soundproofseal R3B435 for bottom
OA-8 Fire rated access door, 1-1/2hrs, 610 x 610
OA-9
Shaft wall(1HR,15.9T "X" type GWB&15.9T "X" GWB w/STL stud
OA-10 Cement board with nail and adhesive, 12THK
OA-11 Cement board with nail and adhesive, 6 THK
OA-12 Iron board with cabinet, 406W x 138D x 1,574H, surface mounted
OA-13 Acoustic wall panel, fabric, 25T, Armstrong sound saok
OA-14 Quarry tile with mortar bed
OA-15 Quarry tile base
LM-1 Heating boiler(1set), including rack, flue vent, control panel and associated gas piping
LM-2 Fan coil unit, Cooling cap. : 2,400 kcal/hr Heating cap.: 4,070 kcal/hr
LM-3 Fan coil unit, Cooling cap. : 4,520 kcal/hr Heating cap.: 8,890 kcal/hr
LM-4 Fan coil unit, Cooling cap. : 6,830 kcal/hr Heating cap.: 13,360 kcal/hr
LM-5 Fan coil unit, Cooling cap. : 8,140 kcal/hr Heating cap.: 14,890 kcal/hr
LM-6 Thermostat for FCU
LM-7 Balacing valve cock
LM-8 Ball valve cock
LM-9 Air conditioning unit (CU-1 & 2)
B-5
Description of Submittal
LM-10 Black steel pipe line including fittings & pipe hangers, various size
LM-11 Pipe flexible cellular insulation, various size
LM-12 Clevis hanger, various size
LM-13 Gate valve, 10Kg/cm2, various size
LM-14 Glove valve, 100 mm dia
LM-15 Ball valve, various size
LM-16 Y-type strainer, 100 mm dia
LM-17 Auto air vent eliminator,15 mm
LM-18 Diffuser (S-1) , various size
LM-19 Registers (R-1), various size
LM-20 Duct Work w/ associated accessories
LM-21 Duct insulation, Flex mineral fiber, 50mm THK
LM-22 Water hammer arrestor PDI "A"
LM-23 Water hammer arrestor PDI "B"
LM-24 Volume damper
LM-25 Pipe flexible connector, 4" dia
LM-26 Pre-air leakage test
LM-27 Post-air leakage test
LM-28 Seal pipe & duct work penetration in mech room
LM-29 Domestic hot water heater(1set), including rack, flue vent, control panel and associated gas piping
LM-30 Water closet, Tank type
LM-31 Shower unit
LM-32 Lavatory w/ faucet
LM-33 Kitchen sink w/ faucet
LM-34 Domestic hot water storage tank (DT-1), Capa.:3,407 LITS
LM-35 Copper tube water line, including fittings & pipe hangers, various size("L" type)
LM-36 Pipe flexible cellular insulation, various size
LM-37 Adhesive, armaflex 850FR
LM-38 Galvanized steel pipe with fittings & hangers, various size
LM-39 Vent thru roof
LM-40 Cast iron soil pipe with coupling, No-hub type, various size
LM-41 Bend 1/4, cast iron soil pipe, various size
LM-42 Copling, various size
LM-43 90 Y-branch, cast iron soil pipe, 100
LM-44 Y-branch double, cast iron soil pipe, various size
LM-45 P-trap, cast iron soil pipe, 50 mm dia
B-6
Description of Submittal
LM-46 V.T.R 4" DIA
LM-47 Floor cleanout, 100 mm dia
LM-48 Floor cleanout, 150 mm dia
LM-49 Floor cleanout, 200 mm dia
LM-50 Floor drain, 50 mm dia
LM-51 Fire Protection Work
LM-52 Black steel pipe line including fittings & pipe hangers, various size
LM-53 Grooved 90, elbow various size
LM-54 Grooved tee, various size
LM-55 Grooved cap, various size
LM-56 Grooved coupling, various size
LM-57 Grooved flexible coupling, various size
LM-58 Valve flange adapter, various size
LM-59 Clevis pipe hanger
LM-60 Sway Brace
LM-61 Sprinkler system shop drawing, calculatio, test & report
LM-62 Misc. Items. 3%
OM-1 Chilled/hot water circ. pump(P-1), Capa.: 755.5 LPM, 5 HP
OM-2 Hot water circ. pump(P-2), Capa.: 316 LPM, 3/4 HP
OM-3 Domestic hot water re-circ. Pump (P-3), 417.3 LPM, 1-1/2 HP
OM-4 Domestic hot water circ. Pump (P-4), 127.1 LPM, 1/4 HP
OM-5 Ceiling exhaust fan (EF-1), Cap.: 23.6LPS
OM-6 Ceiling exhaust fan (F-1), Cap.: 255 CMH
OM-7 Duct mounted, in-line fan (F-2), Cap.: 6,800 CMH
OM-8 Ceiling exhaust fan (F-3), Cap.: 1,020 CMH
OM-9 Roof exhaust fan (F-4), Cap.: 1,780 CMH
OM-10 Roof exhaust fan (F-5), Cap.: 1,330 CMH
OM-11 Wall exhaust fan (F-6), Cap.: 3,570 CMH
OM-12 Range hood, Cap.: 270 CFM, Hood size: 30"x17-1/2"
OM-13 Unit heater,Capa. 19,170 kcal/hr
OM-14 Electric water cooler,Capa. 30.3LPH
OM-15 Heating thermostat for unit heater
OM-16 Change over switch
OM-17 O.A. thermostat
OM-18 Ventilation thermostat
OM-19 Night set-back thermostat
OM-20 7-day timer
B-7
Description of Submittal
OM-21 Aquastat for pipe mounted type
OM-22 Aquastat for tank mounted type
OM-23 Suction diffuser, 100 mm
OM-24 Triple duty valve, 100 mm
OM-25 Chemical feeder
OM-26 Fire damper, variuos size
OM-27 Expansion joint, 80 mm
OM-28 Expansion joint, 65 mm
OM-29 Expansion joint, 50 mm
OM-30 Thermometer
OM-31 Pressure gauge
OM-32 Expansion tank (ET-1), Cap.: 299LITS
OM-33 Air separator, Pie size : 100 dia.
OM-34 Backflow preventer, 32 dia
OM-35 Pressure reducing valve, 32 dia
OM-36 3-way thermostatic mixing valve, 100 mm
OM-37 Hose bibb, 15 mm
OM-38 Non-freeze wall htdrant
OM-39 Gate valve, lead free(plumbing), 80mm
OM-40 Gate valve, lead free(plumbing), 100mm
OM-41 Gate valve, MSS-SP-70(HVAC), 80mm
OM-42 Gate valve, MSS-SP-70(HVAC), 100mm
OM-43 Gate valve, MSS-SP-70(HVAC), 150mm
OM-44 Trap primer, 15 mm
OM-45 Hot & Cold combination water faucet
OM-46 Service sink(P-5)
OM-47 Laundry sink(P-6)
OM-48 Washer connector box
OM-49 Downspou nozzle, 32 mm
OM-50 Fire Protection Work
OM-51 Alarm check valve, 150 mm
OM-52 Backflow preventer, 150 mm
OM-53 OS & Y valve, 150 mm
OM-54 OS & Y valve, 100 mm
OM-55 Tamper switch
OM-56 Ball valve switch, 25 mm
OM-57 Pressure switch
B-8
Description of Submittal
OM-58 Water motor alarm bell
OM-59 Check valve, 100 mm
OM-60 Check valve, 150 mm
OM-61 Fire department connection, 100mm x 65mm x 65mm
OM-62 Ball drip valve, 20 mm
OM-63 Teat header 100 x 65 x 2EA
OM-64 Hose valve w/cap & chain, 65 mm
OM-65 Test valve, 25 mm
OM-66 Water flow switch, 150 mm
OM-67 Sight glass, 25 mm
OM-68 Smooth bore corrosion resistant, 25 mm
OM-69 Pressure gauge
OM-70 Drain valve, 50mm
OM-71 Residential pendent sprinkler head, 15 mm
OM-72 Quick response pendent sprinkler head, 15 mm
OM-73 Quick response pendent sprinkler head, 20 mm
OM-74 Quick response up-right sprinkler head, 20 mm
OM-75 Quick response dry wall type sprinkler head, 15 mm
OM-76 Spare sprinkler head cabinet
OM-77 Misc. Items. 3%
OM-78 Teat header 100 x 65 x 2EA
OM-79 Hose valve w/cap & chain, 65 mm
OM-80 Test valve, 25 mm
OM-81 Water flow switch, 150 mm
OM-82 Sight glass, 25 mm
OM-83 Smooth bore corrosion resistant, 25 mm
OM-84 Residential pendent sprinkler head, 15 mm
OM-85 Quick response pendent sprinkler head, 15 mm
OM-86 Quick response pendent sprinkler head, 20 mm
OM-87 Quick response up-right sprinkler head, 20 mm
OM-88 Quick…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .