Drawing files _ 243526 _ Arch.pdf

PDF 4 MB Posted

Attached to
Repair of Barracks, Project# 243526
Solicitation number
W91QVN21R0073
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

UP

CORRIDOR CORRIDOR

STORAGE STORAGE

MECH ROOM

SLEEPING

LIVING/

111 112

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

134 134

STAIR-2

135 136

STAIR-3

VESTVEST

FEC

EWC

STAIR-1

LAUNDRY

UP

D.STOILET

JAN

LOBBY

ROOM

VEST.ISSUE

ROOM

UP

D5

D11

D22

D24

D19 D18

D21 D20

D17

D16

D13

D10

D9

D8 D7

D6

D1

D14

D15

D4

D3

D12

BIB

HOSE

DDD

D D D

COUNTER

COUNTER

B/B

C.H

SLOPE

FEC

S L

O P

E S

L O

P E

D2

S L

O P

ESLOPE

S L

O P

E

MUD ROOM

CLOSET

S L

O P

E

(TYP-ALL)

W WW COUNTER W W W W

D

D

D

D

W W COUNTER

W W W W W

55,400

3,9753,7003,7003,7003,7003,62510,6003,7753,7003,7003,7003,7003,8252,700 2,700

,2

,0

,6

,4

,0

3,9753,7003,7003,7003,7257,6002,6004,0003,6003,8753,7003,7003,7003,825

D25D25

CABINET(TYP)

IRON BOARD

D23

TYP TYP

MANUFACTURES INDICATED.

PURPOSES ONLY. AND NOT INTENDED TO LIMIT SELECTIONS TO PRODUCTS OF THE

COLORS AND PATTERNS LISTED BY MANUFACTURES ARE FOR BIDDING IDENTIFICATION 1.

ADJACENT AREAS AS DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE (COR).

CAUSED BY THIS PROJECT AND SHALL REPAIR THE DAMAGES TO MATCH UP TO

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGES MADE TO EXISTING AREAS

FOR APPROVAL.

CONTRACTOR ACCORDING TO ACTUAL FIELD CONDITION AND SUBMITED TO COR

CONDITION. IN THAT CASE, SHOP DRAWINGS SHALL BE PREPARED AT THE SITE BY THE

SOME DETAILS SHOWN ON CONTRACT DRAWINGS MAY NOT COINCIDE WITH THE FIELD

8.

FOR APPROVAL.

CONTRACTOR SHALL SUBMIT MANUFACTURER'S INSTALLATION SHOP DRAWINGS TO COR

OFFICE, DPW. PER DIRECTION FROM THE INSPECTOR IN CHARGE OR COR

SALVAGE OR SERVICEABLE MATERIALS SHALL BE RETURNED TO SUPPLY OR STORAGE

2.

3.

4.

5.

6.

7.

CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER

IF THERE ARE ANY CONFLICTS WITHIN THE CONTRACT DOCUMENT. THE GENERAL

AND DIMENSIONS PRIOR TO COMMENCING ANY CONSTRUCTION OR RENOVATION.

THE CONTRACTOR SHALL BE RESPONSIBLE IN VERIFYING ALL EXISTING CONDITION

OF THE LOAD BEARING WALLS TO PREVENT COLLAPSE OF THE STRUCTURE

APPROPRIATE TEMPORARY SUPPORTS SHOULD BE CONSTRUCTED PRIOR TO DEMOLITION

9.

10.

11.

12.

13.

14.

15.

BE AS A PART OF THE CONTRACT DOCUMENT OF THIS PROJECT.

STANDARD DETAIL DRAWINGS FOR O&MA PROJECT, KOREA, DATED OCTOBER 1, 2003 SHALL

NUMBERS ARE FROM TM-5-807-7 AND FEDERAL STANDARD NO. 595b, COLORS.

COLOR OF MATERIALS & PAINTS SHALL BE SELECTED BY USING AGENCY AND COLOR

COMMENCEMENT OF FLOOR TILE WORK.

ALL CONCRETE FLOOR SURFACES SHALL BE LEVELED AND SMOOTHED PRIOR TO

DETAILS AND GET APPROVAL FROM COR. BEFORE FABRICATION AND INSTALLATION.

CONTRACTOR SHALL PREPARE SHOP DRAWINGS FOR ALL DOOR/WINDOW

WALL : 2.00 SM. DEG K/W

ROOF : 5.64 SM. DEG K/W

R-VALUE :

ADDITIONAL COST TO THE GOVERNMENT.

EQUIPMENT, ETC), ELECTRICAL, TELEPHONE AND FIRE ALARM SYSTEM WITHOUT

THE INSTALLATION AND/OR REPLACEMENT OF MECHANICAL (PLUMBING, HEATING,

ITEMS, CUT, PATCH AND RESTORE WALLS, FLOORS AND CEILING WHERE REQUIRED FOR

THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVE/REINSTALL ANY OBSTRUCTED

GENERAL NOTES

B/B

VV

(NIC)

L1

1ST FLOOR PLANS AND GENERAL NOTES

D24

TYP.

TYP

TYP

TYP

SPECIFICATION 15181.

ITEMS REQUIRING MAINTENANCE/OPERATION IAW THE SECTION 3.1.14, OMA STD

PROVIDE ACCESS DOORS FOR ALL CONCEALED VALVES, VENTS, CONTROLS AND OTHER

SCALE: 1/100

1ST FLOOR PLAN

COVER (TYP)

GRATING

W3W3

TYP

W1

TYP

W1

W2

W2 W2

W5

W6

W4

W2

A-5

A-5

A-5

A-3

A-3

A-4

A-4

A-7

A-8

FEC

COMM

A-14

A-1

MULTI PURPOSE

STOOP

CONC

CONC STOOP

CONC STOOP

COVER (TYP)

GRATING

(TYP)

GRANITE CURB

(TYP)

GRANITE CURB

REPAIR BARRACKS S-827

CAMP CASEYKWON, CH

243526

APPLY TC ON NEW 15T GWB

REMOVE EXST AWP &

TC

TCTC

TC

TC

0 1,300

A-2

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

DN UP

CORRIDOR

2ND FL : KITCHEN

4TH FL : GAME ROOM

3RD FL : LOUNGE

D.S

STORAGE

D.S

C.H P.S

STAIR-1

UP

DN

STORAGE

230 330 430

SLEEPING

LIVING/

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

COUNTER & CABINET @2ND FL. ONLY

STAIR-2

STAIR-3

FEC

327 227427

JAN

SLEEPING

LIVING/

SLEEPING

LIVING/

235 435335

UP DN

D30

D29

D28

D27

TYP

D19 D18

D22

D24

D24

D23

D11

D26

D12

D31

MAKERREF REF

ICE

55,400

2,7003,9753,7003,7003,7003,7003,8255,2005,0003,9753,7003,7003,7003,7003,8252,700

,0

,2

,0

2,7003,9753,7003,7003,7003,7003,62510,6003,7753,7003,7003,7003,7003,8252,700

D25D25

TYP

TYP

TYP

TYP

TYPTYP

REPLACE DETERIORATED EXISTING METAL SHELF WITH MOP RACK WITH NEW IN JANITOR ROOM.

AND SCOPE OF WORK

2ND - 4TH FLOOR PLANS

SCALE: 1/100

2ND ~ 4TH FLOOR PLAN

W1 W7

W3

TYP

W1

W3

W2W2

A-5

A-5

A-5

A-3

A-3

A-4

A-4

A-8

FEC FEC

VEST

VEST

COMM

(NIC)(NIC)(NIC)

FLOORING. PROVIDE LEVELING CONCRETE FOR EXISTING CONCRETE SLAB IF NEEDED.

LOW SPOTS, HIGH SPOTS, PAINTING, AND UNEVEN SURFACE SHALL HAVE BEEN CORRECTED FOR NEW

SHALL BE SMOOTH, TRUE, LEVEL PLANE WITH ALL DEFECTS SUCH AS ROUGH OR SCALING CONCRETE, AS SHOWN ON NEW FLOOR PLAN & INTERIOR FINISH SCHEDULE. THE EXISTING CONCRETE FLOORING

REPLACE DETERIORATED EXISTING FLOOR TILE & RUBBER TILE WITH NEW PVCT INCLUDING VCB & RB

ON DOOR/WINDOW SCHEDULE. (NATURAL COLOR, OAK)

REPLACE DETERIORATED EXISTING WOODEN HEAD, JAM & SILL FOR ALL WINDOWS WITH NEW AS SHOWN

1. FLOOR WORK

2. INTERIOR & EXTERIOR WALL WORK

2.1

2.2

2.3

1.1

1.2

1.3

2.4

2.6

1.4

REPAIR / MAINTENANCE (K) WORK

SCOPE OF WORK (ARCHITECTURAL WORK)

SHOWN ON FLOOR PLANS AND SECTIONS.

COATS, WATER PROOF MEMBRANE, PLASTERING W/METAL LATH AND WATERPROOF GWB AS

REPLACE DETERIORATED EXISTING GCWT(FULL HEIGHT) WITH NEW INCLUDING CEMENT BOND

1.5

4.6

4.7

4.8

4.9

4.10

4.11

PLANS AND DETAIL DRAWINGS.

REPLACE DETERIORATED EXISTING ALL TOILET ACCESSORIES WITH NEW AS SHOWN ON FLOOR

ON FLOOR PLANS AND DETAIL DRAWING.

REPLACE DETERIORATED EXISTING FIRE EXTINGUISHERS CABINETS(FEC) WITH NEW AS SHOWN

UPPER CABINET AS SHOWN ON FLOOR PLAN, ELEVATION AND DETAIL DRAWINGS.

REPLACE DETERIORATED EXISTING KITCHENETTE WITH NEW INCLUDING BASE CABINET AND

PLAN, ELEVATIONS AND SIGNAGE SCHEDULE.

REPLACE INTERIOR & EXTERIOR SIGNAGES WITH NEW FOR ALL ROOMS AS SHOWN ON FLOOR

4.1

4.3

4.4

4.5

3.4

4.2

3.2

3.3

4. MISC. WORK

3.1

3. INTERIOR & EXTERIOR CEILING/ROOF WORK

3.5

REPLACE DETERIORATED EXISTING WINDOW HORIZONTAL MINI BLINDS WITH NEW, FIREPROOF TYPE.

ON FLOOR PLANS AND FINISH SCHEDULE.

WATER RESISTANT OR 'X' TYPE) CEILING INCLUDING CEILING SUSPENSION SYSTEM AS SHOWN

REPLACE DETERIORATED EXISTING CEILING WITH NEW GYPSUM WALL BOARD (GWB, NORMAL,

SECTION.

PAINT ON ALL INTERIOR CEILING SURFACES AS SHOWN ON INTERIOR FINISH SCHEDULE AND

FLOOR PLAN AND ELEVATIONS.

PAINT ALL EXISTING EXTERIOR EXPOSED METAL, WOODS, FASCIA AND SOFFIT AS SHOWN ON

FLOOR PLAN AND SECTIONS.

APPLY ACRYLIC FLUID-APPLIED WATERPROOFING COATING ON EXISTING ROOF AS SHOWN ON

SETS AS SHOWN ON NEW FLOOR PLAN AND DOOR SCHEDULE.

REPLACE DETERIORATED EXISTING DOORS AND DOOR FRAMES WITH NEW INCLUDING HARDWARE

AND WINDOW SCHEDULE.

THERMAL BREAKER TYPE WINDOWS INCLUDING GLASS AS SHOWN ON FLOOR PLANS, ELEVATIONS

REPLACE DETERIORATED EXISTING WINDOWS INCLUDING INSECT SCREEN WITH NEW ALUMINUM

AND LOUVER SCHEDULE.

REPLACE DETERIORATED EXISTING ALUMINUM LOUVER WITH NEW AS SHOWN ON FLOOR PLANS

MEMBRANE, MORTAR BED AS SHOWN ON FLOOR PLANS, SECTION AND DETAILS DRAWINGS.

REPLACE DETERIORATED EXISTING CMT WITH NEW INCLUDING CEMENT BOND COAT, WATERPROOF

AND INTERIOR FINISH SCHEDULE.

APPLY EPOXY COATING WITH NON SLIP GRITS ON EXISTING FLOORS AS SHOWN ON FLOOR PLAN

PLANS, SECTIONS AND DETAIL DRAWINGS.

NORMAL, WATER RESISTANT OR 'X' TYPE) INCLUDING METAL STUDS AS SHOWN ON FLOOR

REPLACE DETERIORATED EXISTING ALL GWB WALL BOARD WALLS WITH NEW GWB WALL (GWB,

PIPING SYSTEM AS PER FLOOR PLANS, SECTIONS AND DETAIL DRAWING.

GWB PIPE CHASES / METAL COVER INCLUDING ACCESS DOOR IN EACH ROOMS FOR NEW MECHANICAL

REPLACE DETERIORAGED EXISTING PIPE CHASES / PIPE COVER WITH NEW CMU, WATERPROOF TYPE

METAL SUSPENSION SYSTEMS AS SHOWN ON FLOOR PLANS AND INTERIOR FINISH SCHEDULE.

REPLACE DETERIORATED EXISTING CEILING WITH NEW ACOUSTICAL CEILING TILES INCLUDING

RAILS, GURAD RAILS AS SHOWN ON FLOOR PLAN, DETAIL DRAWINGS INTERIOR FINISH SCHEDULE.

PAINT ALL EXISTING INTERIOR WALLS INCLUDING CMU, METAL, CONCRETE SURFACES, STAIRWAY, HAND

EXTERIOR SURFACE OF THE BUILDING AS SHOWN ON FLOOR PLAN, DETAIL DRAWINGS AND PICTURES.

STAIRWELS, HAND RAILS, GURAD RAILS AND OTHER COMPONENTS (BICYCLE RACK, TRASH BIN) OF

PAINT ALL EXISTING EXTERIOR WALLS INCLUDING EIFS, CMU, METAL, WOODS, CONCRETE SURFACES, 2.5

2.7

4.12

SHOWN ON FLOOR PLANS AND INTERIOR FINISH SCHEDULE.

REPLACE DETERIORATED EXISTING QUARRY TILE INCLUDING QUARRY TILE BASE WITH NEW AS

BED INCLUDING GRANITE CURB AROUND BUILDING AS SHOWN ON FLOOR PLAN AND DETAIL DRAWING.

REPLACE DETERIORATED EXISTING GRAVEL BED AND CONC CURB WITH NEW 100mm DEEP GRAVEL

SHOWN ON FLOOR PLAN AND ENLARGED FLOOR PLAN.

REPLACE DETERIORATED EXISTING ALL ACCESS DOORS ON WALL & CEILING WITH NEW AS

DRAWINGS.

ROOM ON 1ST FLOOR FOR MECHANICAL SEWER LINE WORKS AS SHOWN ON FLOOR PLAN AND MECH

REPLACE EXISTING CONCRETE SLAB AT CORRIDOR, EACH BATH ROOMS, TOILET, LAUNDRY AND MUD

AS SHOWN ON FLOOR PLANS, ELEVATIONS AND INTERIOR FINISH SCHEDULE.

APPLY TEXTURE COATING WITH PLASTERING AT MULTI PURPOSE ROOM, DRESSING ROOM AND CLOSET

INTERIOR FINISH SCHEDULE.

NEW GWB IN MULTI PURPOSE RM, KITCHEN, LOUNGE AND GAME RM AS SHOWN ON FLOOR PLAN AND

REMOVE DETERIORATED EXISTING AWP (ACOUSTICAL WALL PANELS) AND APPLY TEXTURE COAT ON

REPAIR BARRACKS S-827

CAMP CASEYKWON, CH

243526

A-3

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

33.4

33.4

1ST FL.

3RD FL.

2ND FL.

ROOF BEAM

4TH FL.

OPEN

1ST FL.

3RD FL.

2ND FL.

ROOF BEAM

4TH FL.

SEE SIGNAGE SCHEDULE

BUILDING IDENTIFICATION

33.4

,0

,3

,3

,7

,4

SCALE: 1/100

FRONT ELEVATION

SCALE: 1/100

SIDE ELEVATION

BLAST WINDOW(TYP)

AL. SLIDING

AL. BLAST DOOR

(1829x1066)

BULLETIN BOARD

EXST EIFS (TYP)

PAINT ON

EXST CHIMNY (TYP)

PAINT ON

(TYP)

EXST EIFS

PAINT ON

ON EXST METAL ROOF

ACRYLIC FLUID-APPLIED WATERPROOFING

ON EXST METAL ROOF (TYP)

ACRYLIC FLUID-APPLIED WATERPROOFING

CONC STOOP

EXST METAL ROOF (TYP)

WATERPROOFING ON

ACRYLIC FLUID-APPLIED

REPLACE EXISTING ALUMINUM LOUVERS WITH NEW AS SHOWN ON FLOOR PLANS AND DETAIL DRAWINGS.

REPAIR / MAINTENANCE (K) WORK

SCOPE OF WORK (ARCHITECTURAL WORK)

4. MISC. WORK

PLAN AND DETAIL DRAWING.

REPLACE DETERIORATED EXISTING AL GRATING COVERS WITH NEW FOR EACH VEST AS SHOWN ON FLOOR

ON FLOOR PLAN AND DETAIL DRAWING.

REPLACE DETERIORATED EXISTING COUNTER TOP AND SST SHELVES WITH NEW AT LAUNDRY AS SHOWN

DRAWING.

REPLACE DETERIORATED EXISTING IRON BOARD CABINET WITH NEW AS SHOWN ON FLOOR PLAN AND DETAIL

FLOOR PLAN AND DETAILS.

REPLACE WOODEN SHELF, SST ROD AND DRAWER CABINET WITH NEW IN EACH CLOSET AS SHOWN ON

4.13

4.14

4.15

4.16

4.17

4.18

4.19

4.20

4.21

4.22

DRESSING ROOM AS SHOWN ON NEW FLOOR PLANS AND DETAIL DRAWING.

REPLACE DETERIORATED EXISTING VANITY CABINETS INCLUDING WALL HUNG CABINET WITH NEW IN ALL

KITCHEN, LOUNGE AND GAME ROOM WITH NEW AS SHOWN ON FLOOR PLANS AND DETAIL DRAWINGS.

REPLACE EXISTING DETERIORATED WOODEN CHAIR RAILS AND WOODEN HANGER RAILS AT EACH BED ROOM, 4.23

STORAGE BIN AS SHOWN ON FLOOR PLANS AND ELEVATIONS.

REPLACE DETERIORATED EXISTING 18THK PLYWOOD SHELVES INCLUDING PLASTIC LAMINATE AT EACH 4.24

ELEVATIONS & SCOPE OF WORK

REPLACE DETERIORATED EXISTING CONCRETE STOOPS WITH NEW AS SHOWN ON FLOOR PLAN.

CONC STOOP

COVER AT MUD ROOM AS SHOWN ON FLOOR PLAN AND DETAIL DRAWING.

REPLACE DETERIORATED EXISTING TRENCH COVERS, HOOKS AND HOSE BIB WITH NEW, AND PAINT STL

REPLACE SST SPLASH GUARD

FIXED WINDOW(TYP)

INSULATED AL.

SHOWN ON FLOOR PLAN, DETAIL DRAWING AND SIGNAGE SCHEDULE.

REPLACE DETERIORATED EXISTING EXT/INT BULLETIN BOARDS, CARD HOLDER AND FLEXI INFO WITH NEW AS

CONC STOOP

CONC STOOP

4.25 REPAIR AND BLOCK UP DAMAGED EXISTING EIFS WITH NEW AS NECESSARIES.

SST SPLASH GUARD

REPLACE

AND STAIRWELL AS SHOWN ON FLOOR PLANS.

REPLACE DETERIORATED EXISTING FIRE RATED ACCESS DOORS (1-1/2 HRS) WITH NEW AT LAUNDRY RM

EXTERIOR ELEVATIONS.

REPLACE DETERIORATED EXISTING SST SPLASH GUARDS WITH NEW AS SHOWN ON FLOOR PLANS AND 4.26

REPAIR BARRACKS S-827

A-4

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

33.4

1ST FL.

3RD FL.

2ND FL.

33.4

TOP OF

ROOF BEAM

4TH FL.

1ST FL.

3RD FL.

2ND FL.

BUILDING IDENTIFICATION

SEE SIGNAGE SCHEDULE

OPEN

TOP OF

ROOF BEAM

4TH FL.

33.4

,0

,3

,3

,7

SCALE: 1/100

SCALE: 1/100

SIDE ELEVATION

BACK ELEVATION

AL LOUVER

CONC STOOP

SCALE: N/A

FUEL TANK & GUARD WALL

BICYCLE RACK

PICTURES OF OTHER COMPONENTS

ON EXST METAL ROOF (TYP)

ACRYLIC FLUID-APPLIED WATERPROOFING

ON EXST METAL ROOF (TYP)

ACRYLIC FLUID-APPLIED WATERPROOFING

(TYP)

EXST EIFS

PAINT ON

(TYP)

EXST EIFS

PAINT ON

(TYP)

EXST EIFS

PAINT ONCONC STOOP

(TYP)

MTL SURFACE

PAINT ON

EXST EIFS (TYP)

PAINT ON

(TYP)

MTL SURFACE

PAINT ON

(TYP)

MTL SURFACE

PAINT ON

(TYP)

MTL SURFACE

PAINT ON

EXST METAL ROOF (TYP)

WATERPROOFING ON

ACRYLIC FLUID-APPLIED

(TYP)

AND GURAD RAIL

EXST HAND RAIL

PAINT ON

ELEVATIONS AND PICTURES

REPAIR BARRACKS S-827

A-5

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

1ST FL.

C .H

0 2ND FL.

C .H

0 3RD FL.

C .H

SLEEPING

LIVING/ LIVING/

SLEEPING

STAIR-2

LIVING/

SLEEPING

STAIR-2

SLEEPING

LIVING/

SLEEPING

LIVING/

LIVING/

SLEEPING

4TH FL.

C .H

TOP OF

ROOF BEAM

33.4

STAIR-2

SLEEPING

LIVING/

LIVING/

SLEEPING

STORAGESTORAGE

STORAGE STORAGE

STORAGE STORAGE

LIVING/

SLEEPING

LIVING/

SLEEPING

LIVING/

SLEEPING

SLEEPING

LIVING/

STAIR-3

STAIR-3

SLEEPING

LIVING/

SLEEPING

LIVING/

STORAGE STORAGE

LIVING/

SLEEPING

STAIR-3

SLEEPING

LIVING/

33.4

C .H

C .H

KITCHEN STORAGECORRIDOR

MECH. ROOM

1ST FL.

2ND FL.

VEST.

C .H

LOBBY STORAGE

C .H

CORR.

3RD FL.

4TH FL.

ROOF BEAM

TOP OF

CORRIDOR

CORRIDOR

GAME ROOM

LOUNGE

C .H

C .H

STORAGE

STORAGE

C .H

C .H

33.4

C .H

C .H

C .H

SLEEPING2

C .H

SLEEPING

SLEEPINGSLEEPINGC

.H

LIVING/

C .H

C .H

C .H

LIVING/

33.4

SLEEPING

SLEEPING

C .H

LIVING/

SLEEPING

LIVING/

SLEEPINGC

.H

LIVING/

C .H

C .H

C .H

C .H

C .H

LIVING/

C .H

LIVING/

C .H

LIVING/

GENERAL SECTIONS

SCALE: 1/100

GENERAL SECTION-1

SCALE: 1/100

GENERAL SECTION-2

SCALE: 1/100

GENERAL SECTION-3

CORR

CORR

CORR

CORR

ON EXST METAL ROOF (TYP)

ACRYLIC FLUID-APPLIED WATERPROOFING

ON EXST METAL ROOF (TYP)

ACRYLIC FLUID-APPLIED WATERPROOFING

ON EXST METAL ROOF (TYP)

ACRYLIC FLUID-APPLIED WATERPROOFING

EXST CHIMNY (TYP)

PAINT ON

EXST CHIMNY (TYP)

PAINT ON

EXST METAL ROOF (TYP)

WATERPROOFING ON

ACRYLIC FLUID-APPLIED

REPAIR BARRACKS S-827

A-6

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

1B

1ST FLOOR PLAN

1D 1F

1H

TYPICAL FLOOR PLAN

K E Y P L A N

1A 1G

1C

1E

UP

UP

DNUP

DN UP

UPDN

VCB

PVCT

VCB

ACST CEILING

C L

G

H

T

ACST CEILING

150 200

PLASTIC

PLYWOOD

ON 19 THK

LAMINATED

ISSUE ROOM

AL SLIDING

WINDOW

C

T

,4

,3

PVCT

VCB

C

T

CORRIDOR

ACST CEILING

BATH ROOM C

T

ON 12 THK

GWB CEILING

PVCT

VCB VCB

90 STL CHANNEL

GWB CLG ON

@ 406 O.C.

ACST CEILING

ISSUE ROOM VEST.

WINDOW

FIXED STL

CONC

12 THK

,0

,0

,7

,1

,1

,4

,1

,3

,3

,4

,1

,1

,6

PAINT

QT

PAINT ON

PAINT ON

PAINT ON

PAINT ON

SCALE: 1/20

1B 1C 1D

1E

EXST CMU

EXST CMU

CONC SLAB ON 1ST FLOOR ONLY

1J

1K 1N

INTERIOR WALL SECTIONS-1

1M

INTERIOR WALL SECTIONS-1

ON WATERPROOFING MEMBRANE

ON CEMENT MORTAR BED

ON EXST SLAB (TYP)

EXST CMU WALL

MTL LATH ON

PLASTERING W/

MEMBRANE ON

WATERPROOFING

BOND COAT ON

GCWT ON CEMENT

PAINT ON

EXST CMU

CMU

PAINT ON

@400 O.C (TYP)

ON 50T MTL STUD

PAINT ON 15T GWB

@400 O.C (TYP)

ON 50T MTL STUD

PAINT ON 15T GWB

ROOM

MULTI PURPOSE

1L

1A

89200

GWB CEILING

C

T

BATHROOM

ON 12 THK GWB CEILING

BATHROOM

ON 12 THK

SEE MECH DWG

FOR CHASE

(TYP)

PENETRATIONS

PAINT

PAINT

GCWT ON

CEMENT BOND COAT

ON WATERPROOFING

MEMBRANE ON

FT ON CEMENT BOND COAT

ON WATERPROOFING MEMBRANE

ON MORTAR BED ON EXIST

CONC SLAB (TYP)

LATH ON 6THK CEMENT

PLASTERING W/METAL

BOARD ON SHAFT WALL (TYP)

"X" GWB W/STEEL STUD

OR APPROVED EQUAL)

(2-LAYER 12THK TYPE

SHAFT WALL,UL-U497

"X" GWB & 25THK TYPE

[GA FILE NO.WP7080]

(SHOWER AREA)

GWB CEILING

C

T

BATHROOM

ON 12 THK

GWB CEILING

(SHOWER AREA)

MEMBRANE ON

BATHROOM

ON 12 THK

SEE MECH DWG

FOR CHASE

PENETRATIONS

(TYP)

(1ST FL ONLY)

PAINT

PAINT

(2ND THRU 4TH FL ONLY)

ON MORTAR BED ON EXIST

OR FT ON CEMENT BOND COAT

FT ON CEMENT BOND COAT

ON WATERPROOFING MEMBRANE

ON MORTAR BED ON EXIST

CONC SLAB

CONC SLAB

GCWT ON

CEMENT BOND COAT

ON WATER PROOFING

PLASTERING W/MET LATH ON

SHAFT WALL

6 THK CEMENT BOARD ON

"X" GWB W/STEEL STUD

OR APPROVED EQUAL)

(2-LAYER 12THK TYPE

SHAFT WALL,UL-U497

"X" GWB & 25THK TYPE

[GA FILE NO.WP7080]

,3

,3

FT ON CEMENT BOND COAT

PVCT

REPAIR BARRACKS S-827

1F

A-7

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

(SHOWER AREA)

C

T

PVCT

VCB

ON 12 THK

GWB CEILING

SLEEPING

LIVING/

C

TBATHROOM

BATHROOM

GWB CEILING

12 THK

C

T

STL WINDOW

C

T

PVCT

VCB

12THK GWB CEILING

KITCHEN

CMU

CORRIDOR

FIXED

ACST CEILING

,1

,1

,6

,2

,3

,4

,4

PAINT

SCALE: 1/20

1G 1H

PAINT ON

EXST CMU

C

T

SLEEINGC

T

WD FRAME

VCB

PVCT PVCT

VCB

GWB CEILING

ON 12 THK

GWB CEILING

LIVING/ DRESSING

ON 12 THK

ON CMU

LAUNDRY

90 STL CHANNEL

BRACE @ EACH STUD

VAPOR BARRIER

ON CWB(TYP)

MORTAR BED

MORTAR BED

1J

1N

EPOXY PAINT

ON GWB CEILING

C

T

(NIC)

DRYER

DUCT

SEE MECH DWG

ON GWB CEILING

@ EACH STUD

EPOXY PAINT

90 STL CHANNEL

90 STL CHANNEL

BRACE @ EACH STUD

MORTAR BED

C

T

MORTAR BED

1M

SHOWER

INTERIOR WALL SECTIONS-2

INTERIOR WALL SECTIONS-2

LAUNDRY

LAUNDRY LAUNDRY

@ 300 O.C

90 MTL STUD

CEMENT BOARD ON

MTL LATH ON 12T

PLASTERING W/

BOND COAT ON

GCWT ON CEMENT

@ 300 O.C MAX

90 MTL STUD

CEMENT BOARD ON

MTL LATH ON 12T

PLASTERING W/

BOND COAT ON

GCWT ON CEMENT

VERIFY

PAINT

12 THK GWB

ON 22 FURRING

@ 400 O C

C

T

PVCT

ACST CEILING

GWB

LOBBY

VCB

RT

STAIR-1

C

T

,7

,0

,3

PAINT ON 12THK

ON CWB(TYP)

VAPOR BARRIER

MORTAR BED MORTAR BED

1K

LAUNDRY LAUNDRY

@ 300 O.C

150 MTL STUD

CEMENT BOARD ON

MTL LATH ON 12T

PLASTERING W/

BOND COAT ON

GCWT ON CEMENT

1L

TC ON

LOUNGE

GAME ROOM

C

T

C

T

200 STL STUD

VCB

GWB CEILING

GCWT ON CEMENT

ON 12 THK

TOILET

12 THK GWB

ON FURRING

LOBBY

RT

STAIR-1

CEMENT BOARD ON

,4

,3

,7

,3

RB

PAINT

PAINT ON

EXST CMU

PVCT

TC ON

@ 400 OC

FT ON CEMENT BOND COAT

ON MORTAR BED ON EXIST

CONC SLAB (TYP)

BOND COAT ON

W/MET LATH ON

PLASTERING (2ND THRU 4TH

FL ONLY)

(2ND THRU 4TH

FT ON CEMENT BOND COAT

ON WATERPROOFING MEMBRANE

ON MORTAR BED ON EXIST

FT ON CEMENT BOND COAT

ON MORTAR BED ON EXIST

FL ONLY) OR

CONC SLAB

CONC SLAB (1ST FL ONLY)

GCWT ON

CEMENT BOND COAT

ON WATERPROOFING

MEMBRANE ON

PLASTERING W/MET

LATH ON CMU

WALL (TYP)

TC TC ON

TC ON

EXST CMU

TC

TC

TC ON

CURTAIN & ROD

FT ON CEMENT

FT ON CEMENT

FT ON CEMENTFT ON CEMENT

FT ON CEMENT FT ON CEMENT

PVCT

REPAIR BARRACKS S-827

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

A-8

LIVING / SLEEPING

CL LC

FCUFCU

TB

MR

LAV

MC

BATHROOM

SC/R

SH SH

SC/R

TBTB

TB TTD TTD TB

MC

MR

LAV

DRESSING

TB

SHD SHD

2ND FL:KITCHEN

JAN.

D.S

D.S

STAIR-1

COMM.

DN

UP

(NIC)(NIC)

REF REF

(NIC)

MAKER

ICE

COUNTER &

CABINET

@2ND FL

4TH FL:GAME ROOM

3RD FL:LOUNGE

VEST.

LOBBY

TOILET CLOSET

D.S

MUD ROOM

STAIR-1

125 126

128 127

HOSE

BIB

SMLD

PTD TTDSD

UP

FINISH

NON-SLIP

(2400x1000)

IRON BOARD

CABINET

F.D

LAUNDRY

COUNTER

COUNTER

F.D

IRON BOARD

CABINET

7,400

1,8001,4001,0001,4001,800

,2

,4

,8

(NIC)

W

(NIC)

W

(NIC)

W

(NIC)

W

(NIC)

W

(NIC)

W

(NIC)

W

(NIC)

D

(NIC)

D

(NIC)

D

(NIC)

D

(NIC)

D

(NIC)

D

(NIC)

D

(NIC)

D

(NIC)

D

(NIC)

D

(NIC)

W

(NIC)

W

(NIC)

W

(NIC)

W

(NIC)

W

(NIC)

W

(NIC)

W

DROP CEILING LINE

COUNTER &

CABINET

@2ND FL

FINISH

NON-SLIP

D22

D24 D23 D23

D22

D24

D24

D24

TOILET ACCESSORIES ABBREVIATIONS

MR : MIRROR

: MEDICINE CABINETMC

: SHOWER CURTAIN WITH RODSC/R

: SOAP DISPENSER FOR TOILET @ 1ST FLOORSD

: SHOWER HEADSHD

: TOWEL BARTB

: TOILET TISSUE DISPENSER (FULLY RECESSED)TTD

SH : SOAP HOLDER(PORCELAIN,RECESSED TYPE)

W/FRAME(IF NEEDED)

METAL COVER

W1 W1

D25D25

(NIC)

RANGE

B/B

HOOK

B/B

BAR @ 15 O.C

25x5 THK BEARING

RAIL (TYP)

WOODEN HANGER

SCALE: 1/50

ENLARGED PLANS-TYPICAL MODULE PLAN

SCALE: 1/50

ENLARGED PLANS-LAUNDRY AREA

SCALE: 1/50

ENLARGED PLANS-KITCHEN & ETC

MECH. PIPING WORK (TYP)

CHASE WALL FOR

MECH. PIPING WORK (TYP)

CHASE WALL FOR

ONLY (TYP)

ONLY (TYP)

AL GRATING TRENCH COVER

GRATING COVER

COUNTER TABLE(TYP)

ON WALLS AND CEILINGS (TYP)

ALL ACCESS DOORS

W/GRAVEL

GRANITE CURB STONE

SST SHELF (TYP)

SST SHELF (TYP)

(TYP)

COUNTER TABLE

(TYP)

COUNTER TABLE

SST SPLASH

GUARD

A-14

A-14

MECH. PIPING WORK

CHASE WALL FOR

BATHROOM

DRESSING

LIVING / SLEEPING

1H

A-11

@ 400 O.C.

ON 90 MTL STUD

12T CEMENT BOARD

MTL LATH ON

PLASTERING W/

MEMBRANE ON

WATERPROOFING

BOND COAT ON

GCWT ON CEMENT

EXST CMU WALL(TYP)

PAINT ON

PAINT ON EXST CMU

STUDS (TYP)

TC ON GWB W/METAL

STUDS (TYP)

TC ON GWB W/METAL

MECH. PIPING WORK (TYP)

200T MTL STUD WALL FOR

RAIL (TYP)

OAK, CHAIR

MECH. PIPING WORK (TYP)

PAINT ON NEW CMU FOR

MECH. PIPING WORK (TYP)

TC ON NEW CMU FOR

L E G E N D

PIPING WORK

: REPLACE CMU WALL WITH NEW FOR MECHANICAL

DOOR (TYP)

FIRE RATED ACCESS

610 X 610, 1-1/2HRS

FIRE RATED ACCESS DOOR NOTES

ACCESS DOOR-1 :

@ STAIR WAY & LAUNDRY RM

EXPOSED FLANGE, KNURIED KNOB, SELF-CLOSING DOOR

MFG-BABCOCK DAVIS, MODEL NO-BITK2424, UL LISTED

INSULATED FIRE-RATED ACCESS DOOR, 610 X 610, 1-1/2HRS

SEE A-8 NOTE (TYP)

FIRE RATED ACCESS DOOR

610 X 610, 1-1/2HRS

FIRE RATED ACCESS DOOR NOTES

ENLARGED FLOOR PLANS AND

DOOR (TYP)

208x208, ACCESS

EPOXY

EPOXY

7,550

1,8753,8001,875

(TYP)

ON 50T MET STUD

TC ON 15T GWB

GCWT

PAINT ON EXST GWB WALL

W/HANDLES

CHECKED MET COVER

REPAIR BARRACKS S-827

A-9

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

INTERIOR ELEVATIONS-1

1G 1H 1J

TBSH

TTD

TB

GCWT

C

T

S H

O W

E R

C U

R T

IN

O

D

T O

W

B

R

S H

O W

A D

T T

D

TRIM

TILE

T O

W

R

T T

D

TTD

TB TB

GCWT

SC/R

GCWT

C

T

S H

O W

U

R T

D

C

T

,5

,9

,9

,3

,3

,5

,3

,8

AS REQUIRED

VERIFY DIMENSION

1A

OPNG

1B

C

T

C

T

@ 1st FLOOR ONLY

ACCESS DOOR

BLIND

C

T

H A

N G

IL

VCB

1C

TB

T O

W

R C

T

1D

ON 18 THK PLYWOOD

(SEE ELEC DWG)

LIGHTING FIXTURE

WOOD DOOR

VCB

C

T

C

T

1E

OPNG

L A

V

MR

TB

C

T

1F

L A

V

C

T

MR

MC

LIGHTING

FIXTURE FIXTURE

LIGHTING

,6

,8

,2

,6

,6

,2

,3

,4

,2

,5

,2

,4

,6

,8

,2

,1

,4

,4

,1

,8

,2

PAINT ON CMU

METAL COVER

PAINT ON CMU

HANGING RAIL(TYP)

WOODEN

PAINT ON EXST CMU

WOODEN HANGING RAIL(TYP)

EXST CMU

PAINT ON

HANGING ROD

SHELF W/

CABINET

SCALE:

INTERIOR ELEVATIONS-1

@ LIVING/SLEEPING ROOM @ LIVING/SLEEPING ROOM @ DRESSING ROOM

@ DRESSING ROOM

@ DRESSING ROOM @ DRESSING ROOM

TC ON 12mmTHK GWB

ON 90 STL STUD (TYP)

TC ON 12mmTHK GWB

ON 90 STL STUD(TYP)

PLASTIC LAMINATE(PL-1)

WOODEN FRAME

VARNISH ON EXST

TC ON 15mmTHK GWB

ON 90 STL STUD (TYP)

SCALE: 1 : 25

PAINT ON CMU

TC ON GWB

@ BATHROOM @ BATHROOM @ BATHROOM

REPAIR BARRACKS S-827

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

VCB

WINDOW (TYP)

AL BLAST

(TYP)

ON 50T MTL STUD @ 400 O.C

PAINT ON 15T GWB

A-10

ARCHITECTURAL

INTERIOR ELEVATIONS-2

EWC WD DOOR STL DR

C

T

OPEN

VCB BULLETIN BOARD

C

T

1A

1M

1D

1C

,3

,7

,3

1G

C

T

BULLETIN BOARD

C

T

1E 1F

OAK CHAIR RAIL

1H

1J

C

T

C

T

VCB

C

T

OAK CHAIR RAIL

REF

VCB

(NIC)

ICE MAKER

(NIC)

,6

,2

,1

,1

,2

,1

,1

5,450 3,600

,6

,4

,5

,6

,5

(NIC)

RANGE (NIC)

1K

C

T RANGE HOOD

(SEE MACH DWG)

BACK SPLASH

REF

,4

,6

1L

C

T

VCB

OAK CHAIR RAIL

,6

,0

EXST CMU

PAINT ON EXST CMU

PAINT ON PAINT ON

EXST CMU (BEYOND)

EXST CMU

PAINT ON PAINT STORAGE BIN

PAINT STORAGE BIN

EXST CMU

PAINT ON

PAINT ON EXST CMU EXST CMU

PAINT ON

@ LOBBY@ LOBBY @ LOBBY @ STORAGE @ STORAGE

@ KITCHEN

@ KITCHEN@ KITCHEN@ KITCHEN

1A

A-13 1C

ON 18 THK PLYWOOD(TYP)

PLASTIC LAMINATE(PL-1)

SCALE:

INTERIOR ELEVATIONS-2

SCALE: 1 : 50

1B

A-13 A-13

C

T

VCB

VCB

ON 90 STL STUD

PAINT ON EXST CONC

,7

STL FIXED FIRE RATED GLASS

ON 22 MET FURRING

TC ON 15T GWB

ON 22 MTL FURRING

TC ON 15T GWB

@ MULTI PURPOSE ROOM @ MULTI PURPOSE ROOM

TC ON 15T GWB W/ METAL LATH

ON 22 MET FURRING

TC ON 15T GWB

TC ON EXST CMU

TC ON EXST CMU

GCWT (TYP)GCWT (TYP)

1B @ MULTI PURPOSE ROOM

,7

PAINT ON EXST CONC

REPAIR BARRACKS S-827

T

M

P

C K

S

IN

K

1H

MOP RACK

,4

,8

A-11

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

MG

SMLDSD

C

T

P T

D

T T

D

GCWT

SOAP DISPENSER (SD)

MIRROR GLASS (MG)

WATER CLOSET

GCWTLAVATORY

GCWT

WASHER(TYP), GFGI

DRYER(TYP),GFGI

GCWT

COUNTER

WASHER(TYP)

C

T

1B 1D

PTD

OPEN

1E

1C

C

T

C

T

GFGI

SHELF METAL LIGHT DUTY (SMLD)

PAPER TOWEL DISPENSER (PTD)

TOILET TISSUE DISPENSER (TTD)

,4

,5

,4

,4

,4

1A

GCWT

C

T

BRASS HOOK

GCWT

DRAIN BOARD

1F 1G

C

T

FAUCET

SEE MECH DWG

,0

,4

,6

,2

,4

EXST CMU

PAINT ON

EXST CMU

PAINT ON

VCB

INTERIOR ELEVATIONS-3

@ CORRIDOR

@ TOILET @ LAUNDRY @ LAUNDRY

@ LAUNDRY @ MUD ROOM @ MUD ROOM

A-14

A-14

A-13

SCALE:

INTERIOR ELEVATIONS-3

SCALE: 1 : 50

@ JANITOR CLOSET

PAINT ON GWB OR EXST CMU

SST SHELF (TYP)

SST SHELF (TYP)

REPAIR BARRACKS S-827

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

A-12

ARCHITECTURAL

T O

F

L O

O R

(SEE DOOR SCUEDULE)

VCB

1F

PVCT

1H

FINISH(POST FRAMING COUNTER TOP)

ANCHOR BOLT

@ 450 O.C

25X50 WD.

SPACER

WOOD DOOR

C E

IL

IN

G

H

G T

12 THK. GWB

CEILING

WD. DOOR

PROVIDE A FACE PANEL AT EACH END

THE CLOSET DOORS ARE OPEN

DRAWER WIDTH SHALL BE 500 mm.

DRAWERS TO OPEN FULLY WHEN

OF DRAWER UNIT TO ALLOW THE

X NOTE ;

PLYWOOD W/PLASTIC LAM(PL-1)

EXST CMU

PAINT ON

CLOSET DETAILS

SCALE:

AS SHOWN

CLOSET DETAILS

A-14

A-14

SCALE:

1H

SECTION

116509

A-18

CLOTHES HANGING ROD W/

25x32 WD. NAILER W/

18 THK. PLYWD SHELF

WOOD DOOR

SEALANT

#2 OR #4

DOOR FRAME

1B

1C

SEALANT #2 OR #4

(BELOW TOP)

FILLER PANEL

WOOD DOOR

MATERIAL

BACK STOP

O R

CABINET

TOP OF

CABINET WALL

1D

1E

1H

O R

HD.WD.TRIM

WD. FRAME

SHELF CLOTHES

HANGING ROD

EXST CMU

PAINT ON

GWB WALLS

PAINT ON EXST

EXST CMU

PAINT ON

PLASTIC LAMINATE(PL-1) ON

PAINT ON CMU

EXST TRIM

CABINET

DRAWER

SCALE:

1A

CLOSET PLAN

SCALE:

1B

PLAN DETAIL

SCALE:

1C

HEAD DETAIL

SCALE:

1D

ELEVATION

SCALE:

1E

SECTION DETAIL

SCALE:

1F

JAMB DETAIL

SCALE:

1G

PLAN DETAIL

1G

50 EQ EQ195 50

15010001000

,8

,2

,4

PAINT ON WALL

ON EXST HD. WD. TRIM

VARNISH OR PAINT

EXST WD. DOOR FRAME

VARNISH OR PAINT ON

EXST WD. DOOR FRAME

VARNISH OR PAINT ON

20x40 WD. TRIM

VARNISH OR PAINT ON EXST

ON EXST WD FRAME

VARNISH OR PAINT

ON EXST WD TRIM

VARNISH OR PAINT

VARNISH OR PAINT ON EXST

VARNISH OR PAINT ON EXST

VARNISH OR PAINT ON

VARNISH OR PAINT ON EXST

1F

1/5

1/30 1/5 1/5

1/30 1/5 1/5

1/5

TC ON

TC ON

DOOR FRAME

VARNISH ON EXST WD.

VARNISH ON EXST WD TRIM

VARNISH ON EXST WD TRIM

12 THK. GWB WALL/CEILING

REPAIR BARRACKS S-827

A-13

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

THK PLYWD

& EDGE.)

(FRONT,BACK

ON 18 THK

PLASTIC

PLASTIC LAMINATE

VCB

PLYWD FRONT(TYP.)

(TOP, BOTTOM & EDGE.)

ADJUSTABLE SHELVES

ON 18 THK PLYWD

50X50X6X50LG

ON 18 THK PLYWD

(TOP, BOTTOM & EDGE.)

EXP BOLT @600 O.C

ADJUSTABLE SHELVES

ON 6 THK

50x100 WD

PLYWD (FRONT)TYP.

25x100 WD

ON 6 THK

PLYWD (FRONT,

ON 18 THK

BACK & EDGE)

METAL PULL(B02011)

@ EACH DRAWER)

(2PR-B01602 @ EACH DOOR)

MET PULL(B02011)

DRAWER W/ SLIDE(2PR-B05011

MET PULL (B02011)

@ 600 O.C.

50X100 WD & 50X50X6

TOP & EDGE

FRONT, BACK & EDGE W/ HINGE

18 THK PLYWOOD

PVCT

VCB

6 THK PLYWOOD

18 THK PLYWOOD

SEE MECH DWG

RANGE HOOD

6 THK PLYWOOD

METAL

BOTTOM & EDGE)

25X100

PLASTIC

PLYWOOD (TOP,

HANDWARE

ADJUSTABLE

SHELF

25X100 WD

12 THK PLYWOOD

25X100

50X100 WD

50x100 WD

50X50X6X50LG

EXP BOLT @ 600 O.C

ON 6 THK

PLYWD FRONT(TYP.)

25x100 WD

VCB

THK PLYWD

& EDGE.)

(FRONT,BACK

ON 18

PLASTIC

PLYWD (FRONT,

ON 18 THK

BACK & EDGE)

METAL PULL(B02011)

ON 18THK PLYWD

(TOP, BOTTOM & EDGE.)

ADJUSTABLE SHELF

PLASTIC

ON 18

THK PLYWD

(FRONT,BACK

& EDGE.)

ON 19 THK PLYWD

ADJUSTABLE SHELF

(TOP, BOTTOM & EDGE.)

HAREWARD

MET ADJ SHELF

50X100 WD 50X100 WD

25X100

MET ADJUSTABLE

SHELF HARDWARD

MET ADJ SHELF

HARDWARE

18 THK PLYWOOD

FRONT, BACK & EDGE W/ HINGE

(2PR - B01602 @ EACH DOOR)

MET FULL (B02011)

18 THK PLYWOOD

ADJUSTIBLE SHELF (TOP,BOTTOM & EDGE)

BLOCKING(TYP.)

ON 18 THK

PLYWD (FRONT)

W/ HINGES (2PR-B01602

@ EACH DOOR)

MET ADJ SHELF

HAREWARD

METAL PULL(B02011)

METAL PULL(B02011)

W/ HINGES (2PR-B01602

@ EACH DOOR)

W/ HINGES (2PR-B01602

@ EACH DOOR)

25X100 WD

BLOCKING(TYP.)

ON 18 THK

PLASTIC LAMINATE

PLYWD (FRONT)

@ EACH DOOR)

W/ HINGES (2PR-B01602

MET ADJUSTABLE

SHELF HARDWARD

W/ HINGES (2PR-B01602

@ EACH DOOR)

PLYWD (FRONT)

ON 18 THK

12 THK

PLYWOOD

,4

,4

,4

25X100

(2PR-B01612 2 EACH DOOR)

MET PULL (B02011)

50X100 WD & 50X50X6

18 THK PLYWOOD

18 THK PLYWOOD

6 THK PLYWOOD

FRONT, BACK & EDGE W/ HINGE

@600 O.C.

TOP & EDGE

PVCT

VCB

25X100 WD

6 THK PLYWOOD

KITCHEN SINK25X50 WD

18 THK PLYWOOD

13 THK SOLID SURFACE

MATERIAL (SSM-1) OVER

(COUNTERTOP, BACK &

SIDE SPLASH)

18 THK PLYWOOD

13 THK SOLID SURFACE

MATERIAL (SSM-1) OVER

(COUNTERTOP, BACK &

SIDE SPLASH)

18 THK PLYWOOD

13 THK SOLID SURFACE

MATERIAL (SSM-1) OVER

(COUNTERTOP, BACK &

SIDE SPLASH)

PLASTIC LAMINATE(PL-1)

PLASTIC LAMINATE(PL-1)

W/ PLASTIC LAMINATE(PL-2)

LAMINATE(PL-1)

LAMINATE(PL-1)

PLASTIC LAMINATE(PL-2)

PLASTIC LAMINATE(PL-2)

PLASTIC LAMINATE(PL-1)

PLASTIC LAMINATE(PL-1)

PLASTIC LAMINATE(PL-2)

PLASTIC LAMINATE(PL-2)

PLASTIC LAMINATE(PL-1)

LAMINATE (PL-1)

PLASTIC LAMINATE(PL-1) ON

PLASTIC LAMINATE(PL-2) ON

PLASTIC LAMINATE(PL-2) ON

ON 18 THK

LAMINATE(PL-1)

PLASTIC LAMINATE(PL-1) ON

PLASTIC LAMINATE(PL-1) ON

PLASTIC LAMINATE(PL-1)

PLASTIC LAMINATE(PL-1) ON

ON 6 THK PLYWOOD

PLASTIC LAMINATE(PL-1)

PLASTIC LAMINATE(PL-1) ON

PLASTIC LAMINATE(PL-1) ON

PLASTIC LAMINATE(PL-2) ON

PLASTIC LAMINATE(PL-2) ON

(PL-1).

PLYWD PANEL W/ PLASTIC LAMINATE

CONSTRUCTED OF SOLID WD TRIMS &

END PANEL AND ETC. SHALL BE

INCLUDING DOOR, DRAWER FRONTS, SIDE

ALL EXPOSED COUNTER CABINET FACES

5.

6.

(PL-2).

FINISHED W/ PLASTIC LAMINATE

ALL CABINET INSIDE SURFACE SHALL BE

7.

FOR THE SOUND SILENCE.

EQUIPPED WITH RUBBER BUMPER

ALL CABINET DOORS SHALL BE

AND TO BE INSTALLED BY OTHER.

GOVERNMENT FURNISHED MATERIALS

MICROWAVE, RANGE AND REFRIGERATOR WILL BE 1.

2.

3.

4.

FINISHED W/ SOLID SURFACE MATERIAL (SSM-1).

ALL CABINET COUNTERTOP SHALL BE

8.

SOLID SURFACE MATERIALS FOR APPROVAL.

OF HARDWARE, PLYWOOD, PLASTIC LAMINATE &

AND TEST REPORTS, CERTIFICATIONS

OF KITCHEN CABINETS WITH HARDWARE,

CONTRACTOR SHOULD SUBMIT SHOP DRAWING

TWO (2) INCHES ACTURAL SIZE OF THE REF.)

JOB SITE, (REFRIGERATOR SPACE SHALL BE

AND CABINET SIZE WILL BE ADJUSTED ON THE

REFRIGERATOR DIMENSION IS APPROXIMATE

SELECTED BY USING AGENCY.

PLASTIC LAMINATED COLOR TO BE

SCALE: AS SHOWN

KITCHEN CABINET DETAILS @ KITCHEN

1A

SCALE: 1/10

DETAIL-1

1B

SCALE: 1/10

DETAIL-2

1C

SCALE: 1/10

DETAIL-3

1D

SCALE: 1/10

DETAIL-4 ON 12 THK GWB

PAINT

ACST

CEILING

CORNER

REINFORCEMENT

SCALE: 1/5

DROP CEILING DETAILS

KITCHEN CABINET NOTES

KITCHEN CABINET NOTES & DETAIL

KITCHEN CABINET DETAILS,

REPAIR BARRACKS S-827

A-14

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

300300

910340

SCALE: AS SHOWN

VANITY CABINET DETAILS

1A

SCALE: 1/20

VANITY CABINET PLAN

1B

SCALE: 1/5

VANITY CABINET DETAIL

1C

SCALE: 1/10

VANITY CABINET SECTION-1

1D

SCALE: 1/10

VANITY CABINET SECTION-2

1E

SCALE: 1/5

DETAIL-1

1F

SCALE: 1/5

DETAIL-2

1G

SCALE: 1/5

DETAIL-3

1H

SCALE: 1/5

DETAIL-4

SCALE: 1/5

LAUNDRY COUNTER SECTION

FACE OF CMU

WD BLOCK & TO

CLIP FIXED TO

L-75x75x6 STL

50x100 WD BLOCK

18THK. PLYWD

PAINT ON CMU

WITH PLASTIC LAM

CONC SLAB W/

AT 450 O.C.

GCWT FINISH

MEDICINE

CABINET

1F

1D1C

18 x 18

18 PLYWD W/

PLASTIC LAM

HARDWD TRIM

TOP (POST FORMING METHOD)

& 12 THK PLYWOOD COUNTER

PLASTIC LAMINATE ON 18 THK

BRACING @600 O.C.(MAX.)

L-75x75x6 STEEL

GCWT FINISH WALL

L-75x75x6

STEEL

EACH ANGLE

20x20

HARDWD TRIM

T

Y P

CABINET DRAWER

PLASTIC LAM FINISH

18 THK PLYWD W/

FIXED TO WD BLOCK &

L-75x75x6 STL. CLIP

W/PLASTIC LAM

PLASTIC LAMINATE

6 THK PLYWD W/

18 THK PLYWD

EXP ANCHORS AT 450 O.C.

20x40 HARD WD

DRAWER STOPPER

CLIP

PLASTIC LAMINATE

6 THK PLYWD W/

6 THK PLYWOOD

PLASTIC LAMINATE

18 THK PLYWD WITH

18x18 HARDWD TRIM

SILICONE SEALANT

MIRROR ON 12HK PLYWD

WITH PLASIC LAMINATE

12 THK GWB

ANCHOR BOLT

25 x 50 WD

HARDWD

38X38

25 x100 HARDWD

COUNTER TOP

@450 O.C.

18 THK PLYWD

WITH PLASTIC LAM

BLOCK

50x100 WD

BOLT @600 O.C.

SPACER WITH

25X 50 WD

PLASTIC LAM

PLYWD WITH

HARDWD TRIM

18 x 18

18 THK

6 THK PLYWOOD

W/ PLASTIC LAMINATE

W/ PLASTIC

MIRROR ON 12 THK PLYWOOD

W/ PLASTIC LAMINATE

(SEE ELEC. DWG.)

LAMINATE

LIGHT

PLYWOOD

18 THK

18 THK PLYWOOD

COUNTER TOP)

PLASTIC LAM

(POST FORMING

PLYWOOD

W/ PLASTIC

LAMINATE

PLY WD WITH

18 THK

18 THK

PLYWD W/

PLASTIC LAM

18 THK

FORMING) TYP

FIN FL

W/ PLASTIC LAMINATE

6 THK PLYWOOD

W/ PLASTIC LAMINATE

18 THK PLY WOOD

W/ PLASTIC LAMINATE

18 THK PLYWOOD

LIGHT(SEE ELEC DWG)

COUNTER TOP)

(POST FRAMING

18 THK PLYWOOD

W/ PLASTIC LAM

MIRROR

ON 12 THK

PLYWOOD

W/ PLASTIC

LAMINATE

PLYWOOD

18 THK

1E

1F

1H 1B

1H

1E

1G

1B

(POST

VCB

PVCT

TC ON GWB

& LAUNDRY COUNTER SECTION

VANITY CABINET DETAILS

REPAIR BARRACKS S-827

1ST FLOOR

1050150

1102020

GRAVEL

BED.

GRANITE CURB

SCALE:

GRANITE CURB & GRAVEL BED DETAIL

1/10

A-15

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

FASTENER

LINE OF WALL

"A"

"A"

PLATE GLASS

MIRROR

METAL FRAMED

RUBBER BACKING

1.2 THK 12x12 SST FRAME

1.2 THK 12x25 GALV STL

PLATE GLASS MIRROR

W/ PIN KNOT SCREWS

BOLTS 2 - PER SIDE

2 - PER SIDE

RUBBER LINER

SCALE:

1 : 10

SCALE:

1 : 20

SHOWER CURB DETAIL

SCALE:

MIRROR DETAILS

5A

ELEVATION

N/A

5B

SECTION "A"-"A"

SCALE: 1 : 25

DETAILS-1

LIVING / SLEEPING LIVING / SLEEPING

FCUFCU

W/FRAME(IF NEEDED)

METAL COVER

PENETRATION (TYP)

FIRE SEAL @ PIPE

PIPE CHASE WALL DETAIL @ FCU

CONC. COLUMN

@900

90 STL CHANNEL

GCWT ON

CEMENT MORTAR

METAL LATH

(TYP.)

@400 O.C.

FURRING

ON 22 METAL

CORNER REINFORCEMENT

90 MET. STUD

SCALE:

1 : 10

COLUMN DETAIL @ LAUNDRY COLUMN DETAIL @ EXERCISE

(TYP)

EXST EIFS

PAINT ON

15THK GWB

PAINT ON

@400 O.C (TYP)

50THK MTL STUD

15THK GWB ON

PAINT ON

425425

(TYP)

@ 1ST FLOOR ONLY

208 X 208 ACCESS DOOR

TC ON 15T

PIPING WORK

CHASE WALL FOR MECH.

GWB ON 90T MTL STUD

SHOWER AREA

BATH ROOM

R=5

12 THK SSM

SEALANT

WATER PROOFING

MEMBRANE

SHOWER AREA

SHOWER CURTAIN

SLOPE SLOPE

CERAMIC FLOOR

TILE

CEMENT MORTAR

BED

SHOWER CURTAIN

W/ROD

FABRIC REINF

WATER PROOFING

MEMBRANE

EXST CONC OR BRICK CURB

REPAIR BARRACKS S-827

A-16

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

(OUTSIDE TRIM DIM.)

(OUTSIDE TRIM DIM.)

(INSIDE BOX DIM.)

T

F

L

IN

S

ID

X

D

IM

O

U T S

METAL DOOR

PULL

METAL TRIM

METAL FIRE

EXTINGUISHER CABINET

METAL DOOR PULL

GLASS

(INSIDE BOX DIM.)

WOOD SHIM

(ALL AROUND)

200 CMU WALL

CONC.FILL

IN

S

X

CONC.FILL

PRECAST CONC.

TC ON SCP

ON 200 CMU WALL

FLOOR FINISH

VCB

LINE

PULL

METAL DOOR

WOOD SHIM

(ALL AROUND)

PRECAST CONC.

SIDE)

SCREW (3-PER

A

A

44 305 44

.F

L

TC ON

OAK RAIL

40 x 100

@600 O.C.

OAK PLUG

18 18

CMU WALL

METHODS OF WALL

FASTENING

BOLT &

3-1.5 THK SST SHELF

TOGGLE BOLT OF EXP

BRACKET W/ 2 -6

1.2 THK SST SHELF

TOWEL BAR

TOWEL BAR

FLANGE

NEED CNETER BRKT

/o

SST HOOK

SST MOP HOLDER

@300 O.C

FASTENER

LINE OF WALL

"A"

"A"

PLATE GLASS

MIRROR

METAL FRAMED

RUBBER BACKING

1.2 THK 12x12 SST FRAME

1.2 THK 12x25 GALV STL

PLATE GLASS MIRROR

W/ PIN KNOT SCREWS

BOLTS 2 - PER SIDE

2 - PER SIDE

RUBBER LINER

DETAILS-2

SCALE: AS SHOWN

FIRE EXTINGUISHER CABINET

1A

SCALE: 1/10

P L A N

1B

SCALE: 1/10

E L E V A T I O N 1C

SCALE: 1/10

S E C T I O N "A - A"

SCALE:

RECESSED SOAP HOLDER DETAILS

1/5

2A SECTION 2B PLAN-SECTION

SCALE: 1/5

WOODEN HANGER RAIL

SCALE: AS SHOWN

MIRROR DETAILS

4A

SCALE: 1/10

E L E V A T I O N 4B

SCALE: 1/10

S E C T I O N "A"-"A"

SCALE:

MOP RACK DETAIL

1/4

SCALE: 1/5

TOWEL BAR

"A"

"A"

AS SHOWN

SST BRACKET

SST SHELF

OR EXP. AHR. TO

MATCH BRACKET

SCALE:

SHELF METAL LIGHT DUTY DETAILS(SMLD)

7A

PLAN

SCALE : 1/5

7B

ELEVATION

SCALE: 1 : 2

SECTION "A-A"

7C

SOAP HOLDER

MORTAR BED

SCRATCH COAT

CERAMIC TILE

METAL LATH

PORCELAIN

SOAP HOLDER

MORTAR BED

EXPANDED METAL LATH

WATERPROOFING MEMBRANE

SCRATCH COAT

CERAMIC TILE

PORCELAIN

WATERPROOFING MEMBRANE

REPAIR BARRACKS S-827

CHIP OUT MASONRY

TO CLEAR BOLT COVER

610X61025

AUTOMATIC DOOR CLOSER

INTERIOR LATCH RELEASE

HOLE FOR MASONRY ANCHOR

SPACERSRETENTION UNIT

COMPRESSION ROD

STEEL

M

X

M

1200150

900150

BAR @ 100 O.C

5x5 THK CROSS

BAR @ 15 O.C

25x5 THK BEARNG

2.0 THK SST SHELF

SUPPORT FRAME @ 800 O.C

@ EACH SUPPORT FRAME

FACE OF WALL

A-17

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

DETAILS-3

EXISTING FRAME

EXST FRAME

SCALE:

TRENCH DETAIL @ MUD ROOM

1/10

SCALE: 1/10

SST SHELF DETAIL @ LAUNDRY

SCALE: 1/2

FIRE RATED ACCESS DOOR DETAIL

SCALE: 1/10

AL. GRATING DETAIL @ VEST

500 400

W/ ABRASIVE GRAIN

EPOXY ON CONC

EPOXY ON CONC

ON 150 MTL STUD @ 400 O.C.

ON 12T CEMENT BOARD

ON PLASTERING W/MTL LATH

ON WATERPROOFING MEMBRANE

GCWT ON CEMENTBOND COAT

REPAIR BARRACKS S-827

STRIP WITH 2.0 THK

STAINLESS STEEL

@ 500 O.C.

20x90 WOOD

BRASS HOOK

COVER

@ 400mm OC

@ 500 O.C

BRASS HOOK

STRIP WITH 2.0 THK

20x90 WOOD

STAINLESS

STEEL COVER

SCALE: 1/5

3A E L E V A T I O N 3B S E C T I O N

HOOK DETAILS @ MUD ROOM

SCALE: N/A

2B

W/ 6 DIA EXP BOLTS

BULLETIN BOARD

(SEE MATERIAL SCHEDULE

(HEAD & SILL)

3 THK METAL CLIP

@ 450 OC

O O

R

0 SECTION

BULLETIN BOARD

ELEVATION2AFL

CMU WALL

25x50 OAK FRAME

25x50 OAK FRAME

1,200

BULLETIN BOARD DETAIL

R .O

METAL FLASHING

EXT. INSUL. &

FNSH. SYSTEM

R .O

INSECT SCREEN

INSECT SCREEN

MINI-BLIND

18THK WD TRIM

18THK. WOOD TRIM

INSULATED GLASS UNIT

INSULATED GLASS

H E A D4A

4C S I L L

SEALANT

1/5SCALE :

A-18

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

ARCHITECTURAL

DETAILS-4

1A 1C

HANGING ROD

4 DIA HOLE (TYP)

CLOTHES

25 DIA SST PIPE

-25x25x2

2.5 THK SST

BRACKET

22x200 WOOD

1.6 THK SST SOCKET

CLOTHES HANGING ROD

25 DIA SST PIPE

5 50

0 50

PAINT GWB

@ 900 OC

BOLTS

9 DIA TOGGLE

PLASTIC LAMINATE (PL-1)

O O

R

HANGING ROD

SST BRACKET

CLOTHES

2.5 THK

25 DIA SST PIPE

-25x25x2 SST BRACKET

POSTFORM

9 DIA TOGGLE BOLTS

PAINT CMU

BOTH SIDES-SHELF & SIDE PANEL

ON 18 THK PLYWD

PLASTIC LAMINATE (PL-1)

ON 18 THK PLYWD

@ 300 O.C

SEE DETAIL

@ 900 OC

100350

@ 900 OC

1C

1B

SCALE:

1:5

TYP SHELF & ROD DETAILS @ WALK-IN CLOSET

BB-1 , A-18)

SEALANT

PAINT ON CMU

PAINT ON CMU

4B J A M B

R .O

. INSECT SCREEN

INSULATED GLASS

18THK. WD TRIMSEALANT

WINDOW DETAILS

AS PER MFR

AL. BLAST WINDOW FRAME

AL. BLAST WINDOW FRAME

AL. BLAST WINDOW FRAME

PAINT ON EXST EIFS

PAINT ON EXST EIFS

REPAIR BARRACKS S-827

O O

R

OAK CHAIR RAIL

20 THKx90

@ 600 O.C

1 / 2SCALE:

CHAIR RAIL DETAIL

1 / 10SCALE:

IRON BOARD DETAIL

1.

2.

IRON BOARD NOTE

CUSTOM CLOSET SYSTEM ACCESSORY THAT FOLDS AWAY WHEN NOT IN USE.

3.

5.

SWIVELS UP TO 90 DEGREES FROM MOUNTING POSITION.4.

6.

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

SCALE:

N/A

PICTURES OF IRON BOARD & CABINET

A-19

ARCHITECTURAL

DETAILS-5

CABINET. THE SIZE OF IRON BOARD & CABINET CAN BE ADJUSTABLE.

APPROX. SIZE IS 406W X 1574H X 138D SURFACE MOUNTED IRON BOARD &

PULLS OUT ON SOFT CLOSE, BALL BEARING SLIDES.

FOLD-DOWN LEGS WITH 900MM HEIGHT-ADJUST FOR LEVELING.

406Wx1574Hx138D

IRON BOARD & CABINET

APPROX SIZE

SURFACE MOUNTED

PAINT ON

12 THK GWB

GCWT

,4

,2

1,050

EACH CORNER

CONTRACTOR SHOULD SUBMIT SHOP DRAWING OF CABINET FOR APPROVAL.

CONTRACTOR SHOULD SUBMIT SHOP DRAWING OF IRON BOARD FOR APPROVAL.

7.

BOLT @

FT

REPAIR BARRACKS S-827

ABBREVIATION

INTERIOR FINISH SCHEDULE

FLOOR BASE WALLS CEILING

REMARKS

1.

FINISH SCHEDULE NOTES :

2.

3.

MANUFACTURERS STANDARD MUST APPROACH.

TO INDICATE THE COLOR WHICH THE

IS NOT REQUIRED. THE SELECTIONS SERVE ONLY

AN EXACT MATCH OF THE MANUFACTURERS COLOR

INTENDED TO LIMIT SELECTIONS OF PRODUCTS.

IDENTIFICATION PURPOSES ONLY AND ARE NOT

MANUFACTURERS' COLORS LISTED ARE FOR

4.

FINISH SYSTEM.

PUBLIC WORKS FOR COLOR OF EXTERIOR INSULATION

APPROVED BY THE COR OR THE DIRECTORATE OF

THE AREA I EXTERIOR COLOR SCHEME AS

APPLIED COLORS SHALL BE IN ACCORDANCE WITH

SELECTION OF EXTERIOR PAINT AND FACTORY

FINISH COLOR FINISH COLOR FINISH COLOR FINISH COLOR HEIGHT

PVCT

PVCT

PVCT

F.F.

PVCT

F.F.

F.F.

F.F.

F.F.

F.F.

F.F.

F.F.

F.F.

F.F.

F.F.

PAINT GWB 2600

SHALL BE WATERPROOF TYPE GWB.

WET AREAS GWB FOR TOILETS, AND OTHER

SURFACE

ROOFING

FLASHING

FASCIA

SOFFIT

DOOR & FRAME

HANDRAIL

MATERIAL

ROOF LINER

STEEL

STEEL PIPE

COLOR

CHOCOLATE

COLOR NO.

20095

CHOCOLATE

CHOCOLATE

CHOCOLATE

CHOCOLATE

CHOCOLATE

20095

20095

20095

20095

20095

REMARKS

WALL EIFS

WALL CMU

BEAM/COL CONC

STAIR CONC

SAND-STONE

SAND-STONE

SAND-STONE

SAND-STONE

23617

23617

23617

23617

PROTECTED METAL

PROTECTED METAL

PROTECTED METAL

EXTERIOR COLOR SCHEDULE-1

FS 595B

FS 595B

FS 595B

FS 595B

FS 595B

FS 595B

FS 595B

FS 595B

FS 595B

FS 595B

GWB

FIRE EXTINGUISHER CABINETFEC

GYPSUM WALL BOARD

QT QUARRY TILE

VINYL COVE BASE

SPRAY TEXTURE

VCB

ST

AWP

FACTORY FINISH

HARDENER

GWB

HDR

FF

CERAMIC MOSAIC TILE

EXTERIOR INSULATION & FINISH SYSTEM

CMT

EIFS

ACOUSTICAL TILEACST

CMU CONCRETE MASONRY UNIT

CPL CEMENT PLASTER

PVCT

PVCT F.F.

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

PVCT

F.F.

PVCT-1

PVCT-2

PVCT-2

PVCT-2

PVCT-2

RB

F.F.

F.F. PVCT-2PVCT

PT-1

MATERIAL & COLOR SCHEDULE

FLOOR MATERIAL/COLOR

BASE MATERIAL/COLOR

WALL MATERIAL/COLOR

GCWT-1

CEILING MATERIAL/COLOR

PVCT-1

OR APPROVED EQUAL

457.2MMx457.2MM, 3MM THK

KCC SENSE TILE, CERAMIC, TN2412C

PVC TILE

VCB-1

F.F.

F.F.

VCB F.F. VCB-1

VCB F.F. VCB-1

VCB F.F. VCB-1

VCB F.F. VCB-1PVCT-2

F.F.

VCB F.F. VCB-1

F.F.

F.F.

VCB F.F. VCB-1

VCB F.F. VCB-1

VCB F.F. VCB-1

VCB F.F. VCB-1

PAINT

PAINT

PAINT PT-1

PAINT PT-1

GCWT

PAINT PT-1

PAINT PT-1

PAINT PT-1

PAINT PT-1

PAINT-

PAINT- PT-1

PAINT PT-1

PAINT PT-1

GWB 2300PAINT PT-2

GWB 2400GWB

PAINT PT-2

2400GWB*

2400GWB*

2400GWB*

2616GWB

2400ACST F.F. ACST-1

2700ACSTACST

3500CONC

ACST 2400

CONC VAR- PAINT PT-2

VARCONC

2400GWBGWB

2400GWB*GWB

ACST-1

OR APPROVED EQUAL

WHITE

MC 3102 (3S)

"KCC MITONE"

603MM x 603MM x 15MM THK

ACOUSTICAL CEILING TILE

GWB* PAINT PT-2

GWB* PAINT PT-2

COLORS SHALL BE APPROVED BY USER AGENCY.

SELECTION OF INTERIOR PAINT AND FACTORY APPLIED

PVC TILE

EPOXY PAINT EP-1

- PAINT

GWB* : WATER RESISTANT TYPE

PVCT-2

OR APPROVED EQUAL

457.2MMx457.2MM, 3MM THK

KCC SENSE TILE, CERAMIC, TN2232C

PVC TILE

GWB

GWB

CONC/GWB

GWB/ACST

GWB

GWB

GWB

GWB

GWB

ACST

CONC

GWB/ACST

GWB/ACST

GWB/ACST

VAR/2400

2700/2300

3270/2870

2400/2600

2400/2600

2400/2600

PVCT

PVCT

CMT

RT

PVCT

A-20

ARCHITECTURAL

& FINISH SCHEDULE NOTES

INTERIOR, EXTERIOR FINISH SCHEDULE

EPOXY

EPOXY

F.F.

F.F.

PAINT

PAINT

PVCT-1

PVCT-1

RT-1

EP-1

PVCT-2

EP-1

MAT'L

EXST

MAT'L

NEW

MAT'L

EXST

MAT'L

NEW

MAT'L

EXST

MAT'L

NEW

MAT'L

NEW

MAT'L

EXST

VCB

VCB

VCB

VCB

VCB

F.F.

F.F.

F.F.

VCB-1

VCB-1

RB-1

VCB-1

VCB-1

GCWT

GCWT

GCWT

F.F.

F.F.

PAINT

F.F.

F.F.

PT-1

PT-1

GWB

GWB*

ACST

PAINT

PAINT/F.F.

PAINT

PAINT

PAINT

PAINT

F.F.

PAINT

F.F.

PAINT

PAINT

PAINT

PAINT/F.F.

PAINT/F.F.

PAINT/F.F.

TC-1

TC-1

TC-1

ACST-1

PT-2/

PT-2

PT-2

PT-2

PT-2

ACST-1

PT-2

ACST-2

PT-2

PT-2

PT-2

ACST-1

PT-2/

ACST-1

PT-2/

ACST-1

PT-2/

GWB* : WATER RESISTANT TYPE

GWB* : WATER RESISTANT TYPE

GWB* : WATER RESISTANT TYPE

GWB* : WATER RESISTANT TYPE

GWB* : WATER RESISTANT TYPE

GWB* : FIRE RESISTANT TYPE

RT-1

RB-1

CMT-1

TC-1

FOR TEXTURED COATING

WITH MANUFACTURE'S STANDARD PUTTY

ALL CMU & VOIDS SHALL BE FILLED FLUSH

PRIOR TO APPLICATION OF TEXTURED COATING

OR APPROVED EQUAL FOR INTERIOR.

BON TILE BY MFG BY KUNSUL ENTERPRISE

TEXTURED COATING

ROOM NAMESROOM NOS

LIVING / SLEEPING

DRESSING

BATH ROOM

LAUNDRY

STAIR-1

LOBBY

JANITOR CLOSET

TOILET

CLOSET

MUD ROOM

VESTIBULE

STORAGE

MECH ROOM

CORRIDOR

STAIR-2

STAIR-3

KITCHEN/ DINING

LOUNGE

GAME ROOM

CLOSET

ISSUE ROOM

122,226,326,426

124,227,327,427

131,133,228,229

328,329,428,429

134,230,330,430

135,231,331,431

136,232,332,432

101 THRU 120

201 THRU 224

401 THRU 424

301 THRU 324

137,138,233,234

333,334,433,434

VESTIBULE

139,235,335,435 COMM.

VCT

CMT

VCT

VCT

CMT

RT

VCT

VCT

VCT

VCT

VCT

CMT

CMT

CONC. W/

HARDENER

CONC. W/

HARDENER

CONC. W/

HARDENER

VCB

VCB

VCB

VCB

VCB

VCB

VCB

VCB

VCB

VCB

VCB

VCB

GCWT

GCWT

CMU

CMU

GCWT

CMU

GCWT

CMU

CMU

CMU

CMU

CMU

CMU

CMU

CMU

CMU/GWB

CMU/GWB

CMU/GWB

CONC. W/

HARDENER

RB

VCT

VCT

SSM-1

OR APPROVED EQUAL

MELATON, 1157EA

PLASTIC LAMINATED SHEET

OR APPROVED EQUAL

MELATON, 3357EA

PLASTIC LAMINATED SHEET

BB-1

APPROVED EQUAL

SIZE - 1200(W) x 900(H) OR

W/ 50 WIDE NATURAL OAK TRIM

TAN NUCORK TACKBOARD

THE MOON CO,

BULLETIN BOARD

MISC MATERIAL/COLOR

PL-1

PL-2

OR APPROVED EQUAL

CRYSTAL PACIFIC, #NP932

SAMSUNG STARON MFG,

SOLID SURFACE MATERIAL

MULTI PURPOSE ROOM

QT-1

#Q06,FAWN GRAY

152X152X12THK

AMERICAN OLEAN

W/ ABRASIVE GRAIN

QUARRY TILE

AMERICAN OLEAN

QTB-1

#Q06,FAWN GRAY

COVE ROUND TOP

127X152X12THK

QUARRY TILE BASE

PVCT PVCT-2 CMU/AWP PAINT

PT-1

TC-1

PT-1

/GWB

CMU/AWP

/GWB

CMU/AWP

/GWB

CMU/AWP

CMU/GWB

QT QT QT-1 QB QB QB-1

QT QT QT-1 QB QB QB-1

CMU

EP-1

ABRASIVE GRAIN FINISH

OR APPROVED EQUAL

CLEANPOXY 3100

NOROO PAINT & CO

EPOXY PAINT

* GROUT COLOR FOR GCWT

OR APPROVED EQUAL

: MOLD & MILDEW RESISTANT, STAIN PROOF

ANTIQUE WHITE

PT-2

ACOUSTICAL WALL PANEL

GWB/ACST

GWB/ACST

GWB/ACST

-/GWB* GWB* : FIRE RESISTANT TYPE

-/GWB** GWB** : WATER RESISTANT TYPE & 1st FL ONLY

EPOXY

CONC W/

EPOXY

CONC W/

EPOXY PAINT EP-1

EPOXY PAINT EP-1

-/GWB

TC-1

TC

TC

RUBBER TILE

OR APPROVED EQUAL

RUBBER BASE

FT-1

OR APPROVED EQUAL

NON-SLIP, 300 x 300 x 8 THK

FG 7L67-1, MARON

DONGSEO, INUS

NON-SLIP CERAMIC FLOOR TILE

OR APPROVED EQUAL

300 x 600 x 10 THK

LQR 1N92-1, GLOSS

DONGSEO, INUS

GLAZED CERAMIC WALL TILE

I-BADAK FLOORING SYSTEM

CMR42 FOR FLOOR, 3THK

SCOR42 FOR TREAD/RISER, 3THK

RM 4200 FOR STRINGER, 2THK

OR APPROVED EQUAL

RM 4200, 2THK

OR APPROVED EQUAL

EX8816-PALEBEIGE

KCC SUPRO HOME AND WELLBEING

LATEX, INTERIOR

ANTI-MOLD AND MILDEW

PAINT

OR APPROVED EQUAL

EX8816-N/WHITE

KCC SUPRO HOME AND WELLBEING

LATEX, INTERIOR

ANTI-MOLD AND MILDEW

PAINT

FT FT-1

GCWT-1

GCWT-1

-/GWB

TC-1

PT-1

-/- PT-1

GWB/ACST

FT FT-1

FT FT-1 GCWT-1

GCWT-1

VCT -/GWB

PT-1

-/GWB PAINT/TC

-/GWB PAINT/TC

-/GWB PAINT/TC

TC-1

PT-1/

TC-1

PT-1/

TC-1

PT-1/

I-BADAK FLOORING SYSTEM

OR APPROVED EQUAL

DARK…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .