Drawing files _ 243526 _ Title.pdf

PDF 474 KB Posted

Attached to
Repair of Barracks, Project# 243526
Solicitation number
W91QVN21R0073
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF DRAWINGS

RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.

T - 1

RING NO.

CIVIL

C - 1

M - 2

M - 3

ELECTRICAL

A - 1

A - 2

A - 3

ARCHITECTURAL

DESCRIPTION OF DRAWINGS DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS

T-1

A - 4

A - 5

A - 6

A - 7

A - 8

A - 9

M - 4

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

A - 10

A - 11

A - 12

E - 1

E - 2

E - 3

REPAIR BUILDING NO. S-827

2ND - 4TH FLOOR PLANS AND SCOPE OF WORKS

GENERAL SECTIONS

INTERIOR ELEVATIONS-1

INTERIOR ELEVATIONS-2

CLOSET DETAILS

DETAILS-1

DETAILS-2

INTERIOR, EXTERIOR FINISH SCHEDULE & FINISH SCHEDULE NOTES

DOOR / WINDOW SCHEDULE, ELEVATIONS

HARDWARE SCHEDULE AND NOTES

SIGNAGES SCHEDULE

A - 13

A - 14

A - 15

A - 16

M - 13

M - 14

M - 15

M - 16

M - 17

M - 18

M - 19

M - 20

M - 21

M - 22

M - 23

M - 24

M - 25

M - 26

M - 27

M - 28

M - 29

M - 30

LEGEND, GENERAL NOTES AND SCOPE OF WORK

1ST FLOOR LIGHTING PLAN AND 2ND-4TH FLOOR LIGHTING PLAN

KITCHEN CABINET DETAILS & KITCHEN CABINET NOTE

VANITY CABINET DETAILS, CHAIR RAIL DETAIL & LAUNDRY COUNTER SECTION

1ST FLOOR PLAN AND GENERAL NOTES

ELEVATIONS AND PICTURES

A - 17

A - 18

A - 19

4TH FL. FIRE PROTECTION PIPING PLAN,

DETAILS-1

PLUMBING PIPING PLAN (1ST FLOOR) AND NOTE

PLUMBING PIPING PLAN (2ND FLOOR) AND NOTE

PLUMBING PIPING PLAN (3RD FLOOR) AND NOTE

PLUMBING PIPING PLAN (4TH FLOOR) AND NOTE

BATH. RM. PLUMBING PIPING PARTIAL PLAN AND NOTE

LAUNDRY & MUD RM PLUMBING PIPING PARTIAL PLAN AND NOTE

1ST FL. FIRE PROTECTION PIPING PLAN, AND GENERAL NOTES

2ND & 3RD FL. FIRE PROTECTION PIPING PLAN

M - 31

M - 32

M - 33

M - 34

DETAILS-2

DETAILS-3

FEWR NO. 243526, CAMP CASEY

ELEVATIONS AND PICTURES

DETAILS-4

EQUIPMENT SCHEDULE - 1

EQUIPMENT SCHEDULE - 2

UNIT SYSTEM CONTROL DIAGRAM

HOT/CHILLED WATER FLOW SYSTEM DIAGRAMN AND AIR HANDLING

LIGHTING FIXTURE DETAILS

HEAT/VENT SYSTEM CONTROL DIAGRAM

DOMESTIC HOT WATER SYSTEM CONTROL DIAGRAM

QUALIFICATION OF AIR LEAKAGE TESTING

MECH ROOM AIR LEAKAGE TEST FLOW CHART, AIR BARRIERS AND

GENERAL NOTES, SPRINKLER Q'TY LIST AND NOTE

FIRE PROTECTION LEGEND & ABBREVIATION, AUTOMATIC FIRE SUPPRESSION

REQUIREMENTS

MECH ROOM FIRE PROTECTION PIPING PARTIAL PLAN AND FIRE PROTECTION

M - 35

DETAILS-5

DETAILS-6

C - 2

C - 3

C - 4

T - 2

TITLE SHEET-1

TITLE SHEET-2

TITLE SHEET - 1

M - 5

M - 6

M - 7

M - 8

M - 9

M - 10

M - 11

M - 12

HVAC PIPING PLAN (1ST FLOOR) AND NOTES

HVAC PIPING PLAN (2ND - 3RD FLOOR) AND NOTES

HVAC PIPING PLAN (4TH FLOOR) AND NOTES

HVAC PIPING SCHEMATIC DIAGRAM AND NOTES

MECH. ROOM PARTIAL PLAN AND NOTES

HVAC DUCT PLAN (1ST FLOOR) AND NOTES

HVAC DUCT PLAN (2ND-3RD FLOOR) AND NOTES

HVAC DUCT PLAN (4TH FLOOR) AND NOTES

INTERIOR WALL SECTIONS-1

INTERIOR WALL SECTIONS-2

ENLARGED FLOOR PLANS AND FIRE RATED ACCESS DOOR NOTES

DETAILS-3

DETAILS-4

A - 20

A - 21

SITE LAYOUT PLAN AND SCOPE OF WORK

MISC. DETAILS - 1

MICS. DETAILS - 2

INTERIOR WALL SECTIONS-3

DETAILS-5

LOCATION PLAN AND GENERAL NOTES

C - 5

BARBEQUE KITCHENETTE SHED PLAN, SECTION AND DETAILS

A - 22

A - 23

M - 1

MECHANICAL

MECHANICAL MATERIAL INDICATIONS & SYMBOLS AND ABBREVIATIONS

REPAIR BARRACKS S-827

CAMP CASEYKWON, CH

243526

FIRE PROTECTION AND MECHANICAL GENERAL NOTES, NOTES AND SCOPE OF WORK

PLAN(1ST FL.) LINT FILTER DETAIL AND NOTES

MECH. ROOM DUCT PARTIAL PLAN, LAUNDRY ROOM DUCT PARTIAL

LAUNDRY & MUD RM PLUMBING PIPING ISOMETRIC DIAGRAM AND NOTES

E - 4

E - 5

E - 6

E - 7

E - 8

E - 9

E - 10

E - 11

E - 12

E - 13

E - 14

E - 15

POWER ONE LINE DIAGRAM

CCTV SYSTEM DIAGRAM

1ST FLOOR F/A & MNS PLAN AND 2ND-4TH FLOOR F/A & MNS PLAN

NEW FIRE ALARM/MASS NOTIFICATION SYSTEM DIAGRAM

1ST FLOOR CCTV PLAN AND 2ND-4TH FLOOR CCTV PLAN

TYPICAL MODULE ELEC. PLAN-A & B MECH. RM PARTIAL POWER PLAN

1ST FLOOR POWER PLAN AND 2ND-4TH FLOOR POWER PLAN

EXISTING PANELBOARD "A", "B", "C", "D", "E" & "F" CONN. DIAGRAM

EXISTING PANELBOARD "G", "H", "I", "J" & "M" CONN. DIAGRAM

1ST FLOOR TEL/TV PLAN AND 2ND-4TH FLOOR TEL/TV PLAN

LIGHTING FIXTURE SCHEDULE & PHOTOCELL CONTROL DIAGRAM

CATV SYSTEM RISER DIAGRAM

SCHEDULE OF DRAWINGS

RING NO. REF. NO.REVISION STATUSDWG. NO. SHT. NO.REF. NO.RING NO. DESCRIPTION OF DRAWINGS DWG. NO. SHT. NO. DESCRIPTION OF DRAWINGS REVISION STATUS

T-2

A

B C D

E F G H

SYMBOL BY

DESIGNED BY

ENERGY MANAGER

SUBMITTED BY

USING AGENCY

APPROVED BY

PROJECT NO. DRAWING NO. REF NO.

SCALE :

ZONE DATE APVD.

UTILITIES

SHEET OF

REVIEWED BY

DESCRIPTION

BLDGS & GROUNDS

CHIEF, ENGR'G DIV

DES

CHK'D

REVISIONS

IMCOM

FIRE & EMERGENCY SVC

SAFETY

ENVIRONMENT

UNIT #15707, APO AP 96258-5707

ENGINEERING DIVISON, DPW, USAG-RED CLOUD

HEADQUARTERS, UNITED STATES ARMY GARRISON, RED CLOUD

US ARMY INSTALLATION MANAGEMENT COMMAND

DEPARTMENT OF THE ARMY

REPAIR BUILDING NO. S-827

FEWR NO. 243526, CAMP CASEY

TITLE SHEET - 2

REPAIR BARRACKS S-827

CAMP CASEYKWON, CH

243526