About this file

This is a Request for Quotation (RFQ) for membrane roof replacement and masonry repairs at the Fox Point Hurricane Barrier Pump Station in Providence, Rhode Island. The U.S. Army Corps of Engineers New England District is seeking a contractor to replace an existing 90 mil Ethylene Propylene Diene Monomer (EPDM) roof system, which involves demolishing the current roof down to the concrete slab and removing and replacing through wall metal flashing in the adjacent brick wall. The project requires installing a new fully adhered EPDM roof system designed for high wind coastal conditions with a 30-year warranty.

The solicitation (W912WJ25QA010) is set aside for small businesses with a NAICS code of 238160 and a small business size standard of $19 million. The contract magnitude is between $100,000 and $250,000, with a performance period of 130 calendar days from the Notice to Proceed. Contractors must have an active SAM.gov registration, attend a mandatory site visit on April 17, 2025, and submit quotes by April 23, 2025. The contract will require payment and performance bonds, and contractors must comply with specific technical requirements for materials, installation, and warranty provisions.

View the file

Other files

File Type Posted
Amendment W912WJ25QA010-0003.pdf PDF
Attachments 25QA010_Revised.pdf PDF
Amendment W912WJ25QA010-0002.pdf PDF
Amendment W912WJ25QA010-0001.pdf PDF
Attachments 25QA010.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE

15. DATE OF QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

b. TELEPHONE

AREA CODE

NUMBER

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

8. TO:

b. COMPANYa. NAME

c. STREET ADDRESS

d. CITY e. STATE f. ZIP CODE

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

c. CITY

d. STATE e. ZIP CODE

7. DELIVERY

FOB DESTINATION

OTHER

(See Schedule)

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)

IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER

a. NAME OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG. 1

RATING

5a. ISSUED BY 6. DELIVER BY (Date)

5b. FOR INFORMATION CALL (NO COLLECT CALLS)

NAME TELEPHONE NUMBER

AREA CODE NUMBER

Section A - Solicitation/Contract Form

Membrane Roof Replacement and Masonry Repairs, Pump Station at Fox Point Hurricane Barrier, Providence, RI

W912WJ25QA010

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

INSTRUCTIONS TO VENDORS

VENDORS SUBMITTING A QUOTE IN RESPONSE TO A SOLICITATION ARE RESPONSIBLE FOR ADHERING TO ALL INSTRUCTIONS AND TERMS AND CONDITIONS INCLUDED IN THE SOLICITATION. FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED

NON-RESPONSIVE.

INFORMATION:

1. This is a Request for Quotations (RFQ) in accordance with Federal Acquisition Regulation (FAR) Part 13.

2. Potential vendors are notified that the basis on which award will be made is price alone.

3. All responsible sources may submit a quote which, if timely received, must be considered by the Agency.

4. The Government may request that a vendor respond to a Quote Verification after the solicitation closes, but prior to award. The vendor shall respond in sufficient detail to all questions or statements no later than the response date and time listed in the correspondence. Failure to do so may result in quotes being deemed non-responsive and removed from consideration. The Government is under no obligation to provide extensions for responses.

QUESTIONS REGARDING SOLICITATIONS:

1. Questions regarding the solicitation shall be directed to the Contract Specialist:

a. Name: Alicia LaCrosse

b. Phone: 978-318-8902

c. Email: Alicia.N.LaCrosse@usace.army.mil

2. Technical Points of Contact shall not provide responses to interested vendors.

3. Please direct questions to the Contract Specialist. Any information received at the site visit which conflicts with this solicitation should be brought to the attention of the Contract Specialist. The solicitation and resulting contract shall be the governing document in all cases.

QUOTE SUBMISSION:

1. Quotes shall be submitted via email to the Contract Specialist listed above no later than the closing date and time identified in the solicitation or subsequent amendments.

2. The Government is under no obligation to consider any quote received after the solicitation closing date or time.

BID SCHEDULES:

1. If a Bid Schedule is included in the solicitation, vendors shall complete the bid schedule in its entirety (all tasks, all years).

2. Vendors shall enter $0.00 on Bid Schedules in which items are Not Separately Priced. Blank entries will not be considered and will result in quotes being deemed non-responsive.

3. Failure to complete the Bid Schedule in its entirety and return same with a quote will result in quotes being deemed non-responsive.

SITE VISITS:

1. SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE. SEE CLAUSE 52.236-27 or 2.236-27 ALT I FOR

ADDITIONAL INFORMATION.

2. If date(s)/time(s) for site visits are included in the solicitation, then interested vendors will be permitted to visit the site during those dates/times. No other dates/times will be permitted for site visits.

3. If no dates/times for site visits are included in the solicitation, then interested vendors shall contact the Technical Point of Contact as identified in the solicitation to schedule a site visit.

4. No site visits will be permitted AFTER a solicitation closes.

BONDING:

1. In accordance with FAR 28.101-1(c), the Contractor will NOT be required to provide a Bid Guarantee.

2. In accordance with FAR 28.102-2(b), the Contractor will be required to provide the following payment protections for all construction contracts at or above $150,000.00.

(i) Payment Bond or

(ii) Irrevocable Letter of Credit and

(iii) Performance Bond

A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.

A Performance Bond shall be required if the total price of the quote is $150,000.00 or above. The penal amount of the Performance Bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall also be submitted to the Contracting Officer within 10 days after receipt of award.

3. In accordance with FAR Part 28.102-2(c), the Contractor will be required to provide one of the following payment protections for all construction contracts $35,000.00 or above, but not exceeding $150,000.00.

(i) Payment bond or

(ii) Irrevocable letter of credit

A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.

**No Payment Protections Required for construction contracts less than $35,000**

4. Prior to award, the Government may request that the Contractor provide a Letter of Bond Ability issued by a Surety that is listed on US Treasury Circular 570 (https://www.fiscal.treasury.gov/surety-bonds/list-certified-companies.html).

Letter of Bond Ability shall be issued to the Contractor and shall state that the Contractor is pre-qualified for bonding, include the single and aggregate bond limits that the bond company will support, and provide contact information of the bond agent or attorney-in-fact.

Failure to provide a Letter of Bond Ability as required will result in the Contractor's quote being deemed non-responsive.

QUOTATION INSTRUCTIONS:

1. If subcontractor will be used for this work, please provide company name and contact information:

2. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.

gov) to submit a quote. Registered is considered when a SAM registration is marked "Active".

3. In accordance with FAR Clause 52.204-8(d), Representations and Certifications are to be completed in www.sam.gov.

NOTE: SAM.gov registration takes approximately 3 weeks (Unique Entity Identified (UEI) 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor's responsibility to track SAM.gov registration and follow-up with required tasks.

4. Provide business Unique Entity Identifier (UEI): _______________________________

5. Provide business CAGE code: __________________________________

6. Contractors are not required to submit an Accident Prevention Plan (APP) with their quote. The successful Contractor will be required to submit this document at the direction of the Technical Point of Contact. The APP must be accepted by the Government Designated Authority prior to the commencement of work.

Item Supplies/Service Quantity Unit Unit Price Amount

Contractor shall provide all labor, materials, equipment, and transportation to replace the existing Ethylene Propylene Diene Monomer (EPDM) roof system and provide masonry demolition to replace the through wall flashing in the adjacent brick wall on a pump station building at the Fox Point Hurricane Barrier, Providence, RI in accordance with the Statement of Work.

Pricing Arrangement: Firm Fixed Price

1 Job

Section C - Description/Specifications/Statement of Work

MEMBRANE ROOF REPLACEMENT & MASONRY REPAIRS

CONTROL ROOM ROOF AT FOX POINT PUMP STATION

PROVIDENCE, RHODE ISLAND

STATEMENT OF WORK

I. General

1. Scope - Contractor shall replace an existing Ethylene Propylene Diene Monomer (EPDM) roof system on a pumpstation building located in Providence, RI. Includes all labor, equipment, tools, services, and materials to install a fully adhered 90 millimeter (mil) nominal thickness EPDM roofing system. Work includes demolition and removal of the entire existing EPDM roof system down to the underlying 5" thick concrete roof slab.

Work includes masonry demolition of at least 5 rows of brick in the wall adjacent to the roof to remove an existing through wall metal flashing and install a new through wall metal flashing 7 inches higher than the original. The new EPDM roof system shall be designed for high wind coastal conditions and be warrantied for 30 years. All work shall be completed in accordance with the following Statement of Work.

2. Location - The pump station building is located at 40 Point Street, Providence, RI 02905. All access is through a power plant security checkpoint.

The roof location is on the south side of a pump station building with very limited access for vehicles next to the roof. The Contractor is responsible for all means and methods for access to and from the roof location. Only designated staging and parking areas shown on the figures shall be used by the Contractor.

3. Existing Conditions - The existing EPDM roof system on the control room was installed in 2018. The existing roof system is a fully adhered 90 mil membrane over 1/2 inch cover board mechanically fastened through several layers of insulation into the existing concrete roof slab. An expansion joint spanning north to south down the center of the roof. The existing perimeter flashing is aluminum. An existing stainless steel heater chimney penetrating the roof shall be protected and reinstalled with new flashing integrated into the new roof. The brick wall adjacent to the roof has an original through wall copper flashing that is too low for proper drainage from the wall cavity to the existing roof surface.

4. Site Visit - Scheduled site visits will be provided for all interested vendors, with a date and time to be listed in the solicitation. Interested vendors are highly encouraged to attend the site visit to confirm understanding of the scope, inspect field conditions, and assess access to the roof, and prior to providing a quote. No extra payment will be allowed for perceived additional work caused by unfamiliarity with site conditions and requirements.

After Notice to Proceed (NTP), contact the Technical Point of Contact (TPOC) with questions and coordination, Andrew Cattano 978-318-8329 or Andrew.M.Cattano@usace.army.mil.

5. Schedule - The Contractor shall commence work within 21 days after NTP, prosecute work diligently, and complete all work no later than 130 days after Notice to Proceed. The project area will be open to the Contractor Monday through Friday, 7:00 AM to 5:00 PM. All work must be done during these hours unless additional hours are approved by the TPOC. No work shall be done on weekends or Government holidays.

All Pre-Construction submittals shall be submitted, reviewed, and accepted within 21 days of Notice to Proceed. The Government reserves up to 21 days for review and acceptance on each submittal/ resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall be resubmitted to the Government in an acceptable form within 14 days of the Government's response, unless additional time is granted by the Government in writing. No field work may proceed prior to the acceptance of Pre-Construction submittals.

6. SAFETY REQUIREMENTS

a. General:

All work shall be conducted in accordance with the U.S. Army Corps of Engineers (USACE) Safety and Occupational Health Requirements (EM 385- 1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at the following link:

https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE%2015March2024.pdf

Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.

b. Accident Prevention Plan (APP):

The Contractor shall prepare a site-specific Accident Prevention Plan. The APP must be written by a Competent Person (CP) and document the specific work processes, equipment, materials to be used, hazards and applicable control measures.

The mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) must be submitted and accepted prior to beginning on site work:

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6293_Aug%202024%20-%20FINAL.pdf

A preparatory meeting shall be conducted by the Prime Contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

Daily safety meetings shall be held and documented. Records shall be available to the TPOC upon request.

c. Activity Hazard Analysis (AHA):

An AHA shall be submitted and accepted for each definable feature of work (DFOW) in accordance with EM 385-1-1, Chapter 2-6. A DFOW is defined as any task, which is separate and distinct from other tasks, has separate control requirements, or is identified as different trades or disciplines.

The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.

For a non-mandatory formatted outline of an AHA, see ENG Form 6206 (Activity Hazard Analysis) https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_Sep%202024%20-%20FINAL.pdf

d. Site Safety and Health Officer (SSHO) Requirements:

The Contractor shall employ a minimum of one person to function as a Level 3, SSHO. A Level 3 SSHO is a designated Qualified Person (QP) or Competent Person (CP) with Safety and Occupational Health (SOH) responsibility that meets the requirements of EM 385-1-1, Chapter 2-3.b and 2-4.

b.

Level 3 SSHOs must have training, knowledge, and/or experience identifying hazards and implementing controls for the work being performed.

The SSHO shall be present at the project site and be responsible for overseeing the implementation of the Prime Contractor's SOH program.

Contractor shall designate all SSHOs on a mandatory ENG Form 6282 (Site Safety and Health Officer Designation Letter):

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6282_Site%20Safety%20&%20Health%20Officer%20(SSHO)%20Designation% 20Letter_2024%20Aug%20-%20FINAL.pdf

e. First-Aid and CPR Personnel Requirements:

For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency.

Minimum First Aid and CPR qualifications are outlined in EM 385-1-1, Chapter 3-3.

f. Additional Personnel Requirements:

Other Competent Person (CP) or Qualified Persons (QP) may be required per EM 385-1-1 and/or other sections of this Scope of Work, based on the definable features of work for this project.

g. Accident Reporting:

All accidents and near misses shall be investigated by the Contractor and reported to the Technical Point of Contact in accordance with EM 385-1-1, Table 2-1.

The mandatory ENG Form 3394 shall be completed and submitted to the TPOC within seven (7) days of an incident: https://www.publications.usace.

army.mil/Portals/76/Publications/EngineerForms/Eng_Form_3394_2021Aug.pdf

7. Fall Protection

a. General: The requirements of this section are applicable to Contractors when their employees are working at heights above 6 feet, exposed to fall hazards, and/or using fall protection equipment. Every Contractor is responsible for establishing, implementing, and managing a fall protection program in accordance with EM 385-1-1, Chapter 21.

b. Submittals: A site-specific Fall Protection and Prevention Plan is required to be submitted and approved by the Technical Point of Contact (TPOC) prior to any work being completed at heights. USACE will provide a non-mandatory, fillable template plan. However, the Contractor is permitted to submit their own plan, at a minimum it must address the items listed in EM 385-1-1, Chapter 21-7:

i. General

1) Detailed description of the activity being performed;

2) Description of anticipated hazards and fall hazard prevention and control;

3) Assignment of personnel and their duties and responsibilities;

4) Inspection and oversight methods to insure adherence to the plan;

5) Describe maintenance and storage of fall protection equipment;

ii. Rescue Plan

1) Methods for rescue;

2) Identify, select, and document anchorages for rescue;

3) Rescue equipment;

4) Identify safety spotters;

c. Competent Person (CP): The person designated in writing by the employer to be responsible for immediate supervising, implementing, and monitoring of the fall protection program, who through training, knowledge and experience in fall protection and rescue systems and equipment, is capable of identifying, evaluating, and addressing existing and potential fall hazards and, who has the authority to take prompt corrective measures with regard to such hazards. The CP shall:

i. Be onsite at all times while work at height is being performed;

ii. Be trained in accordance with EM 385-1-1, Section 21-3. c, to include a minimum of 24-hour CP in fall protection training made up of classroom and practical hands-on components.

iii. Prepare, update, review and approve fall protection and prevention plans;

iv. Review procedures as workplace activities change to determine if additional practices, procedures or training need to be implemented;

v. Supervise the selection, installation, use and inspection of non-certified anchorages;

vi. Verify End Users who work at heights are trained and authorized to do so;

vii. Inspect fall protection equipment at the frequency required by the manufacturer and EM 385-1-1.

d. Qualified Person (QP): A person with a recognized degree, or professional certificate, with extensive knowledge, training and experience in the fall protection and rescue field who is capable of designing, analyzing, evaluating and specifying fall protection and rescue systems. The QP shall:

i. Be trained to the applicable level, as described in EM 385-1-1, Chapter 21-3. b;

ii. Provide technical support for the fall protection program;

iii. Have advanced understanding and knowledge of the requirements, equipment, systems, physical sciences, and engineering principles that affect fall protection and rescue systems;

iv. Supervise the design, selection, installation and inspection of certified anchorages and horizontal lifelines;

v. Be qualified to select proper fall protection and rescue equipment;

e. End User: A person who has been trained and authorized by the employer on the use of assigned fall protection equipment in a typical fall hazard situation. They must have an understanding of workplace activities and follow the policy, procedures, and instructions of the Competent Person regarding the use of fall protection, rescue systems, and related equipment. They shall:

a. Be trained by a CP in accordance with EM 385-1-1, Chapter 21-3. d, to include hands-on training and practical demonstrations;

b. Bring all unsafe or hazardous conditions or actions that may cause injury to them or others, to the attention of the CP;

c. Properly use, inspect, maintain, store and care for their fall protection equipment and systems;

d. Inspect all fall protection equipment or damage or defects, prior to each use.

e. Understand the nature of fall hazards in the work area and how to properly mitigate them;

f. Calculate free fall distances and clearance requirements of fall protection systems;

g. Understand the site-specific rescue procedures;

f. Personal Fall Arrest System Requirements (PFAS): All PFAS shall meet the requirements contained in ANSI Z359, Fall Protection Code, to include fall restrain and positioning systems. A PFAS consist of a full body harness, connecting means, and an anchorage system. General this equipment is certified for users within the capacity range of 130 to 310 lbs., including the weight of the worker, equipment, and tools. A CP shall inspect the equipment at least once semi-annually and whenever the equipment is subject to a fall or impact.

a. Full body harnesses shall meet the requirements of ANSI Z359 and be used in accordance with EM 385-1-1, Section 21-8. c. Body belts and full body harnesses meeting only the requirements of the ANSI A10.14 shall not be used. Equipment manufactured to ANSI/ASSP Z359.1 prior to 2007 is not permitted on USACE project sites. All full body harnesses shall be equipped with Suspension Trauma Preventers such as stirrups, relief steps, or similar in order to provide short-term relief from the effects of orthostatic intolerance.

b. All energy absorbing lanyards shall meet the requirements of ANSI Z359.13 and be used in accordance with EM 385-1-1, Chapter 21-8. c. (4).

Self-Retracting Devices (SRDs) shall meet the requirements of the ANSI/ASSE Z359.14 standard and be used in accordance with EM 385-1-1, Chapter 21-8. c. (5)

All scaffolding, aerial work platforms, scissor lifts, or similar must be used in accordance with EM 385-1-1, Chapter 22.

8. Preconstruction Conference - Prior to the start of any work, the TPOC will schedule and conduct a "Pre-Construction Conference". The Contractor's Project Manager and Quality Control Personnel will be physically present to attend this meeting. The Contractor shall directly oversee all work on the project and the Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor. This conference will be held at the time and location agreeable to the Government and Contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the TPOC to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government's administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Construction conference the Contractor shall provide the name of the project superintendent with a telephone number for project coordination. The purpose of the conference is to discuss the contract requirements in terms of safety, quality, submittals, communications, access to the site, inspections, and payments.

9. Permits - There are no permits required to complete this work. The Contractor shall comply with any applicable Federal, State, county, and municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

10. Security - All Contractor access to the pumpstation worksite will be through the Manchester Street Power Station's security checkpoint located at 40 Point Street, Providence RI. The Contractor's staff shall sign in each day at the security checkpoint and strictly obey driving restrictions within the property. The Contractor shall meet all deliveries of materials and equipment at the security checkpoint. All activities shall be limited to staging and parking areas identified on figures.

11. Payment - After final inspection and acceptance by the Government, the Contractor must submit an invoice to the TPOC. The invoice shall include the invoice date, contract number, dates of work, description of work, quantities, process, and total amount due per line item. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry. For jobs greater than 30 days the Contractor may request progress payment. All invoices shall be coordinated with Andrew.M.Cattano@usace.army.mil Mailing address:

US Army Corps of Engineers Cape Cod Canal Field Office PO Box 1555 Buzzards Bay, MA 02532 Attn: Andrew Cattano

12. Warranty - Contractor shall provide roof system material and workmanship warranties meeting the following requirements. Provide a manufacturer's warranty for the materials that covers full system watertightness for a minimum duration of 30 years. Material warranty shall include membrane, flashing, insulation, and accessories. The roof system installer must warrant for a period of one year that the roof system, as installed, is free from defects in installation workmanship. This warranty shall be in writing with USACE listed as the owner. The roof system installer is responsible for correction of defective workmanship and replacement of damaged or affected materials. The roof system installer is responsible for all costs associated with the repair or replacement work.

II. Technical Requirements:

Part 1 General:

1. Requests for Information:

After Notice to proceed, questions and requests for information should be directed to the TPOC Andrew Cattano at 978-318-8329 or Andrew.M.

Cattano@usace.army.mil.

2. Submittals - Although the Government reviews submissions required by this Statement of Work, it is emphasized that the Contractor's work must be completed using proper internal controls and review procedures. The Government reserves up to seven (21) days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government in acceptable form within seven (14) days of the Government's response, unless additional time is granted by the Government in writing.

The documents identified below must be prepared in accordance with the applicable standards, submitted to the TPOC for review and accepted by the Government.

a. Pre-construction: Submitted within twenty-one (21) days of NTP. Submittals must be accepted prior to the commencement of any field work .

Accident Prevention Plan (ENG Form 6293) Activity Hazard Analysis Site Safety and Health Officer Designation Letter (ENG Form 6282) Fall Protection and Prevention Plan Proposed Schedule for completing the work.

Work Plan - Plan that describes the proposed means and methods of access to the roof, debris removal, hoisting of materials, masonry demolition, installation of new through wall flashing and replacement of brick courses.

CPR and First aid Certification Manufacture Data for new EPDM roof system - EPDM membrane, cover board, insulation material, mechanical fasteners and plates, pressure treated nailers, caulking, adhesives, flashing, facia, metal drip edge flashing, and expansion joint sealant.

Manufacture Data for through wall flashing - 16 oz copper roll Masonry bricks and mortar - to match existing Warranty Information

b. Other Submittals As-built Drawing - accurate as-built of the new roof system and new wall flashing

3. Clean Up and Waste Disposal - The Contractor shall practice good housekeeping to maintain a safe job site. The Contractor shall keep the work area, including any storage areas, free from the accumulation of waste materials. Upon completing work, the Contractor shall remove all tools, equipment, and materials that are not the property of the Government and shall clean up the job site to the satisfaction of the Government. Debris, rubbish, and all waste materials resulting from the work under this contract shall be disposed of by the Contractor at his expense off Government property. Segregate and maximize recycling of all waste generated.

4. Environmental Protection - Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the Contractor at the site. Contractors means and methods shall prevent any release of debris or any contaminants onto land or the adjacent waterway. Contractor staff shall utilize strict collection of demolition debris and removal from the site. All containers and staging areas shall be inspected / cleaned on a daily basis. Water, air and land resources shall not be adversely impacted during the course of the work. Contractor will take necessary steps to ensure all federal, state, and local environmental regulatory requirements are met. Contractor shall immediately notify the TPOC of any spill or any release of contaminants to land or the waterway.

5. Sustainability - EPA Designated: Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials, and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for a complete list of designated products and the associated recommended contents levels. Offerors must be able to demonstrate that each offered products meets minimum content levels upon request.

6. Government Resources - The Government will not provide any resources on this project. The Contractor may have a portable toilet delivered and placed in the staging area. The Government will temporarily turn off the electrical transformers located adjacent to the roof while work is occurring on the roof. The Government will turn off the heater in the control room to prevent any exhaust in the heater chimney while work is occurring on the roof.

7. Damage to Government and Private Property - The Contractor shall be responsible for restoring any and all Government facilities or equipment damaged as a result of contract work. The Contractor shall also be responsible for any damage to private property or injury to any person as a result of contract work.

8. Omissions - Although work is not specifically shown or specified, the contract shall include miscellaneous items, appurtenances, and materials obviously necessary for a sound, secure and complete roof installation. In case of omission, the normal industry, State, or Federal standards, practices, specifications, and/or guides shall prevail.

9. Quality Assurance - The Contractor is responsible for quality control of the work. The Government has the right to inspect and test all items called for by the contract, to the extent practicable at all times during the term of the contract.

10. Potential Flood Control Operations - In the event that weather conditions may require the pumpstation to operate for flood control operations, the Contractor shall cease all work onsite. Government will provide 24 hours advance notice for such events. The Contractor shall fully cooperate with other Contractors and Government employees to not impede any operations work.

11. Staging Area for Contractor Use -The figures attached show available staging area and parking for Contractor personnel. Only designated staging and parking areas shown shall be used by the Contractor. The Contractor is responsible for protecting any stored material until it is placed in service.

The Contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive material at the site and will not be responsible for damage to the Contractor's equipment or materials.

Part 2 Products:

All products shall be new and unused. All product submittals shall be approved by the TPOC prior to installation. All products and materials used in the roofing system must be approved by the manufacturer for use in a high wind marine environment location. Uplift resistance designed for service with up to 110 mph wind forces. The roof system, including the EPDM membrane, insulation and facia/flashing shall include a 30-year manufacturer warranty.

1. Membrane shall meet the following requirements (ASTM D4637, Type 1 EPDM)

a. 90 mil nominal thickness EPDM

b. Watertight seams

c. Fully adhered

d. Black in color

e. Able to withstand normal foot traffic without concern of puncture.

2. Cover Board shall meet the following requirements:

a. 1/2 inch thickness

b. Gypsum Fiber

c. Fully waterproof bonding

d. Suitable for exterior applications that are subject to permanent exposure to the weather or moisture.

3. Insulation meets the following requirements:

a. Extruded polystyrene foam board

b. Minimum of R-30 insulating value

c. Able to withstand foot traffic without crushing.

d. Ensure insulation system and facer material is compatible with membrane application specified and as approved by the roof membrane manufacturer.

4. Seam Tape that meets the following requirements:

Double-sided synthetic rubber tape, minimum 0.03 inch thick, minimum 3 inch wide. Utilize seam tape as recommended by the manufacturer's printed data for forming watertight bond of EPDM sheet materials to each other. 6-inch-wide tape is required for seam seals along lines of mechanical attachment of membrane.

5. Lap Splice Adhesive that meets the following requirements:

Low volatile organic compound (VOC) synthetic rubber adhesive as supplied by roof membrane manufacturer and recommended by the manufacturer's printed data for forming watertight bond of EPDM sheet membrane materials to each other.

6. Bonding Adhesive that meets the following requirements:

Low volatile organic compound (VOC) synthetic rubber adhesive as supplied by roof membrane manufacturer and recommended by the manufacturer's printed data for bonding EPDM membrane materials to insulation, wood, metal, concrete or other substrate materials.

7. Lap Cleaner, Lap Sealant, and Edge Treatment that meets the following requirements:

As supplied by the roof membrane manufacturer and recommended by the manufacturer's printed data.

8. Water Cutoff Mastic/Water Block that meets the following requirements:

As supplied by the roof membrane manufacturer and recommended by the manufacturer's printed data.

9. Membrane Flashings and Flashing Accessories that meets the following requirements:

Provide membrane flashing, including self-adhering membrane flashing, perimeter flashing, flashing around roof penetrations, that is minimum 1.1 mm 0.045-inch cured EPDM, as recommended by the roof membrane manufacturer or minimum 1.4 mm 0.055-inch-thick uncured EPDM sheet in compliance with ASTM D4811/D4811M, Type I. Use cured EPDM membrane to the maximum extent recommended by the roof membrane manufacturer.

10. Flashing Tape that meets the following requirements:

EPDM-backed synthetic rubber tape, minimum 150 mm 6 inch wide as supplied by the roof membrane manufacturer and recommended by the manufacturer's printed data.

11. Mechanical Fasteners and Plates that meets the following requirements:

Coated, corrosion-resistant fasteners as recommended by the roof membrane manufacturer and meeting the requirements of FM 4470 and FM APP GUIDE for Class I roof deck construction and the wind uplift resistance specified. As supplied and warranted for the substrate type(s) by EPDM sheet manufacturer and recommended by EPDM sheet manufacturer's printed data.

12. Stress Plates for Fasteners that meets the following requirements:

Flat corrosion-resistant round stress plates as recommended by the roof membrane manufacturer's printed instructions and meeting the requirements of FM 4470; not less than 50 mm 2 inch in diameter. Provide pre-formed discs to prevent dishing or cupping.

13. Auxiliary Fasteners that meet the following requirements:

Corrosion resistant screws, nails, or anchors suitable for intended attachment purpose and as recommended by the roof membrane manufacturer to meet 110 mph design standard.

14. Flashing Cement that meets the following requirements:

Provide a self-vulcanizing butyl compound flashing cement for splicing laps.

15. Caulk that meets the following requirements:

a. Fast-Cure, Low VOC, High Solids Polyurethane Sealant

b. Exterior grade adhesive sealant product, compatible with new membrane material, as recommended by manufacturer.

c. Color of the surrounding substrate

16. Flashing, through wall metal flashing, facia and edge strips:

a. Pure copper material minimum of 16 oz.

b. Adhesives, sealants and grout materials compatible with new roofing materials.

17. Chimney

a. Protect and reuse the existing stainless steel metal chimney. Reinstall the chimney with new watertight flashing and fasteners for the support arms into the brick wall to match existing conditions.

18. Brick and Mortar

a. Exterior brick and mortar shall match existing brick type, size, and color.

Face brick type A, metal ties 16" on center vertical and 32" horizontal. Contractor to verify dimensions of bricks.

Part 3 Execution:

General

1. All onsite work shall be coordinated with the TPOC prior to start of mobilization. Contractor to verify existing conditions and that all required submittals are approved prior to commencing any demolition work.

2. Contractor shall take measures and be responsible for the protection of all existing equipment and work areas from damage during construction.

Work shall proceed to minimize any exposure of the concrete slab to rain events. The Contractor shall keep on site the means to quickly cover and protect all areas open to the elements during all rain weather events. Means and methods for access to the roof, and demolition shall be with care to ensure no impact to electrical transformers and other equipment that are near the roof work area.

3. Refer to attached Figures 1-14 that show the existing conditions, layout and details of required work on the roof.

Roof Demolition

1. Demolish and remove the entire existing roof system including the membrane, cover boards, insulation, mechanical fasteners, pressure treated nailers, flashing, sealants, and blocking down to the underlying concrete roof slab. Dismantle and protect the existing stainless-steel chimney and anchorage for reuse. Cut flush or remove any objects, such as old mechanical fasteners, that may puncture the new roofing system. Ensure surfaces are rigid, dry, smooth, free from cracks, holes and sharp edges prior to application of the new roof system. Seal any observed cracks or penetrations through the existing concrete deck in accordance with manufactures recommendations for the new roof membrane. Notify the TPOC immediately if any discrepancies are discovered that will affect demolition or new work. During all phases of work, the means and methods shall prevent any construction debris from falling into the river or impacting the adjacent electrical equipment.

Brick Demolition to replace the original through wall flashing

1. Perform demolition of at least five rows of brick to remove an original through wall flashing. Replace the flashing to limits one foot past the intersection with the brick wall on both sides of the control room roof. The original flashing will be visible after demolition of the roof system.

Sequence brick demolition and provide temporary support to rows of brick above the demolished area. Perform demolition work with care to not impact bricks to remain and the expansion joint in the middle of the roof. The expansion joint space shall be maintained both horizontally and vertically, minimum of 3/4" gap.

2. Install new 16 oz copper through wall flashing into the existing brick wall at least 7 inches higher than the original elevation. Include grouting, sealing and counterflashing with lead wedges into a sawcut reglet. Seal all gaps and seams to prevent any leakage past the new flashing. Install full head weep holes spaced approximately 16-inch on center.

3. Brick installation work in accordance with industry best management practices. All brick work shall be completed by skilled personnel with experience in the masonry brick, flashing and mortar repairs. Mortar joints shall be smooth and professional quality to match original conditions.

Roof Installation

1. All components of new roof shall be from same roof system and be compatible with all other components being used. All details and methods of installation to be in complete accordance with manufacturer's installation requirements. New roof details shall match existing as built conditions or equal approved from another membrane manufacturer.

2. Furnish and install new pressure treated wood blocking at entire perimeter of roof and along each edge of the expansion joint. Blocking shall be installed to develop a 3/8 inch per foot slope on the surface of the new membrane roof to drain to the appropriate roof edge.

3. Install new tapered insulation system utilizing extruded polystyrene insulation. Installed to provide a slope on the finished roof surface of at least 3 /8" per foot to drain water from the roof. Fasten to the clean existing concrete roof slab as required by the insulation manufacturer. The insulation shall be fully adhered to the concrete decking. Insulation boards shall be installed smoothly and evenly, without cracks and no gaps in joints exceeding 1/4 inch width.

4. Furnish and install one layer of 1/2" thick gypsum fiber cover board to completely cover tapered insulation. The cover board shall be fully adhered to the tapered insulation system. Stagger joints in the cover board and insulation joints. Install using approved fasteners with plates or adhesive and follow manufacturers' directions for spacing. Only install what can be covered by a nal membrane system within the same day. Mechanically secure cover boards through insulation with specified fasteners and insulation plates into the concrete decking. Space fasteners as required to provide the wind uplift resistance specified and in accordance with manufacturer's installation requirements.

5. Furnish and install 90 mil, black, reinforced EPDM rubber roofing membrane fully adhered to the cover board. Layout membrane and side lap adjoining sheets in accordance with membrane manufacturer's printed installation instructions. All seams will overlap and be heat welded to form a waterproof seam. Install flashing and flashing accessories as the roof membrane is installed. Apply flashing to cleaned surfaces and as recommended by the roof membrane manufacturer. Remove dusting agents and dirt from membrane and substrate areas where bonding adhesives are to be applied.

Apply specified adhesive evenly and continuously to substrate [and underside of sheets] at rates recommended by the roof membrane manufacturer.

Roll each sheet into adhesive slowly and evenly to avoid wrinkles; broom or roll the membrane to remove air pockets and fish mouths and to ensure full, continuous bonding of sheet to substrate. Check all seams and ensure full lap seal applied to all adhesive formed seams and all cut edges of reinforced membrane materials. All seams and lap splices reinforced with seam tape in accordance with membrane manufacturer's printed instructions. Apply minimum 9-inch-long strip of membrane-backed flashing tape over T-intersections of roof membrane. Roll tape to ensure full adhesion and seal over T-joint. Extend and adhere EPDM roofing material a minimum of 8-inches up brick wall. Includes all flashing and counter flashing to work with the weep holes of new through wall flashing in the adjacent brick wall.

6. Re-install saved heater chimney pipe into the new roof with all new seals, flashing to make waterproof. New anchor hardware for support arms to match existing.

7. Install new 16 oz minimum copper edge strip/facia to cover the area where the membrane is keyed into the roof edge. Install 8-inch wide EPDM at roof edge to seal copper edge strip.

Closeout Procedures

1. Contractor shall coordinate with the TPOC for a final inspection walkthrough of the project to ensure the work is completed in accordance with this Statement of Work. Contractor shall leave the entire site of the work in a neat and orderly condition.

2. Contractor shall ensure that a complete "As Built" drawing was submitted to the TPOC and is accepted as accurately depicting the as-built configuration of the installation. Contractor shall ensure that a written warranty document was submitted to the TPOC and is accepted. Contractor shall complete Final Payment Forms and Certifications and submit to the TPOC for review and processing.

Requirements See Statement of Work and Attachments included with this solicitation for additional information.

Magnitude of Construction is between $100,000 and $250,000.

Product Service Code: Y1QA

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.246-12 Inspection of Construction. Aug 1996

Section F - Deliveries or Performance

From date of lead time event to completion of performance 130 Calendar Days Date of Notice to Proceed Receipt

Line Item Delivery Schedule Quantity Address and POC

Delivery Schedule From date of lead time event to completion of performance 130 Calendar Days Date of Notice to Proceed Receipt

1 Job Place of Performance DoDAAC: 961503 CountryCode: USA

CORPS OF ENGINEERS NEW ENGLAND DIST

FOXPOINT HURRICANE BARRIER, 700 ALLENS

AVE

PROVIDENCE, RI 02905

UNITED STATES

Andrew Cattano, DELIVER_TO_EMP_ID_NO Email: Andrew.M.Cattano@usace.army.mil Telephone: 978-318-8329

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.236-7000 Modification Proposals--Price Breakdown. Dec 1991

Section H - Special Contract Requirements

SECURITY REQUIREMENTS

General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor ("Contractor") and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (eg., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as "RAMs"), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures -this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clauses of this contract, should FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program.