Solicitation - N4215826QS011.pdf

PDF 2 MB Posted

Attached to
Generator Rental 1000kW
Solicitation number
N4215826QS011
Issued by

About this file

This is a Request for Quote (RFQ) for emergency diesel generator rental services issued by Norfolk Naval Shipyard to support destructive weather and transit operations for a 688 Class submarine. The solicitation number is N4215826QS011, issued February 13, 2026, with an offer due date of February 18, 2026 at 11:00 AM. The contract is a women-owned small business (WOSB) set-aside for 100% of the requirement, with a North American Industry Classification Standard (NAICS) code of 532490 and a size standard of USD 40,000,000.

The government seeks one trailer-mounted 1,000 kW minimum standby power diesel generator (750 kW continuous power) for a 12-month base period with three one-month extension options. Pricing must be provided in daily, weekly, and monthly rates for firm fixed-price service rental. Key technical requirements include 450-volt, 3-phase ungrounded output; capability to parallel with the ship's ungrounded electric plant; 24-hour minimum fuel capacity at continuous base load; self-contained cooling system with outdoor enclosure; and equipment no more than ten years old. The contractor must provide all preventative maintenance per manufacturer schedules, dispatching service technicians within four hours of notification and replacing the generator within twelve hours if repairs cannot be made. Additional responsibilities include on-site electrical connection assistance, training, technical documentation, and protective coverings for saltwater exposure. Delivery and removal are at no cost to the government at Norfolk Naval Shipyard, Building 298, Portsmouth, Virginia 23709. Evaluation will be based on technical capability (acceptability required) followed by price reasonableness, with award to the lowest-price qualified offeror. Interested vendors should submit proposals via email to Alicia.l.almberg.civ@us.navy.mil.

View the file

Other files

File Type Posted
Questions and answers updated.docx DOCX document
Questions and answers.docx DOCX document
Technical Capability Attachment.docx DOCX document
Solicitation Amendment N4215826QS0110001 SF 30.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

Section A - Solicitation/Contract Form

MPL Emergency Diesel Generator

N4215826QS011

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price Amount

0001 Emergency Diesel Generator

Pricing Arrangement: Firm Fixed Price

12 Months

Option Line Item

MPL Emergency Diesel Generator

Pricing Arrangement: Firm Fixed Price

1 Months

Option Line Item

MPL Emergency Diesel Generator

Pricing Arrangement: Firm Fixed Price

1 Months

Option Line Item

MPL Emergency Diesel Generator

Pricing Arrangement: Firm Fixed Price

1 Months

Section C - Description/Specifications/Statement of Work

1. SCOPE:

Service rental from vendor to provide one (1) trailer mounted 1,000 kW minimum Standby Power (750 kW Continuous Power (COP)) Diesel Generator. Diesel Generator is needed to support destructive weather and transit of a 688 Class submarine.

2. PERIOD OF PERFORMANCE:

The period of performance for base of one year with clause to extend month to month for three (3) months if needed.

3. APPLICABLE DOCUMENTS:

3.1. N/A

3.2. GENERAL SPECIFICATIONS:

3.1. 1,000kW Standby Diesel Generator:

3.1.1. Shall be provided with the following capabilities, features and specifications:

3.1.1.1. Output: 450volts, 3 phase, 3 wire ungrounded.

3.1.1.2. Standby Rating of 1,000kW (minimum), Continuous Power (COP) of 750kW (minimum).

3.1.1.3. Must be equipped with a block heater and battery charging circuit and suitable pigtails for mating with NNSY 120V distribution services cans.

3.1.1.4. Diesel generator shall be capable of parallel operation with ship's ungrounded electric plant.

3.1.1.5. Diesel generator shall be capable of paralleling with a shipboard diesel generator, diesel to be ungrounded with neutral lifted.

3.1.1.6. Safety Devices: Output circuit breaker Long Time Overcurrent trip set to 150% of Base Load COP current rating.

3.1.1.7. Diesel generator unit dimensions shall not exceed 20' L x 8' W. Weight not to exceed 45,000 lbs.

3.1.1.8. Diesel fuel capacity must be capable of twenty-four (24) hour minimum run time prior to refueling at full Continuous Base Load. (onboard and/or external fuel tank included).

3.1.1.9. External fuel tank shall be 1240 gallons maximum, if utilized. Unit dimensions shall not exceed 10' L by 8' W, fully fueled weight not to exceed 15,000 lbs. In lieu of one (1) tank, two (2) tanks can be used with dimensions not to exceed 5'-5 3/8" by 7'-8 5/8" max weight per tank 6200lbs (fully fueled). Fuel cell lifting points shall have current capacity certifications.

3.1.1.10. Onboard/External fuel tank(s) shall allow for refueling while diesel generator is operating.

3.1.1.11. Self-contained cooling system.

3.1.1.12. Trailer mounted. Lifting points shall have current capacity certifications.

3.1.1.13. Outdoor enclosure. Unit shall be equipped with rain-tight enclosure & block heater.

3.1.1.14. The Diesel generator shall be of recent vintage (not more than ten years old), clean, and well maintained. The generator winding shall be a minimum of 5M above ground with neutral disconnected. The unit shall have been tested within two weeks of delivery and applicable test data sent with unit.

3.1.1.15. All neutral connections shall be disconnected and isolated from generator windings and any additional equipment as necessary.

3.1.1.16. Unit shall have posted operating instructions in the vicinity of the control panel that clearly state how to start, stop and operate the diesel generator and output circuit breaker. The posted instructions shall include any necessary steps for proper operation of the diesel generator in parallel with ship's service motor generator.

Operating instructions may require clarification at ship's request after delivery, and vendor is to clarify instructions as necessary.

3.1.1.17. Unit shall be compatible with Shipyard furnished "THOF-500E"-T-500 lugged output cables (4 per phase). If mechanical lug connections are provided, they shall be sized for 500MCM (4 per phase).

4. CONTRACTOR RESPONSIBILITIES:

4.1. Provide all parts requiring repair or replacement under circumstances of normal equipment wear and tear at no additional charge.

4.2. Contractor is responsible for ensuring that all preventative maintenance is performed on equipment prior to delivery to the government as well as performing preventative maintenance as specified by the equipment's manufacturer preventative maintenance schedule during the term of the rental period with the government Contractor is responsible for all travel associated with preventative maintenance.

4.3. Contractor is responsible for providing service technicians and truck drivers that are able to meet the badging and security requirements of Norfolk Naval Shipyard. Contracted personnel must be United States Citizens. Foreign Nationals will not be allowed on job site.

4.4. Post contact information for service/repair of equipment directly on the rental equipment. Contact information must be packaged to withstand being located in an outdoor environment.

4.5. The contractor shall dispatch a representative in response to a service request to repair and/or replace a diesel generator within four (4) hours of notification by Norfolk Naval Shipyard at no additional charge, regardless if request is placed during normal business hours or outside of normal business hours. Contractor is responsible for travel associated with repair/replacement of equipment. Contractor is responsible to replace the diesel generator within twelve (12) hours of initial notification if repairs cannot be made to the existing unit.

4.6. Provide training of equipment to the government in the proper operation of the generator set utilizing Contractor written operation instructions. Contractor is responsible for all travel associated with providing startup training of equipment to the government.

4.7. Contractor is responsible for modifying rental diesel generator as required to allow paralleling of rental diesel generator with ship's ungrounded electric plant.

4.8. The Diesel Generator will be exposed to everyday weather, and saltwater air. It is the contractor's responsibility to provide any protective coverings for the units.

4.9. Contractor to provide written documentation of the operational parameters of diesel generator. Written documentation to included Technical Manual, allowable hours of operation, e.g. 15 hours, 24 hours, 50 hours, etc., at specified ratings, e.g. Standby Power Rating, Prime Power Rating, Continuous Power Rating, etc. Also, written documentation to include Fuel Consumption and Running Hour Data.

4.10. Contractor to provide assistance with electrically connecting output cables and providing for disconnect/reconnect of any electrical components that require access into equipment cabinets. Voltage and Phase Rotation checks must be taken on site to verify proper connection of output cabling.

4.11. Contractor to provide the option of contract extension past with three one-month duration option to extend if 01 APR 2027 needed up to three (3) months.

5. NNSY RESPONSIBILITIES:

5.1. Security clearance and access for all personnel will be managed by the project Work Integration Leader (WIL).

5.2. Provide operators.

5.2.1. Monitor all gauges.

5.3. Provide pier location.

5.4. Lost items and equipment damage beyond normal wear and tear.

6. REQUIREMENTS FOR LIFTING OF EQUIPMENT:

6.1. The equipment shall be outfitted with suitable attachments for overhead lifting.

6.1.1. For multiple point lifts each lifting attachment shall be capable of supporting one half the gross weight of the equipment with a design factor of five to one based on ultimate strength. For single point lifts the lifting attachment shall be capable of supporting the gross weight of the equipment with a design factor of five to one based on ultimate strength.

6.1.2. For multiple point lifts each lifting attachment shall be designed to accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting one half the gross weight of the equipment. For single point lifts the lifting attachment shall be designed to accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting the gross weight of the equipment.

6.1.3. Design of the lifting attachments shall be such that the attachments and shackles are not side loaded more than 10 out of the plane. Lifting attachments shall be located such that the lifting slings do not contact the equipment, or alternatively a spreader beam certified to NAVFAC P-307 shall be provided. Whenever practical, the lifting attachments shall be located above the center of gravity, and such that the lifting slings do not contact the equipment housings.

6.1.4. Each lifting attachment shall be conspicuously marked in a contrasting color "Lift Here". Letters shall have a minimum height of 1".

6.2. The equipment shall be marked in a prominent location with the gross weight. Sand hoppers, tubs, or other containers that may contain material shall be marked with the empty and full weight (or alternatively the empty weight and working load limit).

Marking shall be upper case letters of a contrasting color, with a minimum height of 1". Marking shall include the units (i.e.

"pounds", "long tons", etc.).

6.3. The equipment shall be provided with a lifting sketch / rigging diagram that meets the Rigging Sketch Requirements as outlined below.

6.3.1. The lifting sketch shall detail any specific requirements and / or configurations that must be meet prior to lifting (i.e.

"engage swing lock", "Tilt mast back fully", "Rotate lifting basket over side", "Utilize 10' minimum length slings", "Spreader beam required", etc.).

6.3.2. The lifting sketch shall include the location of the center of gravity of the equipment (full fuel, hydraulic tanks, etc.), equipment model/manufacturer, and gross weight.

6.3.3. A copy of the lifting sketch shall be permanently posted on the equipment, and a copy shall be forwarded to Code 714 (757-396-3345, 3346).

7. RIGGING SKETCH REQUIREMENTS:

7.1. Rigging sketches, as a minimum, shall identify the following:

- The weight of the load.

- The location of the center of gravity.

- The minimum crane capacity.

- The minimum capacity / length of slings.

- The minimum capacity of other standard rigging gear.

- The attachment (lifting) points for the load.

7.1.1. The attachment points for multiple leg lifts shall be sized such that each attachment point can support half the load's weight at the anticipated lift angle.

7.1.2. The attachment point for single leg lifts shall be sized such that the attachment point can support the entire load's weight.

7.2. Limitations on allowable orientations for any parts making up the lifting assembly.

7.3. For single leg vertical lifts using twisted rope (wire or synthetic), two parallel ropes each capable of supporting the entire load alone shall be required unless a method is used to prevent unlaying the rope.

7.4. A minimum D/d ratio of one shall be required where wire rope slings pass over any object, or in the eyes of wire rope slings.

A minimum D/d ratio of two shall be required where synthetic rope slings pass over any object, or in the eyes of synthetic rope slings.

7.4.1. "D" represents the diameter of the object the sling passes over.

7.4.2. "d" represents the diameter of the sling.

7.4.3. Table 14-3 of NAVFAC P-307 lists efficiency factors at various D/d ratios.

7.5. Components in each handling assembly shall be sized based on the worst case distribution of loads.

7.5.1. When making a two, three, or four point lift, the handling gear shall be sized so that two legs can support the load without exceeding the safe working load (SWL) at the lift angle expected, unless an equalizing method is used.

7.6. When non-standard gear is required (i.e. round stock lifting bars) written instructions shall be provided that ensure:

7.6.1. The proper material is being used,

7.6.2. The item is certified IAW NAVFAC P-307.

7.6.3. Any special requirements or dimensions are followed to ensure that engineering assumptions are met (i.e. eccentricity of the bearing points).

8. SAFETY:

Per FAR 22.102-1(a) entitled "Safety", Contractors are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard cognizance must follow Federal and State OSHA requirements and Norfolk Naval Shipyard OSHE Program Manual, NAVSHIPYDNORINST P5090.2 requirements or safety requirements for site specific location of the contract.

Contractors and Non-NNSY Government Agencies (NNGAs) are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard (NNSY) cognizance must adhere to Federal OSHA requirements for hazardous energy control IAW 29 CFR 1915.89 and must follow Hazardous Energy Control (HEC) procedures as identified in NAVSEA's Occupational Safety, Health, and Environment Corporate Manual (OSHECM) Chapter 250 (latest revision), when performing work under NNSY contract.

All HEC work to be performed by Contractors and NNGAs requires that NNSY Technical Points of Contact (TPOCs) and/or Contracting Officer's Representatives (CORs) be notified of the HEC scope of work prior to starting work. Any changes or deviations in the initial scope of HEC work requires the NNSY TPOCs and/or CORs be informed of the change/deviation. Appendix 250.B-1 through B-3 of OSHECM Chapter 250 for multiple employer work identifies when Contractors and NNGAs are required to assign their Lockout/Tags-Plus Coordinator (LOTC) to coordinate HEC work with the cognizant NNSY LOTC. HEC locks shall be provided by the contractor or NNGA for their employees use. The HEC locks shall have red bodies with name labels or name tags affixed, identifying who installed the HEC lock(s) and a point of contact telephone number. HEC lock name labels and tags must be made of materials that will hold up to the environment to which they are exposed. HEC tags used for Tags-Plus HEC work shall be provided by the cognizant NNSY LOTC to the contractor or NNGA for their use if machinery, equipment, or systems (MES) cannot be locked out. OSHECM Chapter 250 Tags-Plus procedures will be strictly followed.

Contractors and NNGA's may obtain electronic copies of OSHECM Chapter 250 (latest revision) and access the OSHA 1915.89 web site by using the following link to NNSY's public access web site: http://www.navsea.navy.mil/shipyards/norfolk/default.aspx

Names and contact information for NNSY LOTCs and/or the Facility Custodian will be provided by NNSY TPOC and/or CORs set forth elsewhere in this award document."

9. PLACE OF PERFORMANCE:

Contractor to deliver equipment to Norfolk Naval Shipyard, Bldg 298, Portsmouth, VA 23709

10. DEFENSE BIOMETRIC IDENTIFICATION SYSTEMS (DBIDS) FOR INSTALLATION ACCESS:

All contractors, with the exception of permanent party (or "seated" contractors with Common Access Cards (CACs), will be required to obtain a DBIDS card to gain access to NNSY.

Procedure for receiving a DBIDS card:

a. Contractor will complete the SECNAV 5512 form(s) and forward them to their NNSY Sponsor/Contracting Officer's Representative

(COR).

b. The sponsor will complete the CVS spreadsheet utilizing the information on the completed SECNAV5512 forms and forward all documents to Commander Navy region Mid-Atlantic (CNRMA) for vetting.

c. CNRMA will add the contractor to the "179-Day List" which is utilized by the Pass and ID office to create the DBIDS card.

d. Once on the 179-Day List, the contractor may go to Pass and ID to have their DBIDS card generated.

e. Green NAVSEA access badges can be generated at this point with contractors providing proof of U.S. Citizenship (Birth Certificate/ US Passport).

11. PORTABLE ELECTRONIC DEVICES:

a. NAVSEA 04 Ser 04/281 IMPLEMENTATION PLAN FOR ALLOWING CAMERA-PORTABLE ELECTRONIC DEVICES WITHIN

THE CONTROLLED INDSUTRIAL AREA

b. NAVSEAINST 2200.1A PORTABLE ELECTRONIC DEVICES POLICY

c. SECPROMAN Vol 1 5510.36 Rev E

In accordance with ref (a), personally owned camera enabled PEDs will be authorized inside of the Controlled Industrial Area (CIA) and all Security Islands. Camera enabled PEDs will remain unauthorized within Controlled Nuclear Information Areas (CNIAs), Nuclear Work Areas (NWAs) and Open Storage Areas.

All PEDs, camera enabled or not, are still prohibited within NWAs and Open Storage Areas.

The allowance of camera enabled PEDs inside of the CIA and Security Islands does not negate existing photography policies. Unofficial photography, filming of video, or live streaming from the camera-enabled PED remains prohibited within the CIA or any NAVSEA controlled space outside of the CIA. Further, audio recordings (both digitally or magnetically) in NAVSEA spaces is prohibited without the approval of the Code 1120 Security Director.

Submarine SPECIFIC PEDs Instructions: In accordance with COMSUBLANT/ COMSUBPACINST 2075.1C, the use of PEDs while in or on Department of Navy Submarines are prohibited.

12. DELIVERY TERMS/SHIPPING/TRANSPORTATION:

12.1. Location: Norfolk Naval Shipyard (NNSY), Bldg 298, Portsmouth, VA 23709

12.2. Equipment delivery and removal at no cost to the government

13. PICK UP/REMOVAL OF RENTAL UNITS:

13.1. Unless otherwise notified by NNSY Contacting Office, Code 451, rental/lease unit(s) shall be picked up (removed) by Contractor on the morning after expiration of the established contract period of performance. In the event that this date occurs on a Saturday, Sunday, or a recognized Federal Holiday, the contractor may make the appropriate arrangements to pick-up the equipment on the first working day following the expiration of the contract at no additional cost to the Government. If any difficulty is experienced in picking-up (removing) unit(s), the Contractor MUST immediately request the Contracting Officer's direction by contacting the specialist Brittany Tavassoli, Code 451 via telephone at 757-396-9694 AND providing notification of same via email to brittany.b.tavassoli.civ@us.navy.mil. A Contractor's failure to follow the above instruction regarding pick-up /removal of rental units will relieve the Government of any liability for further charges for the equipment.

Daily Rate : $

Weekly Rate: $

Monthly Rate: $

13.2. The government reserves the right to return one or all units at any time prior to expiration of the rental period. The contractor agrees to prorate costs for the time the units are in use. The government agrees to give the contractor forty-eight (48) hours-notice for return of units prior to expiration of rental period.

14. AFTER HOURS ACCESS:

14.1. Contractors are to go to Gate 15 and let the guards know they are to provide services/support. A copy of the awarded contract shall be provided by the Contractor to the Gate guards. The guards at the gate will contact the Base Precinct and subsequently escort the Contractor to Bldg 1618 to have a badge made.

15. AUTHORIZATION OF ADDITIONAL WORK:

Any additional work outside the scope of this contract/purchase order shall have written authorization from the Contracting Officer prior to executing any additional work. Any work performed without the written authorization of the Contracting Officer shall be considered "At-Risk" and the government will have no legal obligation to pay for the work performed. Pursuant 13.0004, once you have initiated performance of the work, this shall constitute your acceptance of the contract.

Requirements Emergency Diesel Generator

Additional Regulation or Supplemental Clauses Incorporated by Full Text

C-202-H001 ADDITIONAL DEFINITIONS--BASIC (Oct 2018)

(a) Department means the Department of the Navy.

(b) Commander, Naval Sea Systems Command means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.

(c) References to The Federal Acquisition Regulation (FAR) All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(d) National Stock Numbers Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

(1) . The number assigned to each approved Item Identification under the National Item Identification Number (NIIN) Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit nonsignificant number.

(2) . The National Stock Number (NSN) for an item of supply consists of the applicable National Stock Number (NSN) four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.

(Endof Text)

C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019) (Jan 2019)

Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

(End of Text)

Section D - Packaging and Marking

Section E - Inspection and Acceptance

Overall Contract Inspection/Acceptance Locations

Acceptance Location

Acceptance Destination Instructions: Acceptance and Inspection found within the statement of work

DoDAAC: N42158 CountryCode: USA

NORFOLK NAVAL SHIPYARD GF

1 NORFOLK NAVAL SHIPYARD, BUILDING 276

PORTSMOUTH, VA 23709-1001

UNITED STATES

Leonard Mcintyre, COR Email: leonard.b.mcintyre.civ@us.navy.mil

Inspection Location

Inspection Destination Instructions: Acceptance and Inspection are found within the statement of work

DoDAAC: N42158 CountryCode: USA

NORFOLK NAVAL SHIPYARD GF

1 NORFOLK NAVAL SHIPYARD, BUILDING 276

PORTSMOUTH, VA 23709-1001

UNITED STATES

Leonard Mcintyre, COR Email: leonard.b.mcintyre.civ@us.navy.mil

Option Line Item

Acceptance Location

Acceptance Destination Instructions: Acceptance and Inspection found within the statement of work

DoDAAC: N42158 CountryCode: USA

NORFOLK NAVAL SHIPYARD GF

1 NORFOLK NAVAL SHIPYARD, BUILDING 276

PORTSMOUTH, VA 23709-1001

UNITED STATES

Leonard Mcintyre, COR Email: leonard.b.mcintyre.civ@us.navy.mil

Inspection Location

Inspection Destination Instructions: Acceptance and Inspection are found within the statement of work

DoDAAC: N42158 CountryCode: USA

NORFOLK NAVAL SHIPYARD GF

1 NORFOLK NAVAL SHIPYARD, BUILDING 276

PORTSMOUTH, VA 23709-1001

UNITED STATES

Leonard Mcintyre, COR Email: leonard.b.mcintyre.civ@us.navy.mil

Option Line Item

Acceptance Location

Acceptance Destination Instructions: Acceptance and Inspection found within the statement of work

DoDAAC: N42158 CountryCode: USA

NORFOLK NAVAL SHIPYARD GF

1 NORFOLK NAVAL SHIPYARD, BUILDING 276

PORTSMOUTH, VA 23709-1001

UNITED STATES

Leonard Mcintyre, COR Email: leonard.b.mcintyre.civ@us.navy.mil

Inspection Location

Inspection Destination Instructions: Acceptance and Inspection are found within the statement of work

DoDAAC: N42158 CountryCode: USA

NORFOLK NAVAL SHIPYARD GF

1 NORFOLK NAVAL SHIPYARD, BUILDING 276

PORTSMOUTH, VA 23709-1001

UNITED STATES

Leonard Mcintyre, COR Email: leonard.b.mcintyre.civ@us.navy.mil

Option Line Item

Acceptance Location

Acceptance Destination Instructions: Acceptance and Inspection found within the

Inspection Location

Inspection Destination Instructions: Acceptance and Inspection are found within statement of work

DoDAAC: N42158 CountryCode: USA

NORFOLK NAVAL SHIPYARD GF

1 NORFOLK NAVAL SHIPYARD, BUILDING 276

PORTSMOUTH, VA 23709-1001

UNITED STATES

Leonard Mcintyre, COR Email: leonard.b.mcintyre.civ@us.navy.mil the statement of work

DoDAAC: N42158 CountryCode: USA

NORFOLK NAVAL SHIPYARD GF

1 NORFOLK NAVAL SHIPYARD, BUILDING 276

PORTSMOUTH, VA 23709-1001

UNITED STATES

Leonard Mcintyre, COR Email: leonard.b.mcintyre.civ@us.navy.mil

Section F - Deliveries or Performance

Overall Contract Delivery Period

Contractor Destination

Line Item Delivery Schedule Quantity Address and POC

Period of Performance From 01 Apr 2026 To 31 Mar 2027

12 Months

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.201-7000 Contracting Officer's Representative. Dec 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.

authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall- WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.

Protocol.

(f) The Contractor shall use the following information when submitting payment requests and receiving reports WAWF payment instructions.

in WAWF for this contract or task or delivery order:

(1) The Contractor shall submit payment requests using the following document type(s): Document type.

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Invoice 2in1

(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in Document routing.

WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC N50082

Issue By DoDAAC N42158

Admin DoDAAC N42158

Inspect By DoDAAC N42158

Ship To Code N42158

Ship From Code ____

Mark For Code N4215826XX

Service Approver (DoDAAC) N42158

Service Acceptor (DoDAAC) N42158

Accept at Other DoDAAC ____

LPO DoDAAC N42158

DCAA Auditor DoDAAC ____

Other DoDAAC(s) 050120

(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.

accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

(Contracting Officer: Insert applicable information or "Not applicable.")

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Additional Regulation or Supplemental Clauses Incorporated by Full Text

G-232-H002 H002 PAYMENT INSTRUCTIONS (NAVSEA) (FEB 2024) (Feb 2024)

Payment office allocation methods can be found in the table at DFARS PGI 204.7108(b)(2) (https://www.acq.osd.mil/dpap /dars/pgi/pgi_htm/current/PGI204_71.htm#payment_instructions).

(End of text)

G-232-H005 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (JAN

2019)

(Jan 2019)

(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the sub line item number (SLIN) or CLIN level, rather than at the total contract/TO level, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost break down of other direct costs (ODCs), materials, and travel, by technical instruction (TI), SLIN, or CLIN level. For other than firm fixed price subcontracts, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal. Subcontractors may email encryption code information directly to the Contracting Officer and Contracting Officer Representative (COR). Shouldthe subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the Contracting Officer and COR; or other method as agreed to by the Contracting Officer.

(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and Contracting Officer on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and Contracting Officer email notification as required herein.

(End of Text)

G-242-H001 GOVERNMENT CONTRACTADMINISTRATION POINTS-OF-CONTACT AND

RESPONSIBILITIES (NAVSEA) (OCT 2023)

(Oct 2023)

(a) The Government reserves the right to administratively substitute any of the points of contact listed below at any time.

(b) The contracting officer is the only person authorized to change this contract or orders issued thereunder. The Contractor shall not comply with any order, direction or request of Government personnel - that would constitute a change - unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as part of this contract. If, in the opinion of the contractor, an effort outside the existing scope of this contract is requested, the contractor shall promptly comply with the Notification of Changes clause of this contract.

(c) The points of contact are as follows:

(i) The Procuring Contracting Officer (PCO) is:

Name: [ * ] Address:

[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

(ii) The Contract Specialist is:

Name: [ * ] Address:

[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

(iii) The Administrative Contracting Officer (ACO)is:

Name: [ * ] Address:

[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

(d) The Contracting Officer's Representative (COR) is the contracting officer's appointed representative for technical matters. The COR is not a contracting officer and does not have the authority to direct the accomplishment of effort which is beyond the scope of the contract or to otherwise change any contract requirements. An informational copy of the COR appointment letter, which provides a delineation of COR authority and responsibilities, will be provided upon award of this contract.

The Contracting Officer's Representative (COR) is:

Name: [ * ] Address:

[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

(e) The Alternate Contracting Officer's Representative (ACOR) is responsible for COR responsibilities and functions in the event that the COR is unavailable due to leave, illness, or other official business. The ACOR is appointed by the contracting officer; a copy of the ACOR appointment will be provided upon award of this contract.

The Alternate Contracting Officer's Representative (ACOR) is:

Name: [ * ] Address:

[ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

(f) The Technical Point of Contact (TPOC) is the contracting officer's representative for technical matters when a COR is not appointed. The TPOC is responsible for technical issues of contract administration, such as providing all items of Government Furnished Information (GFI), Government Furnished Material (GFM) and Government Furnished Equipment (GFE) if specified in the contract as well as the inspection and acceptance of all contract deliverables.

The Technical Point of Contact (TPOC) is:

Name: [ * ] Address: [ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

(g) The Alternate Technical Point of Contact (ATPOC) is responsible for TPOC responsibilities and functions in the event that the TPOC is unavailable due to leave, illness, or other official business.

The Alternate Technical Point of Contact (ATPOC) is:

Name: [ * ] Address:

[ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

(h) The Authorized Ordering Person(s) for Per-Call Maintenance is responsible for issuing and maintaining records for any per-call orders for remedial maintenance placed under this contract. No per-call order shall be placed outside the scope of this contract and the cumulative total of all orders shall not be in excess of any not-to-exceed amount specified in the contract. Per-call orders shall not, in any way, modify any terms and conditions of the contract.

(i) The Authorized Ordering Person(s) for Per-Call Maintenance is:

Name: [ * ] Address:

[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx];

E-mail: [ * ]

(j) The Contractor's point of contact for performance under this contract is:

Name: [ * ] Address:

[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

[ * ] To be completed at contract award

(End of Text)

G-242-H002 HOURS OF OPERATION AND HOLIDAY SCHEDULE (NAVSEA) (JUL 2021) (Jul 2021)

(a) The policy of this activity is to schedule periods of reduced operations or shutdown during holiday periods. Deliveries will not be accepted on Saturdays, Sundays or Holidays except as specifically requested by the [insert activity name]. All goods or services attempted to be delivered on a Saturday, Sunday or Holiday without specific instructions from the Contracting Officer or his duly appointed representative will be returned to the contractor at the contractor's expense with no cost or liability to the U.

S. Government.

(b) The federal Government observes public Holidays that have been established under 5 U.S.C. 6103. The actual date of observance for each of the holidays, for a specific calendar year, may be obtained from the OPM website at OPM.GOV or by using the following direct link: https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/.

(c) Delayed Opening, Early Dismissal and Closure of Government Facilities. When a Government facility has a delayed opening, is closed or Federal employees are dismissed early (due to severe weather, security threat, security exercise, or a facility related problem) that prevents personnel from working, onsite contractor personnel regularly assigned to work at that facility shall follow the same reporting and/or departure directions given to Government personnel. The contractor shall not direct charge to the contract for such time off, but shall follow parent company policies regarding taking leave (administrative or other). Non-essential contractor personnel, who are not required to remain at or report to the facility, shall follow their parent

N4215826QS011

https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/ https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early dismissal, delayed opening, or during periods of inclement weather, onsite contractors should monitor the OPM website as well as radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.

(d) When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site contractors shall continue working established work hours or take leave in accordance with parent company policy. Those contractor employees who take leave shall not direct charge the non-working hours to the contract. Contractors are responsible for predetermining and disclosing their charging practices for early dismissal, delayed openings, or closings in accordance with the FAR, applicable cost accounting standards, and the company's established policy and procedures. Contractors shall follow their disclosed charging practices during the contract period of performance, and shall not follow any verbal directions to the contrary. The Contracting Officer will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy and procedures.

(e) If you intend to visit the Contracts Office, it is advised that you call for an appointment at least 24 hours in advance.

(f) The hours of operation are as follows:

AREA FROM TO

[ ] [ ]insert specific Departments insert times

(g) All deliveries to the Receiving Officer, [ Negotiator insert delivery location],shall be made Monday through Friday from [ ] to [ ], local time. Deliveries will not be accepted after Negotiator enter beginning hour of operation Negotiator enter closing hour of operation

[ ]. No deliveries will be accepted on federal government holidays.Negotiator enter closing hour of operation

(End of Text)

Section H - Special Contract Requirements

Section I - Contract Clauses

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. Feb 2026 52.204-13 System for Award Management-Maintenance. Feb 2026

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded.

Feb 2026

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. Feb 2026 52.213-4 Terms and Conditions-Simplified Acquisitions (Noncommercial). Feb 2026 52.219-6 Notice of Total Small Business Set-Aside. Feb 2026 52.222-3 Convict Labor. Feb 2026 52.222-35 Equal Opportunity for Veterans. Feb 2026 52.222-36 Equal Opportunity for Workers with Disabilities. Feb 2026 52.222-37 Employment Reports on Veterans. Feb 2026 52.222-50 Combating Trafficking in Persons. Feb 2026 52.222-54 Employment Eligibility Verification. Feb 2026 52.223-5 Pollution Prevention and Right-to-Know Information. May 2024 52.223-23 Sustainable Products. Feb 2026 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.229-12 Tax on Certain Foreign Procurements. Feb 2021 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.233-3 Protest after Award. Feb 2026 52.233-4 Applicable Law for Breach of Contract Claim. Feb 2026 52.240-91 Security Prohibitions and Exclusions. Feb 2026 52.244-6 Subcontracts for Commercial Products and Commercial Services. Feb 2026

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.225-7012 Preference for Certain Domestic Commodities. Apr 2022 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023 252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region. Jun 2023 252.232-7010 Levies on Contract Payments. Dec 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel. Jan 2023 252.247-7023 Transportation of Supplies by Sea. Oct 2024

FAR Clauses Incorporated by Full Text

52.217-8 Option to Extend Services. (Nov 1999)

OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within [insert the period of time within which the Contracting Officer may exercise the option].any time before contract expiration

(End of clause)

52.217-9 Option to Extend the Term of the Contract. (Mar 2000)

OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within [insert the any time before contract expiration period of time within which the Contracting Officer may exercise the option]; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least days[ ] before the contract expires. The preliminary 1 60days unless a different number of days is inserted notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed (months) (years).15 months

(End of clause)

Section J - List of Attachments

Attachments:

Number Attachment Name Attachment Description Reference Identifier

Date

Technical Capability Attachment

13 Feb

Section K - Representations, Certification, & Other Statements

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.240-90 Security Prohibitions and Exclusions Representations and Certifications. Feb 2026

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.203-7005 Representation Relating to Compensation of Former DoD Officials. Sep 2022 252.225-7055 Representation Regarding Business Operations with the Maduro Regime. May 2022

252.225-7059 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region- Representation.

Jun 2023

FAR Clauses Incorporated by Full Text

52.229-11 Tax on Certain Foreign Procurements-Notice and Representation. (Jun 2020)

TAX ON CERTAIN FOREIGN PROCUREMENTS-NOTICE AND REPRESENTATION (JUN 2020)

(a) . As used in this provision-Definitions

Foreign person means any person other than a United States person.

Specified Federal procurement payment means any payment made pursuant to a contract with a foreign contracting party that is for goods, manufactured or produced, or services provided in a foreign country that is not a party to an international procurement agreement with the United States. For purposes of the prior sentence, a foreign country does not include an outlying area.

United States person as defined in 26 U.S.C. 7701(a)(30) means

(1) A citizen or resident of the United States;

(2) A domestic partnership;

(3) A domestic corporation;

(4) Any estate (other than a foreign estate, within the meaning of 26 U.S.C. 701(a)(31)); and

(5) Any trust if-

(i) A court within the United States is able to exercise primary supervision over the administration of the trust; and

(ii) One or more United States persons have the authority to control all substantial decisions of the trust.

(b) Unless exempted, there is a 2 percent tax of the amount of a specified Federal procurement payment on any foreign person receiving such payment. See 26 U.S.C. 5000C and its implementing regulations at 26 CFR 1.5000C-1 through 1.5000C-7.

(c) Exemptions from withholding under this provision are described at 26 CFR 1.5000C-1(d)(5) through (7). The Offeror would claim an exemption from the withholding by using the Department of the Treasury Internal Revenue Service Form W-14, Certificate of Foreign Contracting Party Receiving Federal Procurement Payments, available via the internet at www.irs.gov/w14. Any exemption claimed and self-certified on the IRS Form W-14 is subject to audit by the IRS. Any disputes regarding the imposition and collection of the 26 U.S.C. 5000C tax are adjudicated by the IRS as the 26 U.S.C. 5000C tax is a tax matter, not a contract issue. The IRS Form W-14 is provided to the acquiring agency rather than to the IRS.

(d) For purposes of withholding under 26 U.S.C. 5000C, the Offeror represents that

(1) It is is not a foreign person; and

(2) If the Offeror indicates "is" in paragraph (d)(1) of this provision, then the Offeror represents that-I am claiming on the IRS Form W-14 a full exemption, or partial or no exemption [Offeror shall select one] from the excise tax.

(e) If the Offeror represents it is a foreign person in paragraph…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .