This is a Solicitation (Request for Proposal) for a construction project at Tinker Air Force Base. The solicitation, numbered FA813725R0014, seeks renovation services for restrooms in Buildings B2121, Posts C7, 2C7, B19, and 2B19, with a project estimated between $5-10 million. The project involves renovating and upgrading men's, women's restrooms, showers, and janitor closets, and is exclusively available to current Multiple Award Contract (MAC) Basic Ordering Agreement (BOA) holders.
Key details include a solicitation issued on 11 Mar 2025, with proposals due by 31 Mar 2025. The contract will be awarded using Lowest Priced Technically Acceptable (LPTA) source selection procedures. The performance period is 630 calendar days, with a 10-day start period. Contractors must attend an initial site visit to be eligible to propose, and only MAC BOA holders who attend the site visit can continue in the competition. The project is managed by the Department of the Air Force Materiel Command Air Force Sustainment Center at Tinker Air Force Base, Oklahoma.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF PAGES
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Section A - Solicitation/Contract Form TAFB MACB Renovate Restrooms - B2121, Posts C7, 2C7, B19, and 2B19
Product Service Code: Z1AA
FA813725R0014
Section B - Supplies or Services & Prices or Costs Additional Information/Notes
Item Supplies / Services Quantity Unit Unit Price Amount
DESCRIPTION: Phase 1-WWYK200132 -Renovate Restrooms - B2121, Posts C7, 2C7, B19, and 2B19
EEIC: 52200
Product Service Code: Z1AA Claimant Program Code: C2 Pricing Arrangement: Firm Fixed Price
1 Each
DESCRIPTION: Phase 2a-WWYK200132 -Renovate Restrooms - B2121, Posts C7, 2C7, B19, and 2B19
EEIC: 52200
Product Service Code: Z1AA Claimant Program Code: C2 Pricing Arrangement: Firm Fixed Price
1 Each
DESCRIPTION: Phase 2B-WWYK200132 -Renovate Restrooms - B2121, Posts C7, 2C7, B19, and 2B19
EEIC: 52200
Product Service Code: Z1AA Claimant Program Code: C2 Pricing Arrangement: Firm Fixed Price
1 Each
Section C - Description/Specifications/Statement of Work
Requirements WWYK200132 - Renovate Restrooms - B2121, Posts C7, 2C7, B19, and 2B19
Section D - Packaging and Marking
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.246-4 Inspection of Services-Fixed-Price. Aug 1996 52.246-12 Inspection of Construction. Aug 1996 Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Destination Instructions: See Statement of Work (SOW) for Acceptance/inspection criteria. Contact the POC listed for any additional guidance.
DoDAAC: FA8137 CountryCode: USA
FA8137 AFSC PZIOC
CP 405 739 4040, 7858 5TH ST STE 1
TINKER AFB, OK 73145-9125
UNITED STATES
Billy Deal Email: billy.deal.2@us.af.mil Telephone: 405-739-4975
Inspection and Acceptance Location
Both Destination Instructions: See Statement of Work (SOW) for Acceptance/inspection criteria. Contact the POC listed for any additional guidance.
DoDAAC: FA8137 CountryCode: USA
FA8137 AFSC PZIOC
CP 405 739 4040, 7858 5TH ST STE 1
TINKER AFB, OK 73145-9125
UNITED STATES
Billy Deal Email: billy.deal.2@us.af.mil Telephone: 405-739-4975
Inspection and Acceptance Location
Both Destination Instructions: See Statement of Work (SOW) for Acceptance/inspection criteria. Contact the POC listed for any additional guidance.
DoDAAC: FA8137 CountryCode: USA
FA8137 AFSC PZIOC
CP 405 739 4040, 7858 5TH ST STE 1
TINKER AFB, OK 73145-9125
UNITED STATES
Billy Deal Email: billy.deal.2@us.af.mil Telephone: 405-739-4975
Section F - Deliveries or Performance Overall Contract Delivery Period
Line Item Delivery Schedule Quantity Address and POC
Delivery Schedule From date of lead time event to completion of performance 630 Calendar Days Date of Notice to Proceed Receipt
1 Each Service Performance Site DoDAAC: FA8137 CountryCode: USA
FA8137 AFSC PZIOC
CP 405 739 4040, 7858 5TH ST STE 1
TINKER AFB, OK 73145-9125
UNITED STATES
Billy Deal Email: billy.deal.2@us.af.mil Telephone: 405-739-4975
Delivery Schedule From date of lead time event to completion of performance 630 Calendar Days Date of Notice to Proceed Receipt
1 Each Service Performance Site DoDAAC: FA8137 CountryCode: USA
FA8137 AFSC PZIOC
CP 405 739 4040, 7858 5TH ST STE 1
TINKER AFB, OK 73145-9125
UNITED STATES
Billy Deal Email: billy.deal.2@us.af.mil Telephone: 405-739-4975
Delivery Schedule From date of lead time event to completion of performance 630 Calendar Days Date of Notice to Proceed Receipt
1 Each Service Performance Site DoDAAC: FA8137 CountryCode: USA
FA8137 AFSC PZIOC
CP 405 739 4040, 7858 5TH ST STE 1
TINKER AFB, OK 73145-9125
UNITED STATES
Billy Deal Email: billy.deal.2@us.af.mil Telephone: 405-739-4975
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.201-7000 Contracting Officer's Representative. Dec 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
As prescribed in 232.7004(b), use the following clause:
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause-
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall-
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC F03000 Issue By DoDAAC FA8137 Admin DoDAAC FA8137 Inspect By DoDAAC F3YCH Ship To Code F3YCH Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) F3YCH Service Acceptor (DoDAAC) F3YCH Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____ (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
72CPTS_FMASSYSTEMS@US.AF.MIL
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
Section I - Contract Clauses 252.225-7048 Export-Controlled Items.
As prescribed in , use the following clause: 225.7901-4
EXPORT CONTROLLED ITEMS (JUNE 2013)
(a) "Export-controlled items," as used in this clause, means items subject to the Export Administration Regulations (EAR) (15 CFR Parts 730-774) or the Definition.
International Traffic in Arms Regulations (ITAR) (22 CFR Parts 120-130). The term includes:
(1) "Defense items," defined in the Arms Export Control Act, 22 U.S.C. 2778(j)(4)(A), as defense articles, defense services, and related technical data, and further defined in the ITAR, 22 CFR Part 120.
(2) "Items," defined in the EAR as "commodities", "software", and "technology," terms that are also defined in the EAR, 15 CFR 772.1.
(b) The Contractor shall comply with all applicable laws and regulations regarding export-controlled items, including, but not limited to, the requirement for contractors to register with the Department of State in accordance with the ITAR. The Contractor shall consult with the Department of State regarding any questions relating to compliance with the ITAR and shall consult with the Department of Commerce regarding any questions relating to compliance with the EAR.
(c) The Contractor's responsibility to comply with all applicable laws and regulations regarding export-controlled items exists independent of, and is not established or limited by, the information provided by this clause.
(d) Nothing in the terms of this contract adds, changes, supersedes, or waives any of the requirements of applicable Federal laws, Executive orders, and regulations, including but not limited to--
(1) The Export Administration Act of 1979, as amended (50 U.S.C. App. 2401, ); et seq.
(2) The Arms Export Control Act (22 U.S.C. 2751, .); et seq
(3) The International Emergency Economic Powers Act (50 U.S.C. 1701, et seq.);
(4) The Export Administration Regulations (15 CFR Parts 730-774);
(5) The International Traffic in Arms Regulations (22 CFR Parts 120-130); and
(6) Executive Order 13222, as extended.
(e) The Contractor shall include the substance of this clause, including this paragraph (e), in all subcontracts.
(End of clause)
52.232-27 Prompt Payment for Construction Contracts.
As prescribed in , insert the following clause: (b)32.908
Prompt Payment for Contracts Construction (Jan 2017)
Notwithstanding any other payment terms in this contract, the Government will make payments under the terms and conditions specified in this clause. The invoice Government considers payment as being made on the a check is dated or the date of an . Definitions of pertinent terms are set forth in day electronic funds transfer sections , , and of the Federal Regulation. All days referred to in this clause are calendar days, unless otherwise specified. 2.101 32.001 32.902 Acquisition (However, see paragraph (a)(3) concerning payments due on Saturdays, Sundays, and legal holidays.)
(a) Invoice payments-
(1) Types of payments invoice . For purposes of this clause, there are several types of payments that occur under this contract, as follows: invoice may
(i) Progress payments, if provided for elsewhere in this contract, based on approval of the estimated amount and value of work or services Contracting Officer performed, including payments for reaching milestones in any project.
(A) The due date for making such payments is 14 days after the designated billing office receives a proper payment request. If the designated billing office fails to annotate the payment request with the actual date of receipt at the time of receipt, the payment due date is the 14 thday after the date of the Contractor's payment request, provided the designated billing office receives a proper payment request and there is no disagreement over quantity, quality, or Contractor compliance with contract requirements.
(B) The due date for payment of any amounts retained by the in accordance with the clause at , Payments Under Fixed-Price Contracting Officer 52.232-5 Contracts, is as specified in the contract or, if not specified, 30 days after approval by the for release to the Contractor.Construction Contracting Officer
(ii) Final payments based on completion and acceptance of all work and presentation of release of all against the Government arising by virtue of the claims contract, and payments for partial deliveries that have been accepted by the Government ( each separate building, public work, or other division of the contract e.g., for which the price is stated separately in the contract).
(A) The due date for making such payments is the later of the following two events:
(1) The 30 thday after the designated billing office receives a from the Contractor. proper invoice
FA813725R0014
https://www.acquisition.gov/dfars/part-225-foreign-acquisition#DFARS_225.7901-4 https://www.acquisition.gov/far/part-32#FAR_32_908 https://www.acquisition.gov/far/part-2#FAR_2_101 https://www.acquisition.gov/far/part-32#FAR_32_001 https://www.acquisition.gov/far/part-32#FAR_32_902 https://www.acquisition.gov/far/part-52#FAR_52_232_5
(2) The 30 thday after Government acceptance of the work or services completed by the Contractor. For a final when the payment amount is subject to invoice contract settlement actions ( release of ), acceptance is deemed to occur on the effective date of the contract settlement.e.g., claims
(B) If the designated billing office fails to annotate the with the date of actual receipt at the time of receipt, the payment due date is the 30 thday after invoice invoice the date of the Contractor's , provided the designated billing office receives a and there is no disagreement over quantity, quality, or invoice proper invoice Contractor compliance with contract requirements.
(2) Contractor's invoice. The Contractor prepare and submit to the designated billing office specified in the contract. A include the shall invoices proper invoice must items listed in paragraphs (a)(2)(i) through (a)(2)(xi) of this clause. If the does not comply with these requirements, the designated billing office return it invoice must within 7 days after receipt, with the reasons why it is not a . When computing any interest penalty owed the Contractor, the Government will take into proper invoice account if the Government notifies the Contractor of an improper in an untimely manner. invoice
(i) Name and address of the Contractor.
(ii) Invoice date and number. (The Contractor date as close as possible to the date of mailing or transmission.) invoice should invoices
(iii) Contract number or other authorization for work or services performed (including order number and ). line item number
(iv) Description of work or services performed.
(v) Delivery and payment terms ( discount for prompt payment terms).e.g.,
(vi) Name and address of Contractor official to whom payment is to be sent ( be the same as that in the contract or in a proper notice of assignment).must
(vii) Name (where practicable), title, phone number, and mailing address of person to notify in the event of a defective . invoice
(viii) For payments described in paragraph (a)(1)(i) of this clause, substantiation of the amounts requested and certification in accordance with the requirements of the clause at , Payments Under Fixed-Price Contracts. 52.232-5 Construction
(ix) Taxpayer Identification Number (TIN). The Contractor include its TIN on the only if required elsewhere in this contract. shall invoice
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor include EFT banking information on the only if required elsewhere in this contract. shall invoice
(B) If EFT banking information is not required to be on the , in order for the to be a , the Contractor have submitted correct EFT invoice invoice proper invoice shall banking information in accordance with the applicable provision ( , Submission of Information with ), solicitation e.g., 52.232-38 Electronic Funds Transfer Offer
( , Payment by - , or , Payment by -contract clause e.g., 52.232-33 Electronic Funds Transfer System for Award Management 52.232-34 Electronic Funds Transfer Other Than ), or applicable agency procedures. System for Award Management
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(xi) Any other information or documentation required by the contract.
(3) Interest penalty. The designated payment office will pay an interest penalty automatically, without request from the Contractor, if payment is not made by the due date and the conditions listed in paragraphs (a)(3)(i) through (a)(3)(iii) of this clause are met, if applicable. However, when the due date falls on a Saturday, Sunday, or legal holiday, the designated payment office make payment on the following working without incurring a late payment interest penalty. may day
(i) The designated billing office received a . proper invoice
(ii) The Government processed a or other Government documentation authorizing payment and there was no disagreement over quantity, quality, receiving report Contractor compliance with any contract term or condition, or requested progress payment amount.
(iii) In the case of a final for any balance of funds due the Contractor for work or services performed, the amount was not subject to further contract invoice settlement actions between the Government and the Contractor.
(4) Computing penalty amount. The Government will compute the interest penalty in accordance with the Office of Management and Budget prompt payment regulations at . 5 CFR Part 1315
(i) For the sole purpose of computing an interest penalty that might be due the Contractor for payments described in paragraph (a)(1)(ii) of this clause, Government acceptance or approval is deemed to occur constructively on the 7 thday after the Contractor has completed the work or services in accordance with the terms and conditions of the contract. If actual acceptance or approval occurs within the constructive acceptance or approval period, the Government will base the determination of an interest penalty on the actual date of acceptance or approval. Constructive acceptance or constructive approval requirements do not apply if there is a disagreement over quantity, quality, or Contractor compliance with a contract provision. These requirements also do not compel Government officials to accept work or services, approve Contractor estimates, perform contract administration functions, or make payment prior to fulfilling their responsibilities.
(ii) The prompt payment regulations at 5 CFR1315.10(c) do not require the Government to pay interest penalties if payment delays are due to disagreement between the Government and the Contractor over the payment amount or other issues involving contract compliance, or on amounts temporarily withheld or retained in accordance with the terms of the contract. The Government and the Contractor resolve involving disputes, and any interest that be shall claims may payable in accordance with the clause at FAR , Disputes. 52.233-1
(5) Discounts for prompt payment. The designated payment office will pay an interest penalty automatically, without request from the Contractor, if the Government takes a discount for prompt payment improperly. The Government will calculate the interest penalty in accordance with the prompt payment regulations at 5 CFR
.Part 1315
(6) Additional interest penalty.
(i) The designated payment office will pay a penalty amount, calculated in accordance with the prompt payment regulations at in addition to the 5 CFR Part 1315 interest penalty amount only if-
(A) The Government owes an interest penalty of $1 or more;
(B) The designated payment office does not pay the interest penalty within 10 days after the date the amount is paid; and invoice
FA813725R0014
https://www.acquisition.gov/far/part-52#FAR_52_232_5 https://www.acquisition.gov/far/part-52#FAR_52_232_38 https://www.acquisition.gov/far/part-52#FAR_52_232_33 https://www.acquisition.gov/far/part-52#FAR_52_232_34 https://www.acquisition.gov/far/part-52#FAR_52_233_1
(C) The Contractor makes a written demand to the designated payment office for additional penalty payment, in accordance with paragraph (a)(6)(ii) of this clause, postmarked not later than 40 days after the date the amount is paid. invoice
(ii)
(A) The Contractor support written demands for additional penalty payments with the following data. The Government will not request any additional data. The shall Contractor - shall
(1) Specifically assert that late payment interest is due under a specific , and request payment of all overdue late payment interest penalty and such invoice additional penalty as be required; may
(2) Attach a copy of the on which the unpaid late payment interest was due; and invoice
(3) State that payment of the principal has been received, including the date of receipt.
(B) If there is no postmark or the postmark is illegible-
(1) The designated payment office that receives the demand will annotate it with the date of receipt provided the demand is received on or before the 40 thday after payment was made; or
(2) If the designated payment office fails to make the required annotation, the Government will determine the demand's validity based on the date the Contractor has placed on the demand, provided such date is no later than the 40 thday after payment was made.
(b) Contract financing payments. If this contract provides for contract financing, the Government will make contract financing payments in accordance with the applicable contract financing clause.
(c) Subcontract clause requirements. The Contractor include in each subcontract for property or services (including a material supplier) for the purpose of shall performing this contract the following:
(1) Prompt payment for subcontractors. A payment clause that obligates the Contractor to pay the subcontractor for satisfactory performance under its subcontract not later than 7 days from receipt of payment out of such amounts as are paid to the Contractor under this contract.
(2) Interest for subcontractors. An interest penalty clause that obligates the Contractor to pay to the subcontractor an interest penalty for each payment not made in accordance with the payment clause-
(i) For the period beginning on the after the required payment date and ending on the date on which payment of the amount due is made; and day
(ii) Computed at the rate of interest established by the Secretary of the Treasury, and published in the , for interest payments under 41 U.S.C. 7109 Federal Register in effect at the time the Contractor accrues the obligation to pay an interest penalty.
(3) Subcontractor clause flowdown. A clause requiring each subcontractor to-
(i) Include a payment clause and an interest penalty clause conforming to the standards set forth in paragraphs (c)(1) and (c)(2) of this clause in each of its subcontracts; and
(ii) Require each of its subcontractors to include such clauses in their subcontracts with each lower-tier subcontractor or supplier.
(d) Subcontract clause interpretation. The clauses required by paragraph (c) of this clause not be construed to impair the right of the Contractor or a shall subcontractor at any tier to negotiate, and to include in their subcontract, provisions that-
(1) Retainage permitted. Permit the Contractor or a subcontractor to retain (without cause) a specified percentage of each progress payment otherwise due to a subcontractor for satisfactory performance under the subcontract without incurring any obligation to pay a late payment interest penalty, in accordance with terms and conditions agreed to by the parties to the subcontract, giving such recognition as the parties deem appropriate to the ability of a subcontractor to furnish a performance bond and a payment bond;
(2) Withholding permitted. Permit the Contractor or subcontractor to make a determination that part or all of the subcontractor's request for payment be may withheld in accordance with the subcontract agreement; and
(3) Withholding requirements. Permit such withholding without incurring any obligation to pay a late payment penalty if-
(i) A notice conforming to the standards of paragraph (g) of this clause previously has been furnished to the subcontractor; and
(ii) The Contractor furnishes to the a copy of any notice issued by a Contractor pursuant to paragraph (d)(3)(i) of this clause. Contracting Officer
(e) Subcontractor withholding procedures. If a Contractor, after making a request for payment to the Government but before making a payment to a subcontractor for the subcontractor's performance covered by the payment request, discovers that all or a portion of the payment otherwise due such subcontractor is subject to withholding from the subcontractor in accordance with the subcontract agreement, then the Contractor - shall
(1) Subcontractor notice. Furnish to the subcontractor a notice conforming to the standards of paragraph (g) of this clause as soon as practicable upon ascertaining the cause giving rise to a withholding, but prior to the due date for subcontractor payment;
(2) noticeContracting Officer . Furnish to the , as soon as practicable, a copy of the notice furnished to the subcontractor pursuant to paragraph Contracting Officer (e)(1) of this clause;
(3) Subcontractor progress payment reduction. Reduce the subcontractor's progress payment by an amount not to exceed the amount specified in the notice of withholding furnished under paragraph (e)(1) of this clause;
(4) Subsequent subcontractor payment. Pay the subcontractor as soon as practicable after the correction of the identified subcontract performance deficiency, and-
(i) Make such payment within-
(A) Sevendays after correction of the identified subcontract performance deficiency (unless the funds therefor be recovered from the Government because of must a reduction under paragraph (e)(5)(i)) of this clause; or
(B) Sevendays after the Contractor recovers such funds from the Government; or
(ii) Incur an obligation to pay a late payment interest penalty computed at the rate of interest established by the Secretary of the Treasury, and published in the , for interest payments under 41 U.S.C. 7109 in effect at the time the Contractor accrues the obligation to pay an interest penalty;Federal Register
(5) Notice to Contracting Officer. Notify the upon- Contracting Officer
(i) Reduction of the amount of any subsequent certified application for payment; or
(ii) Payment to the subcontractor of any withheld amounts of a progress payment, specifying-
(A) The amounts withheld under paragraph (e)(1) of this clause; and
(B) The dates that such withholding began and ended; and
(6) Interest to Government. Be obligated to pay to the Government an amount equal to interest on the withheld payments (computed in the manner provided in 31 U.S.C. 3903(c)(1)), from the 8 thday after receipt of the withheld amounts from the Government until-
(i) The the identified subcontractor performance deficiency is corrected; or day
(ii) The date that any subsequent payment is reduced under paragraph (e)(5)(i) of this clause.
(f) Third-party deficiency reports-
(1) Withholding from subcontractor. If a Contractor, after making payment to a first-tier subcontractor, receives from a supplier or subcontractor of the first-tier subcontractor (hereafter referred to as a "second-tier subcontractor") a written notice in accordance with 40 U.S.C. 3133, asserting a deficiency in such first-tier subcontractor's performance under the contract for which the Contractor be ultimately liable, and the Contractor determines that all or a portion of future may payments otherwise due such first-tier subcontractor is subject to withholding in accordance with the subcontract agreement, the Contractor , without incurring may an obligation to pay an interest penalty under paragraph (e)(6) of this clause-
(i) Furnish to the first-tier subcontractor a notice conforming to the standards of paragraph (g) of this clause as soon as practicable upon making such determination; and
(ii) Withhold from the first-tier subcontractor's next available progress payment or payments an amount not to exceed the amount specified in the notice of withholding furnished under paragraph (f)(1)(i) of this clause.
(2) Subsequent payment or interest charge. As soon as practicable, but not later than 7 days after receipt of satisfactory written notification that the identified subcontract performance deficiency has been corrected, the Contractor - shall
(i) Pay the amount withheld under paragraph (f)(1)(ii) of this clause to such first-tier subcontractor; or
(ii) Incur an obligation to pay a late payment interest penalty to such first-tier subcontractor computed at the rate of interest established by the Secretary of the Treasury, and published in the , for interest payments under 41 U.S.C. 7109 in effect at the time the Contractor accrues the obligation to pay an Federal Register interest penalty.
(g) Written notice of subcontractor withholding. The Contractor issue a written notice of any withholding to a subcontractor (with a copy furnished to the shall ), specifying-Contracting Officer
(1) The amount to be withheld;
(2) The specific causes for the withholding under the terms of the subcontract; and
(3) The remedial actions to be taken by the subcontractor in order to receive payment of the amounts withheld.
(h) Subcontractor payment entitlement. The Contractor not request payment from the Government of any amount withheld or retained in accordance with may paragraph (d) of this clause until such time as the Contractor has determined and certified to the that the subcontractor is entitled to the Contracting Officer payment of such amount.
(i) Prime-subcontractor disputes. A dispute between the Contractor and subcontractor relating to the amount or entitlement of a subcontractor to a payment or a late payment interest penalty under a clause included in the subcontract pursuant to paragraph (c) of this clause does not constitute a dispute to which the Government is a party. The Government not be interpleaded in any judicial or administrative proceeding involving such a dispute. may
(j) Preservation of prime-subcontractor rights. Except as provided in paragraph (i) of this clause, this clause not limit or impair any contractual, administrative, shall or judicial remedies otherwise available to the Contractor or a subcontractor in the event of a dispute involving late payment or nonpayment by the Contractor or deficient subcontract performance or nonperformance by a subcontractor.
(k) Non-recourse for prime contractor interest penalty. The Contractor's obligation to pay an interest penalty to a subcontractor pursuant to the clauses included in a subcontract under paragraph (c) of this clause not be construed to be an obligation of the Government for such interest penalty. A cost-reimbursement shall claim not include any amount for reimbursement of such interest penalty.may
(l) Overpayments. If the Contractor becomes aware of a duplicate contract financing or payment or that the Government has otherwise overpaid on a invoice contract financing or payment, the Contractor - invoice shall
(1) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the-
(i) Circumstances of the overpayment ( , duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);e.g.
(ii) Affected contract number and number if applicable; delivery order
(iii) Affected or , if applicable; and line item subline item
(iv) Contractor point of contact.
(2) Provide a copy of the remittance and supporting documentation to the . Contracting Officer
(End of clause)
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.202-1 Definitions. Jun 2020 52.203-3 Gratuities. Apr 1984 52.203-5 Covenant Against Contingent Fees. May 2014 52.203-6 Restrictions on Subcontractor Sales to the Government. Jun 2020 52.203-7 Anti-Kickback Procedures. Jun 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. May 2014 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. May 2014 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. Jun 2020 52.203-17 Contractor Employee Whistleblower Rights. Nov 2023 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. Jun 2020 52.204-13 System for Award Management Maintenance. Oct 2018 52.204-18 Commercial and Government Entity Code Maintenance. Aug 2020
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities.
Dec 2023
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
Nov 2021
52.204-27 Prohibition on a ByteDance Covered Application. Jun 2023
52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment.
Nov 2021
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. Oct 2018 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations. Nov 2015 52.215-2 Audit and Records-Negotiation. Jun 2020 52.215-9 Changes or Additions to Make-or-Buy Program. Oct 1997 52.215-12 Subcontractor Certified Cost or Pricing Data. Jun 2020 52.219-8 Utilization of Small Business Concerns. Feb 2024 52.219-33 Nonmanufacturer Rule. Sep 2021 52.222-3 Convict Labor. Jun 2003 52.222-6 Construction Wage Rate Requirements. Aug 2018 52.222-7 Withholding of Funds. May 2014 52.222-8 Payrolls and Basic Records. Jul 2021 52.222-9 Apprentices and Trainees. Jul 2005 52.222-10 Compliance with Copeland Act Requirements. Feb 1988 52.222-11 Subcontracts (Labor Standards). May 2014 52.222-12 Contract Termination-Debarment. May 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. May 2014 52.222-14 Disputes Concerning Labor Standards. Feb 1988 52.222-15 Certification of Eligibility. May 2014 52.222-21 Prohibition of Segregated Facilities. Apr 2015 52.222-26 Equal Opportunity. Sep 2016 52.222-27 Affirmative Action Compliance Requirements for Construction. Apr 2015 52.222-35 Equal Opportunity for Veterans. Jun 2020 52.222-36 Equal Opportunity for Workers with Disabilities. Jun 2020 52.222-37 Employment Reports on Veterans. Jun 2020 52.222-50 Combating Trafficking in Persons. Nov 2021 52.222-54 Employment Eligibility Verification. May 2022 52.223-21 Foams. May 2024 52.223-23 Sustainable Products and Services. May 2024 52.225-13 Restrictions on Certain Foreign Purchases. Feb 2021 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.228-2 Additional Bond Security. Oct 1997 52.228-5 Insurance-Work on a Government Installation. Jan 1997 52.228-14 Irrevocable Letter of Credit. Nov 2014 52.229-3 Federal, State, and Local Taxes. Feb 2013 52.229-12 Tax on Certain Foreign Procurements. Feb 2021 52.232-23 Assignment of Claims. May 2014 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Mar 2023 52.233-3 Protest after Award. Aug 1996 52.233-4 Applicable Law for Breach of Contract Claim. Oct 2004 52.242-13 Bankruptcy. Jul 1995 52.243-4 Changes. Jun 2007
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7001 Prohibition on Persons Convicted of Fraud or Other Defense-Contract-Related Felonies. Jan 2023 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. May 2024 252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services. Jan 2023 252.204-7020 NIST SP 800-171 DoD Assessment Requirements. Nov 2023 252.205-7000 Provision of Information to Cooperative Agreement Holders. Oct 2024
252.209-7004 Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State Sponsor of Terrorism.
May 2019
252.215-7002 Cost Estimating System Requirements. Dec 2012
252.215-7014 Exception from Certified Cost or Pricing Data Requirements for Foreign Military Sales Indirect Offsets.
Dec 2022
252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements. Jan 2023 252.223-7008 Prohibition of Hexavalent Chromium. Jan 2023 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023
252.226-7001 Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns.
Jan 2023
252.232-7010 Levies on Contract Payments. Dec 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel. Jan 2023 252.243-7002 Requests for Equitable Adjustment. Dec 2022 252.244-7000 Subcontracts for Commercial Products or Commercial Services. Nov 2023
FAR Clauses Incorporated by Full Text
52.211-12 Liquidated Damages-Construction. (Sep 2000)
As prescribed in 11.503(b), insert the following clause in solicitations and contracts:
Liquidated Damages-Construction (Sept 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of ____[Contracting Officer insert amount] for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.219-14 Limitations on Subcontracting. (Oct 2022)
As prescribed in 19.507(e), insert the following clause:
Limitations on Subcontracting (Oct 2022)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Definition. Similarly situated entity, as used in this clause, means a first-tier subcontractor, including an independent contractor, that-
(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and
(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.
(c) Applicability. This clause applies only to-
(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(3) Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;
(4) Orders expected to exceed the simplified acquisition threshold and that are-
(i) Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or
(ii) Issued directly to small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii);
(5) Orders, regardless of dollar value, that are-
(i) Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or
(ii) Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 19.504(c)(1)(ii); and
(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.
(d) Independent contractors. An independent contractor shall be considered a subcontractor.
(e) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for-
(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract;
(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;
(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded; or
(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 percent subcontract amount that cannot be exceeded.
(f) The Contractor shall comply with the limitations on subcontracting as follows:
(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause-
[Contracting Officer check as appropriate.]
[ ] By the end of the base term of the contract and then by the end of each subsequent option period; or
[ ] By the end of the performance period for each order issued under the contract.
(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.
(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.
(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protégé in the joint venture must be more than administrative functions.
(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by the 8(a) participants in the joint venture must be more than administrative functions.
(End of clause)
52.219-28 Post-Award Small Business Program Rerepresentation. (Feb 2024)
As prescribed in 19.309(c)(1), insert the following clause:
Post-Award Small Business Program Rerepresentation (Feb 2024)
(a) Definitions. As used in this clause-
Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern-
(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (d) of this clause.
(2) Affiliates, as used in this definition, means business concerns, one of whom directly or indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .