200132_ATT11_IFC_Drawings_All_Phases.pdf

PDF 15 MB Posted

Attached to
TINKER AFB MAC BOA WWYK200132, Renovate Restrooms - B2121, Posts C7, 2C7, B19, and 2B19
Solicitation number
FA813725R0014
Issued by

About this file

This file contains architectural and engineering drawings for a renovation project at Tinker Air Force Base, Oklahoma. The project involves renovating restrooms in multiple buildings (B2121, Posts C7, 2C7, B19, and 2B19), with detailed plans for architectural, mechanical, electrical, fire protection, and plumbing systems. The comprehensive set of drawings includes demolition and new work plans, covering first and second floors, with specific focus on men's and women's restrooms, janitor closets, and associated spaces.

The renovation scope includes replacing fixtures, updating wall and floor tiles, installing new partitions, upgrading mechanical and electrical systems, and ensuring Americans with Disabilities Act (ADA) compliance. The project is part of a Multiple Award Contract (MAC) Base Operating Agreement (BOA) solicitation with the solicitation number FA813725R0014, exclusively for MAC BOA Holders. Potential contractors must attend an initial site visit to be considered eligible to propose, with a requirement to submit an Entry Access List for base access. The project is being executed by the Department of the Air Force Materiel Command Air Force Sustainment Center at Tinker Air Force Base in Oklahoma.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2283 2280 2212210

B2113

B2112

B2134

B2121

G

EN

ER

AL

SH

EE

T

IN

D

EX

G-001

JW

KH

C G

OF

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

W W

YK

R

EN

O

VA

TE

R

ES

TR

O O

M S, PO

ST

S C

AN

D

C 7, B

N

O V

H D

R

REVIEWED BY:

REVIEWED BY:

USING AGENCY:

ASBESTOS EVALUATION:

SAFETY:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

INDUSTRIAL HYGIENE:

DATE:

SIGNATURES

CORROSION ENGINEER: (CECE)

CE OPERATIONS: (CECO)

COMMUNICATIONS: (COMM)

CHIEF ENGINEER DIR: (CECE)

CHIEF DESIGN BRANCH: (CECE)

DESIGN MANAGER: (CECE)

ZONE MANAGER:

CONSTRUCTION MANAGEMENT: (CECE)

ENVIRONMENTAL:

BASE CIVIL ENGINEER: (CE)

FIRE DEPARTMENT: (CEFT)

WWYK200132

RENOVATE RESTROOMS,

POSTS C7 AND 2C7, B2121 -

PHASE 1

PROJECT DRAWING INDEX

SHT. SHEET TITLE

G-001 GENERAL NOTES, VICINITY MAP AND BUILDING KEY PLAN

SHT. SHEET TITLE

KEY PLAN:

APPROXIMATE

LOCATION

MECHANICAL

M-001

MD101

MD102

M-101 M-102

P-001

PD101

P-101 P-501 P-601

MECHANICAL SYMBOLS, LEGENDS & ABBREVIATIONS

MECHANICAL FIRST FLOOR ENLARGED PLAN - DEMOLITION

MECHANICAL SECOND FLOOR ENLARGED PLAN - DEMOLITION

MECHANICAL FIRST FLOOR ENLARGED PLAN - NEW WORK

MECHANICAL SECOND FLOOR ENLARGED PLAN - NEW WORK

MECHANICAL DETAILS

MECHANICAL SCHEDULES AND CONTROLS

M-501 M-601

PLUMBING

PLUMBING SYMBOLS, LEGENDS & ABBREVIATIONS

PLUMBING FIRST FLOOR ENLARGED PLAN - DEMOLITION

PLUMBING FIRST FLOOR ENLARGED PLAN - NEW WORK

PLUMBING DETAILS

PLUMBING MATERIALS LIST & SCHEDULES

ARCHITECTURAL

AD101

A-101 A-102

ARCHITECTURAL FIRST FLOOR AND REFLECTED CEILING DEMOLITION PLAN

ARCHITECTURAL FIRST FLOOR PLAN AND REFLECTED CEILING PLAN

ARCHITECTURAL SECOND FLOOR AND REFLECTED CEILING PLAN

F-001

FA101

FX101

FIRE PROTECTION

FIRE PROTECTION GENERAL NOTES

FIRE ALARM FIRST FLOOR PLAN - NEW WORK

SPRINKLER PROTECTION PLAN - NEW WORK

ELECTRICAL

E-001

ED101

E-101 E-102

ELECTRICAL SYMBOLS, LEGENDS & ABBREVIATIONS

ELECTRICAL FIRST FLOOR ENLARGED PLAN - DEMOLITION

ELECTRICAL FIRST FLOOR ENLARGED PLAN

ELECTRICAL SECOND FLOOR ENLARGED PLAN

ELECTRICAL DETAILS

ELECTRICAL PARTIAL ONE-LINE DIAGRAM & SCHEDULES

E-501 E-601

A-401 A-501

ARCHITECTURAL INTERIOR ELEVATIONS

ARCHITECTURAL DETAILS AND SCHEDULES

P-901 PLUMBING ISOMETRICS

FD101 SPRINKLER PROTECTION DEMOLITION PLANS

G-101 LIFE SAFETY PLAN

RU

NW

AY

/36

RUNWAY 13/31

TA

XI

W

AY

G

TAXIW

AY H

TAXIWAY B

TAXIWAY C

TAXIWAY M

TA

XI

W

AY

K

TAXIWAY E

TAXIWAY A

TA

XIW

AY EE

TAXIWAY F

TAXIWAY D

TAXIWAY E

TAXIWAY J

TA

XI

W

AY

G

TAXIWAY A

TAXIW

AY H

TAXIWAY C

TAXIWAY D

TAXIWAY EE

TAXIWAY F

Elm Creek

Crutcho Creek

Kuhlman Creek

Kuhlman Creek

Elm Creek

East Crutcho Creek

El m

Cr ee k

Elm Creek

Elm Creek

Ku hlm an Cr ee k

Ea st

Cr utc ho C ree k

West Crutcho Creek W es t C ru tch o C re ek

Elm Creek

Soldier CreekSoldier Creek

Ea st

Cr utc ho C re ek

Elm Creek

Ea st

Cr utc ho C re ek

East Crutcho Creek

So ldi er Cr ee k

East C rutcho Creek

Soldier Creek

Soldier Creek

So ldi er C re ek

East Crutcho Creek

Arnold St.

Ea st

Dr

SE 74th St

SE 59th St.

Ai r D ep ot

Patrol Rd.

St aff

D r.

Reserve Rd.

5th Ave

"A " A ve

Mu nit ion s R d.

W ar eh ou se

R d.

"B " A ve

7th St.

"H " A ve

Mc Na rn ey

A ve

Mitchell Ave

Al er t R d.

Co ok

A ve

W es t D r.

"E "A ve

Extender Dr.

Sentry Rd.

34th St.

Twining Dr.

5th Ave.

Jo ne s

Globemaster Dr.

To we r R d.

Vanaman Rd.

Ind us tria l B lvd

So uth

S t.

1st St.

Do oli ttle A ve

Picnic Rd.

Ja me s D r.

W olfe Dr.

Ai r D ep ot

Ai r D ep ot

"D " A ve

Rawlings Ave.

Perimeter Rd.

Rapcon Rd.

Reserve Rd

"L " A ve

Hercules /Mercury Rd.

"F " A ve

1st St.

Br ow n D r.

Po nd

R d.

Ol d A ir D ep ot

Airey Dr.

General Motors Dr

Bradley Dr.

Entrance Road "C"

Entrance Road "A"

"C " A ve

"C " A ve

Garden Plot Rd.

Hilltop Rd.

Do rm ito ry

Rd

Dormitory Rd.

"M " A ve

Chennault Dr.

Mitchell Ave.

Vandenburg St.

Engine Test Dr.

Doolittle Ave

W hit e D r.

3rd Ave.

"D " D riv e

Ba ll P ar k R d.

Joint STARS Dr.

Ai r D ep ot

Bl vd

Turbine Dr. Turbine Dr.

Central Plant Dr.

6th St.6th St.

Falcon Dr.

Blac kbi rd D r.

W eyland loop

Propulsion Dr.

Thunderbolt D r.

Munitions Rd. Ext.

Codding Rd.

Starlifter Dr.

Chidlaw Ct.

Co rsa ir D r.

Rap tor

Ct.

Ni gh t H aw k C t.

Ph an tom D r.

Franklin

Po we rh ou se D r.

Sk ym as ter

D r.

Spaatz Ct.

La wr en ce

Mu nd ell

Nabors Dr.

Intruder Dr.

McNickle

Mi lle r D r.

Tail Feather Dr.

Holden Dr.

Air ey

Ci r.

Smith Ct.

Raven Ct.

Mitchell Ave

Air Dep ot Ai r D ep ot

Vanaman Rd.

1st St.

1st St.

416506510

59475946

11401128

62540

61089

838837

62509

62528

62523

62501X

43774

62512

62516

62525

3592135916

99999

62543

32101

71086

53902

50414

55300

56601

930G

948-E

911-E

948-W

61019

911-W

33001

35913

62501

65672

930S

45134

43609

42116

62517

62515

62526

62527

62503

62513

61289

62542

62501OK

11289

99999

62501

15930

15908

15904 15904

15908

15908

15904

15904

15908

62502

41046

62501

62514

62501

61018

71089

99999

45134

96022

43120

41157

44045

45815

40592

40935

43610

62522

41163

15930 15930

11824

B3708

B2113

B2112

B2134

B9001

B2121

VANCE GATE

BASE CIVIL ENGINEER

BLDG. 400

EAKER

GATE

TINKER GATE

PASS & ID B6611

HOPE GATE

CONTRACTOR

HAUL ROUTE

MAP LEGEND

GOTT GATE

TRUCK GATE

LIBERATOR GATE

CONTRACTING

B0003

FIRE DEPARTMENT

B0117

BASE OPERATIONS

B0240

PEGASUS GATE

PIAZZA GATE

TEMPORALLY CLOSED

LANCER GATE

HRUSKOCY GATE

N

B2121

LOCATION

TINKER AFB, OKC

VICINITY MAP

3 4 5

NOT IN SCOPE OF WORK

BUSINESS USE

465 SF/ 150 / 4 PER

BUSINESS USE

231 SF/ 150 / 2 PER BUSINESS USE

58 SF/ 150 / 1 PER

BUSINESS USE

57 SF/ 150 / 1 PER

STORAGE USE

144 SF/ 500 / 1 PER

O

FF

IC

E

B C

B C

B C

BUSINESS USE

657 SF/ 150 / 5 PER

STORAGE USE

31 SF/ 500 / 1 PER

BUSINESS USE

557 SF/ 150 / 4 PER

OF

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

W W

YK

R

EN

O

VA

TE

R

ES

TR

O O

M S, PO

ST

S C

AN

D

C 7, B

N

O V

H D

R

KEYPLAN

PROJECT

LOCATIONC7

FIRST FLOORN

NORTH

LI

FE

S

AF

ET

Y

G-101

D E

JM

W B

P

LA

N

LIFE SAFETY PLAN FIRST FLOOR

SCALE: 1/4" = 1'- 0"

G-101

EXISTING AREA (GSF)

LOADLOAD FACTOR AREA TYPEFLOOR

1ST LEVEL

1ST LEVEL BUSINESS

FLOOR

PROJECT AREA

OCCUPANT LOAD CALCULATION

LIFE SAFETY SYMBOLS:

150 SF/ OCC.BUSINESS USE

BUILDING CODE SUMMARY

UFC 3-600-01 (8 AUGUST 2016 WITH CHANGE 6)

UFC 1-200-01 (20 JUNE 2016 WITH CHANGE 3)

NFPA 101 REF.

TABLE 7.3.1.2

2021 IBC AS AMENDED BY UFC 1-200-01

2021 IEBC AS AMENDED BY UFC 3-600-01

2024 NFPA 101 LIFE SAFETY CODE

OCCUPANCY:

GROUP B BUSINESS (EXISTING BUSINESS USE)

GROUP S-1 STORAGE (EXISTING STORAGE USE)

TABLE 7.3.1.2

TOTAL 17

NFPA 101 OCCUPANCY

ROOM AREA / LOAD FACTOR / OCCUPANT LOAD OCCUPANCY LOAD PER SPACE

LIFE SAFETY NOTES:

1. FOR EXIT LIGHTS AND EMERGENCY

LIGHTING, SEE ELECTRICAL

LIGHTING DRAWINGS (E SERIES)

2. ALL MEANS OF EGRESS ARE

EXISTING.

LIFE SAFETY PLAN SECOND FLOOR

SCALE: 1/4" = 1'- 0"

G-101

2ND LEVEL BUSINESS 1,245

STORAGE USE 500 SF/ OCC. TABLE 7.3.1.212ND LEVEL

STORAGE USE 500 SF/ OCC. 11ST LEVEL

2ND LEVEL 150 SF/ OCC.BUSINESS USE TABLE 7.3.1.29

11/01/2024

C

B

C

B

FI

R

ST

F

LO

O

R

AN

D R

EF

LE

C

TE

D C

EI

LI

N G

D

EM

O

LI

TI

O N

P

LA

N

AD101

D S

JG

GENERAL NOTES:

1. DRAWINGS & SPECIFICATIONS ARE COMPONENTS OF THE

CONTRACT DOCUMENTS. REVIEW ALL DRAWINGS &

SPECIFICATIONS FOR THE COMPLETE SCOPE OF WORK.

NOTIFY CONSTRUCTION INSPECTOR IMMEDIATELY FOR

CLARIFICATION IF INCONSISTENCIES, CONTRADICTIONS, OR

OMISSIONS ARE DISCOVERED.

2. DO NOT SCALE DRAWINGS. IF DIMENSIONAL INFORMATION IS

REQUIRED & NOT FOUND, NOTIFY CONSTRUCTION

INSPECTOR IMMEDIATELY FOR CLARIFICATION.

3. ALL DIMENSIONS ARE TO COLUMN CENTERLINES, FACE OF

FINISHED WALLS, OR SURFACES, UNLESS NOTED

OTHERWISE.

4. REPAIR EXISTING WALLS TO REMAIN; REPAIRS SHALL MATCH

EXISTING WALL CONSTRUCTION.

5. REFER TO OTHER DISCIPLINE DRAWINGS FOR ITEMS NOT

SHOWN.

6. REMOVE EXISTING CONCRETE SLAB AS REQUIRED FOR

PLUMBING FIXTURE REPLACEMENT.

7. CONTRACTOR TO PROVIDE ABA - COMPLIANT TEMPORARY

FACILITY (FOR EACH PROJECT UNDER CONSTRUCTION) TO

MEET 2021 IPC FIXTURE COUNT BASED ON THE POPULATION

SERVED BY THE RESTROOM(S) BEING RENOVATED.

LOCATION OF THE TEMPORARY FACILITIES TO BE LOCATED

PER IPC 2021, 403.3.3.

8. CONTRACTOR TO REMOVE EXISTING ACCESSORIES (TOILET

PAPER DISPENSERS, SOAP DISPENSERS) AND RETURN TO

DRTC.

9. ALL EXISTING DIMENSIONS NOT VERIFIED BY LIDAR, VERIFY IN

FIELD

OF

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

W W

YK

R

EN

O

VA

TE

R

ES

TR

O O

M S, PO

ST

S C

AN

D

C 7, B

M

AY

H D

R

KEYPLAN

PROJECT

LOCATIONC7

FIRST FLOOR

FIRST FLOOR DEMOLITION PLAN - C7

SCALE: 1/4" = 1'- 0"

AD-101

DEMOLITION OF EXISTING STRUCTURAL CLAY

TILE WALL

EXISTING CMU WALL TO REMAIN.

EXISTING WIRE MESH PARTITION TO REMAIN

DEMOLITION OF EXISTING GYPSUM BOARD

CEILING AND SUSPENSION SYSTEM

DEMOLITION OF EXISTING ACOUSTICAL

CEILING TILE SUSPENSION SYSTEM

LEGEND:

REMOVE TRANSITION STRIPS, EXISTING HM DOOR, FRAMES

& HARDWARE

DEMOLISH EXISTING PLUMBING FIXTURES, COUNTERS,

AND TOILET ACCESSORIES - REF. PLUMBING

REMOVE EXISTING WALL IN ITS ENTIRETY.

REMOVE EXISTING FLOORING AND BASE, DRAINS, WALL

FINISHES AND FIXTURES. PREPARE SUB-SURFACES TO

RECEIVE NEW FINISH SYSTEMS

EXISTING WIRE MESH PARTITION TO REMAIN

DEMOLISH EXISTING ACOUSTICAL CEILING TILE AND

SUSPENSION SYSTEM

DEMOLISH LAVATORY - REF. PLUMBING

DEMOLISH BRICK PILASTER

DEMOLISH EXISTING TOILET AND URINAL PARTITIONS

DEMOLISH EXISTING GYPSUM BOARD CEILING

DEMOLISH EXISTING ACOUSTIC CEILING TILE AND

SUSPENSION SYSTEM. DEMOLISH GYPSUM BOARD AND

WOOD FRAMING SYSTEM IN ITS ENTIRETY (LOCATED

ABOVE TILE CEILING).

EXISTING CONCRETE COLUMN TO REMAIN

DEMO KEY NOTES:

MEN

WOMEN

MECHANICAL

JAN.

STORAGE

SHOWER

TYP.

TYP.

TYP.

TYP.

FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN - C7

SCALE: 1/4" = 1'- 0"

AD-101

TYP.

OK LF AO HE OT MAT AS DARIUS

SHROFF

A6884

11/01/2024

A7250

ROBERT

ANDREW

MATJASKO

NORTH

B

C

B

AR

C

H

IT

EC

TU

R

AL

FI

R

ST

F

LO

O

R P

LA

N

AN

D

R

EF

LE

C

TE

D

C

EI

LI

N

G P

LA

N

A-101

D S

JG

FIRST FLOOR REFLECTED CEILING PLAN C7 - NEW WORK

SCALE: 1/4" = 1'- 0"

A-101

GENERAL NOTES:

1. DRAWINGS & SPECIFICATIONS ARE COMPONENTS OF THE

CONTRACT DOCUMENTS. REVIEW ALL DRAWINGS &

SPECIFICATIONS FOR THE COMPLETE SCOPE OF WORK.

NOTIFY CONSTRUCTION INSPECTOR IMMEDIATELY FOR

CLARIFICATION IF INCONSISTENCIES, CONTRADICTIONS, OR

OMISSIONS ARE DISCOVERED.

2. DO NOT SCALE DRAWINGS. IF DIMENSIONAL INFORMATION IS

REQUIRED & NOT FOUND, NOTIFY CONSTRUCTION

INSPECTOR IMMEDIATELY FOR CLARIFICATION.

3. ALL DIMENSIONS ARE TO COLUMN CENTERLINES, FACE OF

FINISHED WALLS, OR SURFACES, UNLESS NOTED

OTHERWISE.

4. REPAIR EXISTING WALLS TO REMAIN; REPAIRS SHALL

MATCH EXISTING WALL CONSTRUCTION.

5. REFER TO OTHER DISCIPLINE DRAWINGS FOR ITEMS NOT

SHOWN.

OF

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

W W

YK

R

EN

O

VA

TE

R

ES

TR

O O

M S, PO

ST

S C

AN

D

C 7, B

M

AY

H D

R

KEYPLAN

PROJECT

LOCATIONC7

FIRST FLOOR

FIRST FLOOR PLAN C7 - NEW WORK

SCALE: 1/4" = 1'- 0"

A-101

HOLLOW METAL DOOR AND FRAME

TILE FLOOR

FLOOR-MOUNTED OVERHEAD-BRACED TOILET

PARTITION

WALL-MOUNTED URINAL SCREEN -

NEW PAPER TOWEL DISPENSER - G.F.C.I.

MOP SINK WITH RACK/SHELF MOUNTED ABOVE THE SINK

STAINLESS STEEL CORNER GUARDS

WALL-MOUNTED SOAP DISPENSER - G.F.C.I.

SOLID SURFACE COUNTER WITH INTEGRAL SOLID

SURFACE LAVATORIES

NEW PLUMBING FIXTURE - TYPICAL. REF. PLUMBING

DRAWINGS

PAINTED GYPSUM BOARD CEILING

KEY NOTES:

5 5

MEN

WOMEN MECHANICAL

CORR.

5'-0" CLEAR 3'-1" 3'-1"

'-1

1/

8"

3'-0"

5'-0"

CLEAR

3'-1" 3'-1" 3'-1" 3'-1" 3'-1" 3'-1"

2' -1

/4

'-4

/8

8'-10 3/4" 1'-11 5/8"1'-3 1/8"

/4

2' -8

/8

11'-8"

7' -6

/8

3'

-1 0"

2'-1 1/8" 6'-4 3/4" 2'-8 1/4" 5'-6"

1'-3 1/8"

1' -1

/4

2' -3

/8

'-3

/4

1' -1

/4

2' -3

/8

11 1/2"1'-3 1/8"

'-4

42'-8 5/8"

6' -9

/8

1'-7"

A*

A1

B

A1

A

A1

A1

B1

ME1

M1

W1

C7-3C7-2

C7-1

C7-5

CORR.

C7-4

A-401

A-401

A-401

A-401

8'-6" AFF

9'-0" AFF

8'-6" AFF

5' -0

" C

LE

AR

5'

-0

C

LE

AR

22'-5 3/4"

EQ. EQ. EQ.

8'-8 1/4"

2' -0 m ax

B B

A

A

3' -0

C

B1 A1A1

8'-6" AFF

A-

D

D

4'-11 5/8"

A1

WALL TYPES:

6" METAL STUDS W/ 1 LAYER 5/8" TYPE X GWB, 3 1/2" SOUND

BATT INSULATION, WITH 5/8" FIBER CEMENT BOARD (FCB) W/

3/8" TILE SYSTEM ON THE OTHER SIDE - A* = UL U419 1-HR

RATED

6" METAL STUDS W/ 1 LAYER 5/8" FCB EACH SIDE W/ 3/8" TILE

SYSTEM EACH SIDE

6" METAL STUDS W/ 3 1/2" BATT INSULATION, 5/8" FIBER

CEMENT BOARD (FCB) W/ 3/8" TILE SYSTEM ON ONE SIDE

3 5/8" METAL STUDS W/ 3 1/2" BATT INSULATION, 5/8" FIBER

CEMENT BOARD (FCB) W/ 3/8" TILE SYSTEM ON ONE SIDE

6" METAL STUDS W/ 3 1/2" BATT INSULATION, 5/8" TYPE X

GWB

6" METAL STUDS W/ 1 LAYER 5/8" TYPE X GWB EACH SIDE

COMBINATION OF TYPE B1 AND 6" STUD SUPPORTING 12"

TILE SHELF. REF. PARTITION TYPES ON A-501.

GENERAL NOTE: REF. DETAIL 4/A-501 FOR TYPICAL TILE

SYSTEM ON METAL STUDS AND FIBER CEMENT BOARD

A

A1

B

B1

B2

C

D

3'-1"

A

A*

A

A

EXISTING WALL ASSEMBLY TO REMAIN

NEW WALL ASSEMBLY

NEW GYPSUM CEILING

NOT IN CONTRACT

EXISTING WIRE MESH PARTITION TO REMAIN

2'X4' RECESSED TROFFER

2'X4' RECESSED EMERGENCY BACK UP

TROFFER

DOWNLIGHT

DOWNLIGHT WITH EMERGENCY BACK UP

NEW MECHANICAL EXHAUST GRILLE

ABA CLEARANCE

CEILING HEIGHT

LEGEND:

G.F.C.I. - GOVERNMENT FURNISHED CONTRACTOR INSTALLED

C.F.C.I. - CONTRACT FURNISHED CONTRACTOR INSTALLED

6'-9 3/4"

4' -6

OK LF AO HE OT MAT AS DARIUS

SHROFF

A6884

11/01/2024

A7250

ROBERT

ANDREW

MATJASKO

C

B

AR

C

H

IT

EC

TU

R

AL

SE

C

O N

D F

LO

O

R

AN

R

EF

LE

C

TE

D

C

EI

LI

N

G P

LA

N

A-102

D S

JG

GENERAL NOTES:

1. DRAWINGS & SPECIFICATIONS ARE COMPONENTS OF THE

CONTRACT DOCUMENTS. REVIEW ALL DRAWINGS &

SPECIFICATIONS FOR THE COMPLETE SCOPE OF WORK.

NOTIFY CONSTRUCTION INSPECTOR IMMEDIATELY FOR

CLARIFICATION IF INCONSISTENCIES, CONTRADICTIONS, OR

OMISSIONS ARE DISCOVERED.

2. DO NOT SCALE DRAWINGS. IF DIMENSIONAL INFORMATION IS

REQUIRED AND NOT FOUND, NOTIFY CONSTRUCTION

INSPECTOR IMMEDIATELY FOR CLARIFICATION.

3. ALL DIMENSIONS ARE TO COLUMN CENTERLINES, FACE OF

FINISHED WALLS, OR SURFACES, UNLESS NOTED

OTHERWISE.

4. REPAIR EXISTING WALLS TO REMAIN; REPAIRS SHALL MATCH

EXISTING WALL CONSTRUCTION.

5. REFER TO OTHER DISCIPLINE DRAWINGS FOR ITEMS NOT

SHOWN.

6. ALL EXISTING PLUMBING FIXTURES, BATHROOM PARTITIONS

AND COUNTER TOPS TO REMAIN.

EXISTING LIGHT COVE TO REMAIN

EXISTING PLUMBING FIXTURES TO REMAIN

DEMOLISH EXISTING CEILING GRID AND REPLACE WITH

NEW 2' X 2' ACOUSTICAL CEILING TILE AND SUSPENSION

SYSTEM

KEY NOTES:

OF

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

W W

YK

R

EN

O

VA

TE

R

ES

TR

O O

M S, PO

ST

S C

AN

D

C 7, B

M

AY

H D

R

KEYPLAN

PROJECT

LOCATION

SECOND FLOOR

2C7

EXISTING SECOND FLOOR RESTROOM PLAN - 2C7

SCALE: 1/4" = 1'- 0"

A-102

EXISTING WALL ASSEMBLY TO REMAIN

EXISTING ACOUSTICAL CEILING TILE

SUSPENSION SYSTEM TO BE DEMOLISHED

AND REPLACED

NEW MECHANICAL EXHAUST GRILLE

LEGEND:

EXISTING SECOND FLOOR RESTROOM PLAN - 2C7

SCALE: 1/4" = 1'- 0"

A-102

MEN

WOMEN

MEN

WOMEN

50'-1 1/2"

'-3

/2

'-6

/2

OK LF AO HE OT MAT AS DARIUS

SHROFF

A6884

11/01/2024

A7250

ROBERT

ANDREW

MATJASKO

7"-9"

ABA TOILET

TA-5

LIQUID SOAP

DISPENSER

36" MIN

12" MIN

"-1

9" T.O

. S

EA

T

" M

AX

TO

B .O

OP

ER

AB

LE

P

AR

T

TA-3

TOILET TISSUE

DISPENSER

GRAB BAR

GRAB BAR

"-3

6"

TO

T.

O.

GR

IP

PI

NG

S

UR

FA

CE

12" MAX. 42" MIN

" M

AX

TO

T.

O.

OP

ER

AB

LE

P

AR

T/O

PE

NI

NG

TA-4

DISPENSER

PAPER TOWEL

"-4

8"

TO

B.

O.

O

PE

NI

NG

TA-6

NAPKIN DISPOSER

FEMININE

"-1

8"

TO

DI

SP

EN

SE

R

TA-3

TOILET TISSUE

DISPENSER

3'- 9"

9" M

IN

" M

AX

TO

FL

US

H

HA

ND

LE

ST

D-

" M

AX

. T

.O

HC

-17

" M

AX

T.

O.

R

IM

13 1/2" MIN

16"-18"

BLOCKING

BLOCKING

24" MAX

17"-19"

24" MIN

35" - 37" CLEAR

AMBULATORY STALL

54" MIN

TA-2

TA-1

" M

AX

TO

T.

O.

OP

ER

AB

LE

P

AR

T/O

PE

NI

NG

TA-13

DISPENSER

TOILET SEAT COVER

"-4

8"

TO

T.

O.

OP

ER

AB

LE

P

AR

T

AR

C

H

IT

EC

TU

R

AL

IN

TE

R

IO

EL

EV

AT

IO

N S

A-401

D S

JG

GENERAL NOTES:

1. DRAWINGS & SPECIFICATIONS ARE COMPONENTS OF THE

CONTRACT DOCUMENTS. REVIEW ALL DRAWINGS &

SPECIFICATIONS FOR THE COMPLETE SCOPE OF WORK.

NOTIFY CONSTRUCTION INSPECTOR IMMEDIATELY FOR

CLARIFICATION IF INCONSISTENCIES, CONTRADICTIONS, OR

OMISSIONS ARE DISCOVERED.

2. DO NOT SCALE DRAWINGS. IF DIMENSIONAL INFORMATION IS

REQUIRED & NOT FOUND, NOTIFY CONSTRUCTION

INSPECTOR IMMEDIATELY FOR CLARIFICATION.

3. ALL DIMENSIONS ARE TO COLUMN CENTERLINES, FACE OF

FINISHED WALLS, OR SURFACES, UNLESS NOTED

OTHERWISE.

4. REPAIR EXISTING WALLS TO REMAIN. REPAIRS SHALL MATCH

EXISTING WALL CONSTRUCTION.

5. REFER TO OTHER DISCIPLINE DRAWINGS FOR ITEMS NOT

SHOWN.

OF

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

W W

YK

R

EN

O

VA

TE

R

ES

TR

O O

M S, PO

ST

S C

AN

D

C 7, B

M

AY

H D

R

KEYPLAN

PROJECT

LOCATIONC7

FIRST FLOOR

MEN'S RESTROOM - INTERIOR ELEVATION

SCALE: 3/8" = 1'- 0"

A-401

MEN'S RESTROOM - INTERIOR ELEVATION

SCALE: 3/8" = 1'- 0"

A-401

WOMEN'S RESTROOM - INTERIOR ELEVATION

SCALE: 3/8" = 1'- 0"

A-401

WOMEN'S RESTROOM - INTERIOR ELEVATION

SCALE: 3/8" = 1'- 0"

A-401

TA-4TA-5

TYP.

TA-3

TA-6

TA-3

TA-6

TA-3

TA-6

TA-3

TA-6

TA-3 TA-3 TA-3 TA-3 TA-3 TA-3 TA-3

TOILET PARTITIONS

FULL HEIGHT 6" X 6" WALL TILE

WALL-MOUNTED URINAL SCREEN

PAPER TOWEL DISPENSER - G.F.C.I.

STAINLESS STEEL CORNER GUARD

SOLID SURFACE COUNTER WITH INTEGRAL SOLID

SURFACE LAVATORIES

6" X 12" TILE BASE

BUILT-IN 12" DEEP TILE SHELF

SOLID SURFACE SKIRT

KEY NOTES:

TOILET ACCESSORY SCHEDULE

ACCESSORY DESCRIPTION TAG

36" GRAB BAR - C.F.C.I. TA-1

42" GRAB BAR - C.F.C.I. TA-2

TOILET TISSUE DISPENSER - G.F.C.I. TA-3

PAPER TOWEL DISPENSER - G.F.C.I. TA-4

SOAP DISPENSER - G.F.C.I. TA-5

SANITARY NAPKIN DISPOSER

(WOMEN ONLY) - C.F.C.I. TA-6

MIRROR - C.F.C.I. TA-7

TOILET SEAT COVER

DISPENSERS - G.F.C.I. TA-13

TYP.

TA-4

TYP.

TA-4TA-5

TYP.

TA-1

TA-2

7 7

A-

WOMEN'S RESTROOM - INTERIOR ELEVATION

SCALE: 3/8" = 1'- 0"

A-401

ABA PLUMBING FIXTURES AND ACCESSORIES MOUNTING HEIGHTS

7' -0

3' -6

3' -6

A-

A-

TA-7

TA-7

G.F.C.I. - GOVERNMENT FURNISHED CONTRACTOR INSTALLED

C.F.C.I. - CONTRACTOR FURNISHED CONTRACTOR INSTALLED

TA-13 TA-13 TA-13

TA-13 TA-13 TA-13 TA-13 TA-13 TA-13 TA-13

TA-13

TA-13

6'-9 3/4"

4'-6"

OK LF AO HE OT MAT AS DARIUS

SHROFF

A6884

11/01/2024

A7250

ROBERT

ANDREW

MATJASKO

ADJACENT WALL

(WHERE OCCURS)

SEALANT EACH SIDE &

ALL AROUND - TYP

HOLLOW METAL

FRAME - PAINTED

WALL AS SCHEDULED -

REFER TO FLOOR PLAN

SEALANT EACH SIDE &

ALL AROUND - TYP

HOLLOW METAL

FRAME - PAINTED

WALL AS SCHEDULED -

REFER TO FLOOR PLAN

DOOR AND FRAME SCHEDULE

DOOR NUMBER ROOM NAME SIZE (W x H) TYPE MATERIAL FINISH

DOOR

TYPE MATERIAL FINISH

FRAME

ME1

PAINTM1

W1 WOMEN A

RATING

FIRE

MEN

MECHANICAL

HMPAINT 1 PAINT -

NOTES

3'-0" x 7'-0"

ROOM FINISH SCHEDULE

ROOM

NUMBER

ROOM NAME

NORTH EAST SOUTH WEST

RB

WALL FINISH

NORTH EAST SOUTH

BASE FINISH

WEST

TILE TILE

MAT.

FLOOR

NOTES

TILE

TILE TILE TILETILE

MAT.

CEILING

GWB

HM 1,3

1, 2

NOTES

1. FOR MATERIAL COLORS/TEXTURES/ETC., SEE SPECIFICATION SECTION 09 06 00, SCHEDULES FOR FINISHES.

2. TILE HEIGHT IS TO 6" ABOVE CEILING - TYPICAL. TILE HEIGHT IS TO 8'-0" AT MECHANICAL. TILE HEIGHT IS TO CEILING AT VESTIBULES.

3. PROVIDE 0.09" THICK, EMBOSSED, CLASS A, WHITE FRP PANELS INSTALLED TO 8'0" A.F.F. PROVIDE MANUFACTURER'S STANDARD POLYPROPYLENE/PVC MOLDINGS.

NOTES

1. REF. SPECS FOR HARDWARE

2. 12"W x 12"H LOUVER

3. 24"W x 30"H SIGHTPROOF LOUVER

MEN

WOMEN

MECHANICAL/JANITORIALC7-3

C7-2

C7-1

1,3

1,2

PAINT

PAINT

HM

HM

1PAINT

HM

HM

A

A

3'-0" x 7'-0"

3'-0" x 7'-0"

1,2,3

GWB

GWB

TILE

SC

TILE

TILE

TILE

TILE

TILE

TILE

TILE

TILE

TILE

TILE

FRP

TILEWOMEN'S VESTIBULE TILE TILEC7-4 1,2GWBTILETILETILETILE TILETILE

TILEMEN'S VESTIBULE TILE TILEC7-5 1,2GWBTILETILETILETILE TILETILE

1, 2

RBRBRBFRP FRP FRP

KEY: FRP - FIBERGLASS RESIN PLASTIC GWB - GYPSUM WALL BOARD RB - RUBBER BASE SC - SEALED CONCRETE

KEY: HM - HOLLOW METAL

12"x12" TILE

BONDED WATERPROOF

MEMBRANE

CONCRETE SUB FLOOR

BOND COAT

TILE

FIBER CEMENT

BACKER BOARD

METAL STUDS

BOND COAT

6"x6" TILE AS

SCHEDULED

MORTAR BED

EXISTING

MASONRY WALL

CEMENTITIOUS

BOND COAT

METAL LATH

PARTITION TYPE C

A

DOOR AND FRAME TYPES

FIN. FLR

REFER

SCHEDULE

R

EF

ER

S

C H

ED

U

LE

2"

2" 2"

1' -0

NOT TO SCALE

STRUCTURAL MEMBER

SLOTTED TOP TRACK

CEILING AS SCHEDULED

6" METAL STUDS AT 16"

O.C.

6" SOUND BATT INSULATION

6"x6" CERAMIC TILE TO

CEILING

5/8" CEMENTITIOUS

BACKER BOARD

6"x12" CERAMIC TILE

BASE

STRUCTURAL MEMBER

SLOTTED TOP TRACK

GWB CEILING AS

SCHEDULED

6" METAL STUDS AT 16"

O.C.

6" SOUND BATT INSULATION

5/8" CEMENTITIOUS

BACKER BOARD W/

WALL TILE

ACOUSTICAL SEALANT

NOT TO SCALE - TYPE B1 SIMILAR W/ 3 5/8" STUDS

TYPE B2 SIMILAR

STRUCTURAL MEMBER

SLOTTED TOP TRACK

GWB CEILING AS

SCHEDULED

6" METAL STUDS AT 16"

O.C.

6" SOUND BATT INSULATION

6"x6" CERAMIC TILE TO

CEILING

5/8" CEMENTITIOUS

BACKER BOARD

ACOUSTICAL SEALANT

6"x12" CERAMIC TILE

BASE

BA1A

PARTITION TYPES

PARTITION TYPE A PARTITION TYPE A1 PARTITION TYPE B

RUBBER

BASE

5/8" TYPE X

GWB - PTD.

ACOUSTICAL SEALANT

GWB CEILING AS

SCHEDULED

6" METAL STUDS AT 16"

O.C.

3 1/2" SOUND BATT

INSULATION

6"x6" CERAMIC TILE

5/8" CEMENTITIOUS

BACKER BOARD

6"x12" CERAMIC TILE

BASE

ACOUSTICAL SEALANT

6"x6" CERAMIC TILE

3' - 6" AFF

1'-0"

DPARTITION TYPE D

NOT TO SCALE NOT TO SCALE

3 5/8" METAL STUDS

AT 16" O.C.

6"x6" CERAMIC TILE TO

CEILING

5/8" CEMENTITIOUS

BACKER BOARD

6"x12" CERAMIC TILE

BASE

SOLID SURFACE COUNTER

TOP, BACKSPLASH, &

LAVATORY

WATER-RESISTANT

SUBSTRATE SUPPORT

TREATED

FIRE-RETARDANT

WOOD BLOCKING OR

STEEL BACKING PLATE

WALL-MOUNTED STEEL

TUBE FRAME SUPPORT-

PAINTED GLOSS BLACK

CLEAR AREA

LIMITS FOR HC

ACCESS

REMOVABLE SOLID

SURFACE SKIRT

PANEL - ATTACH

WITH STAINLESS

STEEL HARWARE

9" m in 11" min

8" min

2'- 3" m in 2'-

GRAB BAR

FASTENER

FR TREATED

2X6 BLOCKING

NEW PARTITION

33"- 36" TO T.O.

GRIPPING SURFACE

TUBE FRAME SUPPORT-

FLOOR TILE

THINSET MORTAR BED

NEW FLOOR DRAIN,

SEE MECH

NEW CONCRETE,

SLOPE TO DRAIN

#4X1'-8" DOWEL AT

16" O.C.

LAP NEW VAPOR

BARRIER WITH

EXISTING

1" BELOW FINISH FLR.

WATERPROOFING

MEMBRANE TIED

INTO DRAIN

PROVIDE HILTI HY

200 OR APPROVED

EQUAL. LOCATE

DOWELS AT MID

DEPTH OF SLAB.

LOCATE ALL DRAINS AWAY FROM BEAMS - TYP.

AR

C

H

IT

EC

TU

R

AL

D

ET

AI

LS

A N

D

SC

H

ED

U

LE

S

A-501

D S

JG

OF

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

W W

YK

R

EN

O

VA

TE

R

ES

TR

O O

M S, PO

ST

S C

AN

D

C 7, B

M

AY

H D

R

KEYPLAN

PROJECT

LOCATIONC7

FIRST FLOOR

HM DOOR JAMB

SCALE: 3" = 1'- 0"

A-501

HM DOOR HEAD

SCALE: 3" = 1'- 0"

A-501

TCNA WALL

DETAIL W244F-18

NTS

A-501

TCNA FLOOR

DETAIL F122A-18

NTS

A-501

COUNTER SECTION

SCALE: 3" = 1'- 0"

A-501

TYPICAL GRAB BAR

SCALE: NTS

A-501

FLOOR DRAIN

SCALE: NTS

A-501

TCNA WALL

DETAIL W222-16

NTS

A-501

OK LF AO HE OT MAT AS DARIUS

SHROFF

A6884

11/01/2024

A7250

ROBERT

ANDREW

MATJASKO

OF

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

W W

YK

R

EN

O

VA

TE

R

ES

TR

O O

M S, PO

ST

S C

AN

D

C 7, B

N

O V

H D

R M

EC

H

AN

IC

AL

M-001

BP

S

G

AO

SY

M

BO

LS

LE

G

EN

D S

AB

BR

EV

IA

TI

O N

S

S

T

A

NEW DIFFUSER, GRILLE OR

REGISTER DESIGNATION TAG

ABBREVIATIONS

CD1

8, 100

PIPE ANCHOR

PIPE GUIDE

EXPANSION JOINT

VENTURI

SHUTOFF VALVE

UNION

SOLENOID VALVE

PRESSURE REDUCING VALVE (PRV)

AUTOMATIC CONTROL VALVE, 2-WAY

AUTOMATIC CONTROL VALVE, 3-WAY

PRESSURE / TEMPERATURE PORT

THERMOMETER

PRESSURE GAGE

TEMPERATURE GAGE

FLEXIBLE PIPE CONNECTION

STRAINER

BLIND FLANGE

CONCENTRIC REDUCER

ECCENTRIC REDUCER

MANUAL AIR VENT

THERMOWELL

AUTOMATIC AIR VENT

ELBOW, 90°

ELBOW, 90° TURN DOWN

ELBOW, 90° TURN UP

ELBOW, 45° TURN DOWN

ELBOW, 45° TURN UP

TEE

TEE, OUTLET UP

TEE, OUTLET DOWN

TEE, OUTLET UP W/ 90° TURN

TEE, OUTLET DOWN W/ 90° TURN

PIPE BREAK

CAP

BLIND FLANGE

BACKFLOW PREVENTER

FLOW ARROW

SAFETY OR PRESSURE RELIEF,

STRAIGHT THROUGH VALVE

SAFETY OR PRESSURE RELIEF,

ANGLE VALVE

R

TRANSITION - ONE SIDED

TRANSITION - DOUBLE SIDED

90° ELBOW TURNED DOWN,

RECTANGULAR

TRANSITION -

RECTANGULAR TO ROUND DUCT

STANDARD BRANCH -

FOR SUPPLY AIR W/EXTRACTOR

AND RETURN AIR W/O

EXTRACTOR

RECTANGULAR DUCT INCLINE

- RISE OR DROP IN

RESPECT TO THE AIR FLOW

ROUND DUCT INCLINE -

RISE OR DROP IN

RESPECT TO THE AIR

FLOW

PRESSURE/TEMPERATURE TEST

PLUG (PETE PLUG OR EQUAL)

ELBOW - W/TURNING VANES

(RECTANGULAR), SMOOTH

RADIUS

ELBOW - W/TURNING VANE

(RECTANGULAR)

FIRE DAMPER

SMOKE DAMPER

COMBINATION

FIRE AND SMOKE DAMPER

MOTOR OPERATED DAMPER

M

DUCT ELEVATION TAG

ABOVE FINISH FLOOR12x12

FLEXIBLE CONNECTION

AD

AD

ACCESS DOOR

PLAN SECTION

SUPPLY AIR REGISTER OR

GRILLE - W/DUCT-MOUNTED

EXTRACTOR

EXHAUST OR RETURN AIR

REGISTER OR GRILLE

ACOUSTICAL LINING -

DUCT DIMENSIONS FOR NET

FREE AREA

RETURN AIR GRILLE

90° ELBOW TURNED UP,

RECTANGULAR

90° ELBOW TURNED DOWN,

ROUND

90° ELBOW TURNED UP,

ROUND

RETURN DUCT SECTION,

RECTANGULAR

SUPPLY DUCT SECTION,

RECTANGULAR

EXHAUST DUCT SECTION,

RECTANGULAR

ROUND DUCT

12x12

RECTANGULAR DUCT12x12

R

NEW CONNECTION TO

EXISTING

EXHAUST AIR GRILLE

SUPPLY DIFFUSER

(NO ARROWS INDICATE 4-WAY)

SUPPLY DIFFUSER

(ROUND)

12x12

12ø

12ø

HOSE VALVE WITH CAP

CHECK VALVE

BALANCING VALVE

NEW

NECK SIZE

NEW TAG

DEMOLITION WORK

EXISTING DIFFUSER, GRILLE OR

REGISTER DESIGNATION TAG

EX

8, 100 FLOW RATE TO

BALANCE TO

EXISTING

NECK SIZE

EXISTING TAG

FLOW RATE TO

BALANCE TO

HVAC EMERGENCY

SHUTDOWN SWITCH

P

HOT WATER SUPPLY

HOT WATER RETURN

COMPRESSED AIR

BREATHING AIR

REMOVE EXISTING UP TO

THIS POINT

ESS

CHILLED WATER SUPPLY

CHILLED WATER RETURN

AUDIBLE AND VISUAL

ALARM INDICATING DEVICE

DIFFERENTIAL PRESSURE

GAUGE

FLOW METERM

FLOW METERDP

T THERMOSTAT

H HUMIDISTAT

CD CARBON DIOXIDE SENSOR

CM CARBON MONOXIDE SENSOR

FLEXIBLE DUCT

FD

AD ACCESS DOOR

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AFR ABOVE FINISHED ROOF

AHU AIR HANDLING UNIT

AI ANALOG INPUT

ALT ALTERNATIVE

AMB AMBIENT

AO ANALOG OUTPUT

APD AIR PRESSURE DROP

ARF ABOVE RAISED FLOOR

AV AIR VALVE

AVG AVERAGE

BAS BUILDING AUTOMATION SYSTEM

BHP BRAKE HORSE POWER

BDD BACK DRAFT DAMPER

BOD BOTTOM OF DUCT

BOE BOTTOM OF EQUIPMENT

BOP BOTTOM OF PIPE

BTUH BRITISH THERMAL UNITS PER HOUR

CAV CONSTANT AIR VOLUME

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CLG CEILING, COOLING

CO CLEAN OUT

CONN CONNECTION

CONT CONTINUOUS

COR CONTRACTING OFFICER'S REPRESENTATIVE

CRAC COMPUTER ROOM AIR CONDITIONER

CU CONDENSING UNIT

DB DRY BULB

dB DECIBEL(S)

DDC DIRECT DIGITAL CONTROL

DEG F DEGREES FAHRENHEIT

DH DEHUMIDIFIER

DIA DIAMETER

DN DOWN

DX DIRECT EXPANSION

E EXISTING

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EC ELECTRICAL CONTRACTOR

EDH ELECTRIC DUCT HEATER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EFF EFFICIENCY

EMCS ENERGY MANAGEMENT CONTROL SYSTEM

ERU ENERGY RECOVERY UNIT

ESP EXTERNAL STATIC PRESSURE

ESS EMERGENCY SHUTOFF SWITCH

EWT ENTERING WATER TEMPERATURE

F FUTURE

FA FREE AREA

FCP FAN CONTROL PANEL

FCU FAN COIL UNIT

FDBK FEEDBACK

FLA FULL LOAD AMPS

FPB FAN POWERED BOX

FPM FEET PER MINUTE GAL GALLONS

GC GENERAL CONTRACTOR

GE GRAVITY EXHAUST

GI GRAVITY INTAKE

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

HP HORSE POWER

HR HOUR

HTG HEATING

HVAC HEATING, VENTILATION, & AIR CONDITIONING

HZ HERTZ

IAQ INDOOR AIR QUALITY

ID INSIDE DIAMETER

IE INVERT ELEVATION

IN INCHES

I/O INPUT/OUTPUT

I/P CURRENT TO PNEUMATIC

KW KILOWATT

LAT LEAVING AIR TEMPERATURE

LB POUNDS

LV LOUVER

LWT LEAVING WATER TEMPERATURE

MA MIXED AIR

MAU MAKE-UP AIR UNIT

MAX MAXIMUM

MBH THOUSAND BTUH

MC MECHANICAL CONTRACTOR

MCC MOTOR CONTROL CENTER

MISC MISCELLANEOUS

MIN MINIMUM, MINUTES

MFG MANUFACTURING

MOD MOTOR OPERATED DAMPER

NC NORMALLY CLOSED, NOISE CRITERIA

NIC NOT IN CONTRACT

NO NORMALLY OPEN, NUMBER

NRC NOISE REDUCTION COEFFICIENT

NTS NOT TO SCALE

O³ OZONE

OA OUTSIDE AIR

OD OUTSIDE DIAMETER

OFCI OWNER FURNISHED CONTRACTOR INSTALLED

OFOI OWNER FURNISHED OWNER INSTALLED

OS&Y OUTSIDE SCREW AND YOKE

PC PLUMBING CONTRACTOR

PD PRESSURE DROP

PH PHASE

PLBG PLUMBING

PPH POUNDS PER HOUR

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAUGE

PTAC PACKAGED TERMINAL AIR CONDITIONER

QTY QUANTITY

RA RETURN AIR

REQD REQUIRED

RH RELATIVE HUMIDITY

RPM REVOLUTIONS PER MINUTE

RTU ROOFTOP UNIT

S SIGNAL PORT

SA SUPPLY AIR

SCFM STANDARD CUBIC FEET PER MINUTE

SF SUPPLY FAN, SQUARE FEET

SP STATIC PRESSURE

SQ SQUARE

TC TECHNOLOGY CONTRACTOR

TCC TEMPERATURE CONTROL CONTRACTOR

TCP TEMPERATURE CONTROL PANEL

TD TEMPERATURE DIFFERENTIAL

TEMP TEMPERATURE, TEMPORARY

TES THERMAL ENERGY STORAGE

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

UH UNIT HEATER

V VOLTS

VAV VARIABLE AIR VOLUME

V&C VALVE AND CAP

VFD VARIABLE FREQUENCY DRIVE

VRV VARIABLE REFRIGERANT VOLUME/FLOW

VTR VENT THROUGH ROOF

W WATTS

WB WET BULB

WG WATER GAUGE

WPD WATER PRESSURE DROP

BOD: 9'-0"

12x12

SD

FSD

SYMBOLS

NOTES (APPLICABLE TO ALL MECHANICAL SHEETS)

1. PROVIDE AND INSTALL ALL MECHANICAL SYSTEMS IN ACCORDANCE WITH THE INTERNATIONAL MECHANICAL CODE AS AMENDED BY UFC 3-410-01 AND ALL OTHER

APPLICABLE STATE AND LOCAL CODES.

2. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK (HVAC) ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.

PLANS SHOULD NOT BE SCALED.

3. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURERS' RECOMMENDATIONS, CONTRACT DOCUMENTS, AND APPLICABLE

CODES AND REGULATIONS.

4. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL, CIVIL, ELECTRICAL, PLUMBING, AND OTHER TRADES SHOWN ON OTHER CONTRACT DOCUMENT DRAWINGS.VERIFY ALL CLEARANCES BEFORE FABRICATING AND INSTALLING WORK.

5. DRAWINGS REFLECT DIMENSIONS OF DESIGN MFG. EQUIPMENT. THE CONTRACTOR IS RESPONSIBLE TO ENSURE ALL EQUIPMENT MEETS THE SPACE REQUIREMENTS AND IS EQUIVALENT TO THE BASIS OF DESIGN MANUFACTURER EQUIPMENT. MAINTAIN MANUFACTURER RECOMMENDED CLEARANCES TO ALL MECHANICAL EQUIPMENT. INSTALL

EQUIPMENT SUCH THAT RECOMMENDED CLEARANCE IS PROVIDED.

6. TESTING, ADJUSTING, AND BALANCING AGENCY SHALL BE A MEMBER OF THE ASSOCIATED AIR BALANCE COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB). TESTING ADJUSTING AND BALANCING SHALL BE PERFORMED IN ACCORDANCE WITH THE AABC OR NEBB STANDARDS.

7. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER'S CERTIFIED DRAWINGS. COORDINATE AND PROVIDE ALL DUCT AND PIPING TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DUCT AND PIPING DIMENSIONS BEFORE FABRICATION.

8. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE INTERNATIONAL ELECTRICAL CODE (IEC) AND NFPA 70.

9. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND AS SHOWN IN DETAILS FOR PIPING, DUCTWORK, AND EQUIPMENT (UNLESS OTHERWISE

NOTED) SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR.

10. PROVIDE ACCESS PANELS FOR INSTALLATION IN DUCTWORK, WALLS AND CEILINGS, TO SERVICE CONTROLS DEVICES, DAMPERS, VALVES, DUCTWORK, SMOKE DETECTORS, AND OTHER CONCEALED MECHANICAL EQUIPMENT. ACCESS PANEL INSTALLATION SHALL BE COORDINATED WITH ARCHITECTURAL WORK TO MATCH MATERIALS AND

FINISHES. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

11. ALL DUCTWORK, PIPING, AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL BE COORDINATED WITH ALL TRADES. ALL ATTACHMENTS TO STEEL BAR JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE AT PANEL POINTS OR AS SHOWN ON THE MECHANICAL AND STRUCTURAL DRAWINGS. PROVIDE BEAM CLAMPS MEETING MSS

STANDARDS. WELDING TO STRUCTURAL MEMBERS SHALL NOT BE PERMITTED.

12. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK AND PIPING SYSTEMS CONNECTED TO FANS, PUMPS AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION.

13. DUCTWORK SHALL BE FABRICATED AND INSTALLED PER LATEST SMACNA STANDARDS.

14. ALL EXISTING MECHANICAL/PLUMBING IS SHOWN LIGHT. ALL MECHANICAL/PLUMBING TO BE DEMOLISHED ON THE DEMO SHEETS IS SHOWN DARK AND DASHED. ALL NEW

MECHANICAL/PLUMBING ON THE NEW WORK SHEETS IS SHOWN AS DARK.

HWS

HWR

CHWS

CHWR

CA

BA

NATURAL GAS

G

PROCESS COLD WATER SUPPLY

PCS

PROCESS COLD WATER RETURN

PCR

COMPRESSED / BREATHING AIR VENT

PV

REFRIGERANT LIQUID

RL

REFRIGERANT SUCTION

RS

CONDENSATE DRAIN

CD

MAKEUP WATER

MU

SANITARY SEWER

SAN

SANITARY VENT

V

DOMESTIC COLD WATER

DCW

DOMESTIC HOT WATER

DHW

DOMESTIC HOT WATER RETURN

DHWR

NON POTABLE WATER

NPW

DOMESTIC TEMPERED WATER

DTW

C7 DEMO PLAN - 20200211

B

OF

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

W W

YK

R

EN

O

VA

TE

R

ES

TR

O O

M S, PO

ST

S C

AN

D

C 7, B

N

O V

H D

R

KEYPLAN

PROJECT

LOCATIONC7

FIRST FLOORN

NORTH

M

EC

H

AN

IC

AL

MD101

BP

SG

A O

FI

R

ST

F

LO

EN

LA

R G

ED

P

- D

O

LI

TI

O N

MECHANICAL FIRST FLOOR ENLARGED PLAN - DEMOLITION

SCALE: 1/4" = 1'-0"

MD101

GENERAL DEMOLITION NOTES:

(APPLY TO ALL MECHANICAL DEMOLITION

SHEETS)

1. CONTRACT DOCUMENTS WERE PREPARED FROM FIELD SURVEYS. THEY

ARE NOT INTENDED TO DEPICT UNFORESEEN CONDITIONS THAT MAY

ADVERSELY AFFECT THE MECHANICAL SYSTEM DEMOLITION OR

INSTALLATION. MECHANICAL CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS PRIOR TO STARTING ANY WORK.

2. CONTRACTOR TO PERFORM DEMOLITION AND INSTALLATION IN A MANNER

THAT WILL HAVE LEAST ADVERSE EFFECT ON NORMAL BUILDING

OPERATION. CONTRACTOR SHALL COORDINATE DEMOLITION AND

INSTALLATION WITH THE BUILDING USER AND THE GOVERNMENT.

3. PROVIDE PROTECTION AS REQUIRED TO PREVENT DAMAGE TO EXISTING

EQUIPMENT.

4. REMOVALS SHALL BE COMPLETE, INCLUDING BUT NOT LIMITED TO: DUCT

HANGERS, ALL-THREAD RODS, INCIDENTAL SMALL APPURTENANCES, ETC.

5. CONTRACTOR SHALL PATCH ALL WALL AND FLOOR OPENINGS THAT ARE

CREATED DUE TO DEMOLITION OF DUCTWORK, CONDUITS, ETC AND SHALL

MATCH FINISH AND RATING TO ADJACENT CONSTRUCTION.

6. CONTRACTOR SHALL PROVIDE TEMPORARY COVERS FOR ALL

PENETRATIONS IN WALLS RESULTING FROM DEMOLITION THAT ARE TO BE

REUSED.

7. ALL DEMOLISHED EQUIPMENT SHALL REMAIN PROPERTY OF THE US

GOVERNMENT. CONTRACTOR SHALL CONSULT WITH CONTRACTING

OFFICER FOR DIRECTION ON PROPER DISPOSAL OR STORAGE OF ALL

DEMOLISHED EQUIPMENT.

8. COORDINATE ALL SHUTDOWNS AND REQUIRED WORK IN EACH SPACE

WITH THE GOVERNMENT A MINIMUM OF FOUR WEEKS PRIOR TO STARTING

ANY WORK. CONTRACTOR SHALL CLOSE OFF ALL ASSOCIATED DUCTWORK

WHEN DUCTWORK IS DISCONNECTED TO ELIMINATE AIR FROM ENTERING

DEMOLISHED AREAS.

KEYED NOTES:

REMOVE EXISTING GRILLE AND ASSOCIATED DUCTWORK AS INDICATED.

REMOVE EXISTING EXHAUST DUCT/DUCT RISER TO FLOOR ABOVE.

REFER TO MD102 FOR CONTINUATION AND M-101 FOR NEW WORK.

REMOVE EXISTING MAKEUP AIR LOUVERS. REFER TO ARCHITECTURAL

PLANS FOR ADDITIONAL REQUIREMENTS.

16x8 16x8

(TYP.)

MEN C7

WOMEN C7

MECHANICAL

JAN.

STORAGE

SHOWER

WOMEN

MEN

C

B

OF

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

W W

YK

R

EN

O

VA

TE

R

ES

TR

O O

M S, PO

ST

S C

AN

D

C 7, B

N

O V

H D

R

KEYPLAN

PROJECT

LOCATION

SECOND FLOOR

2C7

N

NORTH

M

EC

H

AN

IC

AL

MD102

BP

SG

AO

SE

C

O N

D F

LO

R G

ED

P

LA

N

- D

EM

O

LI

TI

O

N

MECHANICAL SECOND FLOOR ENLARGED PLAN - DEMOLITION

SCALE: 1/4" = 1'-0"

M-102

KEYED NOTES:

REMOVE EXISTING GRILLE AND ASSOCIATED DUCTWORK BACK TO

EXHAUST RISER THROUGH ROOF.

REMOVE EXISTING EXHAUST RISER IN CHASE FROM FLOOR BELOW.

REMOVE EXHAUST DUCT THROUGH ROOF AND ASSOCIATED EXHAUST FAN

ON ROOF. REFER TO M-102 FOR NEW WORK.

12x12

(TYP.)

OF

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

W W

YK

R

EN

O

VA

TE

R

ES

TR

O O

M S, PO

ST

S C

AN

D

C 7, B

N

O V

H D

R

KEYPLAN

PROJECT

LOCATIONC7

FIRST FLOORN

NORTH

M

EC

H

AN

IC

AL

M-101

BP

SG

A O

FI

R

ST

F

LO

O

R

EN

LA

R

G

ED

P

LA

N

- N

EW

W

O R

K

MECHANICAL FIRST FLOOR ENLARGED PLAN - NEW WORK

SCALE: 1/4" = 1'-0"

M-101

GENERAL NOTES:

1. ALL DUCT BRANCHES TO GRILLES SHALL BE THE SAME AS THE

INLET/OUTLET SIZE UNLESS NOTED OTHERWISE.

2. REMOVE/REPLACE CEILING/WALL AND CUT/PATCH CEILING/WALL

ACCOMMODATE WORK SHOWN. REFER TO THE ARCHITECTURAL PLANS

FOR ADDITIONAL REQUIREMENTS

3. COORDINATE ALL SHUTDOWNS AND REQUIRED WORK IN EACH SPACE

WITH THE GOVERNMENT A MINIMUM OF TWO WEEKS PRIOR TO STARTING

ANY WORK.

4. COORDINATE ROUTING OF ALL DUCTWORK, PIPING, ETC. WITH EXISTING

STRUCTURE, PIPING, DUCTWORK, AND OTHER TRADES.

5. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR

COORDINATION OF CEILING GRILLES AND ELECTRICAL LIGHT FIXTURES.

PROVIDE ACCESS PANELS WHERE DAMPERS OR EQUIPMENT IS LOCATED

ABOVE A NON-ACCESSIBLE CEILING.

6. REFER TO M-501 FOR STANDARD DUCT CONSTRUCTION DETAILS.

KEYED NOTES:

1 RISE 20"x14" EXHAUST DUCT UP TO FLOOR ABOVE. REFER TO 1/M-102

SECOND FLOOR PLAN FOR CONTINUATION.

EMERGENCY SHUTDOWN SWITCH. REFER TO 3/M-501 FOR HVAC

EMERGENCY SHUTDOWN SWITCH DETAIL. COORDINATE EXACT LOCATION

WITH GOVERNMENT.

(APPLICABLE FOR ALL

MECHANICAL SHEETS)

EG-1,

12x12 495EG-1, 12x12 495

EG-1,

8x8 185

8x810 x1

16x12

12x10

12x12

EG-1,

10x10 390

WOMEN

MEN

MECHANICAL

ESS

16x12 x1

OF

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

W W

YK

R

EN

O

VA

TE

R

ES

TR

O O

M S, PO

ST

S C

AN

D

C 7, B

N

O V

H D

R

KEYPLAN

PROJECT

LOCATION

SECOND FLOOR

2C7

N

NORTH

M

EC

H

AN

IC

AL

M-102

BP

SG

AO

SE

C

O N

D F

LO

R G

ED

P

LA

N

- N

EW

W O

R K

MECHANICAL SECOND FLOOR ENLARGED PLAN - NEW WORK

SCALE: 1/4" = 1'-0"

M-102

KEYED NOTES:

1 RISE 20"x14" EXHAUST DUCT UP IN CHASE FROM FLOOR BELOW. ROUTE

ABOVE CEILING AS SHOWN.

EXHAUST DUCT UP THROUGH EXISTING PENETRATION. COORDINATE

EXACT ROOF PENETRATION SIZE IN THE FIELD TO THE NEW EXHAUST FAN

ON ROOF. PROVIDE CURB ADAPTER ON EXISTING ROOF CURB TO

ACCOMMODATE INSTALLATION OF NEW EXHAUST FAN. REFER TO 1/M-501

FOR EXHAUST FAN DETAIL.

EMERGENCY SHUTDOWN SWITCH. REFER TO 3/M-501 FOR HVAC

EMERGENCY SHUTDOWN SWITCH DETAIL. COORDINATE EXACT LOCATION

WITH GOVERNMENT.

EF-C7

(ON ROOF)

10x12

EG-1,

10x10 300EG-1, 10x10 300

EG-1, 8x8

EG-1,

10x10 390 EG-1, 10x10 390

12x12 x1 x1

WOMEN

MEN

ESS

10x12

12x12

L

15°

W1

W1

W

L

W1

W

W2

W1

W

W W1

L

L=4W MINIMUM

R=1-1/2W

1-1/2 "

3/4"

2"

RECT. ELBOW W/

TURNING VANES

RECTANGULAR TAP

45 DEGREE ENTRY

OFFSET TYPE 2

(MITERED)

ECCENTRIC

TRANSITION

RADIUS ELBOW

OFFSET TYPE 1

(ANGLED)

CONCENTRIC

TRANSITION

L

L=4W MINIMUM

45°

L= 1/4W, 4"MINIMUM

L=4W MINIMUM

W

W1x0.9=W2 (MINIMUM) W2<W1

NOTES:

1.

2.

CONSTRUCT VANE EDGES TO PROJECT TANGENTS

PARALLEL TO DUCT SIDES.

POSITION 1ST TURNING VANE IN

CORNER OF ELBOW.

STANDARD DUCT CONSTRUCTION DETAILS

NOT TO SCALE

M-501

AIR FLOW

DIRECTION

AIR FLOW DIRECTION

EXHAUST FAN DETAIL

NOT TO SCALE

M-501

FACTORY SUPPLIED MOTOR

OPERATED DAMPER DUCTWORK

PROVIDE PREFABRICATED ROOF

CURB ADAPTER WITH NEW FAN.

CURB ADAPTER SHALL BE

COORDINATED WITH EXISTING ROOF

CURB AND ROOF SLOPE.

CADMIUM PLATED LAG

SCREWS. PER

MANUFACTURERS

RECOMMENDATIONS

NEW CURB ADAPTER SHALL BE

A MINIMUM OF 12" ABOVE TOP

OF ROOF INSULATION.

EXISTING FRAME, ROOF, &

ROOFING.

EXHAUST

FAN

HVAC EMERGENCY SHUTOFF

PUSH TO STOP EQUIPMENT

BUILDING :

EQUIPMENT :

XXXXX AREA : XXXXX

XXXXX

HORN WILL SOUND

WHEN LIFTED

LIFT HERE

EMERGENCY

HVAC SHUTOFF

PUSH

CUSTOM LABEL

POLYCARBONATE

HOUSING

PUSH BUTTON. RED IN

COLOR KEYED RESET (2

KEYS PROVIDED)

AUDIBLE HORN WILL

SOUND WHEN CLEAR

PLASTIC COVER IS LIFTED

NOTES:

1. ENGRAVED PLASTIC SIGN, GREEN WITH WHITE LETTERING, INSTALLED 1" ABOVE SHUTOFF BUTTON. 3" TALL x 5" WIDE "EMERGENCY

HVAC SHUTOFF" LETTERING 1/2" TALL, OTHER LETTERING 3/16" TALL.

2. SIGH STATES BUILDING NUMBER, AREA AFFECTED, OR "ENTIRE BUILDING" IF BUTTON AFFECTS ENTIRE BUILDING.

3. SIGN LISTS EQUIPMENT TAG NAMES OF ALL HVAC EQUIPMENT AFFECTED BY SHUTDOWN SYSTEM.

4. EMERGENCY SHUTOFF SWITCH TO BE MOUNTED TO NEW OR EXISTING SINGLE GANG BOX.

5. WHEN USED WITH MULTIPLE HVAC UNITS, INTERFACE D.D.C. PANEL. WHEN USED WITH SINGLE HVAC UNIT, UTILIZE DIRECT RELAY.

5"

3 1/4"

4 7/8"

3"

HVAC EMERGENCY SHUTDOWN SWITCH DETAIL

NOT TO SCALE

M-501

OF

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

W W

YK

R

EN

O

VA

TE

R

ES

TR

O O

M S, PO

ST

S C

AN

D

C 7, B

N

O V

H D

R M

EC

H

AN

IC

AL

M-501

BP

SG

A

ET

AI

LS

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

W W

YK

R

EN

O

VA

TE

R

ES

TR

O O

M S, PO

ST

S C

AN

D

C 7, B

N

O V

H D

R M

EC

H

AN

IC

AL

M-601

BP

SG

A O

SC

H

ED

U

LE

S

AN

D

C O

N

TR

O

LS

EXHAUST FAN SEQUENCE OF OPERATION:

REFER TO M-601 FOR EXHAUST FAN CONTROL: EF-A POINTS LIST FOR ADDITIONAL

INFORMATION.

EXHAUST FAN SHALL BE INTERLOCKED TO RUN CONTINUOUSLY WHEN THE BUILDING IS

OCCUPIED. EXACT SCHEDULE SHALL BE CONFIRMED WITH THE GOVERNMENT AND SHALL BE

ADJUSTABLE THROUGH THE UMCS.

2-POSITION DAMPER SHALL FULLY OPEN PRIOR TO THE FAN BEING ENERGIZED. WHEN FAN IS

DE-ENERGIZED, 2-POSITION DAMPER SHALL FULLY CLOSE.

EMERGENCY SHUTDOWN OPERATION: WHEN ANY OF THE NEW EMERGENCY SHUTDOWN

SWITCHES ARE TURNED TO THE ON POSITION, THE EXHAUST FAN SHALL SHUTDOWN AND

ASSOCIATED MOTORIZED DAMPER SHALL CLOSE. COORDINATE EMERGENCY SHUTDOWN

SWITCH LOCATIONS WITH THE GOVERNMENT.

ALARMS, INTERLOCKS AND SAFETIES:

AN ALARM SHALL BE GENERATED AT THE UMCS OPERATOR WORKSTATION IF THE FOLLOWING

OCCURS:

· IN THE EVENT THE UMCS COMMANDS THE EXHAUST FAN TO OPERATE AND THE CURRENT

SENSING RELAY DETECTS INSUFFICIENT CURRENT DRAW.

· ANY NEW EMERGENCY SHUTDOWN SWITCHES ARE TURNED TO THE ON POSITION.

EXHAUST FAN CONTROL: EF-A

NOT TO SCALE

M-601

CONTROL SYMBOLS LIST

SYMBOL: DESCRIPTION:

MOTOR OPERATED DAMPER

AO

DI

AI

DO

ANALOG INPUT

ANALOG OUTPUT

DIGITAL INPUT

DIGITAL OUTPUT

ACTUATORACT

FAN

UMCS FACILITY MANAGEMENT CONTROL SYSTEM

TCC TEMP. CONTROLS CONTRACTOR

EC ELECTRICAL CONTRACTOR

MC MECHANICAL CONTRACTOR

GENERAL CONTROL NOTES (APPLY TO ALL CONTROL

DIAGRAMS)

1. REFER TO EQUIPMENT SCHEDULES TO CROSS

REFERENCE WHICH CONTROL DIAGRAMS APPLY TO

WHICH EQUIPMENT.

2. EACH D.I., D.O., A.I., AND A.O. POINT SHOWN FOR ALL

CONTROL DIAGRAMS SHALL BE DISCRETE FROM ALL

OTHER POINTS EXCEPT AS SPECIFICALLY NOTED.

3. ALL WIRING, CONTROL COMPONENTS, DEVICES, AND

PROGRAMMING SHOWN ON THESE CONTROL

DRAWINGS SHALL BE PROVIDED BY THE TCC UNLESS

SPECIFICALLY NOTED OTHERWISE.

4. ALL ACTUATORS SHALL BE OF THE ELECTRICAL TYPE

UNLESS AN ACTUATOR IS SPECIFICALLY INDICATED

ON THE DRAWINGS OR SPECIFICATIONS TO BE

PNEUMATIC.

5. ALL CONTROL COMPONENTS SUCH AS RELAYS,

SWITCHES, DDC CONTROLLERS, ETC. SHALL BE

MOUNTED IN NEMA 2 ENCLOSURES WITH STEEL

MOUNTING BACKPLATES.

6. EACH CONTROL PANEL SHALL HAVE A LAMINATED

COPY OF THE APPLICABLE SEQUENCE OF

OPERATIONS AND CONTROL DIAGRAMS INDICATING

THE POINTS, COMPONENTS, AND OPERATION OF

EQUIPMENT ASSOCIATED WITH EACH PANEL.

7. TCC SHALL PROVIDE CONDUIT RUNS FOR OUTDOOR

EQUIPMENT AND FOR EQUIPMENT INSTALLED

REMOTELY FROM THE MAIN BUILDING THAT IS BEING

MONITORED OR CONTROLLED BY THE UMCS.

8. CONTROL DIAGRAMS ARE SCHEMATIC IN NATURE AND

DO NOT SHOW ALL REQUIRED CONTROL DEVICES AND

COMPONENTS. REFER TO FLOOR PLANS AND DETAILS

FOR ADDITIONAL CONTROL DEVICES, COMPONENTS,

AND REQUIREMENTS NOT SHOWN ON THE CONTROL

DRAWINGS.

9. TCC SHALL PROVIDE ALL CONTROL COMPONENTS

AND ACCESSORIES AS REQUIRED FOR EQUIPMENT TO

BE CONTROLLED AS DESCRIBED IN THE SEQUENCE OF

OPERATION REGARDLESS OF WHETHER ALL CONTROL

COMPONENTS OR POINTS ARE SHOWN IN THE

ASSOCIATED CONTROL DIAGRAM.

10. TCC SHALL COORDINATE WITH THE GOVERNMENT

FOR LAN DROPS FOR CONNECTION TO THE BUILDING

AUTOMATION SYSTEM.

S

DI

NEW EMERGENCY

SHUTDOWN SWITCH

ALARM

FDBK FEEDBACK

CURRENT SENSORCS

SWITCHS

COR CONTRACTING OFFICER REPRESENTATIVE

CS

FAN

STATUSDI

DO

START/

STOP

EXHAUST

AIR

DO

DMPR

MOD

DI

DMPR

FDBK

EXHAUST FAN

PL

U

M

BI

N G

P-001

BP

SG

A

O

SY

M

BO

LS

, L

EG

EN

D

S

AB

BR

EV

IA

TI

O

N S

OF

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

W W

YK

R

EN

O

VA

TE

R

ES

TR

O O

M S, PO

ST

S C

AN

D

C 7, B

N

O V

H D

R

PLUMBING SYMBOLOGY & ABBREVIATIONS

EXPANSION JOINT

STRAINER

THERMOMETER

TEMPERED WATER

WALL HYDRANT OR HOSE BIBB

SHOWER HEAD (RISER-PLAN)

TW

ECCENTRIC INCREASER

PLUMBING FIXTURE & DESIGNATION

NEW CONNECTION TO EXISTING

DOMESTIC COLD WATER PIPE

DOMESTIC HOT WATER PIPE

DOMESTIC WATER SUPPLY

SEE FIXTURE CONNECTION SCHEDULE

L-1

FLANGE

CAP OR PLUG

PIPE RISE

PIPE DROP

PIPE ANCHOR

CONCENTRIC INCREASER

CONNECTION OF TOP

TEE FITTING - SIDE BRANCH CONNECTION

CONNECTION OUT OF BOTTOM

TEE FITTING - TOP BRANCH CONNECTION

X

DESCRIPTION

90 ELBOW

GENERAL

UNION

SYMBOL

ANGLE VALVE

RELIEF VALVE

PRESSURE & TEMPERATURE

RELIEF VALVE

VALVE IN RISER

PRESSURE GAUGE

PRESSURE GAUGE W/ COCK

AUTOMATIC AIR VENT

P

P

R

CHECK VALVE

LISTED INDICATING VALVE

BALANCING VALVE

PRESSURE REDUCING VALVE

OUTSIDE SCREW & YOKE GATE VALVE

SHUT-OFF VALVE

VALVES

DESCRIPTIONSYMBOL

RISER DIAGRAMS

WALL MOUNTED URINAL OR WATER

CLOSET

LAVATORY OR SINK, P-TRAP

WATER HAMMER ARRESTOR

FLOOR DRAIN

WALL CLEANOUT

SHUTOFF VALVE

CHECK VALVE

BALANCE VALVE

CLEANOUT IN FLOOR

AQUASTAT

NEW CONNECTION TO EXISTING

ARCH ARCHITECTURAL

AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AMERICAN STANDARDS

ASSOCIATION

ATMOSPHERE VENT

AMERICAN SOCIETY FOR TESTING

MATERIALS

ACID VENT THRU ROOF

AMERICAN WATER WORKS

ASSOCIATION

BACK FLOW PREVENTERBFP

AWWA

BFF

AVTR

AV ACID VENT

BELOW FINISHED FLOOR

AUX

ASTM

ATV

ASME

ASSY

ASA

AT

AUXILIARY

ASSEMBLY

DESCRIPTION

ABBREVIATION

ABOVE CEILING

APPROXIMATE

ACCESS PANEL

ABOVE FINISHED FLOORAFF

AP

APPROX

AC

ABBREV.

ABV

AND

ABOVE

ABBREV.

SANITARY VENT

VENT THRU ROOF

FLOOR DRAIN WITH P-TRAP

PUMP DISCHARGE LINE

SANITARY SEWER/WASTE VENT

(PLAN VIEW)

2-WAY COUNTERSUNK

CLEANOUT PLUGS.

MOUNT IN CONC. PAD FLUSH

W/ FINISH GRADE

CLEANOUT IN FLOOR

CLEANOUT EXPOSED

DESCRIPTION

CO

FCO

SYMBOL

SANITARY WASTE

YARD CLEANOUT

YCO

BRITISH THERMAL UNITBTU

BLDG BUILDING

CONTINUATION

CONNECTION

DENTAL AIR

CORROSION RESISTANT PIPECRP

DA

CU COPPER

CONN

CONT

CONC

CO

COL

CLG

CLO

CONCRETE

CEILING

CLOSET

COLUMN

CLEANOUT

CENTER LINEC

CI

L

CAP CAPACITY

CAST IRON

ENGR ENGINEERING

DOMESTIC HOT WATER

RECIRCULATION

HOT WATER RECIRCULATING

PUMP

INVERT ELEVATION

MEDICAL VACUUM

LV LAB VACUUM

MIN

N

MV

MS

MAX

MECH

MA

MINIMUM

MOP SINK

NITROGEN

MEDICAL AIR

MECHANICAL

MAXIMUM

LBS

LAV

IE

DHWR

HWRP

HTR

DHW

LAVATORY

POUNDS

DOMESTIC HOT WATER

HEATER

GALLONS PER HOUR

ELECTRIC WATER COOLER

FLOOR CLEANOUT

GPH

HP

GALV

GAL

FL. MTD.

FLG

FDTN

FF

HORSEPOWER

GALVANIZED

GALLON(S)

FLANGE

FLOOR MTD.

FINISH FLOOR

FOUNDATION

FD

FCO

EWC

FAB

EQUIP

EX

EQ

FABRICATE

FLOOR DRAIN

EXISTING

EQUIPMENT

EQUAL

MGZV

MGZA

EWH

ABBREV. DESCRIPTION

DN

ELEC

ELEV

DWG

DIA

DOWN

ELEVATION (S)

ELECTRICAL

DRAWING

DIAMETER

MEDICAL GAS ZONE VALVE

MEDICAL GAS ZONE ALARM

ELECTRIC WATER HEATER

GCO GRADE CLEAN OUT

NIC NOT IN CONTRACT

RELOCATER

REVOLUTIONS PER MINUTE

SOIL AND/OR WASTE PIPE

STAINLESS STEELSSTL

SAN

SPEC

SANITARY SEWER

SPECIFICATION

SP

SO

S

SHW

REQ

RPM

RD

SHOWER

SOIL PIPE

SINK

REQUIRED

ROOF DRAIN

PLUMBING FIXTURE

DESIGNATION

PRESSURE REDUCING VALVE

POUNDS PER SQUARE INCH,

GAUGE

PUMP DISCHARGE

OPEN SITE DRAIN

ORAL EVACUATION

PRESS

PRV

PSIG

PD

PLBG

P102

PCT

PRESSURE

PLUMBING

PERCENT (%)

OE

OH

OC

OSD

NO

O

NTS

ON CENTER

OVERHEAD

NORMALLY OPEN

NOT TO SCALE

OXYGEN

UL

WCO

WC

W/

VTR

UTIL

V

UR

STL

UF

UG

TYP

ST

ABBREV.

UNDERWRITERS LABORATORIES

WALL CLEAN OUT

VENT THRU ROOF

WATER CLOSET

WITH

UTILITY

URINAL

VENT PIPE

STEEL

TYPICAL

UNDERGROUND

UNDER FLOOR

STORM PIPE

DESCRIPTION

WP WASTE PIPE

YCO YARD CLEAN OUT

RPZ REDUCED PRESSURE

BACKFLOW PREVENTER

V

SAN

DCW

DHW

DOMESTIC HOT WATER RECIRCULATION PIPE

DHWR

FD

GAS FIRED WATER HEATERGWH

NC NORMALLY CLOSED

EC ELECTRICAL CONTRACTOR

GC GENERAL CONTRACTOR

TC TECHNOLOGY CONTRACTOR

TCC TEMPERATURE CONTROL

CONTRACTOR

DOMESTIC COLD WATERDCW

GENERAL NOTES: (APPLY TO ALL

PLUMBING SHEETS)

DESCRIPTIONSYMBOL

NEW

EXISTING TO REMAIN

DEMOLITION

1. PROVIDE AND INSTALL ALL PLUMBING SYSTEMS IN

ACCORDANCE WITH THE INTERNATIONAL PLUMBING

CODE AS AMENDED BY UFC 3-420-01 AND ALL OTHER

APPLICABLE STATE AND LOCAL CODES.

2. THIS IS A STANDARD PLUMBING SYMBOLOGY AND

ABBREVIATIONS SHEET. ALL SYMBOLS ARE NOT

NECESSARILY USED ON THIS PROJECT.

3. ALL EXISTING MECHANICAL/PLUMBING IS SHOWN

LIGHT. ALL MECHANICAL/PLUMBING TO DEMOLISHED

ON THE DEMO SHEETS IS BE SHOWN DARK AND OR

DASHED. ALL NEW MECHANICAL/PLUMBING ON THE

NEW WORK SHEETS IS SHOWN AS DARK.

4. BASIS OF DESIGN PRODUCT BRANDS ARE FOR

INFORMATIONAL PURPOSES ONLY AND SHALL NOT BE

CONSTRUED AS THE ONLY PRODUCT AVAILABLE.

5. PROVIDE ACCESS PANELS FOR INSTALLATION IN

WALLS AND CEILINGS TO SERVICE CONTROL

DEVICES, VALVES, AND OTHER CONCEALED

PLUMBING EQUIPMENT. INSTALLATION OF ACCESS

PANELS SHALL BE COORDINATED WITH

ARCHITECTURAL WORK TO MATCH MATERIALS AND

FINISHES. REFER TO SPECIFICATIONS FOR

ADDITIONAL REQUIREMENTS.

6. MAINTAIN THE CLEARANCE SPACES AROUND, OVER,

AND UNDER EQUIPMENT, SYSTEMS, AND SYSTEM

COMPONENTS IN CEILING CAVITIES CONVENIENT

OBSERVATION, NECESSARY FOR OPERATION, AND

MAINTENANCE.

7. INSTALL PLUMBING VENTS NO CLOSER THAN 30 FEET

FROM ANY OUTSIDE AIR INTAKE.

8. PROVIDE DIELECTRIC UNIONS AT ALL CONNECTIONS

OF DISSIMILAR METALS (SUCH AS COPPER TO

GALVANIZED STEEL).

9. PLUMBING INSTALLATION SHALL COMPLY WITH

APPLICABLE PLUMBING CODE AND THE ABA

GUIDELINES FOR ACCESSIBILITY TO PLACES OF

PUBLIC ACCOMMODATION AND COMMERCIAL

FACILITIES BY INDIVIDUALS WITH DISABILITIES.

10. CLEANOUTS, VALVES, GAUGES, ETC. SHALL BE

LOCATED TO MAINTAIN ACCESSIBILITY. WALL

CLEANOUTS SHALL BE 18" A.F.F. AND FLOOR

CLEANOUTS NO LESS THAN 12" FROM WALL

11. SANITARY SEWER PIPING SMALLER THAN 3" SHALL BE

SLOPED AT 1/4" PER FOOT, 3" AND ABOVE SHALL BE

SLOPED AT 1/8" PER FOOT.

12. COORDINATE INSTALLATION OF NEW WORK WITH

EXISTING CONDITIONS INCLUDING STRUCTURE.

13. BACKFILL AND COMPACTION REQUIREMENTS SHALL

BE PER THE INTERNATIONAL PLUMBING CODE 2015

UNLESS NOTED OTHERWISE WITHIN THE

CONSTRUCTION DOCUMENTS. REFER TO

SPECIFICATIONS FOR EXCAVATION AND EXCAVATED

SOIL TESTING REQUIREMENTS.

14. PIPE PRESSURE TESTING AND ASSOCIATED

DURATIONS SHALL BE PER THE INTERNATIONAL

PLUMBING CODE 2018 AND SPECIFICATIONS.

DEMOLISH EXISTING TO THIS POINT

PRESSURE REDUCING VALVE

TRAP PRIMER

TP TRAP PRIMER PIPING

PL

U

M

BI

N G

PD101

BP

SG

A O

FI

R

ST

F

LO

E

LA

R

G

ED

P

- D

O

LI

TI

O

N

OF

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

W W

YK

R

EN

O

VA

TE

R

ES

TR

O O

M S, PO

ST

S C

AN

D

C 7, B

N

O V

H D

R

KEYPLAN

PROJECT

LOCATIONC7

FIRST FLOORN

NORTH

GENERAL DEMOLITION NOTES:

1. CONTRACT DOCUMENTS WERE PREPARED FROM FIELD SURVEYS. THEY

ARE NOT INTENDED TO DEPICT UNFORESEEN CONDITIONS THAT MAY

ADVERSELY AFFECT THE PLUMBING SYSTEM DEMOLITION OR

INSTALLATION. PLUMBING CONTRACTOR SHALL FIELD VERIFY EXISTING

CONDITIONS PRIOR TO STARTING ANY WORK.

2. UNDERFLOOR PIPE ROUTING IS UNKNOWN. CONTRACTOR TO FIELD

VERIFY EXISTING UNDERFLOOR PIPING LAYOUT AND ASSOCIATED INVERT

ELEVATIONS TO ENSURE NEW SANITARY SEWER TIE-INS FOR NEW

PLUMBING FIXTURES AND FLOOR DRAINS IS POSSIBLE PRIOR TO

COMMENCING ANY SLAB SAW CUTTING OR ASSOCIATED DEMOLITION

WORK. REFER TO P-501 FOR UNDERFLOOR WORK…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .