Solicitation_Development_Form_(Internal_Use_Only).pdf
PDF 122 KB Posted
- Attached to
- Marina Redevelopment (Project No. 25204-130)
- Solicitation number
- RFQ- 26 - 022
- Issued by
- Pinellas County, Florida
About this file
This is a Solicitation Development Form for the City of St. Petersburg's Marina Redevelopment Project (Project No. 25204-130), a progressive Design-Build procurement involving multiple city departments including Parks & Recreation, Police, Port, and Water Resources Division. The project encompasses design and construction services for floating docks, dock houses, ship store renovation, fueling facilities, seawalls, and a bridge connecting to Demens Landing across the North, Central, and South Marina Basins. The solicitation was released on October 28, 2025, with responses due by December 2, 2025, at 3:00 pm. A pre-bid meeting is required. The City will shortlist at least three qualified respondents for interviews scheduled on January 13, 2026. The project has a substantial completion timeline of 60 months from the Notice to Proceed. The CoSP acceptance period is 90 days after bid closure.
The total construction budget is $140,000,000 to $148,000,000 with a Guaranteed Maximum Price delivery method. Funding source is identified as CoSP (City of St. Petersburg). The procurement includes scoring weighted heavily toward technical qualifications, with 33 points for team background, 25 points for experience, and 22 points for project approach. The City has established preferences for Minority Business Enterprises (MBE), Small Business Enterprises (SBE), Woman Owned Business Enterprises (WBE), and Disadvantaged Business Enterprises (DBE). Insurance requirements are substantial, including $10,000,000 in Commercial General Liability, $5,000,000 in Pollution/Environmental Liability, and $5,000,000 in Professional Liability. A Public Construction Bond equal to the cumulative Guaranteed Maximum Price will be required from a surety company with an "A" rating and Class VII financial category. The evaluation committee is chaired by Brejesh Prayman with members including Evan Birk, Catherine Corcoran, David Wirth, and Brian Caper, supported by technical advisor Kristel Bataku.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev: 10/14/25
Solicitation Development Form – DB / CCNA RFQ
OpenGov Followers: Catherine Corcoran and Christy Carlton Routing Council Items and Related Questions:
Catherine Corcoran, Evan Birk, Sarah Johnson, Brejesh Prayman, Janice MacKinnon, and David Wirth OpenGov Approvers: Evan Birk and Brejesh Prayman
Charge Account TBD Budget $ 140,000,000
Funding Source / Grant Info, if known CoSP Acceptance Period 90 Days, after bid closes
Background Checks Parks & Rec Police Port WRD
Pre-bid meeting required? Yes No
Class Item Commodity Description
906.25 Design Build Services
925.44 General Construction: Management, Scheduling, Cost Estimation - Engineering
925.48 Harbors; Jetties; Piers; Ship Terminal Facilities - Engineering
913.13 Construction, Bridge and Drawbridge (Includes Reconstruction/Rehabilitation)
Insurance Requirements: For coverages and limits, refer to Exhibit A – Insurance and Bonds
Committee Members Technical Advisors
1. Chair: Brejesh Prayman 1. Kristel Bataku
2. Evan Birk 2.
3. Catherine Corcoran
4. David Wirth
5. Brian Caper
Attachments DB
Draft AIA Agreement Exhibit D - Owner Direct Purchase Policy
Exhibit A - Insurance and Bonds Exhibit E - Design Criteria Package
Exhibit B - Draft AIA Design Build Exhibit SF 330
Exhibit C - Statement of Qualifications Other: Concept Layout
Additional Firms To Notify:
1.
2.
3.
4.
5.
Project No./Project Title 25204-130 - Marina Redevelopment
Type of Solicitation Fixed Design-Build Progressive Design-Build
For ECID use only Yes No
File details come from the government source that posted it. Updated .