Solicitation_Development_Form_(Internal_Use_Only).pdf

PDF 122 KB Posted

Attached to
Marina Redevelopment (Project No. 25204-130)
Solicitation number
RFQ- 26 - 022
Issued by
Pinellas County, Florida

About this file

This is a Solicitation Development Form for a Progressive Design-Build project titled Marina Redevelopment (Project No. 25204-130), involving multiple municipal departments and governance personnel. The project is a comprehensive marina reconstruction initiative with a total budget of $140,000,000, utilizing a Progressive Design-Build solicitation method. The project encompasses multiple commodity classes including Design Build Services, General Construction Management, Harbors and Terminal Facilities Engineering, and Bridge/Drawbridge Construction/Rehabilitation. The solicitation does not require a pre-bid meeting, and the bid acceptance period is 90 days after bid closure.

The project's funding source is listed as CoSP (Cooperation and Shared Procurement), with the charge account currently marked as To Be Determined (TBD). Insurance requirements are detailed in Exhibit A, and the solicitation includes multiple attachments such as a Draft AIA Agreement, Owner Direct Purchase Policy, Design Criteria Package, Statement of Qualifications, and a Concept Layout. The project committee includes five members led by Chair Brejesh Prayman, with Kristel Bataku identified as the primary technical advisor. Background checks may be conducted, though no specific departments are currently marked for this process.

View the file

Other files

File Type Posted
Marina_Redevelopment_(Project_No._25204-130)_(Addendum_#2_Revision).pdf PDF
Marina_Redevelopment_(Project_No._25204-130)_(Addendum_#1_Revision).pdf PDF
CITY_OF_ST_PETE_PURCHASING_64312-1_PROOF_1.pdf PDF
CITY_OF_ST_PETE_PURCHASING_64312-1_PROOF_1.pdf PDF
CITY_OF_ST_PETE_PURCHASING_64312-1_RECEIPT.pdf PDF
CITY_OF_ST_PETE_PURCHASING_64312-1_RECEIPT.pdf PDF
Marina_Redevelopment_(Project_No._25204-130).pdf PDF
Public_Construction_Bond_.pdf PDF
SF330-21a.pdf PDF
SF330-21a.pdf PDF
SF330-21a.pdf PDF
Public_Construction_Bond_.pdf PDF
Public_Construction_Bond_.pdf PDF
Attachment_-_St_Pete_Marina_Central_Basin_.pdf PDF
Attachment_-_St_Pete_Marina_Central_Basin_.pdf PDF
Attachment_-_St_Pete_Marina_Central_Basin_.pdf PDF
Attachment_-_St_Pete_Marina_South_Basin_.pdf PDF
Attachment_-_St_Pete_Marina_South_Basin_.pdf PDF
Attachment_-_St_Pete_Marina_South_Basin_.pdf PDF
AIA_A141_Desgin-Build_Agreement_00807830_DRAFT.pdf PDF
AIA_A141_Desgin-Build_Agreement_00807830_DRAFT.pdf PDF
AIA_A141_Desgin-Build_Agreement_00807830_DRAFT.pdf PDF
Exhibit_E_-_Design_Criteria_Package.pdf PDF
Exhibit_E_-_Design_Criteria_Package.pdf PDF
Exhibit_E_-_Design_Criteria_Package.pdf PDF
Exhibit_D_-_Owner_Direct_Purchase_Policy.pdf PDF
Exhibit_D_-_Owner_Direct_Purchase_Policy.pdf PDF
Exhibit_D_-_Owner_Direct_Purchase_Policy.pdf PDF
Exhibit_C_-_Statement_of_Qualifications_Requirements.pdf PDF
Exhibit_C_-_Statement_of_Qualifications_Requirements.pdf PDF
Exhibit_C_-_Statement_of_Qualifications_Requirements.pdf PDF
Exhibit_B_-_Design-Build_Admendment_Exhibit_00807833_DRAFT.pdf PDF
Exhibit_B_-_Design-Build_Admendment_Exhibit_00807833_DRAFT.pdf PDF
Exhibit_B_-_Design-Build_Admendment_Exhibit_00807833_DRAFT.pdf PDF
Exhibit_A_-_Insurance_and_Bonds.pdf PDF
Exhibit_A_-_Insurance_and_Bonds.pdf PDF
Exhibit_A_-_Insurance_and_Bonds.pdf PDF
Solicitation_Development_Form_(Internal_Use_Only).pdf PDF
Solicitation_Development_Form_(Internal_Use_Only).pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev: 10/14/25

Solicitation Development Form – DB / CCNA RFQ

OpenGov Followers: Catherine Corcoran and Christy Carlton Routing Council Items and Related Questions:

Catherine Corcoran, Evan Birk, Sarah Johnson, Brejesh Prayman, Janice MacKinnon, and David Wirth OpenGov Approvers: Evan Birk and Brejesh Prayman

Charge Account TBD Budget $ 140,000,000

Funding Source / Grant Info, if known CoSP Acceptance Period 90 Days, after bid closes

Background Checks Parks & Rec Police Port WRD

Pre-bid meeting required? Yes No

Class Item Commodity Description

906.25 Design Build Services

925.44 General Construction: Management, Scheduling, Cost Estimation - Engineering

925.48 Harbors; Jetties; Piers; Ship Terminal Facilities - Engineering

913.13 Construction, Bridge and Drawbridge (Includes Reconstruction/Rehabilitation)

Insurance Requirements: For coverages and limits, refer to Exhibit A – Insurance and Bonds

Committee Members Technical Advisors

1. Chair: Brejesh Prayman 1. Kristel Bataku

2. Evan Birk 2.

3. Catherine Corcoran

4. David Wirth

5. Brian Caper

Attachments DB

Draft AIA Agreement Exhibit D - Owner Direct Purchase Policy

Exhibit A - Insurance and Bonds Exhibit E - Design Criteria Package

Exhibit B - Draft AIA Design Build Exhibit SF 330

Exhibit C - Statement of Qualifications Other: Concept Layout

Additional Firms To Notify:

1.

2.

3.

4.

5.

Project No./Project Title 25204-130 - Marina Redevelopment

Type of Solicitation Fixed Design-Build Progressive Design-Build

For ECID use only Yes No

File details come from the government source that posted it. Updated .