Wage Determination 01-08-2010.docx

DOCX document 18 KB Posted

Attached to
Replace Generators Building 600
Solicitation number
SolFA2550-10-R-1001
Issued by

About this file

Wage Determination

View the file

Other files

File Type Posted
SolFA2550-10-R-1001-0002.doc DOC document
SOW 1 April 2010.rtf RTF text file
SOW Install Three Generators B600 —
FA2550-10-R-1001-0001.doc DOC document
SolFA2550-10-R-1001 Questions Answers.docx DOCX document
Atch 3 Gen Spec.pdf PDF
Atch 2 Tech Sub.pdf PDF
Atch 4 Gen Serv Inf.pdf PDF
Atch 1 Elevation Drawing.pdf PDF
SOW Install Three Generators B600.rtf RTF text file
SOLFA2550-10-R-1001.doc DOC document
PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA2550-10-R-1001

Attachments #3

General Decision Number: CO080012 01/08/2010 CO12

Superseded General Decision Number: CO20070012

State: Colorado

Construction Type: Heavy

Counties: Adams, Arapahoe, Boulder, Broomfield, Denver, Douglas, El Paso, Jefferson, Larimer, Mesa, Pueblo and Weld Counties in Colorado.

HEAVY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 04/04/2008 3 05/02/2008 4 06/06/2008 5 07/04/2008 6 08/15/2008 7 09/05/2008 8 10/03/2008 9 11/07/2008 10 12/05/2008 11 01/02/2009 12 03/20/2009 13 04/03/2009 14 05/01/2009 15 06/05/2009 16 07/03/2009 17 08/07/2009 18 09/11/2009 19 10/16/2009 20 11/13/2009 21 11/27/2009 22 01/08/2010

ASBE0028-001 07/01/2009

Rates Fringes

Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)....................$ 23.54 11.13

BRCO0007-004 01/01/2009

ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS AND

JEFFERSON COUNTIES

Rates Fringes

BRICKLAYER.......................$ 22.95 9.07

BRCO0007-006 05/01/2009

EL PASO AND PUEBLO COUNTIES

Rates Fringes

BRICKLAYER.......................$ 22.32 9.53

ELEC0012-004 06/01/2009

PUEBLO COUNTY

Rates Fringes

ELECTRICIAN

Electrical work where the cost is $150,000 or less....$ 22.85 10.79 Electrical work where the cost is over $150,000.......$ 27.00 10.91

ELEC0068-001 06/01/2009

ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS,

JEFFERSON, LARIMER, AND WELD COUNTIES

ELECTRICIAN......................$ 31.00 11.40

* ELEC0111-001 09/01/2009

Rates Fringes

Line Construction:

Cable Splicer...............$ 28.65 13.75%+4.75 Equipment Operator- Underground.................$ 24.33 12.75%+4.75 Groundman...................$ 20.48 17.75%+4.75 Line Equipment Operator.....$ 24.99 17.75%+4.75 Lineman and Welder..........$ 35.81 20.75%+4.75

ELEC0113-002 06/01/2009

EL PASO COUNTY

Rates Fringes

ELECTRICIAN......................$ 28.80 3%+13.10

ELEC0969-002 06/01/2009

MESA COUNTY

Rates Fringes

ELECTRICIAN......................$ 21.31 8.92

ENGI0009-001 05/01/2009

Rates Fringes

Power equipment operators:

Blade: Finish...............$ 23.97 9.22 Blade: Rough................$ 23.67 9.22 Bulldozer...................$ 23.67 9.22 Cranes: 50 tons and under..$ 23.82 9.22 Cranes: 51 to 90 tons......$ 23.97 9.22 Cranes: 91 to 140 tons.....$ 24.12 9.22 Cranes: 141 tons and over...$ 24.88 9.22 Forklift....................$ 23.32 9.22 Mechanic....................$ 23.82 9.22 Oiler.......................$ 22.97 9.22 Scraper: Single bowl under 40 cubic yards........$ 23.82 9.22 Scraper: Single bowl, including pups 40 cubic yards and over and tandem bowls.......................$ 23.97 9.22 Trackhoe....................$ 23.82 9.22

IRON0024-003 11/01/2009

Rates Fringes

Ironworkers:.....................$ 24.80 12.12 Structural

LABO0086-001 05/01/2009

Rates Fringes

Laborers:

Pipelayer...................$ 18.68 6.78

PLUM0003-005 08/01/2009

JEFFERSON, LARIMER AND WELD COUNTIES

PLUMBER..........................$ 33.37 10.45

PLUM0058-002 07/01/2009

EL PASO COUNTY

Rates Fringes

Plumbers and Pipefitters.........$ 28.55 11.45

PLUM0058-008 07/01/2009

PUEBLO COUNTY

Rates Fringes

Plumbers and Pipefitters.........$ 28.55 11.45

PLUM0145-002 08/01/2009

MESA COUNTY

Rates Fringes

Plumbers and Pipefitters.........$ 24.00 9.70

PLUM0208-004 07/08/2009

JEFFERSON, LARIMER AND WELD COUNTIES

PIPEFITTER.......................$ 33.30 10.52

SHEE0009-002 07/01/2009

Rates Fringes

Sheet metal worker...............$ 30.55 11.67

SUCO2001-006 12/20/2001

Rates Fringes

BOILERMAKER......................$ 17.60

Carpenters:

Form Building and Setting...$ 16.97 2.74 All Other Work..............$ 15.14 3.37

Cement Mason/Concrete Finisher...$ 17.31 2.85

IRONWORKER, REINFORCING..........$ 18.83 3.90

Laborers:

Common......................$ 11.22 2.92 Flagger.....................$ 8.91 3.80 Landscape...................$ 12.56 3.21

Painters:

Brush, Roller & Spray.......$ 15.81 3.26

Power equipment operators:

Backhoe.....................$ 16.36 2.48 Front End Loader............$ 17.24 3.23 Skid Loader.................$ 15.37 4.41

TEAM0435-001 05/01/2000

Rates Fringes

Truck drivers:

Pickup......................$ 14.21 5.27 Tandem/Semi and Water......$ 14.93 5.27

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .