Wage Determination 01-08-2010.docx
DOCX document 18 KB Posted
- Attached to
- Replace Generators Building 600
- Solicitation number
- SolFA2550-10-R-1001
About this file
Wage Determination
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SolFA2550-10-R-1001-0002.doc | DOC document | |
| SOW 1 April 2010.rtf | RTF text file | |
| SOW Install Three Generators B600 | — | |
| FA2550-10-R-1001-0001.doc | DOC document | |
| SolFA2550-10-R-1001 Questions Answers.docx | DOCX document | |
| Atch 3 Gen Spec.pdf | ||
| Atch 2 Tech Sub.pdf | ||
| Atch 4 Gen Serv Inf.pdf | ||
| Atch 1 Elevation Drawing.pdf | ||
| SOW Install Three Generators B600.rtf | RTF text file | |
| SOLFA2550-10-R-1001.doc | DOC document | |
| PAST PERFORMANCE QUESTIONNAIRE.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA2550-10-R-1001
Attachments #3
General Decision Number: CO080012 01/08/2010 CO12
Superseded General Decision Number: CO20070012
State: Colorado
Construction Type: Heavy
Counties: Adams, Arapahoe, Boulder, Broomfield, Denver, Douglas, El Paso, Jefferson, Larimer, Mesa, Pueblo and Weld Counties in Colorado.
HEAVY CONSTRUCTION PROJECTS
Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 04/04/2008 3 05/02/2008 4 06/06/2008 5 07/04/2008 6 08/15/2008 7 09/05/2008 8 10/03/2008 9 11/07/2008 10 12/05/2008 11 01/02/2009 12 03/20/2009 13 04/03/2009 14 05/01/2009 15 06/05/2009 16 07/03/2009 17 08/07/2009 18 09/11/2009 19 10/16/2009 20 11/13/2009 21 11/27/2009 22 01/08/2010
ASBE0028-001 07/01/2009
Rates Fringes
Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)....................$ 23.54 11.13
BRCO0007-004 01/01/2009
ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS AND
JEFFERSON COUNTIES
Rates Fringes
BRICKLAYER.......................$ 22.95 9.07
BRCO0007-006 05/01/2009
EL PASO AND PUEBLO COUNTIES
Rates Fringes
BRICKLAYER.......................$ 22.32 9.53
ELEC0012-004 06/01/2009
PUEBLO COUNTY
Rates Fringes
ELECTRICIAN
Electrical work where the cost is $150,000 or less....$ 22.85 10.79 Electrical work where the cost is over $150,000.......$ 27.00 10.91
ELEC0068-001 06/01/2009
ADAMS, ARAPAHOE, BOULDER, BROOMFIELD, DENVER, DOUGLAS,
JEFFERSON, LARIMER, AND WELD COUNTIES
ELECTRICIAN......................$ 31.00 11.40
* ELEC0111-001 09/01/2009
Rates Fringes
Line Construction:
Cable Splicer...............$ 28.65 13.75%+4.75 Equipment Operator- Underground.................$ 24.33 12.75%+4.75 Groundman...................$ 20.48 17.75%+4.75 Line Equipment Operator.....$ 24.99 17.75%+4.75 Lineman and Welder..........$ 35.81 20.75%+4.75
ELEC0113-002 06/01/2009
EL PASO COUNTY
Rates Fringes
ELECTRICIAN......................$ 28.80 3%+13.10
ELEC0969-002 06/01/2009
MESA COUNTY
Rates Fringes
ELECTRICIAN......................$ 21.31 8.92
ENGI0009-001 05/01/2009
Rates Fringes
Power equipment operators:
Blade: Finish...............$ 23.97 9.22 Blade: Rough................$ 23.67 9.22 Bulldozer...................$ 23.67 9.22 Cranes: 50 tons and under..$ 23.82 9.22 Cranes: 51 to 90 tons......$ 23.97 9.22 Cranes: 91 to 140 tons.....$ 24.12 9.22 Cranes: 141 tons and over...$ 24.88 9.22 Forklift....................$ 23.32 9.22 Mechanic....................$ 23.82 9.22 Oiler.......................$ 22.97 9.22 Scraper: Single bowl under 40 cubic yards........$ 23.82 9.22 Scraper: Single bowl, including pups 40 cubic yards and over and tandem bowls.......................$ 23.97 9.22 Trackhoe....................$ 23.82 9.22
IRON0024-003 11/01/2009
Rates Fringes
Ironworkers:.....................$ 24.80 12.12 Structural
LABO0086-001 05/01/2009
Rates Fringes
Laborers:
Pipelayer...................$ 18.68 6.78
PLUM0003-005 08/01/2009
JEFFERSON, LARIMER AND WELD COUNTIES
PLUMBER..........................$ 33.37 10.45
PLUM0058-002 07/01/2009
EL PASO COUNTY
Rates Fringes
Plumbers and Pipefitters.........$ 28.55 11.45
PLUM0058-008 07/01/2009
PUEBLO COUNTY
Rates Fringes
Plumbers and Pipefitters.........$ 28.55 11.45
PLUM0145-002 08/01/2009
MESA COUNTY
Rates Fringes
Plumbers and Pipefitters.........$ 24.00 9.70
PLUM0208-004 07/08/2009
JEFFERSON, LARIMER AND WELD COUNTIES
PIPEFITTER.......................$ 33.30 10.52
SHEE0009-002 07/01/2009
Rates Fringes
Sheet metal worker...............$ 30.55 11.67
SUCO2001-006 12/20/2001
Rates Fringes
BOILERMAKER......................$ 17.60
Carpenters:
Form Building and Setting...$ 16.97 2.74 All Other Work..............$ 15.14 3.37
Cement Mason/Concrete Finisher...$ 17.31 2.85
IRONWORKER, REINFORCING..........$ 18.83 3.90
Laborers:
Common......................$ 11.22 2.92 Flagger.....................$ 8.91 3.80 Landscape...................$ 12.56 3.21
Painters:
Brush, Roller & Spray.......$ 15.81 3.26
Power equipment operators:
Backhoe.....................$ 16.36 2.48 Front End Loader............$ 17.24 3.23 Skid Loader.................$ 15.37 4.41
TEAM0435-001 05/01/2000
Rates Fringes
Truck drivers:
Pickup......................$ 14.21 5.27 Tandem/Semi and Water......$ 14.93 5.27
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .