Request for Proposal (RFP), SOL-306-16-000004
Strengthening Watershed and Irrigation Management (SWIM)
CONTENTS
ACRONYMS
SF33
PART I – THE SCHEDULE
SECTION B: SUPPLIES OR SERVICES AND PRICE/COSTS _________________________ 11
B.1 PURPOSE
B.2 CONTRACT TYPE
B.3 ESTIMATED COST, FIXED FEE, AND OBLIGATED AMOUNT
B.4 BUDGET ($) - THIS CONTRACT
B.5 INDIRECT COSTS
B.6 CEILING ON INDIRECT COSTS
B.7 COST REIMBURSABLE
B.8 PAYMENT OF FIXED FEE
B.9 CANCELLATION CEILING AND MULTI-YEAR CONTRACT
SECTION C: DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK _____________ 17
C.1 PURPOSE
C.2 BACKGROUND
C.3 ACTIVITY COMPONENTS AND EXPECTED RESULTS
C.4 EXPECTED RESULTS
C.5 GRANTS UNDER CONTRACTS (GUC)
C.6 CROSS CUTTING REQUIREMENTS
C.7 INFORMATION AND COMMUNICATION TECHNOLOGIES (ICT)
C.8 MANAGEMENT STRUCTURE AND OFFICE LOCATIONS
C.9 ELECTRONIC PAYMENTS
SECTION D: PACKAGING AND MARKING _______________________________________ 29
D.1 BRANDING STRATEGY
D.2 AIDAR 752.7009 – MARKING (JAN 1993)
D.3 ANTICIPATED ELEMENTS OF MARKING PLAN
D.4 APPROVAL OF CONRACTOR BRANDING IMPLEMENTATION & MARKING PLAN
SECTION E: INSPECTION AND ACCEPTANCE ___________________________________ 31
E.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE
E.2 INSPECTION AND ACCEPTANCE
E.3 USAID/AFGHANISTAN DATABASE REPORTING REQUIREMENT (JUNE 2015)
SECTION F: DELIVERIES OR PERFORMANCE____________________________________ 33
F.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE
F.2 PERIOD OF PERFORMANCE
F.3 PLACE OF PERFORMANCE
F.4 REPORTS AND DELIVERABLES
F.5 DESCRIPTION OF THE REPORTS:
F.6 REPORTING FORMAT
F.7 LANGUAGE OF REPORTS AND OTHER OUTPUTS
F.8 KEY PERSONNEL
F.9 OTHER PERSONNEL
F.10 PERFORMANCE MONITORING AND EVALUATION PLAN
F.11 AIDAR 752.7005 – SUBMISSION REQUIREMENTS FOR DEVELOPMENT EXPERIENCE
DOCUMENTS (SEP 2013)
F.12 PERFORMANCE STANDARDS
SECTION G: CONTRACT ADMINISTRATION DATA ______________________________ 48
G.1 AIDAR 752.7003 DOCUMENTATION FOR PAYMENT (NOV 1998)
G.2 ADMINISTRATIVE CONTRACTING OFFICE
G.3 CONTRACTING OFFICER’S AUTHORITY
G.4 CONTRACTING OFFICER’S REPRESENTATIVE (COR)
G.5 TECHNICAL DIRECTIONS/RELATIONSHIP WITH USAID
G.6 ACCEPTANCE AND APPROVAL
G.7 PAYING OFFICE
G.8 ACCOUNTING AND APPROPRIATION DATA
G.9 CONTRACTOR’S PRIMARY POINT OF CONTACT
G.10 CONTRACTOR’S PAYMENT ADDRESS
PART II – CLAUSES
SECTION H: SPECIAL CONTRACT REQUIREMENTS ______________________________ 53
H.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE
H.2 752.702 DESIGNATION OF AUTHORIZED GEOGRAPHIC CODE
H.3 752.222-70 USAID DISABILITY POLICY (DEC 2004)
H.4 752.225-70 SOURCE AND NATIONALITY REQUIREMENTS (FEB 2012)
H.5 AIDAR 752.228-3 WORKER’S COMPENSATION INSURANCE (DEC 1991)
H.6 AIDAR 752.228-70 MEDICAL EVACUATION (MEDEVAC) SERVICES (JUL 2007)
H.7 AIDAR 752.231-71 SALARY SUPPLEMENTS FOR HOST GOVERNMENT (HG) EMPLOYEES
(MAR 2015)
H.8 AIDAR 752.7004 EMERGENCY LOCATOR INFORMATION (JUL 1997)
H.9 AIDAR 752.7007 PERSONNEL COMPENSATION (JUL 2007)
H.10 AIDAR 752.7031 LEAVE AND HOLIDAYS (OCT 1989)
H.11 AIDAR 752.7032 INTERNATIONAL TRAVEL APPROVAL AND NOTIFICATION
REQUIREMENTS (APR 2014)
H.12 52.204-5 WOMEN-OWNED BUSINESS (OTHER THAN SMALL BUSINESS) (OCT 2014)
H.13 ADS 302.3.5.5 REPORTING OF FOREIGN TAXES (JULY 2007)
H.14 ADS 302.3.5.9 NONDISCRIMINATION (JUNE 2012)
H.15 ADS 302.3.5.19 USAID-FINANCED THIRD-PARTY WEBSITES (AUG 2013)
H.16 ADS 302.3.5.20 CONFERENCE PLANNING AND REQUIRED APPROVALS (AUG 2013)
H.17 ADS 302.3.5.21 USAID IMPLEMENTING PARTNER NOTICES (IPN) PORTAL FOR
ACQUISITION (JULY 2014)
H.18 302.3.5.22 SUBMISSION OF DATASETS TO THE DEVELOPMENT DATA LIBRARY (DDL)
(OCTOBER 2014)
H.19 INSURANCE AND SERVICES
H.20 ADDITIONAL REQUIREMENTS FOR PERSONNEL COMPENSATION
H.21 INTERNATIONAL TRAVEL APPROVAL
H.22 NONEXPENDABLE PROPERTY PURCHASES AND INFORMATION TECHNOLOGY
RESOURCES
H.23 LOGISTIC SUPPORT GOVERNMENT FURNISHED FACILITIES OR PROPERTY
H.24 COMPLIANCE WITH SECTION 508 OF THE REHABILITATION ACT OF 1973, AS
AMENDED
H.25 CONSENT TO SUBCONTRACTS
H.26 SUB-AWARD REQUIREMENTS (MARCH 2012)
H.27 USAID’S AFGHAN FIRST POLICY AND REPORTING REQUIREMENTS
H.28 FOREIGN GOVERNMENT DELEGATIONS TO INTERNATIONAL CONFERENCES
H.29 LOGISTIC SUPPORT
H.30 LANGUAGE REQUIREMENTS
H.31 STANDARDS OF CONDUCT -- IMPROPER BUSINESS PRACTICES
H.32 PROHIBITION OF ASSISTANCE TO DRUG TRAFFICKERS
H.33 DISCLOSURE OF INFORMATION (AIDAR)
H.34 USAID/AFGHANISTAN DATABASE REPORTING REQUIREMENT (JUNE 2015)
H.35 USE OF SYNCHRONIZED PRE-DEPLOYMENT AND OPERATIONAL TRACKER (SPOT)
FOR CONTRACTORS SUPPORTING A DIPLOMATIC OR CONSULAR MISSION OUTSIDE
THE UNITED STATES (SUPPLEMENT TO FAR 52.225-19)
H.36 FACILITIES USED FOR RELIGIOUS ACTIVITIES
H.37 RIGHT TO PROCURE FROM OTHER SOURCES
H.38 SERIOUS INCIDENT REPORTING IN AFGHANISTAN (DEC 2010)
H.39 FRAUD REPORTING
H.40 VETTING
H.41 ENVIRONMENTAL COMPLIANCE
H.42 HOST COUNTRY TAXES AND DUTIES
H.43 CONFIDENTIALITY AND OWNERSHIP OF INTELLECTUAL PROPERTY
H.44 AMMONIUM NITRATE AND CALCIUM AMMONIUM NITRATE RESTRICTION (September
2011) (Class Deviation OAA-DEV-ll-03c, expiration date September 8, 2016)
H.45 ELECTRONIC PAYMENTS SYSTEM
SECTION I: CONTRACT CLAUSES ______________________________________________ 78
I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
I.2 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE
I.3 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (APR 2010)
I.4 52.216-8 FIXED FEE (JUN 2011)
I.5 52.217-2 CANCELLATION UNDER MULTI-YEAR CONTRACTS (OCT 1997)
I.6 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
I.7 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)
I.8 AIDAR 752.209-71 ORGANIZATIONAL CONFLICTS OF INTEREST DISCOVERED AFTER
AWARD (JUN 1993)
I.9 AIDAR 752.242-70 PERIODIC PROGRESS REPORTS (OCT 2007)
I.10 AIDAR 752.7006 NOTICES (APR 1984)
I.11 AIDAR 752.7008 USE OF GOVERNMENT FACILITIES OR PERSONNEL (APR 1984)
I.12 AIDAR 752.7025 APPROVALS (APR 1984)
PART III- LIST OF DOCUMENTS, EXHIBITS, & OTHER ATTACHMENTS
SECTION J: LIST OF ATTACHMENTS ____________________________________________ 96
SECTION K: REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF
OFFERORS 98
K.1. NOTICE LISTING SOLICITATION PROVISIONS INCORPORATED BY REFERENCE
K.2. 52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE
CERTAIN FEDERAL TRANSACTIONS (SEP 2007)
K.3. 52.204-3 TAXPAYER IDENTIFICATION (OCT 1998)
K.4. 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)
K.5. 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS (DEC 2014)
K.6. AGREEMENT ON, OR EXCEPTIONS TO, TERMS AND CONDITIONS
K.7. 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (APR 2010)
K.8. 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)
K.9. 52.215-6 PLACE OF PERFORMANCE (OCT 1997)
K.10. 52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS (FEB 1999)
K.11. 52.222-25 AFFIRMATIVE ACTION COMPLIANCE (APR 1984)
K.12. 52.222-38 COMPLIANCE WITH VETERANS' EMPLOYMENT REPORTING REQUIREMENTS
(SEP 2010)
K.13. 52.222.56 CERTIFICATION REGARDING TRAFFICKING IN PERSONS COMPLIANCE PLAN
(MAR 2015)
K.14. 52.225-2 BUY AMERICAN ACT - CERTIFICATE. (MAY 2014)
K.15. 52.227-6 ROYALTY INFORMATION (APR 1984)
K.16. 52.227-7 PATENTS - NOTICE OF GOVERNMENT LICENSEE (APR 1984)
K.17. 52.227-15 REPRESENTATION OF LIMITED RIGHTS DATA AND RESTRICTEDCOMPUTER
SOFTWARE (DEC 2007)
K.18. REPRESENTATION BY CORPORATION REGARDING A DELINQUENT TAX LIABILITY
OR A FELONY CRIMINAL CONVICTION (Deviation OAA-DEV-14-02c) (August 2014)
K.19 52.230-1 COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (MAY 2012)
K.20. 52.230-7 PROPOSAL DISCLOSURE--COST ACCOUNTING PRACTICE CHANGES (APR
2005)
K.21. SIGNATURE
K.22. CONTRACTOR PURCHASING SYSTEM REVIEW
SECTION L: INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS ________ 113
L.1 FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
L.2 FAR 52.233-2 SERVICE OF PROTEST (SEP 2006)
L.3 GENERAL INSTRUCTIONS TO OFFERORS
L.4 PROPOSAL PREPARATION AND DELIVERY INSTRUCTIONS
L.5 INSTRUCTIONS FOR THE PREPARATION OF VOLUME I – TECHNICAL PROPOSAL
L.6 INSTRUCTIONS FOR THE PREPARATION OF VOLUME II – COST PROPOSAL
L.7 INSTRUCTIONS FOR THE PREPARATION OF BRANDING IMPLEMENTATION AND
MARKING PLANS
L.8 DISCLOSURE OF INFORMATION
L.9 AIDAR 752.204-70 PARTNER VETTING PRE-AWARD REQUIREMENTS (FEB 2012)
L.10 ELECTRONIC PAYMENTS
L.11 POLICIES AND PROCEDURES
L.12 SUBCONTRACTING PLAN
L.13 JOINT VENTURE INFORMATION
L.14 INFORMATION TO SUPPORT CONSENT TO SUBCONTRACTORS
L.15 LATE SUBMISSIONS
L.16 GOVERNMENT OBLIGATION
SECTION M: TECHNICAL EVALUATION CRITERIA ______________________________ 131
M.1 BEST VALUE CONTINUUM
M.2 GENERAL INFORMATION
M.3 EVALUATION TECHNICAL FACTORS
M.4 EVALUATION OF COST
M.5 DETERMINATION OF COMPETITIVE RANGE
ACRONYMS
ADB Asian Development Bank
ADS Automated Directives System
AIDAR AID Acquisition Regulation
AMEP Activity Monitoring and Evaluation Plan
ANDS Afghanistan National Development Strategy
AOR Agreement Office Representatives
ARTF Afghanistan Reconstruction Trust Fund’s
BIP Branding Implementation Plan
CAS Cost Accounting Standards
CBD Convention on Biodiversity
CCN Cooperating Country National
CCR Central Contractor Registration
CDCs Community Development Councils
CFR Code of Federal Regulation
CITIES Convention on International Trade In Endangered Species
CLIN Contract Line Item Number
CO Contracting Officer
COP Chief of Party
COR Contracting Officer Representatives
CP Component
CPAR Contractor Performance Assessment Report
CPFF Cost-Plus Fixed Fee
DAIL Directorate of Agriculture, Irrigation and Livestock
DBA Defense Base Act
DCOP Deputy Chief of Party
DDL Development Data Library
DEC Development Experience Clearinghouse
DOD Departments of Defense
DQAs Data Quality Assessments
EA Environmental Assessment
EMMP Environmental Mitigation and Monitoring Plan
ESP Engineering Support Program (ESP)
FAPIIS Federal Awardee Performance Integrity Information System
FAR Federal Acquisition Regulation
FAs Forestry Associations
FO Finance Officer
FOIA Freedom of Information Act
FSN Foreign Service National
GDP Gross Domestic Product
GIRoA Government of the Islamic Republic of Afghanistan
GIZ
Deutsche Gesellschaft für Internationale Zusammenarbeit, (German Society for International Cooperation)
GUC Grants Under Contract
HSDP Homeland Security Presidential Directive
IAs Irrigation Associations
ICIMOD International Center for Integrated Mountain Development
ICT Information and Communication Technologies
IEE Initial Environmental Examination
IP Implementing Partner
IPN Implementing Partners Notices
IRM Office of Information Resource Management
JICA Japan International Cooperation Agency
KFW Kreditanstalt für Wiederaufbau (Reconstruction Credit Institute)
KPIs Key Performance Indicators
LCP Local Employee Compensation Plan
LOAs Letters of Authorization
LOE Level of Effort
M&E Monitoring and Evaluation
MAIL Ministry of Agriculture, Irrigation and Livestock
MEW Ministry of Energy and Water
MOU Memorandum of Understanding
MP Marketing Plan
MRRD Ministry of Rural and Rehabilitation Development
MSP Monitoring Support Program
NAPWA National Action Plan for the women of Afghanistan
NEPA National Environment Protection Agency
NGOs Non-Governmental Organizations
NPPs National Priority Programs
NRM Natural Resource Management
NRVA National Risk and Vulnerability Assessment
NSP National Solidarity Program
O&M Operations and Maintenance
OAA Office of Acquisition and Assistance
OAG Office of Agriculture Growth
OEGI Office of Economic Growth and Infrastructure
OFAC Office of Foreign Assets Control
OFWMP On-Farm Water Management
OIG Office of Inspector General
PIV Personal Identity Verification
PMEP Performance Monitoring and Evaluation Plan
PMP Performance Management Plan
PPIRS Past Performance Information Retrieval System
QA Quality Assurance
RADPs Regional Agriculture Development Programs
RFP Request for Proposal
SAM System for Award Management
SC Subcomponent
SCWAM Supreme Council on Water Affairs Management
SEC Office of Security
SERVIR Regional Visualization and Monitoring System
SOW Scope of Work
SPOT Synchronized Pre-deployment and Operational Tracker
STIP Science, Technology, Innovation and Partnerships
SWIM Strengthening Watershed and Irrigation Management
TBD To Be Determined
TCN Third Country National
TIN Taxpayer Identification Number
UNCCD United Nations Convention to Combat Desertification
UNFCC United Nations Framework Convention on Climate Change
USAID U.S. Agency for International Development
WB World Bank
WUAs Water User Associations
PART I – THE SCHEDULE
SECTION B: SUPPLIES OR SERVICES AND PRICE/COSTS
B.1 PURPOSE
The purpose of the Strengthening Watershed and Irrigation Management (SWIM) activity is to support sustainable, agriculture-led economic growth by increasing the sustainable and productive use of water livelihoods, and strengthening water resource management.
The Contractor will provide capacity building, technical services, and related resources to support:
farmers and farm communities as they manage their water and on-farm resources; the Government of the
Islamic Republic of Afghanistan (GIRoA) in strengthening water resource management; and USAID’s
Regional Agriculture Development Programs (RADPs) to increase agricultural water productivity. These interventions will be grouped under the three components: Increased Productive and Sustainable Use of
Water in Agriculture; Strengthen the Water Regulatory Framework; and Strengthen Capacity of Local
Entities to Manage Water Resources.
B.2 CONTRACT TYPE
The U.S. Government contemplates awarding a Cost-Plus-Fixed -Fee (CPFF) completion type contract resulting from this solicitation. For the consideration set forth below, the Contractor must provide the deliverables or outputs described in Section F in accordance with the performance standards specified based on the Scope of Work (SOW) found in Section C of this document.
B.3 ESTIMATED COST, FIXED FEE, AND OBLIGATED AMOUNT
(a) The estimated cost for the performance of the work required for north region, exclusive of fee(s) is $[TBD]. The fixed fee is $[TBD] and the estimated cost plus all fixed fees for north region is $[TBD].
The estimated cost for the performance of the work required for optional regions, west and south, exclusive of fee(s) is $[TBD]. The fixed fee is $[TBD] and the estimated cost plus all fixed fees for optional regions is $[TBD]
The total estimated cost for the performance of the work required for all regions, exclusive of fee(s) is
$[TBD]. The fixed fee is $[TBD] and the estimated cost plus all fixed fees is $[TBD].
(b) Within the estimated cost plus all possible fees specified in paragraph (a) above, the amount currently obligated and available for reimbursement of allowable costs incurred by the Contractor (and payment of fee, if any) for performance is $[to be added upon award]. The Contractor must not exceed the stated obligated amount.
(c) Funds obligated hereunder are anticipated to be sufficient through [date to be added upon award].
B.4 BUDGET ($) - THIS CONTRACT
The program tasks are grouped in three components, namely Increased Productive and Sustainable Use of
Water in Agriculture; Strengthen the Water Regulatory Framework; and Strengthen Capacity of Local
Entities to Manage Water Resources. The CLIN budget is structured into the three components for the five year period for implementation in the North Region and two (2) regional options: West and South.
Contract Line Item Numbers (CLINs)
Regional Options
Year 1 Year 2 Year 3 Year 4 Year5 Total
Direct TBD TBD TBD TBD TBD TBD
Indirect TBD TBD TBD TBD TBD TBD
Direct TBD TBD TBD TBD TBD TBD
Indirect TBD TBD TBD TBD TBD TBD
Direct TBD TBD TBD TBD TBD TBD
Indirect TBD TBD TBD TBD TBD TBD
Grants Under Contracts N/A 750,000 TBD TBD TBD $4,000,000
Security TBD TBD TBD TBD TBD TBD
Sub Total
Fixed Fee TBD TBD TBD TBD TBD TBD
Grand Total
CLIN 0002/Component two Strengthen the Water Regulatory Framework
CLIN
North Region
CLIN 0003/ Component three - Strengthen Capacity of Local Entities to Manage Water Resources
CLIN 0001/Component one - Increase Productive And Sustainable Use Of Water In Agriculture
Year 1 Year 2 Year 3 Year 4 Year 5 Total
Direct TBD TBD TBD TBD
Indirect TBD TBD TBD TBD
Direct TBD TBD TBD TBD
Indirect TBD TBD TBD TBD
Direct TBD TBD TBD TBD
Indirect TBD TBD TBD TBD
Grants Under Contracts TBD TBD TBD $1,500,000
Security TBD TBD TBD TBD
Sub Total
Fixed Fee TBD TBD TBD TBD
Grand Total
West Region
CLIN 0003/ Component three - Strengthen Capacity of Local Entities to Manage Water Resources
CLIN 0002/Component two Strengthen the Water Regulatory Framework
CLIN 0001/Component one - Increase Productive And Sustainable Use Of Water In Agriculture
Year 1 Year 2 Year 3 Year 4 Year 5 Total
Direct TBD TBD TBD TBD
Indirect TBD TBD TBD TBD
Direct TBD TBD TBD TBD
Indirect TBD TBD TBD TBD
Direct TBD TBD TBD TBD
Indirect TBD TBD TBD TBD
Grants Under Contracts TBD TBD TBD $1,500,000
Security TBD TBD TBD TBD
Sub Total
Fixed Fee TBD TBD TBD TBD
Grand Total
CLIN 0001/Component one - Increase Productive And Sustainable Use Of Water In Agriculture
CLIN 0002/Component two - Strengthen the Water Regulatory Framework
CLIN 0003/ Component three - Strengthen Capacity of Local Entities to Manage Water Resources
South Region
B.5 INDIRECT COSTS
For the Prime Contractor: Pending establishment of revised provisional or final indirect cost rates, allowable indirect costs will be reimbursed on the basis of the following negotiated provisional or predetermined rates and the appropriate bases:
Description Rate Base Type Period
TBD 1/ 1/ 1/
1/Base of Application:
Type of Rate: Predetermined
Period:
For Major Subcontractor(s):Pending establishment of revised provisional or final indirect cost rates, allowable indirect costs will be reimbursed on the basis of the following negotiated provisional or predetermined rates and the appropriate bases:
Description Rate Base Type Period
TBD 1/ 1/ 1/
1/Base of Application:
Type of Rate: Predetermined
Period:
“Major subcontractor(s)” are those subcontractors whose proposed costs exceed 15 percent of the contract value or who are otherwise defined by the prime to be essential to successful activity implementation. All primes MUST identify “major subcontractors” in the cover letter of their proposals.
Note: The Contractor is allowed to recover applicable indirect costs (i.e., overhead, G&A, etc.) on other direct costs (ODCs), if it is part of the Contractor’s usual accounting procedures, consistent with FAR
Part 31, and their Negotiated Indirect Cost Rate Agreement (NICRA).
B.6 CEILING ON INDIRECT COSTS
(a) Reimbursement for indirect costs will be at the lower of the negotiated final pre-determined rates or the following ceiling rates:
Description 2016 2017 2018 2019 2020
[Rate 1 description to be inserted] __% ___% ___% ___% ___%
[Rate 2 description to be inserted] __% ___% ___%___% ___%
[Rate 3 description to be inserted] __% ___% ___% ___% ___%
(b) The Government will not be obligated to pay any additional amount should the final indirect cost rates exceed the negotiated ceiling rates. If the final indirect cost rates are less than the negotiated ceiling rates, the negotiated rates will be reduced to conform to the lower rates.
(c) This understanding shall not change any monetary ceiling, obligation, or specific cost allowance or disallowance. Any changes in classifying or allocating indirect costs require the prior written approval of the Contracting Officer.
B.7 COST REIMBURSABLE
The resulting contract will be a Cost Reimbursable contract. The costs allowable will be limited to reasonable, allocable and necessary costs determined in accordance with FAR 52.216-7, “Allowable Cost and Payment”, FAR 52.216-8, “Fixed Fee”, if applicable, and AIDAR 752.7003, “Documentation for
Payment”.
B.8 PAYMENT OF FIXED FEE
Pursuant to FAR 16.306 (d) “Cost-Plus-Fixed-Fee Contracts”, payment of fixed fee will be based on completion of the deliverables described in Section F of the RFP, subject to inspection and acceptance by
USAID as specified in section E, of the same and otherwise in compliance with the terms of the contract.
Upon acceptance by USAID and receipt of approval from the Contracting Officer, the Contractor must submit an invoice for the amount of the fee associated with the deliverable. The Contractor must propose a fee distribution schedule for review and approval by USAID. Percentage of fee proposed for each deliverable must be commensurate with the level of effort required for successful accomplishment.
Fee schedule North Region
DELIVERABLE DUE DATE % of Fee Fee $
CLIN 1
1.1 Baseline Data Collection and Analysis - Key Baseline and
Control Data Plan submitted and analyzed
1.2 Rehabilitation of 15,000 ha of Irrigation Canal in North
Region
1.3 Rehabilitation of an Additional 15,000 ha of Irrigation
Canal in North Region
1.4 Restoration of 10,000 ha of upland watershed
1.5 Restoration of an additional 6,650 ha of upland watershed
CLIN 2
2.1 Train 90 MAIL/DAIL, MEW Staff
2.2 Inform 25,000 people about appropriate water and natural
resource management
CLIN 3
3.1 Establish 130 Demonstration Plots of Improved
Agriculture Techniques
3.2 Demonstrated Precision Land Leveling on 3,000 ha
3.3 Provide $4.0m in Grants to Local Organizations
3.4 Train 20,000 Community Members in Participatory
Watershed Management
3.5 Establish 300 WUAs/IAs/FAs
Total North Region
Fee schedule West Region
1.2 Rehabilitation of 7,000 ha of Irrigation Canal in West
1.3 Rehabilitation of 15,000 ha of Irrigation Canal in West
1.4 Restoration of 12,215 ha of upland watershed
CLIN 2
2.1 Train 55 MAIL/DAIL, MEW Staff
2.2 Inform 10,000 people about appropriate water and natural
3.1 Establish 50 Demonstration Plots of Improved Agriculture
Techniques
3.2 Demonstrated Precision Land Leveling on 1,500 ha
3.3 Provide $1.5m in Grants to Local Organizations
3.4 Train 10,000 Community Members in Participatory
3.5 Establish 200 WUAs/IAs/FAs
Total West Region
Fee schedule South Region
1.2 Rehabilitation of 15,000 ha of Rehabilitated Irrigation
Canal in South Region
1.3 Restoration of 8,238 ha of upland watershed
CLIN 2
2.1 Train 55 MAIL/DAIL, MEW Staff
2.2 Inform 10,000 people about appropriate water and natural
3.1 Establish 30 Demonstration Plots of Improved Agriculture
Techniques
3.2 Demonstrated Precision Land Leveling on 1,500 ha
3.3 Provide $1.5m in Grants to Local Organizations
3.4 Train 5,000 Community Members in Participatory
3.5 Establish 150 WUAs/IAs/FAs
Total South Region
B.9 CANCELLATION CEILING AND MULTI-YEAR CONTRACT
CLINs 0001 through 0003 are considered non-severable and are therefore multi-year contracts as defined in FAR 17.103, “Definitions”. This contract is subject to the requirements of FAR 17.106, “Procedures”.
Cancellation Dates:
Contract Year 2: TBD
Contract Year 3: TBD
Contract Year 4: TBD
Contract Year 5: TBD
Cancellation Ceiling: $0
This is a CPFF type contract where the Contractor is authorized to be reimbursed for all costs which are allowable in accordance with FAR 52.216-7, “Allowable Cost and Payment”. Therefore, the Contractor will not incur any costs which would have been amortized over the life of the contract should the contract be cancelled in accordance with FAR 52.217-2 “Cancellation Under Multi-Year Contracts”. Therefore, the cancellation ceiling for each cancellation date is $0.
[END OF SECTION B]
SECTION C: DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Title: Strengthening Watershed and Irrigation Management (SWIM)
C.1 PURPOSE
The purpose of the Strengthening Watershed and Irrigation Management (SWIM) activity is to support sustainable; agriculture led economic growth by increasing the productive use of water and strengthening water resources management. Specifically, SWIM’s objectives are to:
1. Increase the sustainable and productive use of water in agriculture in targeted areas, through rehabilitation of irrigation infrastructure, and restoration of degraded watersheds; and,
2. Strengthen the water regulatory framework by supporting the collaboration between the governing bodies for irrigation and water management, strengthening the capacity of water resource and irrigation training programs, and improving public outreach; and,
3. Strengthen capacity of local entities to manage water resources by improving the technical and administrative capacity of local entities to sustainably manage water resources and resolve conflicts through community based natural resource management.
In support of SWIM objectives, the Contractor must provide capacity building, technical services, and related resources to support: farmers and farm communities as they manage their water and on-farm resources; the Government of the Islamic Republic of Afghanistan (GIRoA) in strengthening water resource management; and USAID’s Regional Agriculture Development Programs (RADPs) to increase agricultural water productivity. These interventions will be grouped under the following three components: 1) Increased Productive and Sustainable Use of Water in Agriculture; 2) Strengthen the
Water Regulatory Framework; and 3) Strengthen Capacity of Local Entities to Manage Water Resources.
C.2 BACKGROUND
Agriculture is the foundation of Afghanistan’s economy as 80 % of the population work in agriculture and the sector contributes 24% of the country’s Gross Domestic Product (GDP). Low agricultural productivity in Afghanistan means high levels of rural poverty and stagnant economic growth. Improved irrigation and associated agro technologies offer a means to bolster farm income. SWIM will contribute to two of the
Ghani Administration goals: professional public administration in the agriculture-related ministries and promoting key economic sectors. SWIM will work with Ministry of Energy and Water (MEW) and
Ministry of Agriculture, Irrigation and Livestock to identify areas of overlap in governance of the water sector that reduce the impact of their respective ministries.
SWIM is organized as a five year contract with the initial phase to be implemented only in the North region with an option to expand up to two additional regions, west and south. At the 24 - 30 month point in the activity, an evaluation will be conducted to gauge the effectiveness of the program in the North.
This will be both an assessment of the implementation model and the likelihood that this model will perform in the same way in the South and the West. Additional baseline/assessment will also be done in the South and West regions to evaluate if the security situation is conducive to effectively implement the activity and to determine willingness of the Government of Afghanistan and local communities to coordinate and contribute to roll out the activity in the additional region(s).
The Contractor must implement the SWIM activity to be: (a) demand-driven; (b) flexible and responsive to local opportunities for impact; and (c) results-oriented. The Contractor must implement the SWIM activity in close coordination with the relevant GIRoA institution(s) and other USAID/Afghanistan and donor activities, to the greatest extent possible, to avoid duplication, create synergy, and maximize results. The Contractor is expected to allocate 55% of the cost for North Region and 25% and 20% for
West and South Regions respectively.
The Contractor is encouraged to use Science, Technology, Innovation, and Partnerships (STIP) solutions, such as remotely sensed data, for early season crop selection, drought prediction, assessing soil moisture of remote areas, identifying flood and other risks, where appropriate, as technological advances provide mitigating solutions to the many obstacles to effective water management imposed by Afghanistan’s climate and topography. STIP data products have proven to be useful to water managers and planners, and have been incorporated into the design and implementation of interventions.
The Contractor must also implement a Grants Under Contract (GUC) mechanism to support and enable rural Afghans in target areas to restore and manage watersheds, and empower local organizations and institutions to build a strong foundation for watershed restoration and rehabilitation.
C.3 ACTIVITY COMPONENTS AND EXPECTED RESULTS
In order to achieve the required results, the Contractor must provide a variety of services to support each of the components and achieve specified results. The Contractor must document their undertakings through the creation and approval of an annual work plan. For each component, the SOW provides additional background information, expected results and illustrative interventions. The Contractor must, when practical, identify other areas of technical support and GIRoA collaboration it deems necessary to achieving the expected results.
C.3.1 Component One: Increase Productive And Sustainable Use Of Water In Agriculture
The Contractor must increase agriculture water productivity through improved efficiencies in irrigation water conveyance and on-farm water management. The Contractor must rehabilitate irrigation infrastructure and restore degraded upper watersheds to reduce sedimentation and flooding of irrigated areas.
While working directly with affected communities, the Contractor must develop integrated watershed management plans. These plans will form the basis and the requirements for decisions regarding future rehabilitation works. In addition, these discussions will also lay the groundwork for future community-based education and operation and maintenance (O&M) training.
The Contractor is responsible for the selection of irrigation schemes and watersheds for rehabilitation and must coordinate this activity with RADPs and other relevant USAID activities within the geographical focus areas. This will be done in coordination with MAIL staff and with USAID’s Contracting Officer
Representatives (COR). After the selection of the irrigation schemes and watersheds and the determination of the irrigation requirements, the Contractor must provide this information to USAID.
USAID will complete the initial environmental examination, the survey, and the design of irrigation structures in a specified area to meet the irrigation requirements provided by the Contractor. The design package will then be provided the Contractor through USAID’s COR. The Contractor is responsible for the procurement, supervision, and quality control of the construction works, which must be performed by local construction companies under the Contractor’s supervision/oversight.
USAID will monitor the quality of the rehabilitation of irrigation infrastructures, watersheds, and all other construction interventions under Component 1 through various means, including third-party monitoring.
C.3.1.1. The Contractor must rehabilitate and increase efficiency of irrigation infrastructure through interventions that include, but are not limited to:
a) Rehabilitate primary, secondary, and tertiary irrigation canals and water conveyance infrastructure, such as, canal intake structures, flood control structures, canal bank protections, cross-drainage and turnout structures.
b) Canal refurbishment through lining (where appropriate), restructuring, and de-silting.
C.3.1.2. The Contractor must rehabilitate and restore degraded upper watersheds through interventions that include, but are not limited to:
a) Install soil erosion control measures (e.g. terraces and vegetation coverage) to protect the canals
b) Construct diversions and/or retention ditches/small check dams to prevent runoff and flooding into irrigated lands
Construction Warranty - The Contractor must guarantee all the work to be performed and all the materials to be furnished under this contract against defects in materials and workmanship for a period of one (1) year from the date of the construction completion acceptance. The Contractor, must, within a reasonable time but in no case longer than 30 days after receipt of a written notice, repair or replace any defects in materials or workmanship which may develop during the one (1) year period and any damages resulting from repairing or replacing of such defects at its own expense and without cost. In the event the
Contractor fails to remedy any such defect within a reasonable time, which in no case must be longer than
30 days after receipt of such written notice, the Government may proceed with having such defects remedied at Contractor’s expense, and the Contractor must pay the costs and charges accruing from such work and other damages.
C.3.2 Component Two: Strengthen the Water Regulatory Framework
The Contractor must provide technical assistance to GIRoA by supporting the collaboration between the governing bodies for irrigation and water management, the use of technology in water resource management, irrigation management and decision making, the strengthening of the capacity of water resource and irrigation training programs in Afghanistan, and improving outreach to farmers and farm communities.
C.3.2.1 The Contractor must enhance the capacity of GIRoA institutions to develop and manage water resources through interventions such as:
Illustrative interventions:
a) Provide technical assistance to support inter-ministerial coordination and collaboration
b) Provide trainings to GIRoA ministry staff on effective irrigation and water management
C.3.2.2 The Contractor must strengthen the capacity of the National Environment Protection Agency
(NEPA), MAIL, MEW, and other relevant GIRoA institutions to develop and implement public outreach campaigns in sustainable natural resources management through interventions such as:
a) Design natural resources management awareness programs for schools
b) Design outreach programs for print and electronic media to enhance public awareness of integrated water resource management.
C.3.3 Component Three: Strengthen Capacity of Local Entities to Manage Water Resources
The Contractor must improve the technical and administrative capacity of local entities and people to sustainably manage water resources and resolve conflicts. Cooperative engagement between and among various local entities, including Irrigation Associations, farmers, and government technical field staff, is important. The rehabilitation of upland watersheds and downstream irrigation canals (Component 1), the strengthening of MAIL technical experts (Component 2), and the training of community of users must be coordinated for maximum impact on farmers’ fields. It is expected that on-farm technology or management practices that increase agricultural yields will be adapted and encouraged. This component includes grants under contract which will begin in Year Two (see Section C.5).
C.3.3.1 The Contractor must strengthen community based (including women) water and natural resource management through interventions such as:
a) Support ministries and extension agencies to establish and/or strengthen Irrigation Associations
(IAs), Forestry Associations (FAs), and Water User Associations (WUAs)
b) Develop participatory community watershed rehabilitation/restoration and management plans for targeted watersheds
c) Increase women participation in the IAs, FAs, WUAs, and relevant community water and natural resource management groups
d) Train relevant community resource management groups to improve skills in land and water management (i.e. improved on-farm irrigation and management practices and technologies, address threats to watersheds such as deforestation, desertification)
e) Provide grants under contract to communities and NGOs (including women groups) for implementations that will result in a decrease of upstream watershed degradation, soil erosion and runoff, and flooding of irrigation schemes (with potential linkages to nutrition and gender mainstreaming goals)
C.3.3.2 The Contractor must improve on-farm water management through the establishment of demonstration plots, site visits, and customized training for such topics as:
a) Cost effective and simple irrigation technologies acceptable to local communities (e.g. furrow, basin, raised bed…)
b) Water saving irrigation technologies including drip irrigation, sprinklers etc. for high value crops
c) Irrigation scheduling for crop water needs
d) Conservation agriculture technologies (mulching, minimum tillage, rain water harvesting)
e) Precision laser land leveling and improved field drainage network.
C.4 EXPECTED RESULTS
Expected results are listed below.
Region CP SC Description Unit Total
North CP1 SC 1.1 Conduct feasibility study on rehabilitation of one large scale irrigation scheme Number 1
North CP1 SC 1.1 Build capacity of local sub-partners Number 45
North CP1 SC 1.1 Rehabilitate irrigation infrastructure Hectares 30000
North CP1 SC 1.2 Develop Integrated Watershed Management Plans Number 25
North CP1 SC 1.2 Rehabilitate Watersheds Hectares 16650
North CP2 SC 2.1 Inform people about water and natural resource management People 25000
North CP2 SC 2.1 Train MAIL/DAIL and MEW regional staff People 90
North CP3 SC 3.1 Provide grants to communities and NGOs USD 3000000
North CP3 SC 3.2 Demonstrate Precision Land Leveling Hectares 3000
North CP3 SC 3.2 Establish Demonstration Plots of Improved Agriculture Techniques and Irrigation
Methods
Plot 130
North CP3 SC 3.2 Establish WUAs/IAs/FAs Associations 300
North CP3 SC 3.2 Train communities in participatory watershed management People 20000
North CP3 SC 3.2 Train farmers in on-farm water management People 15000
South CP1 SC 1.1 Build capacity of local sub-partners Number 30
South CP1 SC 1.1 Rehabilitate irrigation infrastructure Hectares 15000
South CP1 SC 1.2 Develop Integrated Watershed Management Plans Number 10
South CP1 SC 1.2 Rehabilitate Watersheds Hectares 8328
South CP2 SC 2.1 Inform people about water and natural resource management People 10000
South CP2 SC 2.1 Train MAIL/DAIL and MEW regional staff People 55
South CP3 SC 3.1 Provide grants to communities and NGOs USD 2000000
South CP3 SC 3.2 Demonstrate Precision Land Leveling Hectares 1500
South CP3 SC 3.2 Establish Demonstration Plots of Improved Agriculture Techniques and Irrigation
Methods
Plot 30
South CP3 SC 3.2 Establish WUAs/IAs/FAs Associations 150
Region CP SC Description Unit Total
South CP3 SC 3.2 Train communities in participatory watershed management People 5000
South CP3 SC 3.2 Train farmers in on-farm water management People 6500
West CP1 SC 1.1 Build capacity of local sub-partners Number 15
West CP1 SC 1.1 Rehabilitate irrigation infrastructure Hectares 22000
West CP1 SC 1.2 Develop Integrated Watershed Management Plans Number 10
West CP1 SC 1.2 Rehabilitate Watersheds Hectares 12215
West CP2 SC 2.1 Inform people about water and natural resource management People 10000
West CP2 SC 2.1 Train MAIL/DAIL and MEW regional staff People 55
West CP3 SC 3.1 Provide grants to communities and NGOs USD 2000000
West CP3 SC 3.2 Demonstrate Precision Land Leveling Hectares 2200
West CP3 SC 3.2 Establish Demonstration Plots of Improved Agriculture Techniques and Irrigation
Methods
Plot 50
West CP3 SC 3.2 Establish WUAs/IAs/FAs Associations 200
West CP3 SC 3.2 Train communities in participatory watershed management People 10000
West CP3 SC 3.2 Train farmers in on-farm water management People 7000
Region refers to the corresponding area of Afghanistan under which USAID’s RADP program is already underway. The Contractor is expected to work in all three regions, as authorized. CP refers to Component (corresponding to the three components listed above) and SC refers to
Subcomponent. Description refers to the desired intervention while the unit is the preferred unit of measurement.
C.5 GRANTS UNDER CONTRACTS (GUC)
The SWIM activity includes GUC to engage Afghan partners and build local capacity for watershed management through the implementation of watershed restoration works and the prevention of watershed degradation. A total of $7 million will be made available for the GUC and this grant portion of the contract will begin in the second year of the activity implementation.
The Contractor is expected to administer $4 million in grants in the North during the life of the activity with a further $1.5 million for each additional region adding up to the total life of activity grants of $7 million, inclusive of options. The Contractor must submit a GUC manual within 30 days of the start of the second year of the contract for the Contracting Officer’s Representative (COR) and Contracting
Officer’s (CO) review and approval.
C.6 CROSS CUTTING REQUIREMENTS
The cross cutting issues the Contractor must address in the implementation of the contract includes sustainability, gender, climate change and biodiversity, linkages to other USG and donor programs, and linkages to GIRoA.
C.6.1 Sustainability
The Contractor must use methods that encourage sustainable results. To ensure ownership and maintenance of investments, the Contractor must build the capacity of stakeholders, farmers (both male and female), government officials, community leaders, and upland resource users, to fill gaps in critical areas such as local ownership, local and institutional capacity, financial and economic sustainability, social and cultural soundness, and improvements to the environment and natural resources. The investment in irrigation system rehabilitation must be conditioned on the willingness of benefitting communities to provide the necessary operations and maintenance (O&M) for the irrigation network. To ensure sustainability, the interventions must be technically appropriate for the target communities, and the majority of rehabilitation works will be based on the use of locally available materials that require limited maintenance over a longer period. To strengthen community capacity to carry out O&M, the Contractor must support GIRoA in establishing or strengthening community based organizations (WUAs, IAs, FAs) to carry out the O&M of the irrigation infrastructure that it will rehabilitate. The Contractor must provide technical assistance and training to MAIL and MEW staff to enable them to effectively monitor irrigation system performance, and support farmers to plan, schedule and execute routine, seasonal, and emergency maintenance of the irrigation systems for which they are responsible.
Sustainability is required in the design and implementation of all SWIM interventions. The following are illustrative questions to be considered while planning the activity:
1. Local Capacity and Ownership: Is there a demonstrated local demand and ownership of the proposed interventions? Is there a broad beneficiary/stakeholder base interested to provide the necessary operations and maintenance to ensure the activity/service continues after the implementation ends? Will interventions build the skills and capacity of local stakeholders (e.g.
government institutions; Water User Associations, Irrigation Associations, Forestry Associations, and farmers) to maintain development gains after the implementation ends?
2. Institutional Capacity: What are the national, sub-national and local institutions from the public and private sector, civil society and communities that are most critical to the implementation of the activity’s development interventions? How able and interested are their leadership and membership and how adequate are their structures and resources to participate in the intervention implementation?
RFP, SOL-306-16-000004
3. Financial Sustainability: Will the proposed interventions or services be linked to sustainable financing models? Will the expected results of the activity incentivize the private sector or public institutions to continue investments in the targeted sectors?
4. Economic sustainability: What are the contributions of the activity to the economic welfare of the target areas? Will the proposed interventions be of low to medium technology for easy adoption by the targeted beneficiaries? Will the rehabilitation works be based on locally available materials that require limited maintenance over a longer period?
5. Social and Cultural Soundness: Have there been adequate consultations through participatory community approaches in planning interventions to be implemented?
6. Environment and Natural Resources (NRM): How are the incentives, motivations, and beliefs of the communities factored into the NRM improvement planning and implementation?
How is the capture and control of natural resources monitored and mitigated by GIRoA?
C.6.2 Gender
The Contractor must support gender equity in agriculture, irrigation, and water resource management by integrating gender throughout the implementation of interventions, to include women in decision making roles, and provide economic benefits for women from improved irrigation and water resource management. The Contractor must present a clear strategy for integrating women into SWIM interventions, with specific targets and indicators for the inclusion of women, and measuring benefits afforded to women. Gender equity must be included in all planning, implementation, and monitoring of implementation.
The Contractor must ensure that opportunities to promote female leaders and women’s empowerment are given throughout the life of the activity. The Contractor must ensure fair representation of women in the activity and on the project staff, and must strive to ensure that evaluation designs, methodologies, data collection, and analyses adequately capture the situation and experiences of female beneficiaries. The
National Action Plan for the women of Afghanistan (NAPWA)(Attachment J.1), Realizing Self-Reliance document of the new administration (Attachment J.2), Afghanistan National Development Strategy
(ANDS), and USAID Mission’s order 201.02 (Attachments J.3), contain guidelines on gender mainstreaming, and these guidelines must be taken into account in the planning of interventions. Women, youth, and vulnerable populations must be weighted equally in terms of service delivery austerity.
Inclusion of women in decision making roles is increasingly important in the agricultural sector.
According to the National Risk and Vulnerability Assessment (NRVA) report, employment rates are highest in the agriculture sector (40 percent) at 7.2 million people, of which 1.3 million are women
(Attachment J.4). In poor and rural areas, women and girls are typically responsible for all domestic water needs, taking care of small gardens, livestock, and collection of firewood. In many cases, women use water from irrigation canals for the household and livestock. There is growing evidence that shows works related to irrigated water are not gender neutral. According to NRVA, the repair of the irrigation system is considered a “rural male issue”, regardless of the needs of women in accessing water from irrigation canals. Some of the issues to be addressed that are of concern include, but are not limited to;
1. Resources (water and land) are unevenly distributed and Afghan women do not have a strong professional network to pursue access to resources;
2. Land owned by a woman is most likely managed by the immediate family and not by herself, thereby reducing her inherited wealth and power;
3. Water conflicts are generally resolved by the elders and the mirab and women are not allowed to participate in discussion regarding their resources (Attachment J.5).
4. At the strategic level, MAIL, MEW and other line ministries have established formal and informal consultative organizations (e.g. the Supreme Council on Water Affairs Management
(SCWAM)) and women do not participate in these discussions; and,
5. Cultural norms and household labor requirements prevent girls from entering into agricultural study programs and participating in MAIL and DAIL extension programs
(Attachment J.5).
The Contractor’s works for rehabilitation of irrigation schemes, institutional capacity development, strengthening of community associations, and promotion of environmental awareness must support increasing economic opportunities for women in remote communities. The inclusion of women in IAs, WUAs, and FAs will provide an opportunity for women’s participation in decision making in the management of water resources. Involving women in SCWAM, River Basin Associations, and River
Basin Councils, and establishing working relationship between female technical staff of MAIL and MEW will increase their self-sufficiency regarding access to water resources for agriculture. The implementation of a gender action plan and inclusive consultative platforms will provide women with an avenue to participate in decisions that affect their well-being and livelihoods (Attachment J.5). An inclusive approach for women’s participation in the income generation interventions of the activity, including but not limited to, small-scale water interventions for home garden, drip irrigation systems for family gardens, rehabilitation of watersheds through plantings, capacity building, and awareness programs will increase economic benefits for women.
C.6.3 Climate Change and Biodiversity
The Contractor must consider climate change and biodiversity in the design and implementation of interventions and the following references:
Alliance Development Works, United Nations University (UNU-EHS), and The Nature
Conservancy “World Risk Report” for Afghanistan’s fragile environmental state http://www.preventionweb.net/files/21709_worldriskreport2011.pdf and http://i.unu.edu/media/ehs.unu.edu/news/4070/11895.pdf
The Executive Order of the President of the United States of America (USA) on Climate Resilient
International Development (https://www.whitehouse.gov/the-press-office/2014/09/23/executive-order-climate-resilient-international-development) requiring the integration of climate-resilience considerations in all development projects and programs.
USAID’s Biodiversity Policy https://www.usaid.gov/sites/default/files/documents/1865/USAID%20Biodiversity%20Policy%2
0-%20June%202015.pdf
The National Priority Program, Afghanistan National Development Strategy (ANDS), Environment Sector Strategy and Environment Law. http://mfa.gov.af/en/page/6547/afghanistan-national-development-strategy/afghanistan-national-development-strategy-ands
In addition, Afghanistan has already ratified a number of environmental conventions, such as the UN
Convention on Biodiversity in September 2002, the United Nations Framework Convention on Climate
Change (UNFCC) in September 2002 and entered into force in December 2002, and the United Nations
Convention to Combat Desertification (UNCCD) signed in 1995 and entered into force on December
1996. Afghanistan has made substantial pledges to control or reduce threats to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .