ATTACHMENT_J-3_Task_Order_Bill_of_Quantity.xlsx

XLSX spreadsheet 73 KB Posted

Attached to
Building Foundations Program Federal contract opportunity
Solicitation number
SOL-294-17-000002
Issued by
US Agency for International Development West Bank and Gaza

About this file

Building Foundations RFP No. SOL-294-17-000002 / Attachment J-3: Task Order BOQ

View the file

Other files for this federal contract opportunity

Other files attached to Building Foundations Program, newest first.
File Type Posted
Attachment_J-6_RFTOP_TASK_ORDER_Attachment_J.1_Task_Order_Bill_of_Quantities_BOQ_Rev_03_.xlsx XLSX spreadsheet
Amendment_No._Five_to_RFP_No._SOL-294-17-000002_Building_Foundations.pdf PDF
Attachment_J-6_RFTOP_Task_Order.Attachment_J-7_Annex_A_Addendum_Items.pdf PDF
Amendment_No._4_SF_30.pdf PDF
Attachment_J-6_RFTOP_TASK_ORDER_Attachment_J.1_Task_Order_Bill_of_Quantities.xlsx XLSX spreadsheet
RFP_No._SOL294-17-000002_Building_Foundations_Program_Q&As.pdf PDF
Attachment_J-9_Initial_Environmental_Examination_Building_Foundations.pdf PDF
Amendment_No_4_Cont.pdf PDF
Attachment_J-4_SF-LLL_Disclosure_of_Lobbying_Activities.pdf PDF
RFP_No._SOL_294-17-000002_Amendment_No._3.pdf PDF
RFP_No._SOL_294-17-000002_Amendment_No._3_Annex_1_Part_A.pdf PDF
RFP_No._SOL_294-17-000002_Amendment_No._3_Annex_1_Part_B.pdf PDF
Amendment_No._2_RFP_No._SOL-294-17-000002.pdf PDF
Amendment_No._1_RFP_No._SOL-294-17-000002.pdf PDF
ATTACHMENT_J-1_-_Mission_Order_21.pdf PDF
ATTACHMENT_J-5_SECURITY_PLAN_GUIDANCE.pdf PDF
Attachment_J-2_-_VAT_Guidance.pdf PDF
ATTACHMENT_J-8_Past_Performance_Matrix.xlsx XLSX spreadsheet
RFP_No._SOL_294-17-000002_Building_Foundations_Cover_Letter.pdf PDF
Attachment_J-6_RFTOP_Task_Order.pdf PDF
RFP_No._SOL_294-17-000002_SF1442.pdf PDF
RFP_No._SOL_294-17-000002.Building_Foundations.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Sheet

BILL OF QUANTITIES

for

RFP No. SOL 294-17-000002 / RFTOP

YATTA DISTRIBUTION NETWORK REHABILITATION AND EXTENSION PROJECT

BOQ Rev. 01

CONTRACT NO.

INFRASTRUCTURE NEEDS PROGRAM INPII

Water Project

West Bank

Yatta Distribution Network Rehabilitation and Extension

RFTOP: WATER-294-16-0000XX BOQ Rev. 01

TASK ORDER SUMMARY

BILL OF QUANTITIES

RFTOP: WATER-294-16-0000XX
TASK ORDER SUMMARY SHEET
Item No.Description of WorksPrice
1Yatta Transmission Mains & Distribution Networks$ - 0
2500 m³ Beit Emra Elevated Reservoir$ - 0
31000 m³ At Grade School Reservoir$ - 0
45000 m³ At Grade Khallet Saleem Reservoir$ - 0
Sub-Total$ - 0
5Mobilization - 4% of sub-total cost$ - 0
Demobilization - 1% of sub-total cost$ - 0
Total$ - 0
6Day Works$ 850,000.00
Total of All Works$ 850,000.00
Total in words
Address:

Date: November 2016

Signature and stamp:

Yatta Distribution Network Rehabilitation and Extension

RFTOP: WATER-294-16-0000XX BOQ Rev. 01

Yatta T. Mains & Dist. Networks

BILL OF QUANTITIES - YATTA TRANSMISSION MAINS & DISTRIBUTION NETWORKS
THE COSTS PROVIDED BY THE CONTRACTOR IN THIS BILL OF QUANTITIES ARE ALL INCLUSIVE FOR THE WORK DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS, WHETHER SPECIFICALLY MENTIONED IN THE BELOW DESCRIPTIONS OR NOT.
ItemDescriptionUnitQuantityUnit Price ($)Amount ($)
1Trench Excavation and Backfill. Trench dimensions and backfill zones are shown on details C-201, C-202, C-203, C-204, C-210, C-211, C-212 and C-213
1.1Trench excavation for pipelines: Excavation of trenches in all earth types (soil and / or rock) and disposal of excess materials to locations acceptable to the Engineer and local authorities. Trench dimensions are shown on details C-DT21 & C-DT23
1.1.1Triple line trench excavation for DN300 mm, DN250 and DN200 mm pipes from Khalet Saleem Reservior .lm820$ - 0
1.1.2Triple line trench excavation for DN200, DN150 and DN50 mm pipes for Beit emra Reservaior .lm295$ - 0
1.1.3Double line trench excavation for DN150 and DN 50 mm pipes for Beit emra Reservaior .lm1,130$ - 0
1.1.4Trench Excavation for 150mm pipes for Beit emra Reservaior .lm440$ - 0
1.1.5Double line trench excavation for DN150 and DN150 mm pipes for Beit emra Reservaior .lm325$ - 0
1.1.6Four line trench excavation for DN300, DN300, DN200 and DN50 mm pipeslm770$ - 0
1.1.7Triple line trench excavation for DN300 mm, DN200 and DN50 mm pipeslm5,665$ - 0
1.1.8Triple line trench excavatio for DN300,DN300 and DN50 mm pipes for school's Reservaior.lm165$ - 0
1.1.9Double line trench excavation for DN300 and DN300 mm pipes for Hureiz and Al-Arus Reservoirs.lm320$ - 0
1.1.10Trench excavation for DN200 mm pipes, from Khalet Saleem Reservior .lm255$ - 0
1.1.12Trench Excavation for 150mm pipes in Yatta Distributionlm4,450$ - 0
1.1.13Trench Excavation for 100mm pipes in Yatta Distributionlm16,975$ - 0
1.1.14Trench Excavation for 75mm pipes in Yatta Distributionlm7,000$ - 0
1.1.15Trench Excavation for 50mm pipes in Yatta Distributionlm4,450$ - 0
1.2Pipe and Trench zone and final backfill excluding Surface Restoration
1.2.1Bedding and Backfill for DN300 mm, DN250 and DN200 mm pipes from Khalet Saleem Reservior .lm820$ - 0
1.2.2Bedding and Backfill for DN200, DN150 and DN50 mm pipes for Beit emra Reservaior .lm295$ - 0
1.2.3Bedding and Backfill for DN150 and DN50 mm pipes for Beit emra Reservaior .lm1,130$ - 0
1.2.4Bedding and Backfill for 150mm pipes for Beit emra Reservaior .lm440$ - 0
1.2.5Bedding and Backfill for DN150 and DN150 mm pipes for Beit emra Reservaior .lm325$ - 0
1.2.6Bedding and Backfill for DN300, DN300, DN200 and DN50 mm pipeslm770$ - 0
1.2.7Bedding and Backfill for DN300 mm, DN200 and DN50 mm pipeslm5,665$ - 0
1.2.8Bedding and Backfill for DN300,DN300 and DN50 mm pipes for school's Reservaior.lm165$ - 0
1.2.9Bedding and Backfill for DN300 and DN300 mm pipes for Hureiz and Al-Arus Reservoirs.lm320$ - 0
1.2.10Bedding and Backfill for DN200 mm pipes, from Khalet Saleem Reservior .lm255$ - 0
1.2.12Bedding and Backfill for 150mm pipes in Yatta Distributionlm4,450$ - 0
1.2.13Bedding and Backfill for 100mm pipes in Yatta Distributionlm16,975$ - 0
1.2.14Bedding and Backfill for 75mm pipes in Yatta Distributionlm7,000$ - 0
1.2.15Bedding and Backfill for 50mm pipes in Yatta Distributionlm4,450$ - 0
2Supply ,Install and Deliver Pipes and fittings
2.1Supply ,Install , Deliver and associated fittings and connect to existing pipes and facilities by Contractor as shown in the drawings
2.1.1Steel Pipe and fittings, 300 mmlm8,995$ - 0
2.1.2Steel Pipe and fittings, 250 mmlm820$ - 0
2.1.3Steel Pipe and fittings, 200 mmlm7,805$ - 0
2.1.4Steel Pipe and fittings, 150 mmlm6,965$ - 0
2.1.5Steel Pipe and fittings, 100 mmlm16,975$ - 0
2.1.6Steel Pipe and fittings, 75 mmlm7,000$ - 0
2.1.7Steel Pipe and fittings, 50 mmlm12,475$ - 0
2.2Valves, Connections and Chambers
2.2.1Isolation Flanged (>2") Buried Gate Valves & Chambers or threaded (≤2") Buried Gate Valves & Valve Box
2.2.1.2Supply and install DN 50 mm flanged Gate Valve and fittings as per detail C-507 and according to the related clauses of the technical specifications.ea65$ - 0
2.2.1.3Supply and install DN 80 mm threaded Gate Valve and fittings as per detail C-530 and according to the related clauses of the technical specifications.ea15$ - 0
2.2.1.4Supply and install DN 100 mm threaded Gate Valve and fittings as per detail C-530 and according to the related clauses of the technical specifications.ea42$ - 0
2.2.1.5Supply and install DN 150 mm threaded Gate Valve and fittings as per detail C-530 and according to the related clauses of the technical specifications.ea20$ - 0
2.2.1.6Supply and install DN 200 mm threaded Gate Valve and fittings as per detailC-530 and according to the related clauses of the technical specifications.ea4$ - 0
2.2.1.7Supply and install DN 300,300,200 & 50mm Valves as per detail M-CD-079 and according to the related clauses of the technical specifications.ea1$ - 0
2.2.1.8ditto but for DN 300,200,50 Valves.ea8$ - 0
2.2.1.9ditto but for DN 150,200,50 Valves .ea1$ - 0
2.2.1.9Supply and install Reinforced Concrete for a complete chamber for DN 50 mm flanged Gate Valve as per detail C-507 including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea65$ - 0
2.2.1.10Supply and install Reinforced Concrete for a complete chamber for DN 80 mm threaded Gate Valve as per detail C-530 including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea15$ - 0
2.2.1.11Supply and install Reinforced Concrete for a complete chamber for DN 100 mm threaded Gate Valve as per detail C-530 including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea42$ - 0
2.2.1.12Supply and install Reinforced Concrete for a complete chamber for DN 150 mm threaded Gate Valve as per detail C-530 including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea20$ - 0
2.2.1.13Supply and install Reinforced Concrete for a complete chamber for DN 200mm threaded Gate Valve as per detail C-530 including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea4$ - 0
2.2.1.14Supply and Install Complete Reinforced Concrete chamber for 300,300,200 and 50 mm Valves as per detail S-001 including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea1$ - 0
2.2.1.15ditto but for DN 300,200,50 Valves.ea8$ - 0
2.2.1.16ditto but for DN 150,200,50 Valves and asper detail S-001.ea1$ - 0
2.2.2Combination Air Valve Chambers
2.2.2.1Supply and install DN 50 mm Combination Air Valve (combination of air and vacuum valve and air release valve) as per detail C505A, and according to the related clauses of the technical specifications.ea26$ - 0
2.2.2.2Supply and Install Complete Reinforced Concrete chamber for DN 50 mm Combination Air Valve (combination of air and vacuum valve and air release valve)pipelines as per detail C505A including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea26$ - 0
2.2.2.3Supply and install DN 75 mm Combination Air Valve (combination of air and vacuum valve and air release valve) pipelines as per detail C505A, and according to the related clauses of the technical specifications.ea2$ - 0
2.2.2.4Supply and Install Complete Reinforced Concrete chamber for DN 75 mm Combination Air Valve (combination of air and vacuum valve and air release valve) pipelines as per detail C505A including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea2$ - 0
2.2.2.5Supply and install DN75,75,75mm Combination Air Valve (combination of air and vacuum valve and air release valve) on DN300,250,200mm pipe as per detail M-CD-080 and related works and according to the related clauses of the technical specifications.ea1$ - 0
2.2.2.6Supply and Install Complete Reinforced Concrete chamber for DN75,75,75mm Combination Air Valve (combination of air and vacuum valve and air release valve) on DN300,250,200mm pipe pipelines as per details M-CD-080 and S-01 to S-03 including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea1$ - 0
2.2.2.7Supply and install DN75,75,75 & 50mm Combination Air Valve (combination of air and vacuum valve and air release valve) on DN300,300,200,50 mm pipe as per detail M-CD-080 and related works and according to the related clauses of the technical specifications.ea1$ - 0
2.2.2.8Supply and Install Complete Reinforced Concrete chamber for DN75,75,75 and 50 mm Combination Air Valve (combination of air and vacuum valve and air release valve) on DNDN300,300,200,50 mm pipe pipelines as per details M-CD-080 and S-01 to S-03 including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea1$ - 0
2.2.2.9Supply and install DN75,75,50mm Combination Air Valve (combination of air and vacuum valve and air release valve) on DN300,200,50mm pipe as per detail M-CD-080 and related works and according to the related clauses of the technical specifications.ea8$ - 0
2.2.2.10Supply and Install Complete Reinforced Concrete chamber for DN75,75,50mm Combination Air Valve (combination of air and vacuum valve and air release valve) on DN300,200,50 mm pipe pipelines as per details M-CD-080 and S-01 to S-03 including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea8$ - 0
2.2.2.11Supply and install DN75,50,50mm Combination Air Valve (combination of air and vacuum valve and air release valve) on DN 200, 150,50mm pipe as per detail M-CD-080 and related works and according to the related clauses of the technical specifications.ea1$ - 0
2.2.2.12Supply and Install Complete Reinforced Concrete chamber for DN75,50,50mm Combination Air Valve (combination of air and vacuum valve and air release valve) on DN200,150,50 mm pipe pipelines as per details M-CD-080 and S-01 to S-03 including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea1$ - 0
2.2.2.13Supply and install DN50,50mm Combination Air Valve (combination of air and vacuum valve and air release valve) on DN150,150mm pipe as per detail M-CD-080 and related works and according to the related clauses of the technical specifications.ea3$ - 0
2.2.2.14Supply and Install Complete Reinforced Concrete chamber for DN50,50mm Combination Air Valve (combination of air and vacuum valve and air release valve) on DN150,150 mm pipe pipelines as per details S-01 to S-03 including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea3$ - 0
2.2.3Washout Chamber
2.2.3.1Supply and install 50 mm washout on 50,80,100 mm pipes as per detail C-503 washout outfall in urban areas" and according to the related clauses of the technical specifications.ea25$ - 0
2.2.3.2Supply and Install Complete Reinforced Concrete chamber for 50 mm washout on DN 50,80,100 mm pipes as per detail C-503 washout outfall in urban areas"including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea25$ - 0
2.2.3.3Supply and install 75 mm washout on DN 150,200,250 mm pipes as per detailC-503 washout outfall in urban areas" and according to the related clauses of the technical specifications.ea5$ - 0
2.2.3.4Supply and Install Complete Reinforced Concrete chamber for DN 75 mm washout on DN DN 150,200,250 mm mm pipes as per detail C-503 washout outfall in urban areas"including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea5$ - 0
2.2.3.5Supply and install 100,75,50 mm washout on DN 300,200,50mm pipes as per detail M-CD-078 and related works and according to the related clauses of the technical specifications.ea7$ - 0
2.2.3.6Supply and Install Complete Reinforced Concrete chamber for 100,75,50 mm washout on DN 300,200,50mm pipes as per detail S-01 to S-03 washout outfall in urban areas"including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea7$ - 0
2.2.3.7Supply and install 100,100,75 mm washout on DN 300,250,50mm pipes as per detail M-CD-078 and related works and according to the related clauses of the technical specifications.ea1$ - 0
2.2.3.8Supply and Install Complete Reinforced Concrete chamber for 100,100,75 mm washout on DN 300,250,50mm pipes as per detail S-01 to S-03 washout outfall in urban areas"including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea1$ - 0
2.2.3.9Supply and install 100,100,75,50 mm washout on DN 300,300,200,50 mm pipes as per detail M-CD-078 and related works and according to the related clauses of the technical specifications.ea1$ - 0
2.2.3.10Supply and Install Complete Reinforced Concrete chamber for 100,100,75,50 mm washout on DN 300,300,200,50mm pipes as per detail S-01 to S-03 washout outfall in urban areas"including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea1$ - 0
2.2.3.11Supply and install 75,75,50 mm washout on DN 300,200,50mm pipes as per detail M-CD-078 and related works and according to the related clauses of the technical specifications.ea1$ - 0
2.2.3.12Supply and Install Complete Reinforced Concrete chamber for 75,75,50 mm washout on DN 300,200,50mm pipes as per detail S-01 to S-03 washout outfall in urban areas"including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea1$ - 0
2.2.3.13Supply and install 75,50 mm washout on DN 150,50mm pipes as per detail M-CD-078 and related works and according to the related clauses of the technical specifications.ea2$ - 0
2.2.3.14Supply and Install Complete Reinforced Concrete chamber for 75,50 mm washout on DN 150,50mm pipes as per detail S-01 to S-03 washout outfall in urban areas"including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea2$ - 0
2.2.3.15Supply and install 75,75 mm washout on DN 150,150mm pipes as per detail M-CD-078 and related works and according to the related clauses of the technical specifications.ea1$ - 0
2.2.3.16Supply and Install Complete Reinforced Concrete chamber for 75,75 mm washout on DN 150,150mm pipes as per detail S-01 to S-03 washout outfall in urban areas"including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea1$ - 0
2.2.4Service Connection Chambers
2.2.4.1.1Supply and install all Mechanical valves, fittings for the Flow Monitoring Vault and all fittings needed outside the chambers for Beit Amra service connection (CP-068) on DN 150mm pipe as per Standard Drawing and according to the related clauses of the technical specifications.ea1$ - 0
2.2.4.1.2ditto but for Zif I service connection on DN 500mm pipe (CP-069)ea1$ - 0
2.2.4.1.3ditto but for Zif II service connection on DN 200mm pipe (CP-070)ea1$ - 0
2.2.4.1.4ditto but for Samou service connection on DN 250mm pipe (CP-071)ea1$ - 0
2.2.4.1.5ditto but for Al rihiya I connection on DN 300mm pipe (CP-072)ea1$ - 0
2.2.4.1.6ditto but for Al rihiya II connection on DN 300mm pipe (CP-073)ea1$ - 0
2.2.4.2.1Supply and Install Complete Reinforced Concrete Flow Monitoring Chamber Beit Amra service connection (CP-068) on DN 150mm pipe including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea1$ - 0
2.2.4.2.2ditto but for Zif I service connection on DN 500mm pipe (CP-069)ea1$ - 0
2.2.4.2.3ditto but for Zif II service connection on DN 200mm pipe (CP-070)ea1$ - 0
2.2.4.2.4ditto but for Samou service connection on DN 250mm pipe (CP-071)ea1$ - 0
2.2.4.2.5ditto but for Al rihiya I connection on DN 300mm pipe (CP-072)ea1$ - 0
2.2.4.2.6ditto but for Al rihiya II connection on DN 300mm pipe (CP-073)ea1$ - 0
2.2.4.3Testing and Commissioning of Electrical and Control System and Equipment complete according to design drawings and specificationsea6$ - 0
2.2.4.4Scada head end integration and programming per section 13500B, P&ID, drawings and specificationsea6$ - 0
2.2.4.5Supply Instruments per section 13500A, P&ID, drawings and specifications including all appurtenances required for complete and functional system.ea6$ - 0
2.2.5CONNECTION CHAMBER
2.2.5.1.1Supply and install all Mechanical valves, fittings for 500 mm pipe for Alarus & huraiz reservoir connection detail as per sheets M-CD-074 Detail A and according to the related clauses of the technical specifications.ea1$ - 0
2.2.5.1.2Supply and Install Complete Reinforced Concrete for 500 mm pipe for Alarus & huraiz reservoir connection detail as per sheets S-001 TO S-003 including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea1$ - 0
2.2.5.1.3Supply and install all Mechanical valves, fittings for 300 mm pipe for Alarus & huraiz reservoir connection detail as per sheets M-CD-074 Detail B and according to the related clauses of the technical specifications.ea1$ - 0
2.2.5.1.4Supply and Install Complete Reinforced Concrete for 300 mm pipe for Alarus & huraiz reservoir connection detail as per sheets S-001 TO S-003 including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea1$ - 0
2.2.5.1.5Supply and install all Mechanical valves, fittings for 500 mm pipes for schools reservior connection detail as per sheets M-CD-075 Detail A and according to the related clauses of the technical specifications.ea1$ - 0
2.2.5.1.6Supply and Install Complete Reinforced Concrete for 500 mm pipes for schools reservior connection detail as per sheets S-001 TO S-003 including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea1$ - 0
2.2.5.1.7Supply and install all Mechanical valves, fittings for 300 mm pipes for schools reservior connection detail as per sheets M-CD-075 Detail B and according to the related clauses of the technical specifications.ea1$ - 0
2.2.5.1.8Supply and Install Complete Reinforced Concrete for 300 mm pipes for schools reservior connection detail as per sheets S-001 TO S-003 including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea1$ - 0
2.2.5.1.9Supply and install all Mechanical valves, fittings for 300,250mm pipes for mtaref reservior connection detail as per sheets M-CD-076 and according to the related clauses of the technical specifications.ea1$ - 0
2.2.5.1.10Supply and Install Complete Reinforced Concrete for 300,250mm pipes for mtaref reservior connection detail as per sheets S-001 TO S-003 including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea1$ - 0
2.2.5.1.11Supply and install all Mechanical valves, fittings for 300,250mm pipes for khalet saleem reservior connection detail as per sheets M-CD-077 and according to the related clauses of the technical specifications.ea1$ - 0
2.2.5.1.12Supply and Install Complete Reinforced Concrete for 300,250mm pipes for khalet saleem reservior connection detail as per sheets M-CD-077 sheets S-001 TO S-003 including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea1$ - 0
2.2.6Pressure Reducing Valve
2.2.6.1Supply and install DN 80 mm Pressure Reducing Valve and all mechanical fittings as per detail C-523 and according to the related clauses of the technical specifications.ea3$ - 0
2.2.6.2Supply and install Reinforced Concrete for a complete chamber for DN 80 mm pressure Reducing Valve as per detail C-523 including excavation, backfilling and coating and related works and according to the related clauses of the technical specifications.ea3$ - 0
3Pavement repair and reinstatement as per applicable details no. C-DT22 (Quantity measurement per Trench Section Type I Detail C-211)
3.1Asphalt reinstatement over trench with 150 mm pipes , including 200mm base course layer, 2 asphalt layer 5 cm each, prime coat (MC70), tack coat (RC)as per Specifications and Detail C-212 Type Elm446$ - 0
3.2Asphalt reinstatement over double trench with 150,150 mm pipes , including 200mm base course layer, 2 asphalt layer 5 cm each, prime coat (MC70), tack coat (RC)as per Specifications and Detail C-212 Type Elm194$ - 0
3.3Asphalt reinstatement over double trench with 150, 50 mm pipes , including 200mm base course layer, 2 asphalt layer 5 cm each, prime coat (MC70), tack coat (RC)as per Specifications and Detail C-212 Type Elm1,115$ - 0
3.4Asphalt reinstatement over Triple trench with 200, 250, 300 mm pipes , including 200mm base course layer, 2 asphalt layer 5 cm each, prime coat (MC70), tack coat (RC)as per Specifications and Detail C-212 Type Elm20$ - 0
3.5Asphalt reinstatement over Triple trench with 200, 50, 300 mm pipes , including 200mm base course layer, 2 asphalt layer 5 cm each, prime coat (MC70), tack coat (RC)as per Specifications and Detail C-212 Type Elm5,665$ - 0
3.6Asphalt reinstatement over Triple trench with 200, 150, 50 mm pipes , including 200mm base course layer, 2 asphalt layer 5 cm each, prime coat (MC70), tack coat (RC)as per Specifications and Detail C-212 Type Elm295$ - 0
3.7Asphalt reinstatement over Triple trench with 300, 300, 50 mm pipes , including 200mm base course layer, 2 asphalt layer 5 cm each, prime coat (MC70), tack coat (RC)as per Specifications and Detail C-212 Type Elm165$ - 0
3.8Asphalt reinstatement over Four pipes trench with 300, 300, 200, 50 mm pipes , including 200mm base course layer, 2 asphalt layer 5 cm each, prime coat (MC70), tack coat (RC)as per Specifications and Detail C-212 Type Elm770$ - 0
3.9Asphalt reinstatement in narrow roads up to 5.0 m width including 150 mm base course layer, asphalt wearing course layer (6 cm), prime coat (MC70) for the whole width of the road and removal of the asphalted area and reconstruction to match original asphalt level. as per Specifications and detail C-212 Type Dsqm6,000$ - 0
3.10Basecourse reinstatement over trench 50 mm pipes , including 200mm base course layer over trench as per Specifications detail C-212 Type Blm1,000$ - 0
3.11Basecourse reinstatement over trench 75 mm pipes , including 200mm base course layer over trench as per Specifications detail C-212 Type Blm600$ - 0
3.12Basecourse reinstatement over trench 100 mm pipes , including 200mm base course layer over trench as per Specifications detail C-212 Type Blm500$ - 0
3.13Basecourse reinstatement over trench 150 mm pipes , including 200mm base course layer over trench as per Specifications detail C-212 Type Blm225$ - 0
3.14Basecourse reinstatement including 100mm base course layer for road width as per Specifications detail C-212 Type Bsqm6,500$ - 0
3.15Asphalt reinstatement over trench with 150 mm pipes , including 200mm base course layer, 2 asphalt layer 5 cm each, prime coat (MC70), tack coat (RC)as per Specifications and Detail C-212 Type Elm4,450$ - 0
3.16Ditto but for 100mm pipe.lm16,975$ - 0
3.17Ditto but for 75mm pipe.lm7,000$ - 0
3.18Ditto but for 50mm pipe.lm4,450$ - 0
3.19Asphalt reinstatement over trench with 200 pipes for 3 meter width, including 200 mm Subgrade 200mm base course layer, asphalt wearing course layer (5 cm), prime coat (MC70) as per Specifications and detail C-212 Type FSqm900$ - 0
3.20Milling and Overlay for single lane width with tack coat (RC) and new 40 mm Ac surface layer for as per Specifications and Detail C-212 Type ASqm15,000$ - 0
4Cleaning, Washing, Testing & Disinfection of pipelines
4.1Cleaning, washing, hydraulic test and disinfection for the entire pipelines in the project.lm61,200$ - 0
5Pipeline marking
5.1Markers as per Specs & Detailea90$ - 0
6Pipeline Reinforced Concrete Encasement
6.1Concrete encasementcu m30$ - 0
6.2Reinforced concrete pipe encasement for pipes run on top of culvert, price to include reinforcement barscu m20$ - 0
10.2Concrete pipe encasement for pipes slope 10% or above , as per Detail C-DT23 /C213cu m50$ - 0
7General Requirements
7.1Trainingls1$ - 0
7.2O&M Technical Manualsls1$ - 0
7.3Site inspection/ Support/ Start upls1$ - 0
Total Carried to Project Summary Sheet$ - 0
Unit Legend:
lmlinear meter
sq msquare meter
cu mcubic meter
lslump sum
eaeach

Yatta Distribution Network Rehabilitation and Extension Yatta Transmission Mains and Distribution Networks

RFTOP: WATER-294-16-0000XX Page &P of &N

500 cu m Elevated Beit Emra Res

BILL OF QUANTITIES - 500 mᶟ BEIT EMRA RESERVOIR - ELEVATED
THE COSTS PROVIDED BY THE CONTRACTOR IN THIS BILL OF QUANTITIES ARE ALL INCLUSIVE FOR THE WORK DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS, WHETHER SPECIFICALLY MENTIONED IN THE BELOW DESCRIPTIONS OR NOT.
ItemDescriptionUnitQuantityUnit Price ($)Amount ($)
1GENERAL - SITE PREPARATION AND MISCELLANEOUS WORK
1.1Civil Site Preparation
1.1.1Demolition, removal, clear and grub sitels1$ - 0
1.1.2Site Grading and Preparationls1$ - 0
1.1.3Miscellaneous Excavation: Excavate to the required depth as per design drawings and specifications. Haul off the excess excavated material to an authorized dump site. The Contractor is responsible for locating a dump site at his own expense.cu m100$ - 0
1.1.4Miscellaneous Backfilling: Furnishing, leveling, and compaction of selected fill for subgrade layer (excavated selected materials or imported approved materials) as per design drawings and specifications.cu m650$ - 0
1.1.5Compacted base course for site grading, 200 mm layersq m360$ - 0
1.1.6Asphalt pavement on site (7 cm), ¾” asphalt mix design including MCsq m320$ - 0
1.1.7lean concrete under foundation for reservoircu m20$ - 0
1.1.8Curb stone as shown on detail C-416 and according to the related clauses of the technical specifications.lm10$ - 0
1.1.9Drain structure (Outlet) as shown on detail C-332, include headwall or structural wall, rip rap, granular fill material, footing trench filter fabric and etc..., all according to the related clauses of the technical specifications.ea2$ - 0
1.2Metal work
1.2.1Fence around site perimeter, galvanized steel as shown on detail C-117 Sheet C-DT12 and according to the related clauses of the technical specifications.lm95$ - 0
1.2.2Double Leaf Gate Access gate as shown on detail C-117 Sheet C-DT11 and according to the related clauses of the technical specifications.ea1$ - 0
1.3Mechanical
1.3.1Furnish, install, excavation, backfilling and testing all reservoir inlet, outlet, drain and overflow piping, and appurtenances external to the reservoir and all piping required for connection to internal to the reservoir piping, Reservoir Valve Vault, new and existing pipeline. The price including Furnish and install all other mechanical equipment including tees, Wyes, reducers, flanges, adapters, elbows, pipe support, pipe thimble, Flap valve, Air release valves, Gate valves and any other necessary fittings and associated appearances for a complete and functional Yard piping. The price also include repair and reinstatement works for piping outside the reservoir site.ls1$ - 0
1.4Electrical
1.4.1Furnish and installation of duct bankslm65$ - 0
1.4.2Furnish and installation of pre-cast pullbox as shown in detail No. E-101ea1$ - 0
1.4.3Scada head end integration and programming for the site and its facilities and Structures per section 13500B, P&ID, drawings and specificationsls1$ - 0
1.4.4Supply Instruments for the site and its facilities and Structures per section 13500A, P&ID, drawings and specifications including all appurtenances required for complete and functional system.ls1$ - 0
1.4.5Testing and Commissioning of Electrical and Control Systems and Equipment complete according to design drawings and specifications for the site and its facilities and Structuresls1$ - 0
2500 cu. meter RESERVOIR - ELEVATED
2.1Civil
2.1.1Excavate to the required depth as per specifications and drawings. Haul off the excavated material to an authorized dump site during excavation. The Contractor is responsible for locating a dump site at his own expense.cu m220$ - 0
2.1.2Furnishing, leveling, and compacting of subgrade layer as per drawings and specifications.cu m30$ - 0
2.1.3Furnish and install subgrade piping including excavation, installation of piping, concrete encasement of piping and testing of piping.ls1$ - 0
2.1.4Furnish and install vapor barrier according to design drawings and specificationsls1$ - 0
2.2Structural/Architectural
2.2.1Furnish and install foundation concretecu m131$ - 0
2.2.3Furnish and install slab-on-grade concretecu m8$ - 0
2.2.4Furnish and install moment frame concrete (elevated tank)cu m107$ - 0
2.2.5Furnish and install wall and tank column concretecu m84$ - 0
2.2.6Furnish and install all seismic cans (wall to roof connection detail).ls0$ - 0
2.2.7Furnish and install elevated slab concretecu m72$ - 0
2.2.8Furnish and install stair and landing concrete (elevated tank)cu m38$ - 0
2.2.9Furnish and install hatches, vents, ladders, railings, grating, and all other miscellaneous metalwork according to design drawings and specifications.ls1$ - 0
2.2.10Furnish and install security gate and fence at reservoir base.ls1$ - 0
2.2.11Testing Hydraulic Structure Cleaning, Testing and Disinfection the reservoir according to design drawings, specifications and engineer approvalls1$ - 0
2.3Coatings
2.3.1Furnish and apply all coatings per specificationsls1$ - 0
2.4Mechanical
2.4.1Furnish and install all piping and appurtenances including control valve, backflow valve, check valve, miscellaneous hangers fittings and all piping required for a fully functional elevated reservoir with connection to yard piping.ls1$ - 0
2.4.2Furnish and install all other mechanical equipment and valves as shown on the plans and specifications.ls1$ - 0
2.4.3Testing, Adjusting, Cleaning, Disinfection, Commissioning, and Operator Instruction and Training of Plumbing and Mechanical Systems and Equipment complete according to design drawings and specificationsls1$ - 0
2.5Electrical
2.5.1Furnish and installation of panels, wires, conduits, cables, lights and receptacles according to design drawings and specificationsls1$ - 0
2.5.2Design and Furnish and installation of Lightning Protection and Grounding System complete according to specifications for 500cm Reservoir Elevatedls1$ - 0
2.5.3Beacon light completeea1$ - 0
2.5.4Furnish and installation of RTU, RTU Panel and breaker Panel, electrical conduit and wire complete for RTUea1$ - 0
2.5.5Furnish and install appropriate antenna and wiring complete per design drawings and specificationsea1$ - 0
2.5.6Supply and installation Light pole: 6100mm galvanized (in accordance with ASTM A123M) pole octagonal reinforced shaft on a 15 base plate complete with 50 tubular lighting arm 1500 long. Pole shall be 3.18 thick (min) with minimum yield strength of 331 MPA. Foundation of pole reefer to E-600 on standard details sheet no. E-DT06. Lamp 70W H.P.S with body consists in double valve manufactured in die cast aluminum, locked by one fore stainless steel clip, adjustable reflector made in highly pure aluminum pressed sheet, polished and oxidized. Cut-off optic for flat class version, with very high protection degree IP65. The price include all fittings (cable, pipes, …etc) to have a complete working job.ea2$ - 0
3RETAINING WALLS
3.1Civil
3.1.1Excavate to the required depth as per specifications and drawings. Haul off the excavated material to an authorized dump site during excavation. The Contractor is responsible for locating a dump site at his own expense.cu m300$ - 0
3.1.2Furnishing, leveling, and compaction of selected fill for subgrade layer (excavated selected materials or imported approved materials) as per design drawings and specifications.cu m50$ - 0
3.1.3Furnish and install drain piping.lm40$ - 0
3.1.4Furnish and install filter fabric and drain rock according to design drawings and specificationsls1$ - 0
3.1.5Furnish and install base course (150mm in depth) with selected backfill material in layers not to exceed the depth specified after compaction according to design drawings and specifications.sq m450$ - 0
3.2Structural
3.2.1Furnish and install reinforced concrete foundation according to design drawings and specificationscu m200$ - 0
3.2.2Furnish and install reinforced concrete walls / columns according to design drawings and specificationscu m100$ - 0
3.2.3Lean Concrete under foundation (10 cm thickness)cu m40$ - 0
4Access Road
4.1Excavation and Earthworks
4.1.1Excavation to specified or directed levels in all materials. Unclassified excavation in the cut sections of the road, including removing existing pavement layers ( in cut or fill sections), watercourses, ditches and Wade relocations and removing of subgrade material classified unsuitable all as and where shown on the drawings, including trimming & grading, mixing & shaping, watering, compaction, testing, all tests required, and hauling the excavated material either to locations for road embankments or to stockpiles or to waste, all according to specifications, drawings and/or as directed by the Engineer. (Note: Suitable Excavated materials to be used for embankment construction along the road will not be paid for as Embankment Materials such as filling layers or rock fill inclusive of processing, transportation and installation and any other works deemed necessary).Cu m250$ - 0
4.2Base Course
Base-course layers - Supply of crushed aggregate base course layer , including spreading, watering, mixing, shaping and compaction according to drawings, specifications and as directed by the Engineer.
4.2.1Crushed aggregate Compacted Base Course Layer150 mm thick Class A.Sq m1250$ - 0
4.3Asphalt Works
4.3.1Bituminous Construction:
Supplying and applying bituminous Prime coat MC (rate of application 0.75 - 2.0 kg/m2), all according to specifications, drawings and/or as directed by the Engineer.Sq m500$ - 0
4.3.2Bituminous Wearing Course 3/4":
Supplying, spreading and compacting 70 mm thick bituminous wearing course, including all tests required by specifications, drawings and/or as directed by the Engineer (price shall include but, is not limited to; existing frame and manhole cover adjustment to match the new P.G.L where applicable).Sq m500$ - 0
4.3.3Road Marking:
Continuous and/or intermittent Thermoplastic paint as shown on drawings, all according to specifications and/or as directed by the Engineer.Sq m125$ - 0
5General Requirements
5.1Trainingls1$ - 0
5.2O&M Technical Manualsls1$ - 0
5.3Site inspection/ Support/ Start upls1$ - 0
Total Carried to Project Summary Sheet- 0
Unit Legend:
lmlinear meter
sq msquare meter
cu mcubic meter
lslump sum
eaeach

Yatta Distribution Network Rehabilitation and Extension 500 m³ Beit Emra Elevated Reservoir

RFTOP: WATER-294-16-0000XX Page &P of &N

1000 cu m At Grade school Res.

BILL OF QUANTITIES - 1000 m³ SCHOOLS RESERVOIR - AT GRADE
THE COSTS PROVIDED BY THE CONTRACTOR IN THIS BILL OF QUANTITIES ARE ALL INCLUSIVE FOR THE WORK DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS, WHETHER SPECIFICALLY MENTIONED IN THE BELOW DESCRIPTIONS OR NOT.
ItemDescriptionUnitQuantityUnit Price ($)Amount ($)
1GENERAL - SITE PREPARATION AND MISCELLANEOUS WORK
1.1Civil Site Preparation
1.1.1Demolition, removal, clear and grub sitels1$ - 0
1.1.2Site Grading and Preparationls1$ - 0
1.1.3Miscellaneous Excavation: Excavate to the required depth as per design drawings and specifications. Haul off the excess excavated material to an authorized dump site. The Contractor is responsible for locating a dump site at his own expense.cu m300$ - 0
1.1.4Miscellaneous Backfilling: Furnishing, leveling, and compaction of selected fill for subgrade layer (excavated selected materials or imported approved materials) as per design drawings and specifications.cu m300$ - 0
1.1.5Compacted base course for site grading, 200 mm layersq m711$ - 0
1.1.6Asphalt pavement on site (7 cm), ¾” asphalt mix design including MCsq m550$ - 0
1.1.7Lean concrete under foundation for reservoircu m30$ - 0
1.1.8Curb stone as shown on detail C-416 and according to the related clauses of the technical specifications.lm75$ - 0
1.1.9Concrete side walk as shown on detail C-418 and according to the related clauses of the technical specifications.sq m100$ - 0
1.1.10Drain structure (Outlet) as shown on detail C-332, include headwall or structural wall, rip rap, granular fill material, footing trench filter fabric and etc..., all according to the related clauses of the technical specifications.ea1$ - 0
1.2Metal work
1.2.1Fence around site perimeter, galvanized steel as shown on detail C-117 Sheet C-DT12 and according to the related clauses of the technical specifications.lm70$ - 0
1.2.2Double Leaf Gate Access gate as shown on detail C-117 Sheet C-DT11 and according to the related clauses of the technical specifications.ea1$ - 0
1.3Mechanical
1.3.1Furnish, install, excavation, backfilling and testing all reservoir inlet, outlet, drain and overflow piping, and appurtenances external to the reservoir and all piping required to connection to the reservoir piping, Reservoir Valve Vault, new and existing pipeline. The price including Furnish and install all other mechanical equipment including tees, Wyes, reducers, flanges, adapters, elbows, pipe support, pipe thimble, Flap valve, Air release valves, Gate valves and any other necessary fittings and associated appearances for a complete and functional Yard piping. The price also include repair and reinstatement works for piping outside the reservoir site.ls1$ - 0
1.4Electrical
1.4.1Furnish and installation of duct bankslm110$ - 0
1.4.2Furnish and installation of pre-cast pullbox as shown in detail No. E-101ea3$ - 0
1.4.3Furnish and installation of RTU, RTU Panel and breaker Panells1$ - 0
1.4.4Furnish and install appropriate antenna and wiring complete per design drawings and specificationsea1$ - 0
1.4.5Scada head end integration and programming for the site and its facilities and Structures per section 13500B, P&ID, drawings and specificationsls1$ - 0
1.4.6Supply Instruments for the site and its facilities and Structures per section 13500A, P&ID, drawings and specifications including all appurtenances required for complete and functional system.ls1$ - 0
1.4.7Testing and Commissioning of Electrical and Control Systems and Equipment complete according to design drawings and specifications for the site and its facilities and Structuresls1$ - 0
1.4.8Supply and installation Light pole: 6100mm galvanized (in accordance with ASTM A123M) pole octagonal reinforced shaft on a 15 base plate complete with 50 tubular lighting arm 1500 long. Pole shall be 3.18 thick (min) with minimum yield strength of 331 MPA. Foundation of pole reefer to E-600 on standard details sheet no. E-DT06. Lamp 70W H.P.S with body consists in double valve manufactured in die cast aluminum, locked by one fore stainless steel clip, adjustable reflector made in highly pure aluminum pressed sheet, polished and oxidized. Cut-off optic for flat class version, with very high protection degree IP65. The price include all fittings (cable, pipes, …etc) to have a complete working job.ea4$ - 0
21000 cu. meter RESERVOIR - AT GRADE
2.1Civil
2.1.1Excavate to the required depth as per specifications and drawings. Haul off the excavated material to an authorized dump site during excavation. The Contractor is responsible for locating a dump site at his own expense.cu m253$ - 0
2.1.2Furnishing, leveling, and compacting of subgrade layer as per drawings and specifications.cu m50$ - 0
2.1.3Furnish and install subgrade piping including excavation, installation of piping, concrete encasement of piping and testing of piping (at grade reservoir).ls1$ - 0
2.1.4Furnish and install vapor barrier according to design drawings and specificationsls1$ - 0
2.2Structural/Architectural
2.2.1Furnish and install foundation concretecu m155$ - 0
2.2.2Furnish and install slab-on-grade concretecu m22$ - 0
2.2.3Furnish and install wall and tank column concretecu m115$ - 0
2.2.4Furnish and install all seismic cans (wall to roof connection detail).ls1$ - 0
2.2.5Furnish and install elevated slab concretecu m59$ - 0
2.2.6Furnish and install hatches, vents, ladders, railings, grating, and all other miscellaneous metalwork according to design drawings and specifications.ls1$ - 0
2.2.7Testing Hydraulic Structure Cleaning, Testing and Disinfection the reservoir according to design drawings, specifications and engineer approvalls1$ - 0
2.3Coatings
2.3.1Furnish and apply all coatings per specificationsls1$ - 0
2.4Mechanical
2.4.1Furnish and install all reservoir drain, overflow and potable water piping, and appurtenances internal to the reservoir and all piping required for connection to yard piping.ls1$ - 0
2.4.2Furnish and install all other mechanical equipment including float level indicator, modulating float controls and associated appearances for a complete and functional tank.ls1$ - 0
2.4.3Testing, Adjusting, Cleaning, Disinfection, Commissioning, and Operator Instruction and Training of Plumbing and Mechanical Systems and Equipment complete according to design drawings and specificationsls1$ - 0
2.5Electrical
2.5.1Design, Furnish and installation of Lightning Protection and Grounding System complete according specifications.ls1$ - 0
2.5.2Furnish and install all electrical conduit, cable, equipment, and other miscellaneous electrical elements.ls1$ - 0
3RETAINING WALLS
3.1Civil
3.1.1Excavate to the required depth as per specifications and drawings. Haul off the excavated material to an authorized dump site during excavation. The Contractor is responsible for locating a dump site at his own expense.cu m40$ - 0
3.1.2Furnishing, leveling, and compaction of selected fill for subgrade layer (excavated selected materials or imported approved materials) as per design drawings and specifications.cu m5$ - 0
3.1.3Furnish and install drain piping.lm150$ - 0
3.1.4Furnish and install filter fabric and drain rock according to design drawings and specificationsls1$ - 0
3.1.5Furnish and install base course (150mm in depth) with selected backfill material in layers not to exceed the depth specified after compaction according to design drawings and specifications.sq m50$ - 0
3.2Structural
3.2.1Furnish and install reinforced concrete foundation according to design drawings and specificationscu m10$ - 0
3.2.2Furnish and install reinforced concrete walls / columns according to design drawings and specificationscu m7$ - 0
3.2.3Lean Concrete under foundation (10 cm thickness)cu m1$ - 0
4Valve Vault
4.1furnish and install pipes, valves, fittings, pipe supports, access hatches, ladder, air vents, drain, tees, Wyes, reducers, flanges, adapters, elbows, pipe, Control Valves, Dismantling Joint, check valves, Air release and vacuum valves, Gate valve, Ball Valves, flow meter, Strainer, BFY valves and any other necessary fittings and associated appearances for a complete and functional Reservoir Valve Vault as Per Drawings and Specifications. the Price include all needed instrumentation and wiring. All according to Standard Drawing M-RVV1 and related clauses of the technical specifications.ls1$ - 0
4.2Furnish and Install Reniforced Concrete and construct complete Reservoir Valve Vault as per Specifications and Drawings. the price including excavate, backfilling, coatings, concrete work All according to Standard Drawing S-RVV1 and S-RVV2 and related clauses of the technical specifications.ls1$ - 0
5General Requirements
5.1Trainingls1$ - 0
5.2O&M Technical Manualsls1$ - 0
5.3Site inspection/ Support/ Start upls1$ - 0
Total Carried to Project Summary Sheet- 0
Unit Legend:
lmlinear meter
sq msquare meter
cu mcubic meter
lslump sum
eaeach

Yatta Distribution Network Rehabilitation and Extension 1000 m³ At Grade School Reservoir

RFTOP: WATER-294-16-0000XX Page &P of &N

5000 cu m At Grade kh. S. Res.

BILL OF QUANTITIES - 5000 m³ KHALLET SALEEM RESERVOIR - AT GRADE
THE COSTS PROVIDED BY THE CONTRACTOR IN THIS BILL OF QUANTITIES ARE ALL INCLUSIVE FOR THE WORK DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS, WHETHER SPECIFICALLY MENTIONED IN THE BELOW DESCRIPTIONS OR NOT.
ItemDescriptionUnitQuantityUnit Price ($)Amount ($)
1GENERAL - SITE PREPARATION AND MISCELLANEOUS WORK
1.1Civil Site Preparation
1.1.1Demolition, removal, clear and grub sitels1$ - 0
1.1.2Site Grading and Preparationls1$ - 0
1.1.3Miscellaneous Excavation: Excavate to the required depth as per design drawings and specifications. Haul off the excess excavated material to an authorized dump site. The Contractor is responsible for locating a dump site at his own expense.cu m3200$ - 0
1.1.4Miscellaneous Backfilling: Furnishing, leveling, and compaction of selected fill for subgrade layer (excavated selected materials or imported approved materials) as per design drawings and specifications.cu m2700$ - 0
1.1.5Compacted base course for site grading, 200 mm layersq m2300$ - 0
1.1.6Asphalt pavement on site (7 cm), ¾” asphalt mix design including MCsq m946$ - 0
1.1.7Lean concrete under foundation for reservoircu m70$ - 0
1.1.8Curb stone as shown on detail C-416 and according to the related clauses of the technical specifications.lm120$ - 0
1.1.9Concrete side walk as shown on detail C-418 and according to the related clauses of the technical specifications.sq m135$ - 0
1.1.10Drain structure (Outlet) as shown on detail C-332, include headwall or structural wall, rip rap, granular fill material, footing trench filter fabric and etc..., all according to the related clauses of the technical specifications.ea1$ - 0
1.2Metal work
1.2.1Fence around site perimeter, galvanized steel as shown on detail C-117 Sheet C-DT12 and according to the related clauses of the technical specifications.lm180$ - 0
1.2.2Double Leaf Gate Access gate as shown on detail C-117 Sheet C-DT11 and according to the related clauses of the technical specifications.ea1$ - 0
1.3Mechanical
1.3.1Furnish, install, excavation, backfilling and testing all reservoir inlet, outlet, drain and overflow piping, and appurtenances external to the reservoir and all piping required for connection to internal to the reservoir piping, Reservoir Valve Vault, new and existing pipeline. The price including Furnish and install all other mechanical equipment including tees, Wyes, reducers, flanges, adapters, elbows, pipe support, pipe thimble, Flap valve, Air release valves, Gate valves and any other necessary fittings and associated appearances for a complete and functional Yard piping. The price also include repair and reinstatement works for piping outside the reservoir site.ls1$ - 0
1.4Electrical
1.4.1Furnish and installation of duct bankslm160$ - 0
1.4.2Furnish and installation of pre-cast pullbox as shown in detail No. E-101ea3$ - 0