This solicitation requests proposals for the construction of a new water treatment plant and associated facilities near Leadville, Colorado. Key details include:

  • The Bureau of Reclamation is seeking proposals to construct a new 3.2 million gallon per day water treatment plant adjacent to an existing facility, along with associated site work, utility modifications, demolition of existing structures, and replacement of a detention pond lining system. The estimated value of construction is between $100-150 million.

  • The period of performance is from September 2024 to September 2029. Proposals are due by May 6th, 2024 and the contract award will occur around September 2024. The contractor must begin work within 10 calendar days of award and complete it within 1300 calendar days.

  • The work location is on the north side of Leadville, Colorado at the Leadville Mine Drainage Tunnel Water Treatment Plant. Scope of work includes site work, building construction, equipment installation and commissioning, utility modifications, demolition, and stormwater infrastructure replacement.

  • The solicitation includes a base line item for the water treatment plant construction and an optional line item for the detention pond relining work with an anticipated option exercise date of September 2024. Pricing terms and conditions are also outlined.

View the file

Other files

File Type Posted
Amendment_0004_Attachment_1_Section_07_42_13_-_Pre-Insulated_Metal_Wall_Panels_AMD0004_0004.pdf PDF
Sol_140R6024R0009_Amd_0004.pdf PDF
Amendment_0003_Attachment_2_Contractor_Questions_and_Answers_0003.pdf PDF
Amendment_0003_Attachment_1_RFP_140R6024R0009_Revised14May24_0003.pdf PDF
Amendment_0003_Attachment_3_Revised_Specifications___Drawings_0003.pdf PDF
Sol_140R6024R0009_Amd_0003.pdf PDF
Amendment_0002_Attachment_1_RFP_140R6024R0009_Revised25Apr24_0002.pdf PDF
Amendment_0002_Attachment_2_Questions_and_Answers_0002.pdf PDF
Sol_140R6024R0009_Amd_0002.pdf PDF
Sol_140R6024R0009_Amd_0001.pdf PDF
140R6024R0009_Amendment_No__0001_0001.pdf PDF
Attachment_31_Leadville_Plant_Site_Visit_Map_and_Directions.pdf PDF
Attachment_02_00_00_01_Specifications_2of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_26_Project_Experience_Form.docx DOCX document
Attachment_06_00_00_01_Specifications_6of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_03_00_00_01_Specifications_3of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_13_00_00_02_InfoDwgs_1of6_LeadvilleWTP-B3_679-860_11x17_11-07-2023.pdf PDF
Attachment_24_TM-85-832000-2020-15_PhaseII_SRT-ERT_LeadvilleWTP_12-28-2023.pdf PDF
Attachment_25_Past_Performance_Questionnaire_fillable.pdf PDF
Attachment_28_Wage_Determination__CO20240003__Heavy.pdf PDF
Attachment_18_00_00_02_InfoDwgs_6of6_LeadvilleWTP-B3_1176-1260_11x17_11-07-2023.pdf PDF
RFP_140R6024R0009.pdf PDF
Attachment_21_2022_LMDT-WTP_Field_Investigation_Travel_Report.pdf PDF
Attachment_27_Subcontracting_Plan_Template.docx DOCX document
Attachment_04_00_00_01_Specifications_4of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_22_Leadville_Mine_Drainage_Tunnel-Preconstruction_Geologic_Design_Data_Water_Treatment_Plant.pdf PDF
Attachment_11_00_00_02_Drawings_2of3_LeadvilleWTP-B3_201-400_11x17_11-07-2023.pdf PDF
Attachment_15_00_00_02_InfoDwgs_3of6_LeadvilleWTP-B3_976-1040_11x17_11-07-2023.pdf PDF
Attachment_19_00_00_02_StdDwgs_1of1_LeadvilleWTP-B3_1261-1307_11x17_11-07-2023.pdf PDF
Attachment_23_Test_Pits_at_LMDT_WTP_Leadville__CO_Travel_Report.pdf PDF
Attachment_29_Wage_Determination__CO20240001__Building.pdf PDF
Attachment_07_00_00_01_Specifications_7of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_08_00_00_01_Specifications_8of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_16_00_00_02_InfoDwgs_4of6_LeadvilleWTP-B3_1041-1110_11x17_11-07-2023.pdf PDF
Attachment_12_00_00_02_Drawings_3of3_LeadvilleWTP-B3_401-678_11x17_11-07-2023.pdf PDF
Attachment_01_00_00_01_Specifications_1of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_30_Section_B_Price_Schedules.xlsx XLSX spreadsheet
Attachment_05_00_00_01_Specifications_5of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_09_00_00_01_Specifications_9of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_20_Geotechnical_Recommendations_2022__7-6-2022_FINAL.pdf PDF
Attachment_17_00_00_02_InfoDwgs_5of6_LeadvilleWTP-B3_1111-1175_11x17_11-07-2023.pdf PDF
Attachment_14_00_00_02_InfoDwgs_2of6_LeadvilleWTP-B3_861-975_11x17_11-07-2023.pdf PDF
Attachment_10_00_00_02_Drawings_1of3_LeadvilleWTP-B3_001-200_11x17_11-07-2023.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION CALL

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040602133

Bureau of Reclamation

Upper Colorado Region

Regional Office 125 South State Street, Room 8100

R40

Salt Lake City UT 84138

Steven Stone 0000000000

1x 03/11/2024

140R6024R0009

INVITATION FOR BID

REQUEST FOR PROPOSAL

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

The principal components of the work are listed under the project description below:

Construct new 3.2 million gallons per day (MGD) water treatment plant (WTP) adjacent to existing 3.2 MGD WTP.

A. Install:

i. Site retaining walls.

ii. Hot tap with isolation valve on an existing potable water line.

iii. Potable water piping via auger bore under State highway.

iv. Potable water piping along public road.

v. New WTP building.

vi. New storage building.

vii. New diesel emergency generator.

viii. Site improvements, including yard piping, duct banks, stormwater, perimeter fencing and access point modifications, relocation of two existing flammables container buildings, relocation of one 250-gallon diesel fuel storage tank and supporting structure, surface treatments, landscaping, site lighting, and restoration of construction-impacted areas.

B. Site grading, cuts, and fills as required.

Continued ...

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 1826 calendar days and complete it within ________________ ________________ calendar days after receiving

05/06/2024

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 12/2022)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Bureau of Reclamation Upper Colorado Region

Regional Office 125 South State Street, Room 8100

R40

Salt Lake City UT 84138

Dwane D. Esplin

28. NEGOTIATED AGREEMENT 29. AWARD

and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

10 U.S.C. 3204(a) 41 U.S.C. 3304(a)

STANDARD FORM 1442 (REV. 12/2022) BACK

Continued...

and return

(Contractor is not required to sign this document.) Your offer on this

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140R6024R0009

C. Receive delivery of, store, install, startup, and commission water treatment equipment from three Government-furnished equipment supply contracts.

D. Modify:

i. Permanent power supply to WTP site.

ii. Natural gas service to WTP site.

iii. Site's existing septic system.

iv. Telecommunication service to WTP site.

v. Existing pond pump station to reuse existing wet well and replace pump station.

E. Replace:

i. Programmable logic controllers (PLC) hardware and program new PLCs at two existing mine drainage well facilities.

ii. Existing detention pond lining system and associated components.

F. Plug, seal, and abandon existing WTP building's commercial well.

G. Demolish:

i. Existing storage building.

ii. Existing WTP.

H. Remove existing sediment from two existing

18-inch diameter stormwater outfall lines from existing catch basin to pipe outlet.

LOCATION OF THE WORK: The north side of

Leadville, Colorado in Lake County at the

Leadville Mine Drainage Tunnel Water Treatment

Plant, 749 Highway 91, Leadville, CO 80461.

Per the Reclamation Acquisition Regulation (RAR)

WBR 1436.204 Disclosure of Magnitude the estimated magnitude of construction is between

$100,000,000 and $150,000,000

Period of Performance: 09/02/2024 to 09/01/2029

00010 Leadville Water Treatment Plant Construction

Product/Service Code: Y1PD

Product/Service Description: CONSTRUCTION OF

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

4 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140R6024R0009

WASTE TREATMENT AND STORAGE FACILITIES

00020 Optional Price Schedule 2 - Holding Pond Relining 1 AU

(Option Line Item)

Anticipated Exercise Date 09/02/2024

Product/Service Code: Y1PD

Product/Service Description: CONSTRUCTION OF

WASTE TREATMENT AND STORAGE FACILITIES

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .