This document contains Questions and Answers related to Solicitation No. 140R6024R0009 Amendment No. 0002 for the Leadville Water Treatment Plant project.
The key details are:
- Question 25 addresses the use of a remote storage site labeled for "soil storage only" - the specifications only allow for temporary soil stockpiling, and the drawings will not be revised to allow other storage uses.
- Questions 26-27 request information on electrical equipment sizing and specifications that are not provided directly, but references are given to the relevant specification sections.
- Question 32 asks about the Air Stripper PLCs, which are not government-furnished and the contractor is responsible for determining the procurement approach.
- Questions 33-35 request clarification on control room workstations, thin client specifications, and acceptable Modbus communication devices, with references to the applicable specification sections.
- Questions 38-40 relate to pump lengths, efficiency, and material requirements, with references to relevant specification sections.
- Question 41 states the bid deadline will be extended, per Amendment 0002.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions from Prospective Contractors – Solicitation No. 140R6024R0009 Amendment No. 0002
25. In the final drawing package, there is a remote storage site that is labelled as 'soil storage only'. Can it be used for anything else?
A: No, specifications Section 01 14 10, Paragraph 1.04 C. only allows temporary stockpiling of soil.
Can the drawings referenced be revised to remove “soil only” so contractors could choose to provide their own security and use the site for other storage purposes?
A: No, specifications Section 01 14 10, Paragraph 1.04 C. only allows temporary stockpiling of soil.
26. Drawing 1335-D-61160, DC & UPS Single Line Diagram: Drawing shows the Battery
Disconnect Switch ‘BAC’ being fed from Motor Control Center 00-MCC-002 but the Compartment Schedule for 00-MCC-02 shown on page 8 of Spec Section 26-24-19 does not show a breaker for this load. Please provide breaker size.
A: The size of the circuit breaker for the battery system will depend on the rating of the battery charger supplied with the battery system, supplied under specifications Section 26 33 46. As required by this Section, it is the responsibility of the battery system supplier to perform sizing calculations for the battery system.
27. Drawing 1335-D-61160 – Water Treatment Plant DC & UPS Electrical Single Line Diagram shows Service Entrance Switchgear SES and Main Switchboard SAA as being fed from 125VDC Switchboard BAA however, no other information is given on these two pieces of electrical equipment. What is the voltage and amperage for this equipment?
A: The requirements are as follows:
Service Entrance Switchgear SES: Specifications Section 26 14 14 Main Switchboard DSA: Specifications Section 26 24 13 125 VDC Switchboard BAA: Specifications Section 26 33 48
28. Drawing 1335-D-61161 – Electrical, Equipment Layout – Level 01 shows equipment KP-
010 however, it is unclear what this equipment is. Please clarify.
A: KP-010 is the transformer supplying panel LP-010.
29. Can a cable schedule be provided?
A: No.
30. Please provide a single line for all MCCs.
A: All information for the MCCs is available in tables located in specifications Section 26 24 19 - 600V Motor Control Centers.
31. Can a division of responsibility matrix be provided?
A: No.
32. Air Stripper PLCs: Are those supposed to be manufacturer provided PLCs? They are missing the note 2 denotation on the network diagram.
A: The air strippers are not government-furnished equipment. Refer to specifications Section 46 40 10 - Air Stripper Equipment. Contractor will provide the air strippers as part of this contract. It is up to the contractor to determine how they would like to procure the air strippers, whether the contractor would like to purchase the air strippers with PLCs from the air stripper supplier, or have those controls supplied with the rest of the facility controls by that subcontractor, or some other subcontractor or supplier.
33. Are the “Control Room Workstations” shown on the network diagram, the same as the
“Engineering Workstations” called out in the 25 00 01 document? If not, what are the specs for “Control Room Workstations”?
A: Yes, the Engineering Workstations are required to be located in the control room in specifications Section 25 00 01, Paragraph 2.03 A.
34. Are there specs for thin client machines?
A: Servers provided for the project shall meet the requirements of specifications Section 25 00 01, Paragraph 2.08. Thin client management software shall meet the requirements of specifications Section 25 00 01, Paragraph 2.10 B.
35. Acceptable devices for modbus comms where called for? Do they have to be 1756 rack mounted devices such as prosoft, or can they be external device in CPLs such as a RedLion or other comms gateway?
A: Refer to specifications Section 25 00 01, Paragraph 2.07 F. and 2.24 B for the requirements.
36. Is Sump Pump Control Panel on P&ID Drawing 1135-D-60913 part of “Facility Control
System”?
A: Refer to specifications Section 22 14 30 - Sump Pumping Systems.
37. I see there will be 2 buildings constructed on site 1- Large WTP facility, 1- Small storage facility, will these both be pre-engineered metal building systems? The division 13 specification referenced only the smaller storage facility.
A: Refer to specifications Drawing 1335-D-60816, Sheet No. 676, for architectural drawings of the Pond Pump Station.
38. Please clarify the needed pump lengths, as it does not appear to be clear on drawings.
Especially the Plant Influent and Pond Pumps.
A: Refer to the requirements of the following specifications:
Section 43 23 00, Paragraph 1.06 B.3.
Drawing 1335-D-60625, Sheet No. 129, Concrete Outline – North-South Section.
Drawing 1335-D-61001, Sheet No. 447, Process – Plant Sump Plan and Sections.
Drawing 1335-D-61002, Sheet No. 448, Process – Plant Sump - Sections and Details.
Drawing 1335-D-61141, Sheet No. 449, Influent Suction Piping - Sections and Details.
Drawing 1335-D-61142, Sheet No. 450, Influent Suction Piping - Sections and Details.
For Information Only, Drawing No. 1335-D-130, Sheet No. 937, Treatment Plant – Outline and Reinforcement Design – Plans and Sections for the pond pump station wet well dimensions.
39. Flowserve’s selections are low on efficiency for the influent and pond pumps; See the attached selections. Please verify if this will be acceptable.
A: Refer to the requirements of the following specifications:
Section 43 23 00, Paragraph 1.06 C.6.
Section 43 23 00, Table 43 23 00A – Performance Requirements.
40. Will you accept CF8M or cast 316SS for bowls, impeller, column, and head? 416SS is not a standard material we typically see for these items.
A: Refer to specifications Section 43 23 00, Paragraph 2.01 A.
41. Can the bid deadline be extended?
A: The proposal due date shall be extended; see Amendment 0002 SF30 and/or Amendment
0002 revised RFP (SF1442).