Amendment_0002_Attachment_2_Questions_and_Answers_0002.pdf

PDF 207 KB Posted

Attached to
Leadville Water Treatment Plant
Solicitation number
140R6024R0009
Issued by

About this file

This document contains Questions and Answers related to Solicitation No. 140R6024R0009 Amendment No. 0002 for the Leadville Water Treatment Plant project.

The key details are:

  • Question 25 addresses the use of a remote storage site labeled for "soil storage only" - the specifications only allow for temporary soil stockpiling, and the drawings will not be revised to allow other storage uses.
  • Questions 26-27 request information on electrical equipment sizing and specifications that are not provided directly, but references are given to the relevant specification sections.
  • Question 32 asks about the Air Stripper PLCs, which are not government-furnished and the contractor is responsible for determining the procurement approach.
  • Questions 33-35 request clarification on control room workstations, thin client specifications, and acceptable Modbus communication devices, with references to the applicable specification sections.
  • Questions 38-40 relate to pump lengths, efficiency, and material requirements, with references to relevant specification sections.
  • Question 41 states the bid deadline will be extended, per Amendment 0002.

View the file

Other files

File Type Posted
Amendment_0004_Attachment_1_Section_07_42_13_-_Pre-Insulated_Metal_Wall_Panels_AMD0004_0004.pdf PDF
Sol_140R6024R0009_Amd_0004.pdf PDF
Amendment_0003_Attachment_2_Contractor_Questions_and_Answers_0003.pdf PDF
Amendment_0003_Attachment_1_RFP_140R6024R0009_Revised14May24_0003.pdf PDF
Amendment_0003_Attachment_3_Revised_Specifications___Drawings_0003.pdf PDF
Sol_140R6024R0009_Amd_0003.pdf PDF
Amendment_0002_Attachment_1_RFP_140R6024R0009_Revised25Apr24_0002.pdf PDF
Sol_140R6024R0009_Amd_0002.pdf PDF
Sol_140R6024R0009_Amd_0001.pdf PDF
140R6024R0009_Amendment_No__0001_0001.pdf PDF
Attachment_31_Leadville_Plant_Site_Visit_Map_and_Directions.pdf PDF
Attachment_02_00_00_01_Specifications_2of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_26_Project_Experience_Form.docx DOCX document
Attachment_06_00_00_01_Specifications_6of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_03_00_00_01_Specifications_3of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_13_00_00_02_InfoDwgs_1of6_LeadvilleWTP-B3_679-860_11x17_11-07-2023.pdf PDF
Attachment_24_TM-85-832000-2020-15_PhaseII_SRT-ERT_LeadvilleWTP_12-28-2023.pdf PDF
Attachment_25_Past_Performance_Questionnaire_fillable.pdf PDF
Attachment_28_Wage_Determination__CO20240003__Heavy.pdf PDF
Attachment_18_00_00_02_InfoDwgs_6of6_LeadvilleWTP-B3_1176-1260_11x17_11-07-2023.pdf PDF
RFP_140R6024R0009.pdf PDF
Attachment_21_2022_LMDT-WTP_Field_Investigation_Travel_Report.pdf PDF
Attachment_27_Subcontracting_Plan_Template.docx DOCX document
Attachment_04_00_00_01_Specifications_4of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Sol_140R6024R0009.pdf PDF
Attachment_22_Leadville_Mine_Drainage_Tunnel-Preconstruction_Geologic_Design_Data_Water_Treatment_Plant.pdf PDF
Attachment_11_00_00_02_Drawings_2of3_LeadvilleWTP-B3_201-400_11x17_11-07-2023.pdf PDF
Attachment_15_00_00_02_InfoDwgs_3of6_LeadvilleWTP-B3_976-1040_11x17_11-07-2023.pdf PDF
Attachment_19_00_00_02_StdDwgs_1of1_LeadvilleWTP-B3_1261-1307_11x17_11-07-2023.pdf PDF
Attachment_23_Test_Pits_at_LMDT_WTP_Leadville__CO_Travel_Report.pdf PDF
Attachment_29_Wage_Determination__CO20240001__Building.pdf PDF
Attachment_07_00_00_01_Specifications_7of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_08_00_00_01_Specifications_8of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_16_00_00_02_InfoDwgs_4of6_LeadvilleWTP-B3_1041-1110_11x17_11-07-2023.pdf PDF
Attachment_12_00_00_02_Drawings_3of3_LeadvilleWTP-B3_401-678_11x17_11-07-2023.pdf PDF
Attachment_01_00_00_01_Specifications_1of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_30_Section_B_Price_Schedules.xlsx XLSX spreadsheet
Attachment_05_00_00_01_Specifications_5of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_09_00_00_01_Specifications_9of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_20_Geotechnical_Recommendations_2022__7-6-2022_FINAL.pdf PDF
Attachment_17_00_00_02_InfoDwgs_5of6_LeadvilleWTP-B3_1111-1175_11x17_11-07-2023.pdf PDF
Attachment_14_00_00_02_InfoDwgs_2of6_LeadvilleWTP-B3_861-975_11x17_11-07-2023.pdf PDF
Attachment_10_00_00_02_Drawings_1of3_LeadvilleWTP-B3_001-200_11x17_11-07-2023.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions from Prospective Contractors – Solicitation No. 140R6024R0009 Amendment No. 0002

25. In the final drawing package, there is a remote storage site that is labelled as 'soil storage only'. Can it be used for anything else?

A: No, specifications Section 01 14 10, Paragraph 1.04 C. only allows temporary stockpiling of soil.

Can the drawings referenced be revised to remove “soil only” so contractors could choose to provide their own security and use the site for other storage purposes?

A: No, specifications Section 01 14 10, Paragraph 1.04 C. only allows temporary stockpiling of soil.

26. Drawing 1335-D-61160, DC & UPS Single Line Diagram: Drawing shows the Battery

Disconnect Switch ‘BAC’ being fed from Motor Control Center 00-MCC-002 but the Compartment Schedule for 00-MCC-02 shown on page 8 of Spec Section 26-24-19 does not show a breaker for this load. Please provide breaker size.

A: The size of the circuit breaker for the battery system will depend on the rating of the battery charger supplied with the battery system, supplied under specifications Section 26 33 46. As required by this Section, it is the responsibility of the battery system supplier to perform sizing calculations for the battery system.

27. Drawing 1335-D-61160 – Water Treatment Plant DC & UPS Electrical Single Line Diagram shows Service Entrance Switchgear SES and Main Switchboard SAA as being fed from 125VDC Switchboard BAA however, no other information is given on these two pieces of electrical equipment. What is the voltage and amperage for this equipment?

A: The requirements are as follows:

Service Entrance Switchgear SES: Specifications Section 26 14 14 Main Switchboard DSA: Specifications Section 26 24 13 125 VDC Switchboard BAA: Specifications Section 26 33 48

28. Drawing 1335-D-61161 – Electrical, Equipment Layout – Level 01 shows equipment KP-

010 however, it is unclear what this equipment is. Please clarify.

A: KP-010 is the transformer supplying panel LP-010.

29. Can a cable schedule be provided?

A: No.

30. Please provide a single line for all MCCs.

A: All information for the MCCs is available in tables located in specifications Section 26 24 19 - 600V Motor Control Centers.

31. Can a division of responsibility matrix be provided?

A: No.

32. Air Stripper PLCs: Are those supposed to be manufacturer provided PLCs? They are missing the note 2 denotation on the network diagram.

A: The air strippers are not government-furnished equipment. Refer to specifications Section 46 40 10 - Air Stripper Equipment. Contractor will provide the air strippers as part of this contract. It is up to the contractor to determine how they would like to procure the air strippers, whether the contractor would like to purchase the air strippers with PLCs from the air stripper supplier, or have those controls supplied with the rest of the facility controls by that subcontractor, or some other subcontractor or supplier.

33. Are the “Control Room Workstations” shown on the network diagram, the same as the

“Engineering Workstations” called out in the 25 00 01 document? If not, what are the specs for “Control Room Workstations”?

A: Yes, the Engineering Workstations are required to be located in the control room in specifications Section 25 00 01, Paragraph 2.03 A.

34. Are there specs for thin client machines?

A: Servers provided for the project shall meet the requirements of specifications Section 25 00 01, Paragraph 2.08. Thin client management software shall meet the requirements of specifications Section 25 00 01, Paragraph 2.10 B.

35. Acceptable devices for modbus comms where called for? Do they have to be 1756 rack mounted devices such as prosoft, or can they be external device in CPLs such as a RedLion or other comms gateway?

A: Refer to specifications Section 25 00 01, Paragraph 2.07 F. and 2.24 B for the requirements.

36. Is Sump Pump Control Panel on P&ID Drawing 1135-D-60913 part of “Facility Control

System”?

A: Refer to specifications Section 22 14 30 - Sump Pumping Systems.

37. I see there will be 2 buildings constructed on site 1- Large WTP facility, 1- Small storage facility, will these both be pre-engineered metal building systems? The division 13 specification referenced only the smaller storage facility.

A: Refer to specifications Drawing 1335-D-60816, Sheet No. 676, for architectural drawings of the Pond Pump Station.

38. Please clarify the needed pump lengths, as it does not appear to be clear on drawings.

Especially the Plant Influent and Pond Pumps.

A: Refer to the requirements of the following specifications:

Section 43 23 00, Paragraph 1.06 B.3.

Drawing 1335-D-60625, Sheet No. 129, Concrete Outline – North-South Section.

Drawing 1335-D-61001, Sheet No. 447, Process – Plant Sump Plan and Sections.

Drawing 1335-D-61002, Sheet No. 448, Process – Plant Sump - Sections and Details.

Drawing 1335-D-61141, Sheet No. 449, Influent Suction Piping - Sections and Details.

Drawing 1335-D-61142, Sheet No. 450, Influent Suction Piping - Sections and Details.

For Information Only, Drawing No. 1335-D-130, Sheet No. 937, Treatment Plant – Outline and Reinforcement Design – Plans and Sections for the pond pump station wet well dimensions.

39. Flowserve’s selections are low on efficiency for the influent and pond pumps; See the attached selections. Please verify if this will be acceptable.

A: Refer to the requirements of the following specifications:

Section 43 23 00, Paragraph 1.06 C.6.

Section 43 23 00, Table 43 23 00A – Performance Requirements.

40. Will you accept CF8M or cast 316SS for bowls, impeller, column, and head? 416SS is not a standard material we typically see for these items.

A: Refer to specifications Section 43 23 00, Paragraph 2.01 A.

41. Can the bid deadline be extended?

A: The proposal due date shall be extended; see Amendment 0002 SF30 and/or Amendment

0002 revised RFP (SF1442).