This document is Amendment 0003 to Solicitation 140R6024R0009 for the Leadville Water Treatment Plant project. The amendment incorporates the following key changes:

  1. A revised clause on payment for mobilization and preparatory work.
  2. A list of contractor questions and answers.
  3. Revisions to several specifications sections, including Submittals, Pre-Insulated Metal Wall Panels, Peristaltic Metering Pumps, and Drawings.
  4. Revisions to 12 drawings, with new revision dates of April 23, 2024.

The amendment requires offerors to acknowledge receipt prior to the specified date and time. The period of performance for the contract is September 2, 2024 to September 1, 2029.

View the file

Other files

File Type Posted
Amendment_0004_Attachment_1_Section_07_42_13_-_Pre-Insulated_Metal_Wall_Panels_AMD0004_0004.pdf PDF
Sol_140R6024R0009_Amd_0004.pdf PDF
Amendment_0003_Attachment_2_Contractor_Questions_and_Answers_0003.pdf PDF
Amendment_0003_Attachment_1_RFP_140R6024R0009_Revised14May24_0003.pdf PDF
Amendment_0003_Attachment_3_Revised_Specifications___Drawings_0003.pdf PDF
Amendment_0002_Attachment_1_RFP_140R6024R0009_Revised25Apr24_0002.pdf PDF
Amendment_0002_Attachment_2_Questions_and_Answers_0002.pdf PDF
Sol_140R6024R0009_Amd_0002.pdf PDF
Sol_140R6024R0009_Amd_0001.pdf PDF
140R6024R0009_Amendment_No__0001_0001.pdf PDF
Attachment_31_Leadville_Plant_Site_Visit_Map_and_Directions.pdf PDF
Attachment_02_00_00_01_Specifications_2of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_26_Project_Experience_Form.docx DOCX document
Attachment_06_00_00_01_Specifications_6of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_03_00_00_01_Specifications_3of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_13_00_00_02_InfoDwgs_1of6_LeadvilleWTP-B3_679-860_11x17_11-07-2023.pdf PDF
Attachment_24_TM-85-832000-2020-15_PhaseII_SRT-ERT_LeadvilleWTP_12-28-2023.pdf PDF
Attachment_25_Past_Performance_Questionnaire_fillable.pdf PDF
Attachment_28_Wage_Determination__CO20240003__Heavy.pdf PDF
Attachment_18_00_00_02_InfoDwgs_6of6_LeadvilleWTP-B3_1176-1260_11x17_11-07-2023.pdf PDF
RFP_140R6024R0009.pdf PDF
Attachment_21_2022_LMDT-WTP_Field_Investigation_Travel_Report.pdf PDF
Attachment_27_Subcontracting_Plan_Template.docx DOCX document
Attachment_04_00_00_01_Specifications_4of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Sol_140R6024R0009.pdf PDF
Attachment_22_Leadville_Mine_Drainage_Tunnel-Preconstruction_Geologic_Design_Data_Water_Treatment_Plant.pdf PDF
Attachment_11_00_00_02_Drawings_2of3_LeadvilleWTP-B3_201-400_11x17_11-07-2023.pdf PDF
Attachment_15_00_00_02_InfoDwgs_3of6_LeadvilleWTP-B3_976-1040_11x17_11-07-2023.pdf PDF
Attachment_19_00_00_02_StdDwgs_1of1_LeadvilleWTP-B3_1261-1307_11x17_11-07-2023.pdf PDF
Attachment_23_Test_Pits_at_LMDT_WTP_Leadville__CO_Travel_Report.pdf PDF
Attachment_29_Wage_Determination__CO20240001__Building.pdf PDF
Attachment_07_00_00_01_Specifications_7of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_08_00_00_01_Specifications_8of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_16_00_00_02_InfoDwgs_4of6_LeadvilleWTP-B3_1041-1110_11x17_11-07-2023.pdf PDF
Attachment_12_00_00_02_Drawings_3of3_LeadvilleWTP-B3_401-678_11x17_11-07-2023.pdf PDF
Attachment_01_00_00_01_Specifications_1of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_30_Section_B_Price_Schedules.xlsx XLSX spreadsheet
Attachment_05_00_00_01_Specifications_5of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_09_00_00_01_Specifications_9of9_LeadvilleWTP-B3_11-07-2023.pdf PDF
Attachment_20_Geotechnical_Recommendations_2022__7-6-2022_FINAL.pdf PDF
Attachment_17_00_00_02_InfoDwgs_5of6_LeadvilleWTP-B3_1111-1175_11x17_11-07-2023.pdf PDF
Attachment_14_00_00_02_InfoDwgs_2of6_LeadvilleWTP-B3_861-975_11x17_11-07-2023.pdf PDF
Attachment_10_00_00_02_Drawings_1of3_LeadvilleWTP-B3_001-200_11x17_11-07-2023.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R6024R0009 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Salt Lake City UT 84138

R40

125 South State Street, Room 8100 Regional Office Upper Colorado Region Bureau of Reclamation

03/11/20240003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/11/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to incorporate the following:

1) Revised Request for Proposal (RFP): Revised clause I.25 WBR 1452.232-81 Payment for

Mobilization and Preparatory Work - Bureau of Reclamation Alternate I (March 2022) to include a missing percentage. See Amendment 0003 Attachment 1.

2) Contractor Questions: A list of contractor questions and their respective answers are attached. The deadline for questions has passed; further questions may or may not be acknowledged, based solely upon whether the contracting officer deems it to be in the government's best interest. See Amendment 0003 Attachment 2.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Dwane D. Esplin

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R6024R0009/0003

3) Revised Specifications: The following specifications are hereby revised. The revised pages are provided with a pink background color in accordance with Reclamation Practice 15.1. See

Amendment 0003 Attachment 3.

a) Specifications Section 01 33 00 - Submittals,

b) Specifications Section 07 42 13 -

Pre-Insulated Metal Wall Panels, in its entirety

c) Specifications Section 46 33 44 - Peristaltic

Metering Pumps, in its entirety

d) Specifications Section 52 00 00 - Drawings, in its entirety

4) Revised Drawings: The following drawings are hereby revised. See Amendment 0003 Attachment 3.

a) Sheet No. 496: Drawing 1355-D-61159, Revision

1, Dated April 23, 2024

b) Sheet No. 497: Drawing 1355-D-61160, Revision

1, Dated April 23, 2024

c) Sheet No. 498: Drawing 1355-D-61161, Revision

1, Dated April 23, 2024

d) Sheet No. 500: Drawing 1355-D-61163, Revision

1, Dated April 23, 2024

e) Sheet No. 656: Drawing 1355-D-61344, Revision

1, Dated April 23, 2024

f) Sheet No. 657: Drawing 1355-D-61345, Revision

1, Dated April 23, 2024

g) Sheet No. 658: Drawing 1355-D-61346, Revision

1, Dated April 23, 2024

h) Sheet No. 659: Drawing 1355-D-61347, Revision

1, Dated April 23, 2024

i) Sheet No. 660: Drawing 1355-D-61348, Revision

1, Dated April 23, 2024

j) Sheet No. 661: Drawing 1355-D-61349, Revision

1, Dated April 23, 2024

k) Sheet No. 673: Drawing 1355-D-61197, Revision

1, Dated April 23, 2024

l) Sheet No. 678: Drawing 1355-D-61204, Revision

1, Dated April 23, 2024

Acknowledgement: See Block 11 on this Standard

Form 30 regarding acknowledgement of this amendment by offerors. The Government requires offerors to acknowledge this amendment with their proposals. See also Block 19 on the SF-1442 included with the revised Request for Proposal

(RFP).

Period of Performance: 09/02/2024 to 09/01/2029