SMES Classroom Mods-ADD01-Electrical.pdf
PDF 3 MB Posted
- Attached to
- Scouters Mountain Elementary School Modular Classroom Installation Project, ITB-002-2023
- Solicitation number
- S-P03012-00006604
- Issued by
- Clackamas County, Hebo CDP, Oregon
About this file
The document provided is an electrical site plan for the Scouters Mountain Elementary School Modular Classroom Installation Project, an ITB-002-2023 contract opportunity from the Clackamas School District in Oregon. The project involves site preparation and modification work, including the installation of new electrical conduits, panels, and connections to support two modular classroom buildings. The scope includes providing a new fiber optic cable, Category 5E voice interconnect, paging speaker cables, and a fire alarm zone expander module from the main building to the two modular classrooms. Contractors will be responsible for routing new conduits in the accessible ceiling spaces and patching and painting walls as needed. The project also requires relabeling an existing circuit breaker serving the modular building panels.
The contract opportunity does not provide pricing details, set-asides, incumbent information, or funding sources. The document indicates this is part of a bid set, suggesting a competitive bidding process, but does not specify response dates, award dates, or the term of the contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P
S
S
DW
T
MODULE #1 MODULE #2
(2) 3" C. - TECH
(2) 2" C. - FIRE ALARM
ELECTRICAL
ROOM
MDF ROOM
(1) 3" C. - TECH
(1) 2" C. - FIRE ALARM
(2) 2" C. - POWER
PULL BOXES, LOCATE IN CLASSROOM CEILING, CONCEAL NEW CONDUIT IN
WALL SPACE. PATCH AND PAINT WALL TO MATCH EXISTING CONDITIONS.
(2) 2" C. - POWER
TO FEEDER TAP
DISCONNECT
(1) 2" C.
(1) 2" C.
TRANSFORMER 'X2M2'
E5.1
(1) 3" C. - TECH
(1) 2" C. - FIRE ALARM
(1) 3" C. - TECH FROM
MODULE #1 IDF TO
MODULE #2 CEILING
SPACE.
date phase date project k e y p l a n revisions
EXPIRES: 12/31/24
4/
/2
3:
:0
P
M C
:\U se rs \k ay la a\ D oc um en ts
\S M
E S
C la ss ro om M od s_
E
LE
C _R
_k ay la
_a .r vt
E1.0
SITE PLAN - ELECTRICAL
S C
O U
T E
R S
M O
U N
T A
IN
E
LE
M
E N
T A
R Y
S C
H O
O L
C
LA
S
S R
O O
M M
O D
U
LA
R S
T
-5
-5
N O
R T
H C
LA
C
K A
M A
S S
C H
O O
L D
IS
T
R
IC
T
BID SET
04/17/2023 22027
S
E
N
D A
V E
N U
E H
A P
P Y
V A
LL
E
Y , O
R E
G O
N
PROJECT
CONTACT
www.interfaceengineering.com
KRISTINE LEAVENS
2023-0276
100 SW Main Street, Suite 1600 Portland, OR 97204
TEL 503.382.2266
0' 8' 16' 32'
1/16" = 1'-0"
1 SITE PLAN - ELECTRICAL
1. MODULE PANEL SHOWN FOR COORDINATION ONLY.
PANEL PROVIDED BY MODULE MANUFACTURER.
2. ROUTE NEW CONDUIT IN ACCESSIBLE CEILING SPACE.
3. PROVIDE 30mA GFEP CIRCUIT BREAKER IN MODULE
PANEL TO SERVE HEAT TRACE. PROVIDE CONNECTION
TO HEAT TRACE PER MANUFACTURER REQUIREMENTS
AND COORDINATE WITH DIVISION 22.
4. PROVIDE CONDUIT TO IDF LOCATION. PROVIDE THE
FOLLOWING FROM THE MDF IN THE MAIN BUILDING TO
IDF LOCATION IN MODULE #1:
• ONE (1) CORNING 12-STRAND ARMORED PLENUM-
RATED SINGLE MODE OS2 LSZH FIBER OPTIC
CABLE.
• ONE (1) CATEGORY 5E FOR VOICE INTERCONNECT,
USING NCSD APPROVED CAT5E 1U PATCH PANEL
MOUNTED IN THE CABINET AND LABELED WITH
DESTINATION.
• TWO (2) 18 GAUGE/2 CONDUCTOR STRANDED,
SHIELDED CABLES FOR THE TWO PAGING
SPEAKERS.
• ONE (1) 18 GAUGE/4 CONDUCTOR SOLID RED
CABLE FOR THE FIRE ALARM ZONE EXPANDER
MODULE. VALIDATE WITH THE FIRE ALARM DESIGN
BUILD CONTRACTOR.
5. RELABEL BREAKER SERVING PANEL 4M2: "PANEL 4M2 /
MODULAR BUILDINGS #1 AND #2".
6. LOCATE NEW FEEDER TAP DISCONNECTS IN LOCATION
WHERE EXISTING PANELBOARD OESC CLEARANCES
ARE MAINTAINED. SEE 1/E5.1.
7. STUB-OUT CONDUIT IN MODULE #2 CEILING SPACE.
PROVIDE THE FOLLOWING FROM THE MDF IN THE MAIN
BUILDING TO MODULE #2:
• TWO (2) 18 GAUGE/2 CONDUCTOR STRANDED,
SHIELDED CABLES FOR THE TWO PAGING
SPEAKERS.
• ONE (1) 18 GAUGE/4 CONDUCTOR SOLID RED
CABLE FOR THE FIRE ALARM ZONE EXPANDER
MODULE. VALIDATE WITH THE FIRE ALARM DESIGN
BUILD CONTRACTOR.
SHEET KEYNOTES
4/24/23 ADDENDUM-01
| Sheets |
| E1.0 - SITE PLAN - ELECTRICAL |
File details come from the government source that posted it. Updated .