About this file
This document is a Service Level Standards and Key Performance Indicators (SLAs and KPIs) schedule for the Orange County Aviation Authority's grounds maintenance and irrigation contract (27-167-ITN) covering Terminals A and B Landside and Cargo Road at Orlando International Airport (MCO) in Florida. The contract establishes comprehensive performance metrics and inspection standards across eleven service categories: mowing, edging and trimming, weed control, shrub and groundcover maintenance, fertilization, pest and disease management, irrigation, mulch, litter and debris removal, irrigation staffing, and inspection and deficiency correction. Mowing cycles range from every seven calendar days during April through October to every fourteen calendar days during November through March, with turf maintained between 3-4 inches and zero scalping occurrences permitted. The document specifies minimum staffing requirements including two full-time dedicated irrigation technicians with minimum three years commercial maintenance experience and current industry-recognized certifications, daily litter patrols, monthly pest and disease inspections with reports due on time, and monthly irrigation inspections with 95 percent minimum coverage efficiency. All deficiencies must be corrected within two business days unless otherwise specified, with a required first inspection pass rate of 90 percent minimum.
Performance accountability is enforced through specific Key Performance Indicators (KPIs) for each service category, including a 95 percent or greater passing inspection rate for mowing, 95 percent weed-free ratings, 95 percent plant material maintenance compliance, less than 10 percent nutrient-deficiency symptoms in turf and plant material, less than 2 percent plant loss due to preventable pests or disease, 95 percent operational irrigation system uptime, 95 percent mulch coverage and material-quality compliance, and less than five pieces of litter observed per acre during inspections. The contractor must submit weekly rosters documenting which employees completed specific tasks and crew assignments, daily work tickets including date of service, weather conditions, tasks completed, quantities of trees and palms trimmed, and chemical application details, and complete monthly reports on time. Inspections are conducted daily by the Landscape Contract Compliance team, with herbicide applications, pest control treatments, and all material applications requiring advance authorization and documentation by the Aviation Authority Authorized Representative (AAR).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Grounds_Maintenance_and_Irrigation.pdf | ||
| Map_4_South_Parking_Lots.pdf | ||
| GOAA_Specification_No._02810.pdf | ||
| Map_3_North_Parking_Lots.pdf | ||
| Map_2.pdf | ||
| Map_1.pdf | ||
| Descriptive_Inventory.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
27-167-ITN Terminals A&B Landside and Cargo Rd Grounds Maintenance and Irrigation – SLAs and Performance Standard
Service Level Standards and Key Performance Indicators Inspections will be done daily by the Landscape Contract Compliance (LCC) team.
1. Mowing
Performance Metric Service Level
Mowing Cycle Compliance 100% completion within specified cycle
April-October Frequency Every seven (7) calendar days
November-March Frequency Every fourteen (14) calendar days
Turf Height Maintain between 3-4 inches
Scalping/Gouging Zero (0) occurrences
Mowing Pattern Alter periodically to prevent rutting
Mower Safety Devices Chutes, guards, and shields intact and in operating position
Pre-Mowing Policing 100% litter and debris removal before mowing
• KPI: 95% or greater passing inspection rate.
2. Edging and Trimming
Sidewalk/Curb Edging Every mowing cycle
Tree Ring and Bed-Line Edging Every mowing cycle
Structures and Appurtenances Trim around poles, signs, hydrants, fences, guardrails, and drainage structures each cycle
Equipment Guards Factory-installed guards required on edgers and line trimmers
Surface Cleanliness 100% removal of generated clippings and debris
Property/Vegetation Damage Repair or replace promptly at Contractor expense
• KPI: No visible overgrowth or encroachment at inspection
3. Weed Control
Landscape Bed Weed Coverage Less than 5%
Pavement Crack Weeds 0 visible weeds
Herbicide Applications As needed and only after AAR approval of products and rates
Spray Indicator Dye Required; color approved by AAR
Bed Hand Weeding Each weeding cycle, as required
Drainage Ditches and Inlets Free of nuisance weeds and obstructions
Application Conditions Weather, wind speed, and wind direction documented
PPE Compliance Chemical-resistant boots and gloves, long-sleeved shirt, long pants, and label-required PPE
• KPI: 95% weed-free rating during inspections
4. Shrub and Groundcover Maintenance
Shrub Pruning Monthly minimum
Groundcover Trimming As required to promote healthy lateral growth
Hardscape Encroachment No extension onto concrete, asphalt, sidewalks, curbs, or roadways
Sight-Line/Sign Obstruction 0 occurrences
Dead Material Removal Within seven (7) days of observation
Staking and Guying Maintain while needed; remove promptly after plant establishment
• KPI: 95% of plant material maintained to intended form and designated bed limits
5. Fertilization
Turf Fertilization Minimum two (2) applications per year
Seasonal Timing One application before and one after Orange County blackout dates of June 1-September 30
Shrub and Groundcover Fertilization Spring and fall at 1.5-3.0 lbs. per 100 sq. ft., subject to soil-test recommendations
Palm Fertilization Spring and fall
Fertilization Schedule Submit within thirty (30) days of Contract start
Advance Notification Seven (7) calendar days prior
Application Equipment Rotary spreader
Hard-Surface Cleanup Promptly sweep or blow excess material into turf areas
Application Signage Maintain for 24-hours after application, then remove as required by law
Damage Correction Replace material damaged by fertilizer, herbicide, drift, or overspray within one (1) week
• KPI: Maintain green, healthy turf and plant material with less than 10% nutrient-deficiency symptoms
6. Pest and Disease Management
Site Inspections Monthly; 12 per year
Monthly Report 100% on-time submission
Palm Weevil Preventative Treatment Minimum two (2) times per year
Disease/Insect Response Within five (5) business days of identification
Follow-Up Treatments Every 7-10 days at no additional cost until resolved
CPO Oversight Current appropriately licensed Certified Pest Control Operator on site to oversee applications
Primary Spray Technician
Valid FDACS Limited Certification in Lawn and Ornamental Pest Control; minimum three (3) years similar experience
Certification Documentation Provide current licenses/certifications before work and upon renewal
• KPI: Less than 2% plant loss due to preventable pests or disease
7. Irrigation
Initial System Assessment Complete within forty-five (45) calendar days of Contract start
Contractor Responsibility
Beginning Day 46 for components and mainlines eight
(8) inches in diameter and smaller not identified in assessment
Irrigation Inspection Monthly minimum
Broken Mainline (8 inches and smaller) Repair within 24-hours
Electrical Valves/Controllers Repair within 48-hours
Broken Heads Repair within 48-hours
Broken/Damaged Valve Box Lids Replace promptly
Coverage Efficiency 95% minimum
Overspray Control No spray onto roadways, sidewalks, vehicles, pedestrians, or buildings
Monthly Maintenance Log 100% complete and on-time
• KPI: 95% operational irrigation system uptime defined as the percentage of irrigation zones functioning as designed during monthly inspections.
8. Mulch
Mulch Depth 3-inch minimum
Refresh Frequency Twice annually
Material Quality Clean and free of weeds, seeds, pests, fire ants, mold, mildew, decay, and deleterious material
Sample Approval Required before placement
Weed-Free Condition Maintain year-round
Response to Deficiency Within thirty (30) days
• KPI: 95% mulch coverage and material-quality compliance
9. Litter and Debris Removal
Dedicated Personnel Landscape/grounds maintenance technician(s) assigned
Litter Patrol Daily during Standard Work Hours
Water-Edge Debris Remove during each mowing cycle and daily as needed
Pre-Mowing Cleanup 100% compliance
Palm Frond/Hazardous Limb Removal Immediately upon observation or AAR notification
Debris Disposal Same day; off-site and legally disposed
End-of-Day Condition Work areas clean and free of waste, tools, equipment, and surplus material
• KPI: Less than five (5) pieces of litter observed per acre during inspections
10. Irrigation Staffing
Dedicated Irrigation Technicians Minimum two (2) full-time technicians assigned exclusively to the system
Experience Level Minimum three (3) years commercial irrigation maintenance and repair experience
Rain Bird Knowledge Required
Baseline Irrigation System Knowledge Required
Lead Technician Certification Current industry-recognized irrigation certification approved by AAR
Qualification Documentation Submit Lead Technician qualifications and certifications for AAR pre-approval
• KPI: 100% staffing and certification compliance. Rosters of which employees completed which tasks and what crews are responsible for which areas will be required weekly.
11. Inspection and Deficiency
Deficiency Correction Within two (2) business days unless a shorter period is specified
First Inspection Pass Rate 90% minimum
Re-Inspections Less than 5% of inspections
Daily Work Tickets Submitted daily – must include date of service, weather conditions, tasks completed, quantity of trees/palms trimmed, any additional work requested. Herbicide/pesticide/fertilizer quantities, application rates, amount used, products used, challenges
Monthly Reports Submitted complete and on time
Repeat Deficiencies Corrective Action Plan required when directed by AAR
• KPI: Achieve 90% or higher inspection score
| Service Level Standards and Key Performance Indicators |
| 2. Edging and Trimming |
| 3. Weed Control |
| 4. Shrub and Groundcover Maintenance |
| 5. Fertilization |
| 6. Pest and Disease Management |
| 7. Irrigation |
| 8. Mulch |
| 9. Litter and Debris Removal |
| 10. Irrigation Staffing |
| 11. Inspection and Deficiency |