Map_4_South_Parking_Lots.pdf
PDF 11 MB Posted
- Attached to
- Grounds Maintenance and Irrigation
- Solicitation number
- 27-167-ITN
- Issued by
- Orange County, Orlando City, Florida
About this file
This document is a landscape service area map prepared by the Greater Orlando Aviation Authority Planning & Engineering department for Orlando International Airport (MCO). The map delineates landscape service areas across three parking lot facilities: South Park Place Parking Lot, South Cell Parking Lot, and South Employee Parking Lot. Each parking lot is subdivided into numbered landscape service zones (designated as C-01 through C-49 for South Park Place, E-01 through E-08 for South Cell, and F-01 through F-11 for South Employee Parking Lot) to facilitate comprehensive grounds maintenance and irrigation management. The map includes a key identifying AOA boundary lines, overall contract coverage areas, tenant leaseholds where applicable, motorcycle parking areas, fire lanes, and guard shack locations. The aerial imagery is dated January 2022, with the map created and last revised on May 3, 2023 (Project No. T-5487). The maps are presented at various graphic scales in feet to provide clear spatial reference for contractors.
These landscape service area maps serve as reference documents for the broader 60-month grounds maintenance and irrigation performance-based contract anticipated to commence February 1, 2027, at Orlando International Airport. The contract encompasses landscaping services for multiple airport facilities including Terminals A and B Landside Grounds, Cargo Road, North Parking Lots, and South Parking Lots. The contractor selected will be responsible for all labor, equipment, materials, permits, and resources necessary to maintain landscape assets to best-in-class standards while optimizing water use and ensuring public safety. The Greater Orlando Aviation Authority reserves the right to award the contract to one or multiple respondents for individual service areas or any combination thereof, with actual service frequencies and quantities subject to adjustment based on site conditions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Grounds_Maintenance_and_Irrigation.pdf | ||
| GOAA_Specification_No._02810.pdf | ||
| Map_3_North_Parking_Lots.pdf | ||
| Map_2.pdf | ||
| SLAs_and_KPIs.pdf | ||
| Map_1.pdf | ||
| Descriptive_Inventory.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
. JEFF FU
Q U
A B
LV
D
S. JEFF FU
Q
U A
B
LV
D
SOUTH PARK PLACE
5/ 3/
T :\P ro je ct s\
M ai nt en an ce
\M ow in g\
T-
_P
AR
KI
N G
M O
W A
R
EA
S.
dw g
OF
PROJECT NO.:
REQUESTED BY:
DRAWN BY:
CHECKED BY:
DATE CREATED:
REFERENCE INFO
SHEET NO.
DATE CHANGE
LAST REVISED
REVISION HISTORY
NTS
KEY MAP
GRAPHIC SCALE IN FEET
TITLE
N
S
W E
GOAA
PLANNING & ENGINEERING
««MCO««
ORLANDO
INTERNATIONAL
AIRPORT
GREATER ORLANDO
AVIATION AUTHORITY
SOUTH PARK PLACE PARKING LOT
LANDSCAPE SERVICE AREAS
100 200
5/3/23 T-5487
DP
OV
DP
4/18/2023
3 6
AERIAL DATE: JAN 2022
C-32
C-13
C-14
C-15
C-16
C-02
C-03
C-04
C-05
C-06
C-07
C-08
C-01
C-10 C-11 C-18
C-17
C-19 C-20
C-21 C-22
C-27
C-28
C-30 C-31
C-33 C-34
C-38C-37 C-36
C-49
C-48
C-26
C-41
C-42
C-43
C-44
C-45
C-46
C-47
C-35
C-39 C-40
C-29
C-12
C-23 C-24 C-25
C-09
LEGEND
AOA BOUNDARY LINE
OVERALL CONTRACT COVERAGE
LANDSCAPE SERVICES
Q U
A B
LV
D
X
XXXXXXXXXX
X
X X
X X
X X
X X
X X
X
X
X
X
X
XXXXXXXXXX
X
X X
X X
X X
X X
M O
TO
R
C
YC
LE PAR
KIN
G
S. JEFF FU
Q
U A
B
LV
D
SOUTH PARK PLACE
5/ 3/
T :\P ro je ct s\
M ai nt en an ce
\M ow in g\
T-
_P
AR
KI
N G
M O
W A
R
EA
S.
dw g
OF
NTS
GRAPHIC SCALE IN FEET
PROJECT NO.:
REQUESTED BY:
DRAWN BY:
CHECKED BY:
DATE CREATED:
REFERENCE INFO
TITLE
KEY MAP
SHEET NO.
DATE CHANGE
LAST REVISED
REVISION HISTORY
GOAA
««MCO««
ORLANDO
INTERNATIONAL
AIRPORT
PLANNING & ENGINEERING
GREATER ORLANDO
AVIATION AUTHORITY
N
S
W E
40 80
SOUTH CELL
PARKING LOT
LANDSCAPE
SERVICE AREAS
5/3/23
T-5487
DP
OV
DP
4/18/2023
5 6AERIAL DATE: JAN 2022
E-01
E-04
E-02
E-08
E-05
E-07
E-06
E-03
LEGEND
TENANT LEASEHOLD
OVERALL CONTRACT COVERAGE
LANDSCAPE SERVICES
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text
NO PARKING FIRE LANE
Q U
A B
LV
D
X X X X X
X X
XXXXXXX
X
X X
X X
X X
X
X
X
XXXXXXX
X X
X X
X X
X X
X X
X X
XXXXX
X X
X X
X X
X X
X
XXXXXXXXX
X
X X
XXX
X
X
X
X
XXX
X
X X
X X
X
X
X
X X
X X X
X
X
XXXXXXXXXXXXXXXX
GUARD
SHACK
M O
TO
R
C
YC
LE PAR
KIN
G
N
. JEFF FU
Q U
A B
LVD
S. JEFF FU
Q
U
A BLVD
5/ 3/
T :\P ro je ct s\
M ai nt en an ce
\M ow in g\
T-
_P
AR
KI
N G
M O
W A
R
EA
S.
dw g
OF
NTS
GRAPHIC SCALE IN FEET
PROJECT NO.:
REQUESTED BY:
DRAWN BY:
CHECKED BY:
DATE CREATED:
REFERENCE INFO
TITLE
KEY MAP
SHEET NO.
DATE CHANGE
LAST REVISED
REVISION HISTORY
GOAA
««MCO««
ORLANDO
INTERNATIONAL
AIRPORT
PLANNING & ENGINEERING
GREATER ORLANDO
AVIATION AUTHORITY
N
S
W E
60 120
SOUTH EMPLOYEE
PARKING LOT
LANDSCAPE
SERVICE AREAS
5/3/23
T-5487
DP
OV
DP
4/18/2023
6 6AERIAL DATE: JAN 2022
F-05
F-01 F-02
F-03
F-04
F-10
F-11
F-06
F-09 F-07 F-08
LEGEND
AOA BOUNDARY LINE
OVERALL CONTRACT COVERAGE
LANDSCAPE SERVICES
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text
NO PARKING FIRE LANE
AutoCAD SHX Text
NO PARKING FIRE LANE
AutoCAD SHX Text
NO PARKING FIRE LANE
AutoCAD SHX Text
NO PARKING FIRE LANE
AutoCAD SHX Text
NO PARKING FIRE LANE
File details come from the government source that posted it. Updated .