This is a specification document for grounds maintenance and irrigation services required by the Greater Orlando Aviation Authority (GOAA) for Orlando International Airport (MCO) in Florida. The solicitation seeks comprehensive grounds maintenance and irrigation management services for Terminals A and B Landside Grounds, Cargo Road, North Parking Lots, and South Parking Lots, with services to be provided in accordance with industry best practices and focused on measurable performance outcomes. The contract will be a 60-month performance-based agreement commencing on or about February 1, 2027. The awarded respondent(s) shall provide all necessary labor, supervision, management, equipment, vehicles, tools, materials, supplies, permits, licenses, chemicals, and other resources required for comprehensive grounds maintenance and irrigation management. All landscape assets must meet appearance standards and be maintained at an acceptable quality level at all times, with service frequencies and quantities subject to adjustment based on actual site conditions. The Aviation Authority reserves the right to approve one or multiple awards for individual service areas, groups of service areas, or any combination thereof.
The specification emphasizes that actual conditions may cause the stated service frequencies and quantities to differ from estimates, and such discrepancies do not relieve the contractor from its contractual obligations. The Aviation Authority is only obligated to pay for services specifically authorized, satisfactorily performed, and accepted by the Aviation Authority Authorized Representative. The specification does not identify specific pricing terms, set-asides, incumbent contractors, or funding sources and amounts. Respondents should note that this solicitation focuses on performance-based metrics including maximizing asset life, optimizing water use, enhancing operational efficiency, and ensuring public safety while maintaining a best-in-class environment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Grounds_Maintenance_and_Irrigation.pdf | ||
| Map_4_South_Parking_Lots.pdf | ||
| Map_3_North_Parking_Lots.pdf | ||
| Map_2.pdf | ||
| SLAs_and_KPIs.pdf | ||
| Map_1.pdf | ||
| Descriptive_Inventory.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 02810 - UNDERGROUND IRRIGATION
SYSTEMS
Standard Construction Specification
PART 1 - GENERAL
1.1 SCOPE OF WORK
A. The Contractor shall provide all labor, materials, equipment, trenching, piping, wiring, fittings, backfilling, and testing necessary to deliver a fully operable landscape irrigation system as outlined in the contract documents.
B. The system shall be installed complete with automated controls, backflow prevention, and distribution components tailored to the site landscape layout.
1.2 DESIGN & LICENSING REQUIREMENTS
A. All irrigation systems must be designed by a licensed Landscape Architect or a certified Professional Irrigation Designer.
B. Installation shall be performed exclusively by an irrigation contractor holding a valid license required by the local municipality or governing jurisdiction.
1.3 SUBMITTALS & RECORD DRAWINGS
A. Product Data: Submit manufacturer's technical specifications and installation instructions for all pipes, valves, controllers, and sprinkler heads.
B. As-Built (Record) Drawings: Upon system completion and prior to final acceptance, the Contractor shall provide a scaled, accurate record layout showing the exact routing of mainlines, lateral lines, and positions of all valves and controllers.
C. Certifications: Submit valid backflow assembly tester certificates prior to system activation.
PART 2 - PRODUCTS
2.1 PIPING & MATERIALS
A. Mainlines: Shall be Schedule 40 plastic/PVC (polyvinyl chloride) or approved equivalent. Trace wire must be installed continuously along all mainline piping.
B. Lateral Lines: Shall be Schedule 40 PVC or approved flexible polyethylene pipe depending on regional temperature variations and project guidelines.
2.2 VALVES & BACKFLOW PREVENTION
A. Backflow Preventers: Must comply with local municipal codes, be properly insulated (e.g., using aluminum radiant barrier tape), and be paired with downstream filtration units.
B. Control Valves: Industrial-grade plastic or brass electrical remote control valves (e.g., Rain Bird 150PESB or approved equivalent).
C. Isolation Valves: Gate valves are strictly prohibited; heavy-duty bronze or PVC ball valves shall be used for system isolation.
2.3 CONTROLLERS
A. Automatic Controllers: Automated smart controllers with integrated solar/photovoltaic energy capabilities (such as DIG Corp LEIT series or approved Toro equivalents) capable of autonomous operation and weather-based adjustments.
PART 3 - EXECUTION
3.1 TRENCHING & BEDDING
A. Excavation: Trenches must be dug clean and wide enough to accommodate piping without binding.
B. Pipe Bedding: Provide a uniform bedding consisting of a minimum of 2 to 6 inches of clean sand or fine earth directly around and above the pipe to prevent rock punctures during backfilling.
3.2 TESTING & CLEANING
A. Hydrostatic Testing: Flush all mainlines clean of debris and pressure test at a minimum of 150 PSI (or 1.5 times the operating pressure) for a minimum of 2 hours prior to backfilling over joints.
B. Adjustments: Adjust all sprinkler heads and nozzles to provide optimum coverage with zero overspray onto hardscapes, sidewalks, or building facades.