This is a set of engineering drawings from EnviroSolutions Inc. detailing site excavation and construction plans for a gas station along Highway M-115. The plans show excavation layouts, traffic control measures, and technical specifications for removing and replacing gas station infrastructure including underground storage tanks, fuel dispensers, and concrete work. The drawings include detailed cross-sections showing proposed excavation depths, surface restoration requirements, and specifications for a new concrete pad and canopy foundation.
The drawings indicate various construction zones coded in different colors showing areas requiring concrete removal (shown in gray), gravel placement (shown in green), and asphalt work (shown in orange). Technical specifications include requirements for backfill material (MDOT Class II sand), concrete strength requirements (3,500 PSI minimum), and detailed dimensions for the canopy footing (5'0" x 5'0" x 5'-2"). Traffic control plans show temporary lane closures and traffic pattern modifications required during construction. The plans also detail the reuse of existing fuel dispensing equipment and underground storage tanks while replacing associated piping and safety systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| App VIII DLARA Forms.pdf | ||
| Advertisement 15266.pdf | ||
| Chucks Corner DC Specs (12-19-17).pdf | ||
| Addendum 2.pdf | ||
| App VI RI Report - Part 1.pdf | ||
| Addendum 1.pdf | ||
| App VI RI Report - Part 2.pdf | ||
| App VII MDOT Permit and Dwgs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheets 1 through 9
| SHEET-1 (EXCAVATION LAYOUT) |
| SHEET-2 (EXCAVATION LAYOUT - AERIAL) |
| SHEET-3 (SURFACE RESTORATION DETAILS) |
| SHEET-4 (TRAFFIC CONTROL PLAN - EXISTING PAVEMENT MARKINGS) |
| SHEET-5 (TRAFFIC CONTROL PLAN - AERIAL) 12-7-17 |
| SHEET-6 (REMOVAL CROSS-SECTION) 11-30-17 |
| SHEET-7 (SITE RESTORATION CROSS-SECTION) 12-6-17 |
| SHEET-8 (TYPICAL GASOLINE DISPENSING SYSTEM CONSTRUCTION DIAGRAM) |
SHEET-9 (CANOPY FOOTING DIAGRAM)_FINAL