Sheets 1 through 9.pdf

PDF 673 KB Posted

Attached to
Chuck's Corner - Remedial Investigation 761/15266. SAR
Solicitation number
RFQ-171-180000000260-3
Issued by
Oscoda County, Michigan

About this file

This is a set of engineering drawings from EnviroSolutions Inc. detailing site excavation and construction plans for a gas station along Highway M-115. The plans show excavation layouts, traffic control measures, and technical specifications for removing and replacing gas station infrastructure including underground storage tanks, fuel dispensers, and concrete work. The drawings include detailed cross-sections showing proposed excavation depths, surface restoration requirements, and specifications for a new concrete pad and canopy foundation.

The drawings indicate various construction zones coded in different colors showing areas requiring concrete removal (shown in gray), gravel placement (shown in green), and asphalt work (shown in orange). Technical specifications include requirements for backfill material (MDOT Class II sand), concrete strength requirements (3,500 PSI minimum), and detailed dimensions for the canopy footing (5'0" x 5'0" x 5'-2"). Traffic control plans show temporary lane closures and traffic pattern modifications required during construction. The plans also detail the reuse of existing fuel dispensing equipment and underground storage tanks while replacing associated piping and safety systems.

View the file

Other files

File Type Posted
App VIII DLARA Forms.pdf PDF
Advertisement 15266.pdf PDF
Chucks Corner DC Specs (12-19-17).pdf PDF
Addendum 2.pdf PDF
App VI RI Report - Part 1.pdf PDF
Addendum 1.pdf PDF
App VI RI Report - Part 2.pdf PDF
App VII MDOT Permit and Dwgs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheets 1 through 9

SHEET-1 (EXCAVATION LAYOUT)
SHEET-2 (EXCAVATION LAYOUT - AERIAL)
SHEET-3 (SURFACE RESTORATION DETAILS)
SHEET-4 (TRAFFIC CONTROL PLAN - EXISTING PAVEMENT MARKINGS)
SHEET-5 (TRAFFIC CONTROL PLAN - AERIAL) 12-7-17
SHEET-6 (REMOVAL CROSS-SECTION) 11-30-17
SHEET-7 (SITE RESTORATION CROSS-SECTION) 12-6-17
SHEET-8 (TYPICAL GASOLINE DISPENSING SYSTEM CONSTRUCTION DIAGRAM)

SHEET-9 (CANOPY FOOTING DIAGRAM)_FINAL