This is Addendum No. 1 issued by the Michigan Department of Technology, Management and Budget State Facilities Administration for the Chuck's Corner Site project in Marion, MI (File No. 761/15266.SAR). The bid opening date is January 24, 2018. The addendum modifies the bidding documents to update the contact person for inquiries to Alicia McNeil at amcneil@envirosolutionsinc.net, with questions accepted until January 12, 2018 at 2:00 PM Local Time.
The addendum includes prevailing wage rates to be added to Appendix V, Underground Storage Tank registration information and schematic drawings for reference, and the Pre-Bid Meeting Sign-In sheet. The schematic drawings show the site layout including a 75' x 30' canopied area with gas pumps, tanks, and other station equipment at 15057 M-115 Highway in Marion. According to the tank registration information, there were multiple underground storage tanks for gasoline, kerosene and diesel ranging from 2,000-12,000 gallon capacity that were previously removed from the ground in 1998. Bidders must acknowledge this addendum in the Bid Summary Form for submission of a valid bid.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| App VIII DLARA Forms.pdf | ||
| Advertisement 15266.pdf | ||
| Chucks Corner DC Specs (12-19-17).pdf | ||
| Addendum 2.pdf | ||
| App VI RI Report - Part 1.pdf | ||
| App VI RI Report - Part 2.pdf | ||
| App VII MDOT Permit and Dwgs.pdf | ||
| Sheets 1 through 9.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (R 1/15)
STATE OF MICHIGAN Date Issued: January 9, 2018 Department of Technology, Management and Budget Index No(s): 44301 State Facilities Administration File No: 761/15266.SAR 3111 W. St. Joseph Street Department: Environmental Quality Lansing, Michigan 48917 Project Name: Chuck’s Corner Site Marion, MI Subject: Addendum to Bidding Documents
Bid Opening Date: January 24, 2018
ADDENDUM NO. 1
TO: All Bidders
SUBJECT: Addendum to Bidding Documents Chuck’s Corner Site Marion, MI
INTENT: This Addendum is issued to modify the previously issued Bidding Documents.
Item 1 – Section 00010 Pre-Bid Information, Article 8 Contact Person shall be modified as follows: All requests or inquiries concerning the Bidding Documents or the Work must be addressed to: Alicia McNeil at amcneil@envirosolutionsinc.net. Questions will be accepted until January 12, 2018 at 2:00 PM Local Time.
Item 2 – The attached prevailing wage rates shall be included in Appendix V – Prevailing Wage Rates of the Bidding Documents.
Item 3 – The attached Underground Storage Tank registration information and schematic are provided for informational purposes.
Item 4 – The Pre-Bid Meeting Sign-In sheet is attached for informational purposes.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the bidder in the space provided in the Bid Summary Form submitted with the bidder's bid for submission of a valid bid. The changes and information shall become part of the contract documents. (Authority: 1984 PA 431) mailto:amcneil@envirosolutionsinc.net
STATE OF MICHIGAN
Wage and Hour Division
P.O. Box 30476 Lansing, Michigan 48909-7976 Toll Free: 1-855-4MI-WAGE (1-855-464-9243) www.michigan.gov/wagehour
Informational Sheet: Prevailing Wages on State Projects
P a g e | 1 of 10
REQUIREMENTS OF
THE PREVAILING WAGES ON STATE PROJECTS ACT, PUBLIC ACT 166 OF 1965
The State of Michigan determines prevailing rates pursuant to the Prevailing Wages on State Projects Act, Public Act 166 of 1965, as amended. The purpose of establishing prevailing rates is to provide minimum rates of pay that must be paid to workers on construction projects for which the state or a school district is the contracting agent and which is financed or financially supported by the state. By law, prevailing rates are compiled from the rates contained in collectively bargained agreements which cover the locations of the state projects. The official prevailing rate schedule provides an hourly rate which includes wage and fringe benefit totals for designated construction mechanic classifications. The overtime rates also include wage and fringe benefit totals. Please pay special attention to the overtime and premium pay requirements. Prevailing wage is satisfied when wages plus fringe benefits paid to a worker are equal to or greater than the required rate.
State of Michigan responsibilities under the law:
• The department establishes the prevailing rate for each classification of construction mechanic requested by a contracting agent prior to contracts being let out for bid on a state project.
Contracting agent responsibilities under the law:
• If a contract is not awarded or construction does not start within 90 days of the date of the issuance of rates, a re- determination of rates must be requested by the contracting agent.
• Rates for classifications needed but not provided on the Prevailing Rate Schedule, must be obtained prior to contracts being let out for bid on a state project.
• The contracting agent, by written notice to the contractor and the sureties of the contractor known to the contracting agent, may terminate the contractor's right to proceed with that part of the contract, for which less than the prevailing rates have been or will be paid, and may proceed to complete the contract by separate agreement with another contractor or otherwise, and the original contractor and his sureties shall be liable to the contracting agent for any excess costs occasioned thereby.
Contractor responsibilities under the law:
• Every contractor and subcontractor shall keep posted on the construction site, in a conspicuous place, a copy of all prevailing rates prescribed in a contract.
• Every contractor and subcontractor shall keep an accurate record showing the name and occupation of and the actual wages and benefits paid to each construction mechanic. This record shall be available for reasonable inspection by the contracting agent or the department.
• Each contractor or subcontractor is separately liable for the payment of the prevailing rate to its employees.
• The prime contractor is responsible for advising all subcontractors of the requirement to pay the prevailing rate prior to commencement of work.
• A construction mechanic shall only be paid the apprentice rate if registered with the United States Department of
Labor, Bureau of Apprenticeship and Training and the rate is included in the contract.
Enforcement:
A person who has information of an alleged prevailing wage violation on a state project may file a complaint with the State of Michigan. The department will investigate and attempt to resolve the complaint informally. During the course of an investigation, if the requested records and posting certification are not made available in compliance with Section 5 of Act 166, the investigation will be concluded and a referral may be made to the local prosecuting attorney.
P.O. Box 30476 Lansing, Michigan 48909-7976 Toll Free: 1-855-4MI-WAGE (1-855-464-9243)
P a g e | 2 of 10
General Information Regarding Fringe Benefits Certain fringe benefits may be credited toward the payment of the Prevailing Wage Rate:
o If a fringe benefit is paid directly to a construction mechanic o If a fringe benefit contribution or payment is made on behalf of a construction mechanic o If a fringe benefit, which may be provided to a construction mechanic, is pursuant to a written contract or policy o If a fringe benefit is paid into a fund, for a construction mechanic
When a fringe benefit is not paid by an hourly rate, the hourly credit will be calculated based on the annual value of the fringe benefit divided by 2080 hours per year (52 weeks @ 40 hours per week).
The following is an example of the types of fringe benefits allowed and how an hourly credit is calculated:
Vacation 40 hours X $14.00 per hour = $560/2080 = $.27 Dental insurance $31.07 monthly premium X 12 mos. = $372.84 /2080 = $.18 Vision insurance $5.38 monthly premium X 12 mos. = $64.56/2080 = $.03 Health insurance $230.00 monthly premium X 12 mos. = $2,760.00/2080 = $1.33 Life insurance $27.04 monthly premium X 12 mos. = $324.48/2080 = $.16 Tuition $500.00 annual cost/2080 = $.24 Bonus 4 quarterly bonus/year x $250 = $1000.00/2080 = $.48 401k Employer Contribution $2000.00 total annual contribution/2080 = $.96
Total Hourly Credit $3.65 Other examples of the types of fringe benefits allowed:
Sick pay Holiday pay Accidental Death & Dismemberment insurance premiums
The following are examples of items that will not be credited toward the payment of the Prevailing Wage Rate o Legally required payments, such as:
Unemployment Insurance payments Workers’ Compensation Insurance payments FICA (Social Security contributions, Medicare contributions) o Reimbursable expenses, such as:
Clothing allowance or reimbursement Uniform allowance or reimbursement Gas allowance or reimbursement Travel time or payment Meals or lodging allowance or reimbursement Per diem allowance or payment o Other payments to or on behalf of a construction mechanic that are not wages or fringe benefits, such as:
Industry advancement funds Financial or material loans
P.O. Box 30476 Lansing, Michigan 48909-7976 Toll Free: 1-855-4MI-WAGE (1-855-464-9243)
P a g e | 3 of 10
OVERTIME PROVISIONS for MICHIGAN PREVAILING WAGE RATE COMMERCIAL SCHEDULE
1. Overtime is represented as a nine character code. Each character represents a certain period of time after the first 8 hours Monday thru Friday.
Monday thru Friday Saturday Sunday & Holidays
Four 10s First 8 Hours 4
8 9 9th Hour 1 5 10th Hour 2 6 Over 10 hours 3 7
Overtime for Monday thru Friday after 8 hours:
the 1st character is for time worked in the 9th hour (8.1 - 9 hours) the 2nd character is for time worked in the 10th hour (9.1 - 10 hours) the 3rd character is for time worked beyond the 10th hour (10.1 and beyond)
Overtime on Saturday:
the 4th character is for time worked in the first 8 hours on Saturday (0 - 8 hours) the 5th character is for time worked in the 9th hour on Saturday (8.1 - 9 hours) the 6th character is for time worked in the 10th hour (9.1 - 10 hours) the 7th character is for time worked beyond the 10th hour (10.01 and beyond)
Overtime on Sundays & Holidays The 8th character is for time worked on Sunday or on a holiday
Four Ten Hour Days The 9th character indicates if an optional 4-day 10-hour per day workweek can be worked between Monday and Friday without paying overtime after 8 hours worked, unless otherwise noted in the rate schedule. To utilize a 4 ten workweek, notice is required from the employer to employee prior to the start of work on the project.
2. Overtime Indicators Used in the Overtime Provision:
H - means TIME AND ONE-HALF due X - means TIME AND ONE-HALF due after 40 HOURS worked D - means DOUBLE PAY due Y - means YES an optional 4-day 10-hour per day workweek can be worked without paying overtime after 8 hours worked N - means NO an optional 4-day 10-hour per day workweek cannot be worked without paying overtime after 8 hours worked
3. EXAMPLES:
HHHHHHHDN - This example shows that the 1½ rate must be used for time worked after 8 hours Monday thru Friday (characters 1 - 3); for all hours worked on Saturday, 1½ rate is due (characters 4 - 7). Work done on Sundays or holidays must be paid double time (character 8). The N (character 9) indicates that 4 ten-hour days is not an acceptable workweek at regular pay.
XXXHHHHDY - This example shows that the 1½ rate must be used for time worked after 40 hours are worked Monday thru Friday (characters 1-3); for hours worked on Saturday, 1½ rate is due (characters 4 – 7). Work done on Sundays or holidays must be paid double time (character 8). The Y (character 9) indicates that 4 ten-hour days is an acceptable alternative workweek.
P.O. Box 30476 Lansing, Michigan 48909-7976 Toll Free: 1-855-4MI-WAGE (1-855-464-9243)
P a g e | 4 of 10
ENGINEERS - CLASSES OF EQUIPMENT LIST
UNDERGROUND ENGINEERS
CLASS I
Backfiller Tamper, Backhoe, Batch Plant Operator, Clam-Shell, Concrete Paver (2 drums or larger), Conveyor Loader (Euclid type), Crane (crawler, truck type or pile driving), Dozer, Dragline, Elevating Grader, End Loader, Gradall (and similar type machine), Grader, Power Shovel, Roller (asphalt), Scraper (self propelled or tractor drawn), Side Broom Tractor (type D-4 or larger), Slope Paver, Trencher (over 8’ digging capacity), Well Drilling Rig, Mechanic, Slip Form Paver, Hydro Excavator.
CLASS II
Boom Truck (power swing type boom), Crusher, Hoist, Pump (1 or more 6" discharge or larger gas or diesel powered by generator of 300 amps or more, inclusive of generator), Side Boom Tractor (smaller than type D-4 or equivalent), Tractor (pneu-tired, other than backhoe or front end loader), Trencher (8’ digging capacity and smaller), Vac Truck.
CLASS III
Air Compressors (600 cfm or larger), Air Compressors (2 or more less than 600 cfm), Boom Truck (non-swinging, non-powered type boom), Concrete Breaker (self-propelled or truck mounted, includes compressor), Concrete Paver (1 drum, ½ yard or larger), Elevator (other than passenger), Maintenance Man, Mechanic Helper, Pump (2 or more 4" up to 6" discharge, gas or diesel powered, excluding submersible pump), Pumpcrete Machine (and similar equipment), Wagon Drill Machine, Welding Machine or Generator (2 or more 300 amp or larger, gas or diesel powered).
CLASS IV
Boiler, Concrete Saw (40HP or over), Curing Machine (self-propelled), Farm Tractor (w/attachment), Finishing Machine (concrete), Firemen, Hydraulic Pipe Pushing Machine, Mulching Equipment, Oiler (2 or more up to 4", exclude submersible), Pumps (2 or more up to 4" discharge if used 3 hrs or more a day-gas or diesel powered, excluding submersible pumps), Roller (other than asphalt), Stump Remover, Vibrating Compaction Equipment (6’ wide or over), Trencher (service) Sweeper (Wayne type and similar equipment), Water Wagon, Extend-a-Boom Forklift.
HAZARDOUS WASTE ABATEMENT ENGINEERS
CLASS I
Backhoe, Batch Plant Operator, Clamshell, Concrete Breaker when attached to hoe, Concrete Cleaning Decontamination Machine Operator, Concrete Pump, Concrete Paver, Crusher, Dozer, Elevating Grader, Endloader, Farm Tractor (90 h.p. and higher), Gradall, Grader, Heavy Equipment Robotics Operator, Hydro Excavator, Loader, Pug Mill, Pumpcrete Machines, Pump Trucks, Roller, Scraper (self-propelled or tractor drawn), Side Boom Tractor, Slip Form Paver, Slope Paver, Trencher, Ultra High Pressure Waterjet Cutting Tool System Operator, Vactors, Vacuum Blasting Machine Operator, Vertical Lifting Hoist, Vibrating Compaction Equipment (self-propelled), and Well Drilling Rig.
CLASS II
Air Compressor, Concrete Breaker when not attached to hoe, Elevator, End Dumps, Equipment Decontamination Operator, Farm Tractor (less than 90 h.p.), Forklift, Generator, Heater, Mulcher, Pigs (Portable Reagent Storage Tanks), Power Screens, Pumps (water), Stationary Compressed Air Plant, Sweeper, Water Wagon and Welding Machine.
P.O. Box 30476 Lansing, Michigan 48909-7976 Toll Free: 1-855-4MI-WAGE (1-855-464-9243)
P a g e | 5 of 10
CARPENTER CRAFT JURISDICTION
Michigan recognizes the Carpenters for any and all work related to weatherization that has historically been the work of the Carpenter. This work shall include, but not be limited to: all work defined under the Federal Weatherization Assistance Program.
The jurisdiction of Carpenters, as to all work that has historically and traditionally been performed consisting of the milling, fashioning, joining, assembling, erecting, fastening or dismantling of all materials of wood, plastic, metal, fiber, cork, or composition and all other substitute materials, as well as the handling, cleaning, erecting, installing and dismantling of all machinery, equipment and all materials used by Carpenters.
The jurisdiction, therefore, extends over the following divisions and subdivisions of the trade: Carpenters and Joiners, Millwrights, Pile Drivers, Bridge, Dock and Wharf Carpenters, Underpinners, Timbermen, and Core-drillers, Shipwrights, Boat Builders, Ship- hand, Stair-Builders, Millmen, Wood and Resilient Floor Decorators, Floor Finishers, Carpet-layers, Shinglers, Siders, Insulators, Acoustic and Drywall Applicators, Sharers and House Movers, Loggers, Lumber and Sawmill Workers, Reed and Rattan Workers, Shingle Weavers, Casket and Coffin Makers, Railroad Carpenters and Car Builders, regardless of material used and all those engaged in the operation of woodworking or other machinery required in fashioning, milling or manufacturing of products used in the trade, and the handling, erecting and installing materials on any of the above divisions or sub-divisions, burning, welding and rigging incidental to the trade. When the term "Carpenter and Joiner" is used, it shall mean all the subdivisions of the trade. The trade autonomy of Carpenters therefore extends over the divisions and subdivisions of the trade, which are set forth as follows:
(a) The framing, erecting and prefabrication of roofs, partitions, floors and other parts of buildings of wood, metal, plastic or other substitutes; application of all metal flashing used for hips, valleys and chimneys; the erection of Stran Steel section or its equal. The building and setting of all forms and centers for brick and masonry. The fabrication and erection of all forms for concrete and decking, the dismantling of same (as per International Agreement) when they are to be re-used on the job or stored for re-use. The cutting and handling of all falsework for fireproofing and slabs. Where power is used in the setting or dismantling of forms, all signaling and handling shall be done by carpenters. The setting of templates for anchor bolts for structural members and for machinery, and the placing, leveling and bracing of these bolts. All framing in connection with the setting or metal columns. The setting of all bulkheads, footing forms and the setting of and fabrication of, screeds and stakes for concrete and mastic floors where the screed is notched or fitted, or made up of more than one member. The making of forms for concrete block, bulkheads, figures, posts, rails, balusters and ornaments, etc.
(b) The handling and erecting of rough material and drywall, the handling, assembly, setting and leveling of all fixtures, display cases, all furniture such as tables, chairs, desks, coat racks, etc., all de-mountable or moveable partitions such as Von wall, E Wall, Steel Case, Herman Miller, Haworth, American Seating, Westinghouse, Lazy Boy, rosewood, etc. All rebuilding, remodeling and setting up of all kinds of partitions, finished lumber, metal and plastic trim to be erected by Carpenters shall be handled from the truck or vehicle delivering same to the job by Carpenters.
P.O. Box 30476 Lansing, Michigan 48909-7976 Toll Free: 1-855-4MI-WAGE (1-855-464-9243)
P a g e | 6 of 10
(c) The building and moving of all scaffolding runways and staging where carpenters' tools are used, the building from the ground up of all scaffolds over fourteen (14) feet in height including metal and specially designed scaffolding. The building and construction of all hoists and derricks made of wood; the making of mortar boards, boxes, trestles, all shoring, razing and moving of buildings. Lift type trucks are to be considered a tool of the trade. Metal siding and metal roofing fall within the scope of jurisdiction for the carpenters.
(d) The cutting or framing and fireproofing of the openings for pipes, conduits, ducts, etc., where they pass through floors, partitions, walls, roofs or fixtures composed in whole or in part of wood. The laying out of making and installation of all inserts and sleeves for pipes, ducts, etc., where carpenters' tools and knowledge are required. The making and installing of all wooden meter boards, crippling and backing for fixtures. The welding of studs and other fastenings to receive material being applied by carpenters.
(e) The installation of all grounds, furring or stripping, ceilings and sidewalks, application of all types of shingling and siding, etc.
(f) The installation of all interior and exterior trim or finish of wood, aluminum, kalamein, hollow or extruded metal, plastic, doors, transoms, thresholds, mullions and windows. The setting of jambs, bucks, window frames of wood or metal where braces or wedges are used. The installation of all wood, metal or other substitutes of casing, molding, chair rail, wainscoting, china closets, base of mop boards, wardrobes, metal partitions as per National Decisions or specific agreements, etc. The complete laying out, fabrication and erection of stairs. The making and erecting of all fixtures, cabinets, shelving, racks, louvers, etc. The mortising and application of all hardware in connection with our work. The sanding and refinishing of all wood, cork or composition floors to be sanded or scraped, filled, sized and buffed, either by hand or power machines. The assembling and setting of all seats in theaters, halls, churches, schools, auditorium, grandstands and other buildings. All bowling alley work.
(g) The manufacture, fabrication and installation of all screens, storm sash, storm doors and garage doors; the installation of wood, canvas, plastic or metal awnings or eye shades, door shelters, jalousies, etc. The laying of wood, wood block and wood composition in floors.
(h) The installation of all materials used in drywall construction, such as plasterboard, all types of asbestos boards, transite and other composition board. The application of all material which serves as base for acoustic tile, except plaster. All acoustical applications as per National Agreement or specific agreement.
(i) The building and dismantling of all barricades, hand rails, guard rails, partitions and temporary partitions. The erection and dismantling of all temporary housing on construction projects.
(j) The installation of rock wool, cork and other insulation material used for sound or weatherproofing. The removal of caulking and placing of staff bead and brick mold and all Oakum caulking, substitutes, etc., and all caulking in connection with carpentry work.
(k) The installation of all chalk boards/marker boards.
P.O. Box 30476 Lansing, Michigan 48909-7976 Toll Free: 1-855-4MI-WAGE (1-855-464-9243)
P a g e | 7 of 10
(l) The operation of all hand operated winches used to raise wooden structures.
(m) The erection of porcelain enameled panels and siding.
(n) The unloading and distribution of all furnished, prefabricated and built-up sections such as door bucks, window frames, cupboards, cabinets, store fixtures, counters and show cases or comparably finished or prefabricated materials, to the job sites or points of installation as used in the construction, alteration and remodeling industry.
(o) The handling of doors, metal, wood or composite, partitions and other finished bulk materials used for trim from the point of delivery.
(p) All processing of these materials and handling after processing.
(q) The making up of panels and fitting them into walls, all bracing and securing, all removal of panels from the casting including all braces, whalers, hairpins, etc.
(r) The handling and setting of all metal pans and sections from the stock piles of reasonable distance as required by job needs shall be performed by carpenters. The stripping of such metal pans, panels or sections is to be performed by carpenters.
(s) The sharpening of all carpenter hand or power tools, or those used by carpenters.
(t). The layout, fabrication, assembling of and erection and dismantling of all displays made of wood, metal, plastic, composition board or any substitute material; the covering of same with any type of material, the crating and un-crating, the handling from the point of unloading and back to the point of loading of all displays and other materials or components.
(u) The same shall apply to all other necessary component parts used for display purposes such as turntables, platforms, identification towers and fixtures, regardless of how constructed, assembled or erected or dismantled.
(v) The make-up, handling, cutting and sewing of all materials used in buntings, flags, banners, decorative paper, fabrics and similar materials used in the display decorative industry for draperies and back drops. The decorative framing of trucks, trailers and autos used as floats or moving displays. The slatting of walls to hand fabrics and other decorative materials, drilling of all holes to accommodate such installations. Setting up and removal of booths constructed of steel or aluminum tubing as stanchions, railings, etc., handling and placing of furniture, appliances, etc., which are being used to complete the booth at the request of the exhibitor. Fabricating and application of leather, plastic and other like materials used for covering of booths. The handling of all materials, fabricating of same. The loading and unloading, erecting and assembling at the exhibit of show area, also in or out of storage when used in booth decorations.
P.O. Box 30476 Lansing, Michigan 48909-7976 Toll Free: 1-855-4MI-WAGE (1-855-464-9243)
P a g e | 8 of 10
(w) A display shall be construed as any exhibit or medium of advertising, open to private or public showing, which is constructed of wood, metal, plastic or any other substitute to accomplish the objectives of advertising or displaying.
(x) Handling, fitting, draping, measuring and installation of fixtures and other hardwares for draperies, all manner of making, measuring, repairing, sizing, hanging and installation of necessary fixtures and hardware for shades and Venetian blinds.
(y) Work consisting of cutting and/or forming of all materials in preparation for installing of floors, walls and ceilings;
the installation of all resilient floor and base; wall and ceiling materials to include cork, linoleum, prefabricated, laminated, rubber, asphalt, vinyl, metal, plastic, seamless floors and all other similar materials in sheet, interlocking liquid or tile form; the installation of all artificial turf, the installation, cutting and/or fitting of carpets;
installation of padding, matting, linen crash and all preformed resilient floor coverings; the fitting of all devices for the attachment of carpet and other floor, wall and ceiling coverings; track sewing of carpets, drilling of holes for sockets and pins, putting in dowels and slats; and all metal trimmings used; the installation of all underlayments, sealants in preparation of floors, walls and ceilings, the unloading and handling of all materials to be installed and the removal of all materials in preparing floors when contracted for by the employer, shall be done only by employees covered under this Agreement.
(z) The installation of all sink-tops and cabinets, to include all metal trim and covering for same. All cork, linoleum, congo-wall, linewall, veos tile, plexiglass, vinawall tile, composition tile, plastic tile, aluminum tile and rubber in sheets or tile form and the application thereof. All bolta-wall and bolta-wall tile and similar products.
(aa) The handling and placing of all pictures and frames and the assembly of bed frames and accessories. The hanging and placing of all signage.
(bb) The installation of all framework partitions and trim materials for toilets and bathrooms made of wood, metal, plastics or composition materials; fastening of all wooden, plastic or composition cleats to iron or any other material for accessories.
(cc) The erection of cooling towers and tanks.
(dd) The setting, lining, leveling and bracing of all embedded plates, rails and angles. The setting of all stay in place forms.
(ee) Environmental: Clean room, any type of environmental chamber, walk in refrigerated coolers and all refrigerated rooms or buildings.
P.O. Box 30476 Lansing, Michigan 48909-7976 Toll Free: 1-855-4MI-WAGE (1-855-464-9243)
P a g e | 9 of 10
PILE DRIVING AND CAISSON DRILLING
(ff) All unloading, handling, signaling and driving of piles, whether wood, steel, pipe, beam pile, composite, concrete or molded in place, wood and steel sheeting, cofferdam work, trestle work, dock work, floating derricks, caisson work, foundation work, bridge work, whether old or new, crib work, pipe line work and submarine work. Cutting of all wood, steel or concrete pile, whether by machine or hand; welding and cutting, peeling, and heading of all wood pile, steel sheeting and wood sheeting. The erecting and dismantling of all pile driving rigs, also derricks whether on land or water; also the moving, shoring and underpinning of all buildings. The loading and unloading of all derricks, cranes and pile driving materials. The tending, maintenance and operation of all valves pertaining to the operation of driving of pile. All diving and tending essential to the completion of jurisdictional claims.
All work done in the established yards of the Company and all work not enumerated above, shall be handled and manned as the Employer decides.
The pile driver will unload all material shipped in by rail from the point that the rail car is spotted.
All cleaning and preparation of all piling prior to driving.
The welding and attachment of all boot plates, pile points, splice plates, connectors, rock crosses, driving crosses, driving rigs, point reinforcements and overboots.
The construction, reconstruction, repair, alteration, demolition and partial or complete removal of all marine work including, but not limited to, docks, piers, wharves, quays, jetties, cribs, causeways, breakwaters, lighthouses and permanent buoys, etc. (mixing and placing of concrete excepted).
The driving and pulling of all wood, steel and concrete foundation piles and sheet piling.
The heading, pointing, splicing, cutting and welding of all piles.
The placing of all wales, bolts, studs, lagging, rods and washers including the cutting, drilling, boring or breaking of all holes or openings thereof.
The removal of all materials and/or obstructions of any nature (rip-rap included) that retard or interfere with the driving of piles or with the placing of wales, bolts and rods.
P.O. Box 30476 Lansing, Michigan 48909-7976 Toll Free: 1-855-4MI-WAGE (1-855-464-9243)
P a g e | 10 of 10
This is to be subject to the discretion of the contractor who may choose to use blasting specialists or other demolition specialists.
The handling on the job of all materials used in the work.
The manning of all floating equipment (towing equipment excepted) engaged in the work enumerated, including deck engines, except machinery manned by Operating Engineers.
The placing of all rip-rap, fill stone, bedding stone, cover stone and concrete blocks in connection with marine construction. Work normally performed by Employers, such as soil tests, shoring, underpinning of buildings, cribbing, driving of sheet piling, marine divers, tenders, underwater construction workers and similar operations shall continue to be included in the jurisdiction of this Agreement.
All burning, cutting, welding and fabrication of pipe, H-beams, sheet pile (metal or wood), done on the job site or in the yard of the Employer shall be done by pile drivers. The driving of bearing piles, sheet piling with heavy equipment, caissons, pile caps, auger drilling and boring, the setting up for load testing for any type of piling, all layout and spotting for piling, caisson and boring work, all earth retention, ditch boarding, installing tiebacks.
ASBESTOS ABATEMENT CARPENTERS
(gg) All erection and maintenance of barriers and partitions used in the removing of asbestos or any abatement work. The abatement of any materials previously installed by the carpenter such as transite, ceiling and floor tiles. All operating and maintaining of current equipment used in any abatement work.
State of Michigan WHPWRequest@michigan.gov
Official Request #: 1404 Requestor: MDEQ Project Description: Chuck’s Corner Site, Marion, MI Excavation of petroleum impacted soil Project Number: (file #): 761/15266.SAR Osceola County Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 12/19/2017 Contract must be awarded by: 3/19/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Asbestos & Lead Abatement Laborer
MLDC 9/7/2017
Asbestos & Lead Abatement Laborer $41.30 $55.23 $69.16 H H H X X X X D Y Apprentice Rates:
Trainee 600 hours + 1 calendar year $30.22 $33.28 $41.73 comment 4 ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days
Asbestos, Lead and Mold Abatement, Hazardous Material Handler
AS207 3/27/2017
Asbestos, Lead and Mold Abatement, Hazardous Material Handler $40.75 $54.25 $67.75 H H H X X X X D Y comment Four ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days
Boilermaker
BO169 2/17/2015
Boilermaker $54.70 $81.08 $107.45 H H H H H H H D Y Apprentice Rates:
1st 6 months $40.31 $59.49 $78.67 2nd 6 months $41.45 $61.21 $80.95 3rd 6 months $42.57 $62.88 $83.19 4th 6 months $43.69 $64.57 $85.43 5th 6 months $44.81 $66.24 $87.67 6th 6 months $48.63 $72.50 $96.36 7th 6 months $49.32 $73.01 $96.69 8th 6 months $51.58 $76.40 $101.21
Official Request #: 1404 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Chuck’s Corner Site, Marion, MI Excavation of petroleum on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/15266.SAR prescribed in a contract.
County: Osceola
Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 12/19/2017 Contract must be awarded by: 3/19/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Bricklayer
BR-9-1-B 11/3/2016
Bricklayer & Block Masonry $41.20 $53.42 $65.64 H H H H H H H D Y Apprentice Rates:
0-749 hours $30.60 $37.77 $44.94 750 - 1,499 hours $31.93 $39.76 $47.60 1,500 - 2,249 hours $33.25 $41.74 $50.24 2,250 - 2,999 hours $34.58 $43.74 $52.90 3,000 - 3,749 hours $35.90 $45.72 $55.54 3,750 - 4,499 hours $37.22 $47.70 $58.18 5,250 - 6,000 hours $39.87 $51.68 $63.48 comment make up day allowed Saturday for bricklayer only No make up day for block 4 10s allowed M-F
BR-9-1-BL 11/3/2016
Stone Mason and Artificial Masonry $41.20 $53.42 $65.64 H H H H H H H D Y Apprentice Rates:
0-749 hours $31.93 $39.76 $47.60 750 -1499 hours $33.25 $41.74 $50.24 1500-2249 hours $34.58 $43.74 $52.90 2250-2999 hours $35.90 $45.72 $55.54 3000-3749 hours $37.22 $47.70 $58.18 3750-4499 hours $38.55 $49.70 $60.84 comment 4 10s allowed M-F Carpenter
CA-100 7/5/2017
Carpenter $40.35 $51.16 $61.96 X X H H H H H D N Apprentice Rates:
1st year $33.87 $41.44 $49.00 2nd year $34.95 $43.06 $51.16 3rd year $37.11 $46.30 $55.48 4th year $39.27 $49.54 $59.80 comment make up day allowed Saturday
Official Request #: 1404 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Chuck’s Corner Site, Marion, MI Excavation of petroleum on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/15266.SAR prescribed in a contract.
Contract must be awarded by: 3/19/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
CA-100FL 7/5/2017
Floor Layer $42.09 $53.76 $65.42 X X H H H H H D N Apprentice Rates:
1st year $32.76 $39.76 $46.76 2nd year $35.09 $43.26 $51.42 3rd year $37.42 $46.75 $56.08 4th year $38.59 $48.50 $58.42 comment make up day allowed Saturday Cement Finisher
BR-9-1-CF 11/3/2016
Cement Finisher & Plasterer $36.49 $47.25 $58.01 X X H X X X H D Y Apprentice Rates:
0-749 hours $28.32 $35.21 $42.11 750-1499 hours $29.48 $36.95 $44.43 1500-2249 hours $30.65 $38.70 $46.77 2250-2999 hours $31.82 $40.46 $49.11 3000-3749 hours $32.99 $42.22 $51.45 3750-4499 hours $34.16 $43.97 $53.79 comment 4 10s allowed M-F; plasterer OT schedule is HHHHHHHDY Cement Mason
PL16-15 8/18/2016
Cement Mason $37.48 $49.52 $61.56 H H H H H H H D Y Apprentice Rates:
1st year $29.05 $36.88 $44.70 2nd year $31.46 $40.49 $49.52 3rd year $33.87 $44.10 $54.34 comment make up day allowed Four 10s allowed Monday-Thursday with Friday or Saturday inclement weather make up days. Saturday hours for inclement weather make up shall be paid straight rate unless over 40 hours worked.
Official Request #: 1404 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Chuck’s Corner Site, Marion, MI Excavation of petroleum on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/15266.SAR prescribed in a contract.
Contract must be awarded by: 3/19/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Drywall
PT-1803-DF 6/2/2016
Drywall Finisher $38.49 $50.50 $62.50 H H H H H H H D Y Apprentice Rates:
0 - 900 hours $26.48 $32.48 $38.48 901- 1800 hours $30.09 $37.90 $45.70 1801 - 2700 hours $33.69 $43.30 $52.90 2701 - 3600 hours $36.09 $46.90 $57.70 comment make up day allowed 4 10 hour days allowed on consecutive days, Monday-Friday. Make up day allowed M-F Subdivision of county for work missed due to holidays or inclement weather. North of Highway 10.
PT-845-DF 6/2/2016
Drywall Taper and Finisher $38.89 $51.89 $64.89 H H H H H H H D N Apprentice Rates:
0 - 1,000 hours $27.19 $34.34 $41.49 1,001 - 2,000 hours $28.49 $36.29 $44.09 2,001 to 3,000 hours $30.57 $39.41 $48.25 3,001 to 4,000 hours $32.39 $42.14 $51.89 4,001 to 5,000 hours $34.99 $46.04 $57.09 5,001 to 6,000 hours $37.59 $49.94 $62.29
Electrician
EC-275 SC 10/1/2014
Sound and Communication Journeyman Technician $34.32 $47.25 $60.18 H H H H H H H D Y Apprentice Rates:
1st period $18.88 $26.64 $34.39 2nd period $21.63 $30.68 $39.73 3rd period $24.37 $34.71 $45.05 4th period $27.12 $38.75 $50.39 comment make up day allowed Four consecutive 10s allowed M-Th/Friday may be used as a make-up day Subdivision of county Townships of Richmond, Hersey, Evart, & Orient
Official Request #: 1404 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Chuck’s Corner Site, Marion, MI Excavation of petroleum on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/15266.SAR prescribed in a contract.
Contract must be awarded by: 3/19/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
EC-275-IW 8/25/2017
Journeyman Electrician - Inside Wireman $48.84 $69.90 $90.96 H H H H H H H D Y Apprentice Rates:
1st period 0-1000 hours $19.33 $25.71 $32.08 2nd period 1001-2000 hrs $20.90 $28.07 $35.22 3rd period 2001-3500 hrs $24.28 $33.13 $41.98 4th period 3501-5000 hrs $25.90 $35.57 $45.22 5th period 5001-6500 hrs $29.75 $41.34 $52.92 6th period 6501-8000 hrs $33.06 $46.31 $59.54 comment make up day allowed 4 consecutive 10s allowed M-Th Subdivision of county Friday may be used as a make-up day, Overtime @ time and half after 10 hours worked Richmond, Hersey, Evart, & Orient townships in a day or 40 in week when 4 10 hour days worked
EC-498-IW 5/26/2017
Journeyman Electrician - Inside Wireman $46.78 $66.69 $86.60 H H H H H H D D Y Apprentice Rates:
1st Period 0-1000 hours $18.49 $24.71 $30.92 Period 2 1000-2000 hours $20.00 $26.97 $33.94 Period 3 2000-2500 hours $23.40 $32.08 $40.74 Period 4 3500-5000 hours $24.96 $34.42 $43.86 Period 5 5000-6500 hours $28.79 $40.16 $51.52 Period 6 6500-8000 hours $32.03 $45.01 $58.00 comment make up day allowed Four tens allowed if consecutive days M-Th; Friday may be used as a make-up day.
Subdivision of county Double time beyond 12 hours Mon. - Fri. All Townships EXCEPT Richmond, Hersey, Evart, and Orient.
Elevator Constructor
EL-85 4/8/2013
Elevator Constructor Mechanic $70.77 $116.32 D D D D D D D D Y Apprentice Rates:
1st year $50.27 $75.32 2nd year $54.83 $84.44 3rd year $57.10 $88.98 4th year $61.66 $98.10 comment 4 tens allowed M-TH
Official Request #: 1404 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Chuck’s Corner Site, Marion, MI Excavation of petroleum on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/15266.SAR prescribed in a contract.
Contract must be awarded by: 3/19/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Glazier
GL-826 6/3/2016
Glazier $44.78 $60.87 $76.95 H H H H H H H D Y Apprentice Rates:
1st 6 months $31.91 $41.57 $51.21 2nd 6 months $33.52 $43.98 $54.43 3rd 6 months $35.12 $46.38 $57.63 4th 6 months $36.74 $48.81 $60.87 5th 6 months $38.35 $51.22 $64.09 6th 6 months $39.96 $53.64 $67.31 7th 6 months $41.57 $56.05 $70.53 8th 6 months $43.17 $58.45 $73.73 comment 4 tens allowed on consecutive days Heat and Frost Insulator
AS25S 3/31/2017
Spray Insulation - Qualified Senior Sprayer, application of all products $29.04 $42.35 X X X H H H H H N
Heat and Frost Insulator and Asbestos Worker
AS47 7/25/2017
Heat and Frost Insulator and Asbestos Worker $47.75 $63.01 $78.27 H H H H H H H D Y Apprentice Rates:
1st year $27.88 $35.51 $43.14 2nd year $31.85 $41.00 $50.16 3rd year $35.82 $46.50 $57.18 4th year $39.80 $52.01 $64.22 5th year $43.78 $57.51 $71.25 comment make up day allowed Friday for cancelled work in a four 10 hour schedule
Official Request #: 1404 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Chuck’s Corner Site, Marion, MI Excavation of petroleum on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/15266.SAR prescribed in a contract.
Contract must be awarded by: 3/19/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Ironworker
IR-25-F2 3/31/2017
Fence, Sound Barrier & Guardrail erection/installation and Exterior $31.95 $42.05 $52.15 X X H X X X H D Y Signage work Apprentice Rates:
60% Level $22.99 $29.05 $35.11 65% Level $24.11 $30.68 $37.24 70% Level $25.24 $32.31 $39.38 75% Level $26.35 $33.92 $41.50 80% Level $27.47 $35.55 $43.63 85% Level $28.59 $37.18 $45.76 comment Four ten hour work days may be worked during Monday-Saturday.
IR-25-HH-WEST 12/5/2016
Heavy Hauler $41.43 $52.55 $63.67 H H H H H H H D Y Apprentice Rates:
1st Year $26.18 $31.74 $37.30 2nd Year $29.52 $36.75 $43.98 3rd Year $34.71 $43.60 $52.50 4th Year $36.94 $46.95 $56.96 comment make up day allowed If Saturday worked as a makeup day, work will be at straight time until 40 hours then time and a half
IR-25-PE-Z2 3/31/2017
Pre-engineered Metal Work $45.87 $56.03 $66.19 X X H X X X X D Y Apprentice Rates:
Probation 1st Year $26.83 $32.03 $37.23 1st Level $28.96 $34.92 $40.88 2nd Level $28.96 $34.92 $40.88 3rd Level $31.08 $37.79 $44.50 4th Level $33.21 $40.68 $48.15 5th Level $35.33 $43.55 $51.77 6th Level $37.46 $46.43 $55.41 comment make up day allowed 4 tens allowed M-Th with Saturday make up day
Official Request #: 1404 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Chuck’s Corner Site, Marion, MI Excavation of petroleum on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/15266.SAR prescribed in a contract.
Contract must be awarded by: 3/19/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
IR-25-REF-WEST 7/5/2017
Reinforcing: any work in connection with field fabrication, post $49.25 $61.47 $73.68 H H H H H H H D Y tensioning, prestressing of handling by power, rigging, crane signaling, crane assembly and dismantle, racking, sorting, cutting, bending, hoisting, placing, burning, welding, use of tie gun, and tying of all materials used to reinforce concrete construction. Realigning of reinforcing steel, wire mesh and placing of steel dowels, as well as refastening and resetting same while concrete is being poured. The handling and placing of j or jack bar on slip form construction. The placing of all clips, bolts, and steel rods and wire fabricator mesh pertaining to gunite construction. Drilling holes in concrete for dowels used to reinforce a concrete slab, beam or wall and the use of a chemical anchoring system (such as epoxy) to secure dowels. The use of a non-metallic carbon fiber or polymer typically used to reinforce concrete. Some brand names are NEFMAC, leadline or Tokyo rope.
Apprentice Rates:
1st Level $31.94 $40.13 $48.32 2nd Level $31.94 $40.13 $48.32 3rd Level $33.47 $42.42 $51.37 4th Level $35.00 $44.71 $54.41 5th Level $37.87 $47.72 $57.57 6th Level $38.94 $49.31 $59.69 7th Level $42.45 $53.35 $64.25 8th Level $43.52 $54.95 $66.37 comment make up day allowed If Saturday worked as a makeup day, work will be at straight time until 40 hours then time and a half
IR-25-RIG-west 7/5/2017 Rigging, heavy machinery moving and related tasks $49.25 $61.47 $73.68 X X X X X X X D Y Apprentice Rates:
1st Level $31.94 $40.13 $48.32 2nd Level $31.94 $40.13 $48.32 3rd Level $33.47 $42.42 $51.37 4th Level $35.00 $44.71 $54.41 5th Level $37.87 $47.72 $57.57 6th Level $38.94 $49.31 $59.69 7th Level $42.45 $53.35 $64.25 8th Level $43.52 $54.95 $66.37 comment make up day allowed Saturday
Official Request #: 1404 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Chuck’s Corner Site, Marion, MI Excavation of petroleum on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/15266.SAR prescribed in a contract.
Contract must be awarded by: 3/19/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision
IR-25-STR-WEST 7/5/2017
Structural, ornamental, welder and pre-cast $49.25 $61.47 $73.68 H H H H H H H D Y Apprentice Rates:
1ST LEVEL $31.94 $40.13 $48.32
2ND LEVEL $31.94 $40.13 $48.32
3RD LEVEL $33.47 $42.42 $51.37
4TH LEVEL $35.00 $44.71 $54.41
5TH LEVEL $37.87 $47.72 $57.57
6TH LEVEL $38.94 $49.31 $59.69
7TH LEVEL $42.45 $53.35 $64.25
8TH LEVEL $43.52 $54.95 $66.37
comment make up day allowed If Saturday worked as a makeup day, work will be at straight time until 40 hours then time and a half
Laborer L355-2-A 5/31/2017 Class A Laborer - All Construction Laborers on buildings, pumps, well $32.65 $42.49 $52.33 X X H H H H H D Y wheels, air, electric or gasoline tools, motor driven buggies, Laborers on fire watch duty, working on swing scaffolds, heavy construction work, confined space and FME, carpenter tender, cement finisher tender, heater tender, flagperson, except foremen and others falling within specified classifications.
Apprentice Rates:
0 - 1,000 work hours $27.73 $35.11 $42.49 1,001 - 2,000 work hours $28.71 $36.58 $44.45 2,001 - 3,000 work hours $29.70 $38.07 $46.43 3,001 - 4,000 work hours $31.67 $41.02 $50.37 comment make up day allowed Monday - Saturday L355-2-B 5/31/2017 Class B Laborer - jackhammer operators, crocklayers and caisson $32.90 $42.87 $52.83 X X H H H H H D Y worker in buildings.
Apprentice Rates:
0-1,000 work hours $27.92 $35.39 $42.87 1,001-2,000 work hours $28.91 $36.88 $44.85 2,001-3,000 work hours $29.91 $38.38 $46.85 3,001-4,000 work hours $31.90 $41.37 $50.83
Official Request #: 1404 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Chuck’s Corner Site, Marion, MI Excavation of petroleum on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/15266.SAR prescribed in a contract.
Contract must be awarded by: 3/19/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision comment make up day allowed Monday - Saturday L355-2-C 5/31/2017 Class C Laborer - Top men on chimneys or towers over thirty feet (30’) $33.40 $43.62 $53.83 X X H H H H H D Y in height, material mixers, operators of portable mixers, plasterer tenders, mason tenders that have received certification from the MLTAI for mason tending, and MLTAI-certified demolition burner.
Apprentice Rates:
0-1,000 work hours $28.29 $35.95 $43.61 1,001-2,000 work hours $29.31 $37.48 $45.65 2,001-3,000 work hours $30.34 $39.03 $47.71 3,001-4,000 work hours $32.38 $42.09 $51.79 comment make up day allowed Monday - Saturday L355-2-D 5/31/2017 Class D Laborer - Concrete Specialist When there are no Cement $37.21 $49.28 $61.35 X X H H H H H D Y Finishers available, the classification of Concrete Specialist may be utilized and shall include troweling, finishing, screeding, patching, cutting and curing of cast in place or precast concrete by any and all methods.
Apprentice Rates:
0-1,000 work hours $31.17 $40.22 $49.27 1,001-2,000 work hours $32.38 $42.03 $51.69 2,001-3,000 work hours $33.59 $43.85 $54.11 3,001-4,000 work hours $36.00 $47.47 $58.93 comment make up day allowed Monday - Saturday
Official Request #: 1404 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project Description: Chuck’s Corner Site, Marion, MI Excavation of petroleum on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: (file #): 761/15266.SAR prescribed in a contract.
Contract must be awarded by: 3/19/2018 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision Laborer - Hazardous
LHAZ-Z9-A 11/13/2017
Class A Laborer - performing work in conjunction with site preparation $32.92 $46.40 $59.87 H H H H H H H D Y and other preliminary work prior to actual removal, handling, or containment of hazardous waste substances not requiring use of personal protective equipment required by state or federal regulations;
or a laborer performing work in conjunction with the removal , handling, or containment of hazardous waste substances when use of personal protective equipment level " D" is required.
Apprentice Rates:
0-1,000 work hours $27.93 $38.91 $49.89 1,001-2,000 work hours $28.93 $40.41 $51.89 2,001-3,000 work hours $29.93 $41.91 $53.89 3,001-4,000 work hours $31.92 $44.89 $57.87 comment make up day allowed 4 10s allowed M-Th or T-F; inclement weather makeup day Friday
LHAZ-Z9-B 11/13/2017
Class B Laborer - performing work in conjunction with the removal, $33.92 $47.90 $61.87 H H H H H H H D Y handling, or containment of hazardous waste substances when the use of personal protective equipment levels "A", "B" or "C" is required.
Apprentice Rates:
0-1,000 work hours $28.68 $40.03 $51.39 1,001-2,000 work hours $29.73 $41.61 $53.49 2,001-3,000 work hours $30.78 $43.19 $55.59 3,001-4,000 work hours $32.87 $46.32 $59.77 comment make up day allowed 4 10s allowed M-Th or T-F; inclement weather makeup day Friday Laborer Underground - Open Cut, Class I
LAUC-Z4-1 9/7/2017
Construction Laborer $33.67 $43.98 $54.27 X X X X X X X D Y Apprentice Rates:
0-1,000 work hours $29.17 $37.22 $45.27 1,001-2,000 work hours $30.07 $38.58 $47.07 2,001-3,000 work hours $30.97 $39.92 $48.87 3,001-4,000 work hours $32.77 $42.62 $52.47
Official Request #: 1404 Official Rate Schedule Requestor: MDEQ Every contractor and subcontractor shall keep posted Project…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .