SF24A-T007.pdf
Standard Form PDF 68 KB Posted
- Attached to
- SPoC Resilient Basing
- Solicitation number
- SF24A-T007
- Issued by
-
Department of the Air Force
About this file
This is a Space Force solicitation for technology development under Topic SF24A-T007: SPoC Resilient Basing. The solicitation seeks artificial intelligence, machine learning, and automation technologies to enhance decision-making efficiency for space professionals and to predict and automate critical infrastructure asset failures at U.S. Space Force installations.
The project requires development of an interactive digital twin of critical infrastructure systems (cooling, power, HVAC) supporting space operations at Space Base Delta 1, with applications for facility space planning, what-if analyses, real-time monitoring, predictive maintenance, energy efficiency analysis, and exercise support. Phase I deliverables include analysis demonstrating the ability to perform Phase II functions. Phase II consists of three steps: (1) developing an interactive digital twin prototype at New Boston Space Force Station with implementation of use-cases and lessons learned for scalability to Schriever Space Force Base; (2) integrating sensors into HVAC and electrical infrastructure to enable smart monitoring and anomaly detection to support predictive maintenance models; and (3) creating an AI-augmented situational awareness tool for SBD 1's Civil Engineering Squadrons with potential application across all USSF Space Base Deltas and USAF bases. Phase III includes transition of the pilot program to AFMC for sustainment funding and scaling to SBD 1, 2, and 3 installations. The technology is subject to International Traffic in Arms Regulation (ITAR) restrictions, and offerors must disclose any proposed use of foreign nationals, their countries of origin, visa/work permit types, and assigned statement of work tasks. No CMMC level requirement applies, and no Technical Point of Contact is provided.
View the file
Other versions and copies of SF 24A
| File | Revision | Posted | Attached to |
|---|---|---|---|
| SF24A-T006.pdf | Revision not stated | Low Size, Weight, and Power, High Flux Atomic Source for Scalable Manufacturing | |
| SF24A-T004.pdf | Revision not stated | Integrated lasers and non-magnetic isolators for optical clock technologies | |
| SF24A-T005.pdf | Revision not stated | High Throughput Visible-Wavelength Multispectral Filter Arrays via Spectral Multiplexing | |
| J.4._SF24a_(Payment_Bond).pdf | Revision not stated | DREDGE BOAT BASIN / ACCESS CHANNEL USCG STA. BRUNSWICK, GA |
Who attaches SF 24A
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SF24A-T007: SPoC Resilient Basing
PROJECTED CMMC LEVEL REQUIREMENT:
N/A
TECHNOLOGY AREAS:
Electronics | Human Systems | Information Systems | Materials | Sensors | Space Platforms
MODERNIZATION PRIORITIES:
Advanced Computing and Software | Integrated Sensing and Cyber | Microelectronics | Trusted AI and Autonomy
KEYWORDS:
Artificial Intelligence; AI; Machine Learning; ML; Automation; Smart City; Smart Base; digital twin; BOS; Resiliency;
Smart Maintenance; what-if analysis; Resilient Basing
ADDITIONAL INFORMATION
N/A
OBJECTIVE:
) Digital Transformation AI/ML Capabilities and Automation: Adopt existing technologies or new technologies that increase the efficiency of decision making and routine processes for space professionals in mission accomplishment
1.
) Critical Infrastructure Technologies: Adopt technologies which predict and automate critical infrastructure asset stressors and failures to link power projection capabilities with mission assurance goals.
2.
ITAR:
The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), 22 CFR Parts 120-130, which controls the export and import of defense-related material and services, including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR Parts 730-774, which controls dual use items. Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with section 3.5 of the Announcement. Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws.
DESCRIPTION:
Historically, suitability for new space operation mission growth was assessed in a stovepiped and data constrained fashion. Recent data indicates that shared, whole building systems have reached capacity, thereby potentially impacting or delaying critical mission system or technology upgrades. Space Base Delta 1, in concert with Delta 6, would like to develop an interactive digtial twin of the critical infrastructure (e.g., cooling, power, HVAC) that supports space operations within SBD 1. This digital twin would be used for the following activities:
facility space planning, what‐if analyses for loading and resiliency, real‐time monitoring of critical nodes, development of smart maintenance best practices, energy analysis/efficiency, exercise / wargame support.
PHASE I:
Demonstrate through analysis the abilty to perform the functions outlined in the Phase II.
PHASE II:
Step 1: Develop an interactive model of a facility or piece of infrastructure supporting space operations. Identify and scope infrastructure at New Boston Space Force Station to convert into a digital twin. Develop an interactive digital twin prototype and implement use‐cases (facility space planning, what‐if analyses). Capture lessons learned to scale to a larger system‐of‐systems at Schriever SFB, CO.
Step 2: Add sensors into infrastructure in order to enable smart monitoring of infrastructure performance. Focus on primarily HVAC and electrical equipment. Goal is to detect anomalous conditions that foreshadow a failure. Use date to feed predictive maintenance models.
Step 3: Develop an AI‐augmented situational awareness and decision tool for SBD 1's Civil Engineering Squadrons to command and control smart base infrastructure. Tool could be used on all USSF SBDs as well as USAF bases. Create roadmap to scale to all DAF bases and GSUs.
PHASE III DUAL USE APPLICATIONS:
Transition pilot program to AFMC for sustainment funding. Scale pilot program to other SBD 1, 2, and 3 instatllations.
REFERENCES:
SBD 1_B400 Power - Cooling Assessment MSG_FINAL.pdf1.
BOS Digital Transformation Strategy (as of 3 March 2023) (CUI version).pptx2.
SpOC Near Term Top Challenges Memo.pdf3.
TECHNICAL POINT OF CONTACT (TPOC):
None
File details come from the government source that posted it. Updated .