SEDS Checkpoint Deployment Efforts_SOW.docx

DOCX document 208 KB Posted

Attached to
Screening Equipment Deployment Services (SEDS) - Checkpoint (CP)
Solicitation number
TSA25-04-0431
Issued by

About this file

This document is a Statement of Work (SOW) for a Task Order under the Screening Equipment Deployment Services (SEDS) contract. The SOW consists of deployment efforts of Transportation Security Equipment (TSE) at airports in support of the Transportation Security Administration's (TSA) Deployment and Logistics Division. The required services include site surveys/validations, designs, site preparation, site restoration, packaging, shipping, rigging, removal and disposal, equipment installations, relocations, re-installations, and decommissioning. The Period of Performance is 12 months from the award date. The SOW provides a detailed Price/Cost Schedule with various fixed-price, fixed-unit-price, and time-and-materials contract line items. It also includes requirements for program management, deployment logistics, deliverables, and travel. The SOW specifies the deployment of Advanced Imaging Technology (AIT), Advanced Technology (AT), Bottleneck Liquidation System (BLS), and Walk-Through Metal Detectors (WTMDs) at various Category III, IV, and X airports. Additionally, the SOW covers the deployment of Credential Authentication Technology (CAT) at selected airports.

View the file

Other files

File Type Posted
SEDS Checkpoint Follow-On RFI final.docx DOCX document
SEDS CP IDIQ SOW.pdf PDF
Checkpoint Pricing Worksheetxlsx.xlsx XLSX spreadsheet
SEDS Checkpoint Ad-Hoc Deployment Services SOW.docx DOCX document
Checkpoint CPSS Task Order SOW.docx DOCX document
SEDS Checkpoint Program Management Task Order SOW.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Task Order XXXX: CP Deployment Efforts Checkpoint Screening Equipment Deployment Services (SEDS) Office of Acquisitions Program Management (OAPM)

Acquisition and Program Management Deployment and Logistics Division (DLD)

Table of Contents

1.0Scope3
2.0Period of Performance3
3.0Price/Cost Schedule3
4.0Background5
5.0Program Management Requirements5
6.0Deployment Services5
7.0Travel13
8.0Deliverables13
9.0Contracting Officer’s Representative (COR)14

Task Order XXXX CP Deployment Efforts

Statement of Work

1.0 Scope

This SOW for a Task Order under the SEDS contract consists of deployment efforts of Transportation Security Equipment (TSE) at airports in support of the Deployment and Logistics Division (DLD) for the Transportation Security Administration (TSA). These services shall include site surveys/validations, designs, site preparation, site restoration, packaging, shipping, rigging, removal and disposal, equipment installations, equipment relocations, equipment re-installations, and equipment decommissioning. In addition, all government paperwork must be completed (DD-1149 – Requisition and Invoice/Shipping Document) and submitted to APM’s Government Property Officer 2 business days in advance/prior to removal from the federal airport locations for authorization.

Unless specifically modified within this SOW, the Contractor shall perform any or all tasks and specific requirements outlined in the Base IDIQ Contract (70T4021D7672N003). Any modifications to the SOW requirements of the Base Contract will be applicable to all Task Orders only and do not relieve the contractor of any other Task Order (TO) requirements.

2.0 Period of Performance

The Period of Performance (POP) for this effort will be 12 months from award date.

3.0 Price/Cost Schedule

CLIN
Description
CLIN Type
Unit
Unit Price/Est

Cost

Quantity
Total
00001a
Task Order Program Manager- AIT Deployments
FFP
HR
00001b
Task Order Program Manager- AT Deployments
FFP
HR
00001c
Task Order Program Manager- PSP Legacy Deployments (BLS, WTMD)
FFP
HR
00001d
Task Order Program Manager- CAT Remediation
FFP
HR
00002a
Deployment Services- AIT Deployments
FUP
Job
00002b
Deployment Services- AT Deployments
FUP
Job
00002c
Deployment Services- PSP Legacy Deployments (BLS, WTMD)
FUP
Job
00002d
Deployment Services- CAT Remediation
FUP
Job
00003a
Deployment Services Supplemental – AIT Deployments
FUP
Job
00003b
Deployment Services Supplemental- AT Deployments
FUP
Job
00003c
Deployment Services Supplemental- PSP Legacy Deployments (BLS, WTMD)
FUP
Job
00003d
Deployment Services Supplemental- CAT Remediation
FUP
Job
00004a
Deployment Services Time & Materials – AIT Deployments
T&M
Job
00004b
Deployment Services Time & Materials- AT Deployments
T&M
Job
00004c
Deployment Services Time & Materials- PSP Legacy Deployments (BLS, WTMD)
T&M
Job
00004d
Deployment Services Time & Materials- CAT Remediation
T&M
Job
00005a
Deployment Services- Other - AIT Deployments
FFP
Job
00005b
Deployment Services- Other- AT Deployments
FFP
Job
00005c
Deployment Services- Other- PSP Legacy Deployments (BLS, WTMD)
FFP
Job
00005d
Deployment Services- Other- CAT Remediation
FFP
Job
00006a
Deployment Services- Other Supplemental AIT
FFP
Job
00006b
Deployment Services- Other Supplemental AT Deployments
FFP
Job
00006c
Deployment Servies- Other Supplemental PSP Legacy Deployments (BLS, WTMD)
FFP
Job
00006d
Deployment Services- Other Supplemental CAT Remediation
FFP
Job
00007a
Travel – AIT Deployments
Cost
Job
00007b
Travel – AT Deployments
Cost
Job
00007c
Travel – PSP Legacy Deployments (BLS, WTMD)
Cost
Job
00007d
Travel – CAT Remediation
Cost
Job

TASK ORDER TOTAL

CLIN Descriptions:

CLIN 00001 – Task Order Program Manager (FFP) Only Task Order specific program management shall be proposed for this CLIN. Please provide the labor categories and hours in support of this CLIN.

CLIN 00002 – Deployment Services (Fixed Unit Price) The fixed unit price spreadsheet must be submitted to identify the level of effort proposed under this CLIN. TSA shall be invoiced only for work completed.

CLIN 00003 – Deployment Services Supplemental (Fixed Unit Price) This CLIN may only be invoiced if the proposed quantities will be exceeded under CLIN 00002 and prior approval is provided by the COR or the CO. Email authorization may be obtained by submission of the fixed unit price spreadsheet which identifies the increased delta.

CLIN 00004 – Deployment Services Time & Material Services (T&M) Services that are not identified within the fixed unit price spreadsheet but are required to execute the Deployment Services Time & Material Services CLINs. The Offeror will provide a build-up of these pricing elements in their proposal.

CLIN 00005- Deployment Services- Other (FFP) Services to complete Site Preparation, Site Restoration and services that are not identified within the fixed unit price spreadsheet or T&M labor categories due to unique local conditions or circumstances but are required to execute the Deployment Services in this task order.

CLIN 00006– Travel (CR) The Government will reimburse the Contractor only for travel and per diem costs incurred in the performance of this contract. Reimbursement will be at cost plus G&A only and in accordance with Federal Travel Regulations. Sections C.5 Travel and H.1 Travel and Per Diem of the IDIQ are applicable.

4.0 Background

The TSA Mission is to protect the nation's transportation systems to ensure freedom of movement for people and commerce. The APM office’s mission states: “We deliver innovative, mission-driven capabilities required by the frontline to safeguard America’s transportation system”.

APM achieves this mission by managing the full life-cycle of screening equipment acquisition activities, including requirements identification, testing, procurement, deployment and sustainment.

Within APM, DLD ensures that the most efficient and effective capabilities and technologies are deployed for checkpoint screening operations. DLD develops and implements field communication strategies prior to deploying equipment, and ensures regional consistency in all deployment activities/standards for checkpoint deployment. DLD coordinates and prioritizes deployment efforts with partners to ensure appropriate timelines and support are in place to effectively deploy qualified screening equipment. DLD deploys and maintains operational efficacy of screening technology that ensures operating conditions continue to meet or exceed procurement expectations and criteria during equipment life cycles. DLD develops and maintains a Security Capabilities Deployment Plan that is sustainable for the field.

5.0 Program Management Requirements

The Contractor shall adhere to the guidance and meet specific requirements as outlined in the IDIQ Section 2, Program Management Requirements.

6.0 Deployment Services

The Contractor shall perform any or all activities associated with shipping, rigging, designs, equipment installation, equipment evaluations, temporary storage, decommission, equipment relocations within the same airport or between airports, and equipment reinstallation. The Contractor will oversee the installation of GFP and GFE at designated locations when directed by the TSA. The Contractor shall follow the requirements outlined in this SOW and IDIQ Section 3, Deployment Services.

· The Contractor shall perform a site survey at all airports captured within this SOW, to ensure that infrastructure is in place to support the TSE reconfiguration, relocation, installation, and/or rigging efforts.

· The Contractor shall capture existing condition and site specific information in the Site Survey\Site Validation report template provided by the DC and or ADC.

· The Contractor shall deliver Site Implementation Plan (SIP) up to 10 Business days after the concept drawings have been approved by the local TSA.

· The Contractor shall ensure that duress alarm requirements are captured during the Site Survey for the lanes being relocated and or installed per the CRPG. Any additional parts or support needed for the duress alarm system should be brought to the attention of the DC and or ADC.

· The Contractor shall obtain any permitting required.

· The Contractor shall identify and enter into a contract with a local riggers staging facility, as required.

· The Contractor shall prepare and deliver to the DC, ADC, a Daily Site Report (DSR) for every active project once the site preparation work starts and until onsite project completion in MS Excel format. The DSRs should be received daily by 8:00am EST.

· The Contractor shall decommission, reconfigure, relocate and install all TSE and FF&E, as required.

· TSE Decommission- The Contractor must ensure that all TSE is in working condition prior to decommissioning.

· Condition Code 4 Requirements- the TSE must be in an operational/use status, all peripherals are accounted for and in working order, the aesthetics of TSE is acceptable.

· Condition Code 7 Requirements- if TSE has known issues that prevent an unsuccessful SAT/ORT the details (part failures, significant physical damage, peripherals missing) will be indicated on the decommission checklist.

· If an ETD or BLS unit is not operational at time of the scheduled decommission, the local TSA and DC/ ADC will be notified. Local TSA will have a work order opened, under the current ILS contract, to have the unit repaired before decommission can be scheduled. If the unit, needs to be sent back to the OEM for repair under the ILS contract, the OEM will package and ship to the OEM Facility. If the unit can be repaired onsite by the ILS Technician, then coordination with Local TSA and the DC/ADC shall occur for the remaining unit.

· The Contractor shall coordinate any TSE movements, decommissions and installation with the OEM. It is critical that the contractor develop and maintain a cooperative and professional working relationship with the OEM throughout the life of this TO.

· The Contractor shall coordinate all scheduled work with the local TSA POC, OEM, IV&V, and the APM DLD.

· The Contractor shall coordinate specific work hours with the local TSA and ensure the work area is ready to be turned back over to the TSA at a specified or agreed time

· The Contractor shall coordinate with local airport authorities for all required badging requirements.

· The Contractor shall ship and rig all required TSE and associated FF&E to the airport and designated checkpoint per the agreed upon installation schedule.

· The Contractor shall coordinate all required shipping and rigging through a licensed and insured company in accordance with Federal and State regulations as required.

· Site Lead will get pictures of the MDRs during the site visits so the Technical Monitors or COR can make the decision if they should be sent back to TSALC or disposed of locally.

· The Contractor shall coordinate with the local TSA and Airport Authority to identify delivery times, truck restrictions and rigging paths, to include the need for floor protection and/or special equipment.

· The Contractor shall be responsible for all infield movements at the checkpoint as a result of TSE installations, relocation, and decommission.

· The Contractor shall immediately contact the DC and ADC when any issue occurs during installation or relocation of the TSE that will result in a change to the design, operational status of the checkpoint, or damage to the facility.

· The Contractor shall ensure that the Airport Authorities are aware of the CCTV requirements, as defined in the CRPG, as a result of any TSE installations, relocations, and /or removals.

· The Contractor shall perform any and all site restoration required to return the checkpoint to the same or better condition than that of prior to beginning of the scope of work, to include removing and disposal of all dunnage

· The Contractor shall provide all crating and packaging materials which will sufficiently protect the equipment during the transport process of any required TSE, as required.

· The Contractor shall ensure all associated FF&E are included in the packaging of the TSE as required.

· .The Contractor shall provide a Weekly Status Report (WSR) with an update on the coordination and progress. The WSR shall include a status summary, tracking of risks and or issues and a mitigation strategy with concurrence from COR and/or Technical Monitors if applicable as well as a two week look ahead.

· For all checkpoint TSE installations and removals, the contractor will provide a copy of all applicable documentation (e.g. SAT, RAT, Operational Readiness Tests (ORT), 1149s, etc.) when the contractor receives one from the independent testing contractor, IV&V or the OEM. The copies received will be forwarded to the PSP maintenance COR, PSP maintenance service provider, DC, Government Property Management Officer, COR and Technical Monitors within 48 hours. The Contractor shall advise the COR and/or Technical Monitors if documentation is not provided by the OEM or IV&V.

· The Contractor shall perform a final walkthrough with the local TSA representatives to confirm job completion and/or identify punch list items.

· The Contractor shall provide As- Built drawings at project completion for the required sites, within 30 calendar days.

· The Contractor shall provide meeting minute support on all active IPT Calls

Note: If FF&E is being removed and taken out of service, the TSA ReMAG support Team will send the site affected the “Guidelines for Disposal of Excess Property” email and disposition of the excess equipment will be the responsibility of local TSA.

AIT Deployments

Decommissioning of AITs at De-Federalizations:

TBD (CAT III, IV Airport)

· The Contractor shall perform a Site Survey in an effort to complete the decommissioning of the AIT2 at XX airport.

· Decommission (1) Leidos SDA AIT2 and associated peripherals from the TBD Terminal, TBD Checkpoint, TBD Lane.

· Crate, rig, ship and clean (1) Leidos SDA AIT2 and associated peripherals to the TSALC as condition code 4.

· Perform site restoration, as required.

TBD (CAT III, IV Airport)

· The Contractor shall perform a Site Survey in an effort to complete the decommissioning of the AIT2 at XX airport.

· Decommission (1) Leidos SDA AIT2 and associated peripherals from the TBD Terminal, TBD Checkpoint, TBD Lane.

· Crate, rig, ship and clean (1) Leidos SDA AIT2 and associated peripherals to the TSALC as condition code 4.

· Perform site restoration, as required.

TBD (CAT III, IV Airport)

· The Contractor shall perform a Site Survey in an effort to complete the decommissioning of the AIT2 at XX airport.

· Decommission (1) Leidos SDA AIT2 and associated peripherals from the TBD Terminal, TBD Checkpoint, TBD Lane.

· Crate, rig. ship and clean (1) Leidos SDA AIT2 and associated peripherals to the TSALC as condition code 4.

· Perform site restoration, as required.

TBD (CAT III, IV Airport)

· The Contractor shall perform a Site Survey in an effort to complete the decommissioning of the AIT2 at XX airport.

· Decommission (1) Leidos SDA AIT2 and associated peripherals from the TBD Terminal, TBD Checkpoint, TBD Lane.

· Crate, rig, ship and clean (1) Leidos SDA AIT2 and associated peripherals to the TSALC as condition code 4.

· Perform site restoration, as required.

TBD (CAT III, IV Airport)

· The Contractor shall perform a Site Survey in an effort to complete the decommissioning of the AIT2 at XX airport.

· Decommission (1) Leidos SDA AIT2 and associated peripherals from the TBD Terminal, TBD Checkpoint, TBD Lane.

· Crate, rig, ship and clean (1) Leidos SDA AIT2 and associated peripherals to the TSALC as condition code 4.

· Perform site restoration, as required.

AT Deployments

Decommissioning of ATs at De-Federalizations:

TBD (CAT III, IV Airport)

· The Contractor shall perform a Site Survey in an effort to complete the decommissioning of the AT within XX airport.

· Decommission, rig, package, ship and clean, as condition code 4, (1) Smiths or Rapiscan AT2 and associated peripherals from the TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC.

· Decommission, rig, package and ship, as condition code 4, (2) Leidos Qs B220 either / or Smiths Ionscan 500 DT’s ETD units, and (1) CEIA BLS unit from the TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC.

· Decommission all FF&E items (ie gates, barriers, stanchions, TDC podiums, etc.) and coordinate with Local TSA on disposition of FF&E items.

· Decommission all duress alarm items and coordinate with Local TSA on disposition of FF&E items.

TBD (CAT III, IV Airport)

· The Contractor shall perform a Site Survey in an effort to complete the decommissioning of the AT within XX airport.

· Decommission, rig, package, ship and clean, as condition code 4, (1) Smiths or Rapiscan AT2 and associated peripherals from the TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC.

· Decommission, rig, package and ship, as condition code 4, (2) Leidos Qs B220 either / or Smiths Ionscan 500 DT’s ETD units, and (1) CEIA BLS unit from the TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC.

· Decommission all FF&E items (i.e. gates, barriers, stanchions, TDC podiums, etc.) and follow the GPM Process for disposition.

· Decommission all duress alarm items and follow the GPM Process for disposition.

· Perform site restoration, as required.

TBD (CAT III, IV Airport)

· The Contractor shall perform a Site Survey in an effort to complete the decommissioning of the AT within XX airport.

· Decommission, rig, package, ship and clean, as condition code 4, (1) Smiths or Rapiscan AT2 and associated peripherals from the TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC.

· Decommission, rig, package and ship, as condition code 4, (2) Leidos Qs B220 either / or Smiths Ionscan 500 DT’s ETD units, and (1) CEIA BLS unit from the TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC.

· Decommission all FF&E items (i.e. gates, barriers, stanchions, TDC podiums, etc.) and follow the GPM Process for disposition.

· Decommission all duress alarm items and follow the GPM Process for disposition.

Turnkey Support at TBD (CAT X Airport):

· The Contractor shall perform a Site Validation, utilizing the airport provided drawings, and submit a Site Implementation Plan (SIP) in an effort to complete the installation of (1-16) Rapiscan AT2 units at the TBD Main Terminal, Main Checkpoint, Lanes 1-16.

· Installations may occur at different airports and different timeframes

· The Contractor shall obtain a Riggers Staging Facility in an effort to store (1-16) Rapiscan AT2 units.

· Decommission as condition code 4, package, rig, ship and clean (1-16) Rapiscan AT2 units from the TBD Main Terminal, Main Checkpoint, Lanes 1-16 and ship back to the TSALC.

· Ship, rig and install (1-16) Rapiscan AT2 units from the TSALC to TBD Main Terminal, Main Checkpoint, Lanes 1-16, per the approved concept drawings.

· The Contractor shall perform a Site Validation, utilizing the airport provided drawings, and submit a Site Implementation Plan (SIP) in an effort to complete the installation of (1-23) Smiths AT2 units at the TBD Main Terminal, Main Checkpoint, Lanes 1-23.

· Installations may occur at different airports and different timeframes

· The Contractor shall obtain a Riggers Staging Facility in an effort to store (1-23) Smiths AT2 units.

· Decommission as condition code 4, package, rig, ship and clean (1-23) Smiths AT2 units from the TBD Main Terminal, Main Checkpoint, Lanes 1-23 and ship back to the TSALC.

· Ship, rig and install (1-23) Smiths AT2 units from the TSALC to TBD Main Terminal, Main Checkpoint, Lanes 1-23, per the approved concept drawings.

BLS Deployments

New Federalizations:

· Ship and install (1) Smiths BLS unit from the TSALC to the TBD Terminal, TBD Checkpoint, TBD Lane.

De-Federalizations:

· Decommission, package and ship (1) Smiths BLS unit from the TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC as condition code 4.

TBD (CAT III, IV Airport)

· Decommission, package and ship (1) Smiths BLS unit from the TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC as condition code 4.

· Decommission, package and ship (1) Smiths BLS unit from the TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC as condition code 4.

Relocation Efforts:

TBD (Condition Code 4)

· Decommission, package and ship, as condition code 4, (1) Smiths BLS unit from TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC.

· Install and ship (1) Smiths BLS unit for a TBD Terminal, TBD Checkpoint, TBD Lane from to the TSALC.

· Decommission, package and ship, as condition code 4, (1) Smiths BLS unit from TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC.

· Install and ship (1) Smiths BLS unit for aTBD Terminal, TBD Checkpoint, TBD Lane fromthe TSALC.

· Decommission, package and ship, as condition code 4, (1) Smiths BLS unit from TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC.

Install and ship (1) Smiths BLS unit for a TBD Terminal, TBD Checkpoint, TBD Lane from the TSALC.

TBD (Condition Code 4)

· Decommission, package and ship, as condition code 4, (1) Smiths BLS unit from TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC.

· Install and ship (1) Smiths BLS unit for a TBD Terminal, TBD Checkpoint, TBD Lane from the TSALC.

· Decommission, package and ship, as condition code 4, (1) Smiths BLS unit from TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC.

· Decommission, package and ship, as condition code 4, (1) Smiths BLS unit from TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC.

· Decommission, package and ship, as condition code 4, (1) Smiths BLS unit from TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC.

· Installand ship (1) Smiths BLS unit for aTBD Terminal, TBD Checkpoint, TBD Lane from the TSALC.

· Decommission, package and ship, as condition code 4, (1) Smiths BLS unit from TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC.

· Decommission, package and ship, as condition code 4, (1) Smiths BLS unit from TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC.

· Decommission, package and ship, as condition code 4, (1) Smiths BLS unit from TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC.

· Install and ship (1) Smiths BLS unit for aTBD Terminal, TBD Checkpoint, TBD Lane from the TSALC.

· Decommission, package and ship, as condition code 4, (1) Smiths BLS unit from TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC.

· Install and ship (1) Smiths BLS unit for a TBD Terminal, TBD Checkpoint, TBD Lane from the TSALC.

TBD (Condition Code 4)

· Decommission, package and ship, as condition code 4, (1) Smiths BLS unit from TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC.

· Decommission, package and ship, as condition code 4, (1) Smiths BLS unit from TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC.

· Decommission, package and ship, as condition code 4, (1) Smiths BLS unit from TBD Terminal, TBD Checkpoint, TBD Lane to the TSALC.

WTMD Deployments

· The Contractor shall perform a Site Validation utilizing the airport provided drawings and submit a Site Implementation Plan (SIP) in an effort to complete the installation of (1-8) CEIA WTMDs at the TBD Main Terminal, Main Checkpoint, Lanes 1-8.

· Installations may occur at different airports at different timeframes

· The Contractor shall obtain a Riggers Staging Facility in an effort to store (1-8) CEIA WTMDs.

· Decommission, package, rig, clean and ship (1-8) CEIA WTMDs from the TBD Main Terminal, Main Checkpoint, Lanes 1-8 to the TSALC as condition code 4.

· Ship, rig and install (1-8) CEIA WTMDs from the TSALC to TBD Main Terminal, Main Checkpoint, Lanes 1-8, per the approved concept drawings.

· The Contractor shall perform a Site Validation utilizing the airport provided drawings and submit a Site Implementation Plan (SIP) in an effort to complete the installation of (1-11) CEIA WTMDs at the TBD Main Terminal, Main Checkpoint, Lanes 1-11.

· Installations may occur at different airports at different timeframes

· The Contractor shall obtain a Riggers Staging Facility in an effort to store (1-11) CEIA WTMDs.

· Decommission, package, rig, clean and ship (1-11) CEIA WTMDs from the TBD Main Terminal, Main Checkpoint, Lanes 1-11 to the TSALC as condition code 4.

· Ship, rig and install (1-11) CEIA WTMDs from the TSALC to TBD Main Terminal, Main Checkpoint, Lanes 1-11, per the approved concept drawings.

· Perform site restoration, as required.

EMD Procurement -Deployments:

Deploy WTMD for New Federalization:

TBD (CAT III, IV Airport)

· The Contractor shall perform a Site Validation , utilizing the airport provided drawings, in an effort to complete the installation of (1-15) CEIA WTMD at the identified airports provided by the COR.

· Installations may occur at different airports at different timeframes.

· The Contractor shall ship, rig and install (1-15) CEIA WTMD from the TSALC to the identified airports, terminals, checkpoints, lanes identified by the COR.

· Perform site restoration, as required.

WTMD Expansions (CAT X Airports)

· The Contractor shall perform a Site Validation utilizing the airport provided drawings, in an effort to complete the installation of (1-20) CEIA WTMDs at the identified airports provided by the COR.

· Installations may occur at different airports at different timeframes

· The Contractor shall ship, rig and install (1-20) CEIA WTMDs from the TSALC to the identified airports, terminals, checkpoints, lanes identified by the COR.

· Perform site restoration, as required

WTMD Out of Service Replacements (CAT X Airports)

· The Contractor shall perform a Site Validation, utilizing the airport provided drawings, in an effort to complete the de-installation of (1-20) CEIA WTMDs at the identified airports provided by the COR.

· Installations and decommissions may occur at different airports at different timeframes.

· The Contractor shall decommission (1-20) CEIA WTMDs, package, rig, and ship to the TSALC as condition code 7 from the identified airports, terminals, checkpoints, lanes identified by the COR.

· The Contractor shall ship, rig and install (1-20) CEIA WTMDs, condition code 4 units, from the TSALC to the airports, terminals, checkpoints, lanes identified by the COR.

WTMD Special Events (CAT X Airports)

· The Contractor shall perform a Site Survey in an effort to complete the installation of (1-10) CEIA WTMDs at the identified event location provided by the COR.

· Installations may occur at different airports at different timeframes.

· The Contractor shall obtain a Riggers Staging Facility in an effort to store (10) CEIA WTMDs at each event locations identified by the COR.

· The Contractor shall ship, rig, and install (1-10) CEIA WTMDs from the TSALC to the event locations identified by the COR.

· The Contractor shall decommission (1-10) CEIA WTMDs, package, rig, clean and ship to the TSALC, as condition code 4, from the event locations identified by the COR.

Credential Authentication Technology (Airports Identified as highlighted in Appendix A):

The next generation of identification documentation inspection will include Credential Authentication Technology. CAT enhances the passenger screening process at the checkpoint by serving as a technological solution to improve the inspection of identification documentation and confirm passengers’ Secure Flight status. Through the integration of various technologies, CAT machines can inspect identity documentation, i.e. driver’s licenses and passports for legitimacy. Analysis of particular security features and barcodes allows for the detection of fraudulent documents. Transportation Security Officers (TSO) benefit from the system’s simple interface and reliability. Some lanes receiving CAT systems will require the need for additional data infrastructure and the installation of new electrical service. The deployment strategy for CAT is:

· Two CAT units for each PreCheck Lane

· One CAT unit for each Standard Lane

· Two CAT unit(s) for each Flex Lane

CAT Survey and Site Preparation Requirements:

· The Contractor shall conduct Site Surveys and provide Site Survey Reports at airports identified as highlighted in Appendix A, in preparation for CAT Remediation

· The Contractor shall submit Concept Drawings for each airport identified as highlighted in Appendix A

· The Contractor shall submit IFC Drawiing for each airport identified as highlight in Appendix A.

· The Contractor shall complete all permitting and associated requirements for site preparation at each airport identified as highlight in Appendix A.

· The Contractor shall work with local TSA to identify Standard, PreCheck and Flex Lanes (Overflow).

· For each existing and new TDC/CAT locations, the Contractor shall identify and test the two data ports/network jacks that exist at the TDC to ensure that they have connectivity to the patch panel, and that there are two switch ports available to receive the cable patch from the patch panel at the IT Cabinet. For each existing and new TDC/CAT locationthat does not have two data ports/network jacks and cabling that pass a contintunity test, the Contractor shall install data port/network jacks and network cabling to a patch panel in the IT Cabinet to achieve the required two connections.

· For each existing TDC/CAT locations, the Contractor shall identify that the following Power Requirements exist and the electric line has continuity and the electrical panel has capacity for the circuit(s):

· One dedicated circuit; this needs to be clean power free of noise and transients

· 1.5A, 120VAC, with NEMA rated duplex receptacle.

· The contractor shall procure and ship duress alarm buttons to each airport for new CAT locations, confirm receipt of delivery for duress button quantities, and provide signed confirmation of delivery by local TSA to the government.

· One duress alarm button per CAT unit.

· For each new CAT location, the contractor shall install a dedicated 20Amp circuit.

· The contractor shall confirm that cabling from the data outlet to the IT cabinet is no more than 295’ in length . The 295’ limit is copper cable distance. Document locations exceeding 295 feet in the report and develop a plan to mitigate the issue.

· The contractor shall complete a Site Remediation Close Out Report after the site remediation has been completed, along with Record Drawings at the end of the project.

7.0 Travel

The Contractor shall adhere to the guidance and meet specific requirements as outlined in the IDIQ Section 5, Travel.

8.0 Deliverables

The following Deliverables will be required by this TO:

Title of Deliverable
CDRL
Due Date
SOW

Section Format Requirement

Weekly Status Report
A004
Weekly
2.4.2
MS Excel
IPT Meeting Minutes
N/A
Within 48 hours of scheduled meeting
2.4.3
MS Word
Concept Drawings
B003
10 days after completion of site visit
4.2
PDF/CAD
Issued For Construction (IFC) Design
B004
10 days after approval of concepts
4.2
PDF/CAD
Site Implementation Plan (SIP)
B001
10 days after approval of concepts
4.2
MS Word
Site Survey Report
B002
3-5 Business Days after completion of site visit
4.2
MS Word
Daily Site Report (DSR)
N/A
Daily by 8AM EST, for active site work specified by the Task Order
4.5
MS Excel
Lessons Learned
A005
As required by TO
4.6
MS Word
As Built Drawings
B005
PDF and CAD via email within 30 days of project completion.

Quarterly on CD.

4.2
CAD/PDF/DISC
Incident Report
N/A
NLT 24 hours after the incident
2.6 & 4.4
MS Word
DD1149
N/A
2 business days prior to shipment
2.6
TSA DD1149 Template
Government Furnished Property Transaction Report
A006
Weekly, Monday before noon EST
2.6
MS Excel

9.0 Contracting Officer’s Representative (COR) and Technical Monitors

The principle role of the COR is to support the Contracting Officer in managing the contract. This is done through furnishing technical direction within the confines of the contract, monitoring performance, ensuring requirements are met within the terms of the contract, and maintaining a strong relationship with the Contracting Officer. As a team the Contracting Officer and COR must ensure that program requirements are clearly communicated and that the agreement is performed to meet them. The principle role of the Technical Monitor (TM) is to support the COR on all work orders, tasks, deliverables and actions that require immediate attention relating to the approved scope and obligated funding of the contract action.

The Contracting Officer hereby designates the individual(s) named below as the Contracting Officer's Representative(s) and Technical Monitor(s). Such designations(s) shall specify the scope and limitations of the authority so delegated.

TSA COR:

Name: TBD Office: TBD Mobile: TBD Email: TBD

Regional Technical Monitor- East:

Name: TBD Office: TBD Mobile: TBD Email: TBD

Regional Technical Monitor- Central:

Name: TBD Office: TBD Mobile: TBD Email: TBD

Regional Technical Monitor- West:

Name: TBD Office: TBD Mobile: TBD Email: TBD

Appendix

Appendix A- CAT Remediation Sites

Airport Code
Airport Name
Category
Area
ABR
Aberdeen Regional
IV
Central
ACT
Waco Regional
III
Central
AEX
Alexandria International
IV
Central
AIA
Alliance Municipal
IV
Central
ALO
Waterloo Regional
IV
Central
AMA
Rick Husband Amarillo International
II
Central
APN
Alpena County Regional
IV
Central
ATW
Appleton International
II
Central
ATY
Watertown Regional
IV
Central
AZO
Kalamazoo/Battle Creek International
III
Central
BFF
Western Nebraska Regional
IV
Central
BIS
Bismarck Airport
II
Central
BJI
Bemidji Regional Airport
IV
Central
BLV
MidAmerica St. Louis Airport
III
Central
BMI
Central Illinois Regional
III
Central
BRD
Brainerd Lakes Regional
IV
Central
BRL
Southeast Iowa Regional
IV
Central
BTR
Baton Rouge Metropolitan
II
Central
CAK
Akron-Canton Airport
II
Central
CDR
Chadron Municipal
IV
Central
CGI
Cape Girardeau Regional
IV
Central
CID
The Eastern Iowa Airport
II
Central
CIU
Chippewa County International
IV
Central
CLL
Easterwood Airport
III
Central
CMI
Willard Airport
III
Central
CMX
Houghton County Memorial
IV
Central
CVN
Clovis Regional Airport
IV
Central
CWA
Central Wisconsin Regional
III
Central
DAY
Dayton International
II
Central
DBQ
Dubuque Regional
IV
Central
DDC
Dodge City Regional
IV
Central
DEC
Decatur Airport
IV
Central
DFW
Dallas/Fort Worth International
X
Central
DIK
Dickinson Theodor Roosevelt Regional
IV
Central
DRT
Del Rio International Airport
IV
Central
DSM
Des Moines International
II
Central
DTW
Detroit Metropolitan Wayne County Airport
X
Central
DVL
Devils Lake Regional
IV
Central
EAR
Kearney Regional
IV
Central
EAU
Chippewa Valley Regional
IV
Central
ESC
Delta County Airport
IV
Central
EVV
Evansville Regional
III
Central
FAR
Hector International
II
Central
FNT
Bishop International
II
Central
FOD
Fort Dodge Regional
IV
Central
FOE
Topeka Regional Airport
IV
Central
FSD
Sioux Falls Regional
II
Central
FSM
Fort Smith Regional
III
Central
FWA
Ft. Wayne International Airport
II
Central
GCK
Garden City Regional
IV
Central
GFK
Grand Forks International
III
Central
GGG
East Texas Regional
III
Central
GLH
Mid Delta Regional Airport
IV
Central
GPT
Gulfport Biloxi International
II
Central
GRB
Green Bay Austin Straubel International
II
Central
GRI
Gerald R. Ford International
IV
Central
GRK
Killeen-Fort Hood Regional
III
Central
GTR
Golden Triangle Regional
IV
Central
HIB
Range Regional Airport
IV
Central
HYS
Hays Regional
IV
Central
IAH
George Bush Intercontinental
X
Central
ICT
Wichita Dwight D. Eisenhower National
II
Central
IMT
Ford Airport
IV
Central
INL
Falls International
IV
Central
IRK
Kirksville Regional
IV
Central
IWD
Gogebic- Iron County Airport
IV
Central
JAN
Jackson- Medgar Wiley Evers International
II
Central
JLN
Joplin Regional
III
Central
JMS
Jamestown Regional
IV
Central
LAN
Capital Region International
III
Central
LAW
Lawton- Fort Sill Regional
III
Central
LBB
Lubbock Preston Smith International
II
Central
LBF
North Platte Regional
IV
Central
LBL
Liberal Airport
IV
Central
LCH
Lake Charles Regional
IV
Central
LCK
Rickenbacker International
III
Central
LFT
Lafayette Regional
III
Central
LIT
Bill and Hilary Clinton National
II
Central
LRD
Laredo International
III
Central
LSE
La Crosse Regional
III
Central
MAF
Midland International Air & Space Port
II
Central
MBL
Manistee County Blacker
IV
Central
MBS
MBS International
III
Central
MCK
McKinney National
IV
Central
MCW
Mason City Municipal
IV
Central
MEI
Meridian Regional
IV
Central
MHK
Manhattan Regional
IV
Central
MKG
Muskegon County Airport
IV
Central
MLI
Quad City International
II
Central
MLU
Monroe Regional
IV
Central
MOT
Minot International
III
Central
MQT
Sawyer International
IV
Central
MSN
Dane County Regional
II
Central
MWA
Veterans Airport of Southern Illinois
IV
Central
ORD
O'Hare International
X
Central
PIA
General Wayne A. Downing Peoria International
II
Central
PIB
Hattiesburg- Laurel Regional
IV
Central
PIR
Pierre Regional
IV
Central
PLN
Pellston Regional
IV
Central
RAP
Rapid City Regional
II
Central
RFD
Chicago Rockford International
III
Central
RHI
Rhinelander-Oneida County Airport
IV
Central
ROW
Roswell International Air Center
III
Central
SAF
Santa Fe Regional
III
Central
SBN
South Bend International Airport
II
Central
SGF
Springfield/Branson National
II
Central
SHV
Shreveport Regional
II
Central
SJT
San Angelo Regional
III
Central
SLN
Salina Regional Airport
IV
Central
SPI
Abraham Lincoln Capital Airport
III
Central
SPS
Wichita Falls Regional
III
Central
STC
St. Cloud Regional Airport
III
Central
SUX
Sioux Gateway Airport
IV
Central
SWO
City of Stillwater Regional
IV
Central
TBN
Robert Regional
IV
Central
TOL
Eugene F. Kranz Toledo Express Airport
III
Central
TUP
Tupelo Regional Airport
IV
Central
TVC
Cherry Capital Airport
III
Central
TVF
Thief River Falls Regional
IV
Central
TXK
Texarkana Regional
IV
Central
UIN
Quincy Regional
IV
Central
VCT
Victoria Regional
IV
Central
XNA
Northwest Arkansas National
II
Central
XWA
Williston Basin International Airport
III
Central
ABE
Lehigh Valley International
II
East
ABY
Southwest Georgia Regional
IV
East
ACK
Nantucket Memorial
III
East
ACY
Atlantic City International
II
East
AGS
Augusta Regional Airport
II
East
AOO
Altoona-Blair County Airport
IV
East
ART
Watertown International
IV
East
AUG
Augusta Regional
IV
East
AVL
Asheville Regional
II
East
AVP
Wilkes Barre/Scranton International
II
East
BFD
Bradford Regional
IV
East
BFM
Mobile Downtown Airport
IV
East
BGM
Greater Binghamton Airport
III
East
BHB
Hancock County-Bar Harbor
IV
East
BKW
Raleigh County Memorial
IV
East
BQK
Brunswick Golden Isles Airport
IV
East
BQN
Rafael Hernandez International
III
East
CAE
Columbia Metropolitan
II
East
CEF
Westover Airport
III
East
CHA
Chattanooga Airport
II
East
CHO
Charlottesville/Albemarle Airport
II
East
CKB
North Central West Virginia Airport
III
East
CSG
Columbus Airport
III
East
DHN
Dothan Regional
III
East
DUJ
Dubois Regional
IV
East
ELM
Elmira Corning Regional
III
East
ERI
Erie International
III
East
EWN
Coastal Carolina Regional
III
East
EWR
Newark International
X
East
EYW
Key West International
II
East
FAY
Fayetteville Regional
III
East
FKL
Venango Regional
IV
East
FLO
Florence Regional
IV
East
GSO
Piedmont Triad International Airport
II
East
GSP
Greenville-Spartanburg International
II
East
HGR
Hagerstown Regional
IV
East
HPN
Westchester County
II
East
HVN
Tweed New Haven Airport
III
East
HXD
Hilton Head Airport
III
East
HYA
Barnstable Municipal
III
East
IAG
Niagara Falls International
III
East
ILG
Wilmington Airport
III
East
ILM
Wilmington International
II
East
IPT
Williamsport Regional Airport
IV
East
ISP
Long Island MacArthur Airport
II
East
ITH
Ithaca Tompkins International Airport
III
East
JFK
John F. Kennedy International
X
East
JQF
Concord-Padgett Regional Airport
III
East
JST
John Murtha Johnstown Cambria County Airport
IV
East
LBE
Arnold Palmer Regional Airport
III
East
LEB
Lebanon Municipal
IV
East
LEX
Blue Grass Airport
II
East
LGA
LaGuardia Airport
X
East
LNS
Lancaster Airport
IV
East
LWB
Lebanon Municipal Airport
IV
East
LYH
Lynchburg Regional
IV
East
MCN
Middle Georgia Regional
IV
East
MGM
Montgomery Regional
III
East
MGW
Morgantown Municipal
IV
East
MHT
Manchester Boston Regional
II
East
MLB
Melbourne Orlando International
III
East
MSL
Northwest Alabama Regional
IV
East
MSS
Massena International
IV
East
MVY
Martha's Vineyard Airport
III
East
MYR
Myrtle Beach International
II
East
OAJ
Albert J Ellis Airport
III
East
OGS
Ogdensburg International
III
East
ORH
Worcester Regional
III
East
OWB
Owensboro Daviess County
III
East
PAH
Barkley Regional
IV
East
PBG
Plattsburg International
III
East
PGD
Punta Gorda Airport
II
East
PGV
Pitt-Greenville Airport
IV
East
PHL
Philadelphia International
X
East
PKB
Mid-Ohio Valley Regional
IV
East
PQI
Presque Isle International
IV
East
PSE
Mercedita International
III
East
PSM
Portsmouth International Airport
III
East
PVC
Provincetown Municipal
IV
East
PWM
Portland International Jetport
II
East
RDG
Reading Regional
IV
East
RKD
Knox County Regional
IV
East
ROA
Roanoke- Blacksburg Regional
II
East
ROC
Greater Rochester International Airport
II
East
RUT
Rutland Southern Vermont Regional
IV
East
SAV
Savannah/Hilton Head International
II
East
SBY
Salisbury Regional
IV
East
SFB
Orlando Sanford International
II
East
SHD
Shenandoah Valley Airport
IV
East
SJU
Luis Munoz Marin International
X
East
SLK
Adirondack Regional
IV
East
SRQ
Sarasota-Bradenton International
II
East
STT
Cyril E. King Airport
II
East
STX
Henry E. Rohlsen
III
East
SWF
New York Stewart International
III
East
SYR
Syracuse Hancock International
II
East
TLH
Tallahassee International
II
East
TRI
Tri Cities Airport
III
East
TTN
Trenton Mercer Airport
III
East
TYS
McGhee Tyson Airport
II
East
UNV
University Park Airport
IV
East
VLD
Valdosta Regional Airport
IV
East
VRB
Vero Beach Regional Airport
IV
East
ACV
California Redwood Coast-Humboldt County Airport
III
West
ADK
Adak Airport
III
West
ADQ
Kodiak Airport
III
West
AKN
King Salmon Airport
III
West
ALS
San Luis Valley Regional
IV
West
ALW
Walla Walla Regional
III
West
ANC
Ted Stevens Anchorage International
I
West
ASE
Aspen Pitkin County Airport
III
West
BET
Bethel Airport
III
West
BFL
Meadows Field Airport
III
West
BRW
Wiley Post Will Rogers Memorial Airport
III
West
BTM
Bert Mooney Airport
III
West
CDB
Cold Bay Airport
III
West
CDC
Cedar City Regional
IV
West
CDV
Merle K. (Mudhole) Smith Airport
III
West
CEC
Del Norte County Regional
IV
West
CEZ
Cortez Municipal
IV
West
CNY
Canyonlands Field Airport
IV
West
COD
Yellowstone Regional
IV
West
CPR
Casper/ Natrona County International
III
West
CYS
Cheyenne Regional
IV
West
DEN
Denver International
X
West
DLG
Dillingham Airport
III
West
DRO
Durango-La Plata County Airport
III
West
EAT
Pangborn Memorial Airport
III
West
EGE
Eagle County Regional
III
West
EKO
Elko Regional
IV
West
ENA
Kenai Municipal
IV
West
ENV
Trondheim Airport
III
West
FAI
Fairbanks International
II
West
FAT
Fresno Yosemite International
II
West
FLG
Flagstaff Pulliam Airport
IV
West
FNL
Northern Colorado Regional
III
West
GCC
Northwest Wyoming Regional
IV
West
GDV
Dawson Community Airport
IV
West
GGW
Glasgow Valley County Airport
IV
West
GJT
Grand Junction Regional
III
West
GPI
Glacier Park International
III
West
GSN
Saipan International Airport
II
West
GST
Gustavus Airport
III
West
GTF
Great Falls International
III
West
GUC
Gunnison- Crested Butte Regional
III
West
GUM
Antonio B. Won Pat International
I
West
HDN
Yampa Valley Regional
III
West
HLN
Helena Regional
III
West
HOM
Homer Airport
IV
West
HVR
Havre City-County Airport
IV
West
IDA
Idaho Falls Municipal
III
West
IFP
Laughlin/Bullhead International
III
West
IPL
Imperial County
IV
West
JHM
Kapalua Airport
IV
West
JNU
Juneau International
II
West
KTN
Ketchikan International
III
West
LAR
Laramie Regional
IV
West
LNY
Lanai Airport
IV
West
LWS
Lewiston - Nez Perce County Regional
III
West
MCE
Merced Regional
IV
West
MKK
Molokai Airport
IV
West
MMH
Mammoth Yosemite Airport
III
West
MRY
Monterey Regional Airport
III
West
MSO
Missoula International
II
West
MTJ
Montrose Regional
III
West
NYL
Yuma International
IV
West
OAK
Oakland International
I
West
OGD
Ogdensburg International Airport
III
West
OGG
Kahului Airport
I
West
OLF
L. M. Clayton Airport
IV
West
OME
Nome Airport
III
West
OTH
Southwest Oregon Regional
IV
West
OTZ
Ralph Wien Memorial Airport
III
West
PAE
Snohomish County Airport (Paine Field)
II
West
PGA
Page Municipal Airport
IV
West
PHX
Phoenix Sky Harbor International
X
West
PIH
Pocatello Regional
IV
West
PPG
Pago Pago International
III
West
PRC
Prescott Regional
IV
West
PSG
Petersburg James A. Johnson Airport
III
West
PUB
Pueblo Memorial Airport
III
West
PUW
Pullman/Moscow Regional
III
West
PVU
Provo Airport
III
West
RDD
Redding Airport
III
West
RDM
Redmond Municipal Airport
II
West
RIW
Central Wyoming Regional
IV
West
RKS
Southwest Wyoming Regional
IV
West
SAN
San Diego International
I
West
SCC
Deadhorse Airport
III
West
SCK
Stockton Metropolitan Airport
III
West
SDY
Sidney-Richland Airport
IV
West
SFO
San Francisco International
X
West
SGU
St. George Regional
IV
West
SHR
Sheridan County Airport
IV
West
SIT
Sitka Rocky Gutierrez Airport
III
West
SJC
Norman Y. Mineta San Jose International
I
West
SLC
Salt Lake City International
I
West
SMF
Sacramento International Airport
I
West
SMX
Santa Maria Public Airport
III
West
SNA
John Wayne Airport
I
West
SOW
Show Low Regional
IV
West
STS
Charles M. Schultz- Sonoma County Airport
III
West
SUN
Friedman Memorial
III
West
TEX
Telluride Regional Airport
IV
West
TWF
Magic Valley Regional
IV
West
VDZ
Valdez Airport
IV
West
VEL
Vernal Regional Airport
IV
West
WRG
Wrangell Airport
III
West
WYS
Yellowstone Airport
IV
West
YAK
Yakutat Airport
III
West
YKM
Yakima Air Terminal
III
West

image2.png