This document is a presolicitation/sources sought presentation for the Federal Bureau of Prisons (BOP) Electronics Replacement/Upgrade project. The initiative encompasses three primary components: stun/lethal fence replacement/upgrade, LiDAR detection system installation, and radio system modernization across multiple BOP facilities.

The stun/lethal fence project will replace or upgrade fencing at all penitentiaries except USP Tucson and USP Yazoo City, with contractors responsible for installation. A separate project will install new stun/lethal fencing at ADX Florence, requiring extensive concrete work. The SOW will prioritize systems built with off-the-shelf products to minimize downtime and maintenance. All penitentiaries will install LiDAR sensors to provide continuous volumetric detection from exterior building walls to perimeter fence lines. The LiDAR systems must deliver high detection accuracy with low false-alarm rates and perform fully in low-light and total-darkness conditions; contractor installation is required. The radio system project involves replacing remaining Smartnet systems with an Enterprise system across 64 institutions, including 2 core systems for system control and 30 existing upgraded institutions to be converted to subsystems. BOP staff will handle removal and installation of FCI detection fences, while contractors are responsible for stun/lethal fence and LiDAR installation. No specific response dates, award dates, pricing terms, or set-asides are identified in this presolicitation document.

View the file

Other files

File Type Posted
Industry Day Roofing.pdf PDF
Fire Alarm Industry Day Presentation.pdf PDF
Industry Day MEP.pdf PDF
BF SOLICITATION PROCESS.pdf PDF
Industry Day Registration Form.pdf PDF
BOP Indusrty Day Flyer.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEDERAL BUREAU OF PRISONS

ELECTRONICS REPLACEMENT/UPGRADE

By: Nathan Quick

STUN/LETHAL

FENCES

• All Penitentiary’s with the exception of USP Tucson and USP Yazoo City to replace/upgrade stun/lethal fences

• All Penitentiary’s to install Lidar to cover from building to perimeter fence line.

• Separate project to install a stun/lethal fence and Lidar at ADX Florence.

• Stun/lethal fence SOW will be seeking systems built with off-the-shelf products to minimize downtime and maintenance.

LIDAR

LiDAR sensors provide continuous, volumetric detection across secure areas.

Coverage from exterior building walls to perimeter fence.

System must have high detection accuracy with a low false-alarm rate.

Must perform fully in low light and total darkness situations.

RADIO SYSTEM

BOP project to replace remaining Smartnet radio systems with an Enterprise system.

64 institutions involved, including 2 core systems to control the system.

30 existing upgraded institutions to be converted to sub systems and added to the core’s at a later date.

INSTALLATION

BOP staff will remove and install FCI detection fences.

Stun/lethal fences are responsibility of the contractor.

ADX Florence fence project will require extensive concrete.

Lidar is new to the BOP and will enhance the security of selected institutions.

Lidar installation is the responsibility of the contractor.

FEDERAL BUREAU OF PRISONS Electronics replacement/upgrade
Stun/Lethal Fences
LiDar
Radio system
installation

File details come from the government source that posted it. Updated .