This is a presentational document outlining a federal roofing modernization initiative by the Department of Justice, Federal Bureau of Prisons (BOP). The initiative encompasses 31 roofing replacement projects across BOP facilities nationwide, estimated at approximately $61.2 million in total cost, to be funded and issued for bid over a four-year period. Projects will be grouped by type of work required and geographic location.

The current roofing systems at BOP facilities are past their life expectancy and require constant maintenance, resulting in structural damage, interior finish deterioration, safety hazards, and mold growth. Key initiative goals include replacing damaged and failing roof systems, incorporating new technology, creating safe environments, achieving uniformity across U.S. facilities, and providing staff and inmate training. The initiative prioritizes inmate labor participation where appropriate, with BOP screening for compatibility and mandatory staff supervision. Contractors must provide factory-certified, knowledgeable workforces and train facility staff and inmate crews on problem identification, debris handling, deck preparation, system installation, flashing, and maintenance procedures. Projects will emphasize fiscal responsibility and best value to the government. The document presents detailed project profiles for 12 facilities across multiple regions—South Central (FCI Bastrop, FMC Carswell, MDC Houston, FTC Oklahoma City, FCI Three Rivers), Southeast (FCC Yazoo City FCI 1, FDC Miami), Northeast (FMC Devens, FCI Lewisburg, FCI Fort Dix), Mid-Atlantic (FCI Memphis, USP Lee), and North Central (FCI Waseca)—detailing existing roof conditions, square footage, roofing system types, scope of work including removal and installation of new TPO or standing seam metal systems, and site-specific challenges such as airport proximity, congested urban locations, environmental concerns, and historical preservation requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROOFING

PROJECTS

Roofing Systems

Current Conditions

• Past Life Expectancy \ Storm Related Issues

• Requires constant maintenance and related repair

• Deteriorated roofing systems lead to :

• Increased decking and substrate damage

• Damaged interior finishes and equipment

• Potential safety related issues

• Inherent mold growth and other indoor air quality issues.

Roofing Projects

Goals

• Replace Damaged and Failing Roof Systems

• New Technology

• Provide a safe environment that protects occupants as well contents.

• Uniformity throughout the United States

• Staff and Inmate Training

Training

• Projects to utilize inmate labor, where appropriate.

• Inmate work crews would be screened by BOP to ensure compatibility with this program.

• Staff Supervision will be provided at all times.

• Contractor will be required to train facility staff as well as inmate work crews to:

• Properly identify problem areas.

• Remove and properly handle construction debris.

• Preparing the existing deck and substrate to receive new systems.

• Installation of new systems and required flashing.

• Proper maintenance procedures to maintain longevity of the new system

• Provide a knowledgeable experienced "Factory" certified work force.

Project Implementation

• 31 Roofing projects will be funded and issued for bid proposal over the next 4 fiscal years.

• These projects are estimated at a total cost of approximately $61.2 m.

• Projects will be issued for bid by groups, based on type of work required and geographic locations.

• Projects to utilize inmate labor, where appropriate.

• Fiscal Responsibility to ensure "Best Value" to the Government.

Projects South Central Region

FCI Bastrop

FCI Bastrop

• FCI Bastrop was constructed in 1979 consists of 393,348 s.f. under roof and occupies 175 acres.

•Existing TPO on Housing Units (4) and asphalt built-up roofs over other areas are past life cycle.

• Housing Units – approx. 40,000 s.f.

• Remove existing TPO roof system and repair damaged Decking.

• Install new TPO roof system with insulation, parapet coping/cap and roof drain bodies

•Remaining Roof Area – approx. 58,000 s.f.

• Thoroughly clean the existing asphalt built-up roof

• Overlay new TPO roof system over existing

• Install new drain bodies, parapet coping and caps

FMC Carswell

FMC Carswell

• FMC Carswell was constructed in 1995, comprised of 20 buildings with 171,185 s.f. under roof.

• Existing roofing systems of various types installed and are past life cycle and beyond repair.

• Roof leaks have caused some damage to sections of the metal decking and associated supports.

• Deck types vary from concrete (approx. 63,000 s.f.) to metal (approx. 40,000 s.f.)

• Leaks have caused damage to interior finishes and suspected mold is present.

• New Work will consist of •Remove all damaged roof system ( approx. 103,000 s.f.) and repair all damaged decking/supports •Install new TPO roof system to include insulation, roof drain bodies, parapet coping/cap and flashing.

•Perform complete mold remediation in affected areas.

•Repair damaged interior finishes.

MDC Houston

MDC Houston

• MDC Houston was constructed in 1998 and consist of 300,000 s.f. and 11 floors.

• Existing asphalt built-up roof is past life cycle and despite regular maintenance continues to deteriorate.

• Evaluate existing roof area (approx. 30,000 s.f.) and repair damaged areas.

• Install new TPO roof system overlay with new drain bodies, parapet coping/cap and flashing.

• Possible difficulties:

• Working in congested street conditions.

• Roof areas on multiple floors and locations.

• Handling of material and construction debris.

FTC Oklahoma City

Western Region FTC Oklahoma City

• FTC Oklahoma City was constructed in 1995, consists of 5 buildings with approximately 585,000

• The main FTC building consists of 5 floors and approximately 100,000 s.f. of roof area. This area has a modified bitumen roof system that is exceeded it's life cycle and multiple areas are leaking, causing roof deck and interior finish damage.

• Remove existing roof system and repair damaged decking and supports.

• Install new TPO roof with insulation, drain bodies, parapet coping/cap and flashing.

• Possible difficulties:

• Working in close vicinity to an active airport operation

FCI Three Rivers

FCI Three Rivers

• FCI Three Rivers was constructed in 1990 and occupies approximately 300 acres.

• Existing roofs are approx. 110,000 s.f. and constructed of standing seam metal with skylights.

• Metal roofs are leaking throughout and have caused damaged to existing wood structure and decking.

• Replace all roofs with new standing seam metal roofing system to include new decking and insulation.

• Remove skylights and reframe the openings to allow proper tie-in to existing slopes.

• No suspected environmental issues are expected.

Southeast Region

FCC Yazoo City – FCI 1

FCC Yazoo – FCI 1

• FCC Yazoo was constructed in 1997, consists of 4 facilities and occupies approx. 1000 acres.

• FCI 1 has approximately 43,500 s.f. of asphalt built-up roofing that is past life cycle.

• Areas affected – Special Housing Unit, GP Housing Unit (1),,Administrative, Medical, Recreation Buildings

• Remove existing roofing system and repair damaged metal decking

• Install new TPO roofing system with insulation, roof drain bodies, parapet coping/cap and flashing.

FDC Miami

FDC Miami

• FDC Miami was constructed in 1999 consists of 550,965 s.f. and 13 floor levels

• Existing 44,000 s.f. asphalt built-up roof located on the 4th and 13th floor levels are is past life cycle and leaking.

• Remove existing roof system and repair metal decking and supports.

• Install new TPO roof system with new insulation drain bodies, parapet coping/cap and flashing.

• Possible difficulties:

• Working in congested street conditions.

• Roof areas on multiple floors and locations.

Northeast Region

FMC Devens

FMC Devens

• FMC Devens was originally constructed in 1960 and converted to BOP Facility in 1998

• Consists of 22 buildings and situated on approximately 222 acres

• Existing asphalt built-up roof approximately 120,000 s.f. is severely deteriorated and past life cycle.

• Remove existing roof system and repair existing metal roof deck and supports

• Install new TPO roof system with new insulation drain bodies, parapet coping/cap and flashing.

• No asbestos or environmental concerns are expected.

FCI Lewisburg

FCI Lewisburg

• FCI Lewisburg was constructed in 1932, consists 1,158,514 s.f. and situated on 950 acres.

• Existing asphalt built-up roof on the UNICOR Factory (approximately 105,000) s.f. is severely deteriorated and past life cycle.

• Remove existing roof system and repair existing metal roof deck and supports

• Install new TPO roof system with new insulation drain bodies, parapet coping/cap and flashing.

• No asbestos or environmental concerns are expected.

• Historical Preservation Concerns.

FCI Fort Dix

FCI Fort Dix

• FCI DIX was constructed in 1992 consists of 1,228,428 s.f. and occupies 210 acres.

• Existing roofing system is EPDM with gravel ballast and is past life cycle.

• Remove existing roof system (approx. 225,000 s.f.) and repair existing metal roof deck and supports

• Install new TPO roof system with new insulation drain bodies, parapet coping/cap and flashing.

• New gutters, scuppers and downspout.

• Mold Remediation Expected

• Repair/Replace damaged interior ceilings and finished.

• Minor brick repair and tuck pointing.

Mid-Atlantic Region

FCI Memphis

FCI Memphis

• FCI Memphis was constructed in 1977, consists 24 buildings totaling 304,000 s.f. and occupies 111 acres

• Existing roof is a mixture of TPO and EPDM roofing systems and are severely deteriorated.

• Remove existing roof systems (approx. 245,000 s.f.) and repair existing metal roof deck and supports

• Install new TPO roof system with new insulation, drain bodies, parapet coping/cap and flashing.

USP Lee

USP Lee

• USP Lee was constructed in 2001, consists of 675,647 s.f. and occupies 265 acres.

• Existing EPDM roofing systems are past life cycle and severely deteriorated.

• Remove existing roof systems (approx. 128,000 s.f.) and repair existing metal roof deck and supports

• Repair existing lightning protection system to eliminate on-going ground fault issues.

North Central Region

FCI Waseca

North Central Region

FCI Waseca

• FCI Waseca was originally an Agricultural College for the University of Minnesota and converted to a BOP Facility in 1996.

• Consists of 675,647 s.f. and occupies 265 acres.

• Existing gravel ballast EPDM roofing systems are past life cycle and severely deteriorated.

• Concrete decking is present however roofs have significant ponding throughout.

• Remove existing roof systems on Special Housing Unit, Medical, Food Service and Recreation

• Buildings (approx. 250,000 s.f.).

Slide Number 1
Roofing Systems�
Roofing Projects�
Roofing Systems�
Roofing Systems�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�

File details come from the government source that posted it. Updated .