This document is a presolicitation briefing presenting the U.S. Department of Justice, Federal Bureau of Prisons' comprehensive Mechanical, Electrical, and Plumbing (MEP) Systems modernization initiative. The program will fund and issue 207 MEP projects across federal correctional facilities over four fiscal years, with an estimated total cost of approximately $660 million. Projects will be grouped and issued for competitive bid based on work type and geographic location, with preference for utilizing inmate labor where appropriate. The initiative addresses outdated and failing infrastructure including equipment past life expectancy, increasing operational and maintenance costs, unreliable systems, and lack of redundancy. Goals include replacing outdated equipment, implementing new technology, ensuring reliability and redundant systems, increasing operational efficiency, and providing staff and inmate training.

The presolicitation details representative projects across five regions: South Central (FCI La Tuna—chilled water and HVAC systems; FCI Seagoville—HVAC systems for housing units; FCI Three Rivers—electrical generator and transformer replacement; FCC Beaumont—sewer and water piping systems; FMC Fort Worth—water storage tank); Western (FCI Herlong—heating distribution loop replacement; FCC Victorville—chiller and heat recovery system; MCC San Diego—domestic water line replacement); Northeast (FCI Berlin and FCI Schuylkill—heating distribution loop replacement); Southeast (FCC Coleman—chiller and boiler/control system replacement; FCI Atlanta—electrical distribution system upgrade); Mid-Atlantic (FCI Morgantown and FMC Lexington—emergency generator installation; FCI Ashland—domestic water system replacement); and North Central (FCI Englewood and FCI Marion—electrical infrastructure upgrade). Multiple projects involve historic preservation concerns and require Architect/Engineer (A/E) services to provide full construction documents and specifications. All projects emphasize fiscal responsibility to ensure best value to the government.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MECHANICAL, ELECTRICAL

AND

PLUMBING PROJECTS

MEP SYSTEMS

Current Conditions

• Outdated Equipment and Technology

• Past Life Expectancy

• Increasing Operational and Maintenance Cost

• Unreliable Systems

• Lack of Redundancy

Goals

• Replace Outdated and Failing Equipment

• New Technology

• Reliability

• Redundant Systems

• Increase Operational Efficiency

• Staff and Inmate Training

Project Implementation

• 207 MEP projects will be funded and issued for bid proposal over the next 4 fiscal years.

• These projects are estimated at a total cost of approximately $660 m.

• Projects will be issued for bid by groups, based on type of work required and geographic locations.

• Projects to utilize inmate labor, where appropriate.

• Fiscal Responsibility to ensure "Best Value" to the Government.

Projects South Central Region

FCI La Tuna

FCI La Tuna

• FCI La Tuna was constructed in 1932 consists of 25 buildings and approximately 80,185 s.f. under roof.

• Currently does not have a chilled water system.

• Install a complete Chilled Water System: Chillers, Cooling Tower, Pumping Systems and associated piping.

• Install new HVAC system: Roof Top Units, Make-Up Air Units Automated Environmental Controls, Exhaust Systems and all associated ductwork/piping.

• Upgrade the existing Electrical Systems to accommodate new power demand.

• A/E to provide full construction documents and specifications.

FCI Seagoville

FCI Seagoville

• FCI Seagoville was constructed in 1937, comprised of 38 building with 500,314 s.f. under roof.

• Inmate housing units 5, 7, 10 & 12 (57,746 sq ft) currently have heating and ventilation systems only.

• Heating is accomplished with steam-fired radiators located throughout each building with steam delivered by boilers located in the Powerhouse.

• Currently there are no chillers located within the Powerhouse.

• Provide a complete HVAC system for the 4 buildings to include: Chiller(s), Air Handling Units, Automated Control System, ductwork, piping and pumping systems.

• Historic Preservation concerns.

FCI Three Rivers

FCI Three Rivers

• FCI Three Rivers was constructed in 1990 and occupies approximately 300 acres.

• Replace two existing 450 kw generators, associated transfer switches and cabling located within the equipment room.

• Replace underground high voltage cabling in feed loop "B".

• Replace leaking high voltage transformers.

• Replace main switch gear and distribution panels in the Food Service Buildings at FCI and Camp.

FCC Beaumont

FCC Beaumont

• FCC Beaumont was constructed from 1996 to 1998 , consists of one USP, Two FCIs and one Satellite Prison Camp totaling 1,641,623 s.f. and situated on 960 acres.

• Existing complex sewer lift station is in a low-lying area subject to ground infiltration.

• Install new sewer lift station with proper elevations to ensure compliant operation.

• Existing underground domestic and fire water piping, all associated valves and pumping systems are severely corroded due to the corrosive environment and past flooding/storms

• Replace all underground piping system to include isolation valves.

• Replace all damaged piping in the Remote Utility Buildings (3) to include fire/domestic water systems and associated controls.

FMC Fort Worth

FMC Fort Worth

• FMC Fort Worth was constructed in 1934 consists of 31 buildings and occupies approximately 38 acres.

• Construct one domestic water storage tank to hold one million gallons of water.

• Addition of this tank will allow for 10 days of water to be used during emergency events.

Water Storage Tanks Projects

• Northeast Region – FCI Berlin, USP Allenwood, USP Lewisburg

• Mid-Atlantic Region – FCI Ashland, FCI Petersburg, FCI Morgantown, FCI Cumberland

• North Central Region – USP Terre Haute, FCI Cumberland

• South Central Region – FCI La Tuna, FCC Beaumont, FCC Oakdale, FCI Texarkana, FCI Carswell

• Western Region – FCI Safford, USP Lompoc

Western Region

FCI Herlong

FCI Herlong

• FCI Herlong was constructed in 2005, consists of 23 building with approximately 560,000 s.f. under roof.

• Replace existing heating hot water distribution loop due to excessive leaks.

• Current loop extends from Central Utility Plant to multiple building entries throughout the complex.

FCC Victorville - FCI-2

FCI Victorville

• FCC Victorville was constructed in 2000, consists of one USP, Two Medium FCIs and one Satellite Prison Camp totaling 1,732,420 s.f. and situated on 960 acres.

• The work will be isolated to FCI – 2.

• Replace two centrifugal Chillers and two Cooling Towers and associated piping located with-in the Central Utility Plant.

• Install a heat recovery system to capture rejected heat and utilize it to supplement the hot water boilers.

MCC San Diego

MCC San Diego

• MCC San Diego was constructed in 1974, consists of 23 stories and approximately 225,000 sf.

• Replace all domestic water lines throughout the building with selection demolition required.

• Access to some piping will be require demolition of various existing building components to replace.

• Building repair to current conditions will be required.

Northeast Region

FCI Berlin

FCI Berlin

• FCI Berlin was constructed in 2010 consists of 689,909 s.f. and situated on approximately 707 acres

• Replace existing pre-insulated heating hot water distribution loop due significant leaks.

• Current loop extends from Central Utility Plant to multiple building entries throughout the complex.

FCI Schuylkill

FCI Schuylkill

• FCI Schuylkill was constructed in 1991 consists of 516,397 s.f. and situated on approximately 600 acres

• Replace existing pre-insulated heating hot water distribution loop due to significant leaks.

• Current loop extends from Central Utility Plant to multiple building entries throughout the complex.

Southeast Region

FCC Coleman

USP 1 / USP 2 Coleman

• FCC Coleman was constructed in 1993, consists of two USPs, Two FCIs and one Prison Camp totaling 2,434,578 s.f. and situated on 1,746 acres.

• Replace two centrifugal Chillers and associated pumping systems located with-in the Central Utility Plant at USP-2.

• Replace Automated Controls Systems and Repair/Replace Boilers and associated pumping systems at USP-1.

FCI Atlanta

FCI Atlanta

• FCI Atlanta was constructed in 1902 consists of 47 buildings totaling approximately 1.6 million sq.ft.

• Currently the vast majority of the electrical distribution system is in need of major repair or replacement.

• Repair existing basement and subsurface drainage system to eliminate heavy water intrusion.

• Generator #3, all paralleling switchgear and automatic transfer switches are in need of replacement.

• Upgrade all existing electrical switchgear, distribution panels and transformers throughout the institutional grounds.

• Replace all High Mast Light Poles.

Mid-Atlantic Region

FCI Morgantown

FCI Morgantown

• FCI Morgantown was constructed in 1968, consists 22 buildings totaling 369,000 s.f. and occupies 400 acres.

• Currently the institution has no means of supplying emergency power in the event of commercial outage.

• Existing main electrical switch gear and distribution panels are overloaded and/or in need or replacement

• Install two new generators with switchgear, fuel tanks, emergency panels and all underground cabling required to adequately provide reliable power during times of emergency or inclement weather conditions.

• Upgrade all existing electrical switchgear, distribution panels and transformers throughout the institutional grounds.

FMC Lexington

FMC Lexington

• FMC Lexington was constructed in 1931 is comprised of 34 buildings with a total of 1,051,096 square feet.

• Currently the institution has no means of supplying emergency power in the event of commercial outage.

• Existing main electrical switch gear and distribution panels are overloaded and/or in need or replacement.

• Install two new generators with switchgear, fuel tanks, emergency panels and all underground cabling required to adequately provide reliable power during times of emergency or inclement weather conditions.

• Upgrade all existing electrical switchgear, distribution panels and transformers throughout the institutional grounds.

FCI Ashland

FCI Ashland

• FCI Ashland was constructed in 1940 is comprised of approximately 500,000 and encompasses 143 acres.

• Currently the institution domestic water needs are being service a 5" bronze water main located within the utility tunnel. Main and all laterals have signs of significant deterioration.

• Current pipe sizing is not adequate to meet the demands.

• Replace the entire domestic water system located throughout the institution grounds to include piping, valves and backflow prevention devices.

North Central Region

FCI Englewood

FCI Englewood

• FCI Englewood was constructed in 1938 is comprised of 15 buildings with a total of 263,000 square feet

• Existing electrical infrastructure is up to 35 years old and past it’s serviceable life cycle.

• 13.2KV switchgear located in the Powerhouse ( frequent operational failures)

• Main and feeder relays(existing GE 750 relays obsolete, upgrade to digital relays)

• Replace main motor control center in Powerhouse ( reliability and overheating issues)

• Replace underground feeder throughout the institution ( installed in 1938, loss of integrity, undersized )

• Upgrade medium voltage, distribution panels and transformers throughout the institutional grounds.

FCI Marion

FCI Marion

• FCI Marion was constructed in 1963 is comprised of 15 buildings and occupies 935 acres

• Existing electrical infrastructure is up to 50 years old and past it’s serviceable life cycle.

• Replace six medium voltage pad mount transformers.

• Replace electrical substations located within five different transformer vaults.

• Replace current grounding system ( electronic equipment and staff safety issues.)

• Replace high voltage underground feeders throughout the FCI

• Replace substation and distribution feeders and panel at FPC

Slide Number 1
MEP SYSTEMS�
MEP SYSTEMS�
MEP SYSTEMS�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Water Storage Tanks Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�
Projects�

File details come from the government source that posted it. Updated .