Section V_Attachment 3b_Temporary Staffing Pricing Worksheet (version 1)_4152024.xlsx

XLSX spreadsheet 135 KB Posted

Attached to
Temporary Staffing Services
Solicitation number
RFP_24_054
Issued by

About this file

This document is a Pricing Worksheet Attachment that is part of RFP 24-054 for Temporary Staffing Services issued by Princeton Plasma Physics Laboratory (PPPL), a U.S. Department of Energy Prime Contractor.

The Pricing Worksheet provides instructions and definitions for completing cost estimates across various labor categories, including Clerical, Business Administration, Technical, Engineering, IT, and Custodial. It specifies the maximum allowable markup percentages for overhead, general and administrative expenses, and profit/fee. The worksheet also includes a Temporary to Permanent Hire Percentage Fee schedule based on the number of hours worked. Offerors are instructed to utilize this Pricing Worksheet in conjunction with the Statement of Work (Attachment 1a) and the Sample Job Description (Attachment 2) to submit their pricing proposals in response to the RFP. Award will be for a three-year base period with two option periods.

View the file

Other files

File Type Posted
Section I_Attachment 1_SOW Temporary Staffing_RV 1_06242024.pdf PDF
Amendment 3_RFP_24-054_07012024.pdf PDF
Amendment 2_RFP_24-054_06242024.pdf PDF
Section V_Attachment 3b_Temporary Staffing Pricing Worksheet (version 2)_06142024_RV2.xlsx XLSX spreadsheet
Amendment 1_RFP_24-054_06102024v1.pdf PDF
Section V_Attachment 3b_Temporary Staffing Pricing Worksheet (version 1)_06062024_RV1.xlsx XLSX spreadsheet
Section V_Attachment 4_Reps and Certs- (Booklet) PPL-PD-RC2_ Rev 11_ 09-2013_RV1_06042024.pdf PDF
Amendment 1_RFP_24-054_06102024.pdf PDF
Section III_Instructions for Proposal Preparation_RV1_06042024.pdf PDF
Section II_Schedule A_PPPL-PD-F (TM)-Rev 9_Sept2022.pdf PDF
Section II_Schedule A_PPPL-PD-T Provisions For Work Performed-Rev 5_Sept2022.pdf PDF
Section II_Schedule C_PPPL Subcontractor Guidelines-Rev21 Aug2022.pdf PDF
Section IV_Evaluation Criteria Basis for Award.pdf PDF
Section V_Attachment 4_Reps and Certs- (Booklet) PPL-PD-RC2_ Rev 11_ 09-2013.pdf PDF
Section V_Attachment 5_Organizational Conflicts of Interest Certification Form.pdf PDF
Letter of Invitiation_05172024.pdf PDF
Section II_Sample_Basic Ordering Agreement_BOA.pdf PDF
Section II_Schedule A_PPPL-PD-S_Service Contract_Rev 8_Sept2022.pdf PDF
Section V_Attachment 3a_Offeror Information and Pricing Form.pdf PDF
Acknowledgement of Receipt RFP 24-054.pdf PDF
Table of Contents_RFP 24-054.pdf PDF
Section I_Attachment 1_2024 SOW Temp Staffing_4.12.2024 vRM Signed.pdf PDF
Section I_Attachment 2_Sample_Mechanical Engineer JD.pdf PDF
Section II_Schedule A_PPPL-PD-CTC (Commercial) Rev 25_Nov 2021.pdf PDF
Section II_Schedule A_PPPL-PD-D (Fixed Price) Rev 10_Sept2022.pdf PDF
Section II_Schedule F_SCA WD 15-4193-24 12-26-2023.pdf PDF
Section III_Instructions for Proposal Preparation.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

RFP 24-054- Temporary Staffing Services
Attachment 3b

TEMPORARY STAFFING PRICING WORKSHEET

Offeror Name:
Date:

Instructions: Complete the cost estimates within the various tabs. Please ensure that pricing responses are aligned with your written proposal response wherever applicable. All pricing estimates and options shall be provided to PPPL using this workbook.

Base Period - 3 years from date of implementation.

- Complete Tab 1- Reference Attachment 1a_Statement of Work
- Complete Tab 2- Reference Attachment 1a_Statement of Work
-Complete Tab 3- Reference Attachment 2_Sample Job Description
DEFINITIONS
A. Direct Labor Cost or Direct Labor Rate - These terms mean hourly wages paid by the Subcontractor to its personnel for hours the personnel actually worked as authorized by PPPL in Job Orders issued under this Agreement.
B. Overtime Rate - Overtime rate shall be noted on each Job Order and payment of overtime will be in accordance with the Federal laws which are applicable to each Service Contract Act (SCA) labor category. Reference the General Provisions for Commercial Subcontract (Schedule A).
C. Shift Differential - There shall be no shift differential paid to the Subcontractors’ personnel for work during second, third, or rotating shift assignments.
D. Standard Work Week - PPPL’s standard work week is Monday through Friday
E. Standard Bill Rate -The term “Standard Bill Rate’ shall mean the sum of “direct Labor Costs” and “Total Mark Up” as calculated in dollars.
F. Subcontracted Personnel - This term, as used throughout this Agreement, shall mean the personnel assigned to work at PPPL by the Subcontractor and remain employees of the Subcontractor and not of PPPL.
G. Total Mark-up (or Mark-up) -This shall be the percentage which shall include all overhead, general and administrative expenses, profit or fee, and other indirect expenses of the Subcontractor

1. Markup

Worker Categories & Max Markup Rates
The Staffing Agency agrees to the following Maximum Bill Rate and Markup Schedule:
Base Period (3 Years)
TOTAL MARK UP Base Period (3 Years)
Skill CategoryDefinitionOverhead %General & Administrative %Fringe %Total Mark Up Fee %Reduce Total Mark Up Fee % (*Reference Statement of Work, Section 3.2)
ClericalProvides secretarial and clerical services. Work mostly involves filing, record keeping and other such functions. Clerical job roles often require individuals to perform highly routine office support tasks with little autonomy.
Business AdministrationBusiness Administration roles are required to have higher educational qualifications such as a bachelor’s degree and/or equivalent experience. Administrative services involve management or the performance of business operations, decision making, as well as handling of people and other resources to direct activities toward common goals. Services include Professionals in Human Resources, Communications, Project Management, Facilities Management, Business Operations (Accounting, Procurement & Budgeting), etc.
TechnicalTechnical Support Staff are responsible for the fabrication, maintenance and operation of instruments and equipment and for the maintenance and upkeep of facilities. Other members of this staff provide services such as computer support, A/V support, drafting, material handling, stock room, shipping and receiving, etc.
EngineeringEngineering staff participate in the research and development programs at the Princeton Plasma Physics Laboratory by designing, maintaining, operating, and improving instruments, equipment, and systems; by designing, writing, maintaining, and improving computer programs and systems; or by providing equivalent professional knowledge and skills in other disciplines necessary to carry out the Laboratory's research and development efforts.
ITInformation Technology (IT) involves the development, implementation, support, maintenance, repair or protection of data or computer systems. Specific roles in IT can be categorized as engineering, technical or business administration and will be identified in the job description.
CustodialCustodians are responsible for the cleaning, maintenance and care of buildings, facilities and fixtures.
*Statement of Work Reference:
Section 3.2Staffing Agency agrees to reduce markup % to the negotiated Reduced Max Mark Up Fee %
upon Agency personnel’s two thousand eighty (2080) work hours and for the remainder or the assignment, without reducing
temporary personnel(s) Pay Rate.

2. Temp to Hire Fee

Temporary to Permanent Hire Percentage Fee

The Subcontractor’s Contract to Hire (Temporary to Permanent or “temp. to perm.”)
schedule is based on the annual salary (excluding overtime) to which PPPL and your candidate agree.
If PPPL elects to hire one of the Subcontractor’s employees
before the 1000-hour period, the following schedule applies.
Please provide the annual % fee for the below schedule
No. of HoursApprox. time frame% of annual Salary
0 to 500 hours3 months
501 to 999 hours4-6 months
After 1000 hoursNo Charge

3. Sample Job Order Proposal

SAMPLE JOB ORDER PROPOSAL
Instructions for completion
Sample Job Order Proposal pricing should be provided utilizing the sample Job Description (Attachment 2_Sample Job Description ) and in conjunction with Markup Fees proposed on Tab 1 for the appropriate Skill Category
Utlilizing the Same Job Description- utlizing the sample Job Description
Skill CategoryJob DescriptionMin DL hourly (provided by PPPL)Max DL hourly Rate (provided by PPPL)Proposed Direct Labor RateMark up (from Fee Page)Total Standard Bill Rate
EngineeringMechanical Engineer$70.00$75.00$%$

File details come from the government source that posted it. Updated .