Section P - Oil Water Separator Cleaning 2.3.2026 Final.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Oil/Water Separator Cleaning & Sludge Removal Services at BWI Thurgood Marshall& Martin State Airports
Solicitation number
BPM055229
Issued by
Anne Arundel County, Maryland

About this file

This is a scheduling and specification document for oil/water separator cleaning services prepared by the Maryland Department of Transportation Maryland Aviation Administration (MDOT MAA) for cleaning operations at Baltimore/Washington International Thurgood Marshall Airport and Martin State Airport. The document outlines a comprehensive cleaning and inspection program for existing oil/water separators and additional treatment and containment structures. The contractor is required to provide all necessary labor, supervision, materials, equipment, containers, insurance, and expertise to perform cleaning and inspection operations in accordance with specified standards. The spreadsheet appears to contain a detailed schedule organized by date, with entries for February 2026 indicating specific cleaning activities and associated operational requirements for the two airport facilities.

The document establishes the technical framework and timeline for service delivery without indicating specific pricing terms, bid amounts, or contract duration within the provided file. The service scope encompasses complete oil/water separator maintenance operations at both airport locations, requiring qualified contractors with appropriate equipment and insurance coverage to manage hazardous material removal and treatment. No renewal options, set-asides, incumbent information, or funding source details are evident in this scheduling document, which primarily serves as an operational reference for executing the cleaning services as specified in the broader contract opportunity.

View the file

Other files

File Type Posted
Volume II.pdf PDF
eMMA Addendum No. 2.pdf PDF
Volume I.pdf PDF
eMMA Addendum No. 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SECTION P

BID

BID OF
ADDRESS
TELEPHONE NUMBER
FACSIMILE NUMBER
E-MAIL ADDRESS
MADE THISDAY OF
BID GUARANTYFive (5) percent of the total contract price
TIME OF COMPLETIONSee (TP-1.04) Duration
LIQUIDATED DAMAGES PER CALENDAR DAYNA

BIDS ARE IRREVOCABLE FOR 90 DAYS FOLLOWING BID OPENING

TO THE MARYLAND AVIATION ADMINISTRATION
BALTIMORE/WASHINGTON INTERNATIONAL THURGOOD MARSHALL AIRPORT

GENTLEMEN:

The undersigned hereby declares to have carefully examined the Specifications entitled: Maryland Department of Transportation, Maryland Aviation Administration, Contract No. MAA-MC-27-002 Oil/Water Separator Cleaning and Sludge Removal Services at Baltimore/Washington International Thurgood Marshall (BWI Thurgood Marshall) and Martin State (MTN) Airports, dated February, 2026.

The undersigned proposes and agrees to furnish all labor, materials, equipment and services necessary for the above-said project for the Maryland Aviation Administration in accordance with the Specifications and other Contract Documents including all Addenda issued by the Maryland Aviation Administration at and for the following price(s):

Bidders shall submit positive unit price amounts or a bid of zero on the Bid form only. No negative unit price amounts shall be accepted as responsive bids.

The Total Contract Cost will be evaluated by reviewing the total amount provided in each of the following Sections:

Part I – Labor and Equipment Fees

BID ITEM DESCRIPTIONS
A. Bid Item Number 1 - On-Site Supervisor
The Contractors shall provide the On-site Supervisor to manage all aspects of the assigned projects. The On-Site Supervisor shall also be responsible for submitting the daily reports and notifying the MES of any contingencies that may occur. The hourly rate shall include the costs for all personal protective equipment (PPE) required to complete each assigned project. This item shall be at an hourly rate with an estimated quantity of 60 hours for each year.
B. Bid Item Number 2 - Laborers
The Contractors shall provide an hourly rate for general labor in addition to the labor required for operating the vacuum truck (Bid Item 3), rack truck (Bid Item 4), and Vacuum Tanker (Bid Item 8). The hourly rate shall include the costs for all personal protective equipment (PPE) required to complete each assigned project. This item shall be bid as an hourly rate with an estimated quantity of 120 hours for each year.
C. Bid Item Number 3 - Vactor & Operator
The Contractors shall provide an hourly rate for a minimum of 3,000-gallon capacity Vactor vacuum truck or equal. This piece of equipment is to be an ‘air mover’ and possess the capability to tilt and open from the back allowing for the release of accumulated solids within the tank. The Vactor truck is a vehicle/unit designed to pump heavy sludges and/or solids. The minimum rating for the pump on this vehicle is 3800 cubic feet per minute (CFM). This cost includes an experienced operator to assume all responsibilities. The operator will also be required to maintain the Vactor on-site as well as when hauling materials off-site for disposal. This unit price will include the labor for the operator; fuel for the equipment, all hoses required to complete each project as well as any tools or required equipment to perform the necessary maintenance on the facility or Vactor. This item shall be bid as an hourly rate as required on a daily basis with an estimated 30 hours for each year.
D. Bid Item Number 4 - Rack Truck
The Contractors shall provide a daily rate for a Rack truck (flat bed transportation truck). This unit price will include hand tools and equipment outfitted on truck to perform the necessary maintenance on the facility. This unit price will also include fuel for the rack truck itself and all associated equipment (i.e. pressure washer etc.). The Contractors shall supply all necessary tools (i.e. wrenches, hammers, screw drivers, shovels, brooms, safety equipment and other necessary equipment & meters) needed to remove sediment and debris from pipes, oil/water separators and storage facilities. This vehicle must also include a gasoline powered pressure washer with a minimum of 3500 psi rating. The pressure washer included in this vehicle must also include a minimum of 250-gallon capacity self contained water tank. This item shall be bid as a daily rate with an estimated 8 days for each year.
E. Bid Item Number 5 - Confined Space Entry
The Contractors shall provide all necessary equipment to complete any confined space entry. This item will include any equipment/meters that are required to enter any confined space. All equipment/meters include but is not limited to tripod, oxygen meters, oxygen tanks, SCBA’s, etc. This item shall be bid as a daily rate with an estimated 8 days for each year.
F. Bid Item Number 6 - Non-Hazardous Liquids Disposal (Stormwater Based)
The Contractors shall provide the necessary labor and equipment to collect and dispose of all waste materials generated from the maintenance operations. This item shall include the transportation and disposal of liquid wastes offsite. This item shall be bid at a rate per gallon for an estimated 60,000 gallons each year.
G. Bid Item Number 7 - Non-Hazardous Solids Disposal (Landfill)
The Contractors shall provide the necessary labor and equipment to collect and dispose of all waste materials generated from the maintenance operations. This item shall include the transportation and disposal of solid wastes offsite. This item shall be bid at a rate per gallon for an estimated 5,000 gallons each year.
H. Bid Item Number 8 - Vacuum Tanker & Operator
The Contractors shall provide an hourly rate for a minimum of 5,000-gallon capacity vacuum tanker truck. The tanker truck is a vehicle/unit designed to pump liquids. The minimum rating for the pump on this vehicle is to be 750 cubic feet per minute (CFM). This cost includes an experienced operator to assume all responsibilities. The operator will also be required to maintain the vacuum tanker on-site as well as when hauling materials off-site for disposal. This unit price will include the labor of the operator; fuel for the equipment, all hoses required to complete each project as well as any tools or required equipment to perform the necessary maintenance on the facility or vacuum tanker truck. This item shall be bid as an hourly rate as required on a daily basis with an estimated 90 hours each year.
Contract Year 1
Bid Item & Description(1)
On-Site Supervisor(2)
Laborer(3)
Vactor & Operator(4)
Rack Truck(5)
Confined Space Entry(6)
Non-Hazardous Liquid Disposal(7)
Non-Hazardous Solids Disposal(8)

Vacuum Tanker & Operator

UnitsPer HourPer HourPer HourPer DayPer DayPer GallonPer GallonPer Hour
Est. Quantity60120308860,0005,00090
Unit Price$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Price$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00

Contract Year 1 (Bid Items 1 thru 8) Total . $0.00

Contract Year 2

Bid Item & Description(1)
On-Site Supervisor(2)
Laborer(3)
Vactor & Operator(4)
Rack Truck(5)
Confined Space Entry(6)
Non-Hazardous Liquid Disposal(7)
Non-Hazardous Solids Disposal(8)

Vacuum Tanker & Operator

UnitsPer HourPer HourPer HourPer DayPer DayPer GallonPer GallonPer Hour
Est. Quantity60120308860,0005,00090
Unit Price$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Price$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00

Contract Year 2 (Bid Items 1 thru 8) Total . $0.00

Contract Year 3
Bid Item & Description(1)
On-Site Supervisor(2)
Laborer(3)
Vactor & Operator(4)
Rack Truck(5)
Confined Space Entry(6)
Non-Hazardous Liquid Disposal(7)
Non-Hazardous Solids Disposal(8)

Vacuum Tanker & Operator

UnitsPer HourPer HourPer HourPer DayPer DayPer GallonPer GallonPer Hour
Est. Quantity60120308860,0005,00090
Unit Price$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Price$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00

Contract Year 3 (Bid Items 1 thru 8) Total . $0.00

Contract Year 4
Bid Item & Description(1)
On-Site Supervisor(2)
Laborer(3)
Vactor & Operator(4)
Rack Truck(5)
Confined Space Entry(6)
Non-Hazardous Liquid Disposal(7)
Non-Hazardous Solids Disposal(8)

Vacuum Tanker & Operator

UnitsPer HourPer HourPer HourPer DayPer DayPer GallonPer GallonPer Hour
Est. Quantity60120308860,0005,00090
Unit Price$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Price$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00

Contract Year 4 (Bid Items 1 thru 8) Total . $0.00

Contract Year 5
Bid Item & Description(1)
On-Site Supervisor(2)
Laborer(3)
Vactor & Operator(4)
Rack Truck(5)
Confined Space Entry(6)
Non-Hazardous Liquid Disposal(7)
Non-Hazardous Solids Disposal(8)

Vacuum Tanker & Operator

UnitsPer HourPer HourPer HourPer DayPer DayPer GallonPer GallonPer Hour
Est. Quantity60120308860,0005,00090
Unit Price$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Price$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00

Contract Year 5 (Bid Items 1 thru 8) Total . $0.00

Part II – Total Contract Cost

TOTAL BID PRICE (Total Contract Years 1 through 5) $ $0.00

TOTAL CONTRACT COST DOLLARS

AND CENTS ($ )

The contract shall be award of this contract will be based on the lowest responsive bid submitted by a responsible bidder meeting specifications.

The foregoing prices include and cover the furnishing of all vendor/subcontractor labor and material, mark-up, overhead, profit, delivery, storage, burden, installation, equipment, tools, insurance, and all similar incidental costs to complete each individual task, as set forth, described, and shown in the Specifications and other Contract Documents. Total Contract Cost listed above is the maximum spending authority for this contract and is subject to approval by the Maryland Board of Public Works. It should be noted, however, Administration spending authority for the contract is subject to fiscal year appropriations as approved by the Governor and the State Legislature and may be funded at less than the full contract value.

The contractor shall fill out the information page of the Bid Proposal Section P and submit all required items including pricing on the EXCEL SPREADSHEET attached to this solicitation. In addition, the contractor mustfill in the price sheet on eMMA and ensure that the pricing matches the excel sheet. In the event of a discrepancy between the excel sheet and the eMMA pricing sheet, the EXCEL sheet will prevail. This project is being bid via eMaryland Marketplace Advantage (eMMA), https://emma.maryland.gov. Bids shall only be accepted via the State’s internet based electronic procurement system, eMMA at https://emma.maryland.gov.
Each and every person bidding and named above must sign here. In case of firm, give the first and last name of each member in full with residence.

In case a bid shall be submitted by or on behalf of any corporation it must be signed in the name of such corporation by an authorized officer, or agent thereof, who shall also subscribe his name and office. The seal of the corporation shall be fixed.

*******************************************************************************
IN WITNESS WHEREOF:

Witness Contractor

By:
DateSignature

Name of Point of Contact Printed or Typed

Phone Number of Point of Contact Title

E-Mail Address of Point of ContactFederal Tax Identification Number
or Social Security Number

Title of Point of Contact

File details come from the government source that posted it. Updated .