BASE YEAR
| Golden Gate National Recreation Area |
| Marin County Areas |
| Portable Toilet and Vauilt Toilet Services Contract |
| 3.15.25 thru 3.14.26 (BASE YEAR) |
| VAULT TOILET PUMPING COSTS | | | | | | |
| Vault Toilet Locations | No. of Vaults at location | Estimated number of pumpings for 12 month period | Total Pumpings | Cost per pump | 12 month total | 3 |
| Battery Spencer | 2 | 6 | 12 | | | |
| Battery Alexander | 1 | 5 | 5 | | $ - 0 | |
| Battery Wallace | 1 | 2 | 2 | | $ - 0 | |
| Blacksands Beach Parking Lot (Conzelman Rd) | 1 | 4 | 4 | | $ - 0 | |
| Conzelman Rd @ McCullough Rd Roundabout | 1 | 4 | 4 | | $ - 0 | |
| Haypress Campground | 2 | 2 | 4 | | $ - 0 | |
| Kirby Cove | 3 | 5 | 15 | | $ - 0 | |
| Muir Beach Overlook | 2 | 6 | 12 | | $ - 0 | |
| Muir Beach Parking Lot | 4 | 7 | 28 | | $ - 0 | |
| Point Bonita (Battery Mendell) | 2 | 7 | 14 | | $ - 0 | |
| Tennessee Valley Parking Lot | 2 | 5 | 10 | | $ - 0 | |
| Tennessee Valley Beach (Trail) | 1 | 3 | 3 | | $ - 0 | |
| Smith Road/Gerbode Parking Area | 1 | 2 | 4 | | $ - 0 | |
| Battery Hill (top of Conzelman) | 2 | 4 | 8 | | | |
| 25 | 62 | 123 | | $ - 0 | |
Total vault toilet pumping costs for 12 months $ - 0
| PORTABLE TOILET RENTAL COSTS | | | |
| Portable Toilet Locations | ADA Quantities | ADA Monthly rental | Total Cost for 12 months |
| Fort Baker Pier | 5 | | |
| Bicentennial Camp | 1 | | |
| Building T-1111 | 1 | | |
| Hawk Camp | 1 | | |
| Nike Site | 3 | | |
| Totals | 11 | | $ - 0 |
| Total rental charges for 12 months | | $ - 0 |
| PORTABLE TOILET CLEANING COSTS | | | | | |
| Frequency | No. of services over twelve month period | Total number of ADA portables at location | Cost per service | Total Cost for 12 Months |
| Fort Baker Pier | 3 x per week | 780 | 5 | | |
| Bicentennial Camp | Weekly | 52 | 1 | | |
| Building T-1111 | Weekly | 52 | 1 | | |
| Hawk Camp | Weekly | 52 | 1 | | |
| Nike Site | Weekly | 52 | 3 | | |
| Totals | | 988 | 11 | | $ - 0 |
| SINK RENTAL COSTS | | | | | |
| Frequency | No. of services over twelve month period | Total Number of sinks at location | Cost per service | Total Cost for 12 Months |
| Nike Site | Weekly | 52 | 2 | | |
| Totals | | 52 | 2 | | $ - 0 |
Total cleaning charges for 12 months $ - 0
| ANNUAL RENTAL COSTS | | | | | | | | |
| Frequency | No. of services over Special Event period | Total number of ADA portables at location | Total number of Standard portables at location | Total number of Sinks at location | Total Days of Rental | Cost per service | Total Cost for Special Events |
| FOURTH OF JULY | Once Annually | 1 | 3 | 5 | 2 | 3 | | |
| FLEET WEEK | Once Annually | 1 | 3 | 5 | 2 | 4 | | |
| Totals | | 2 | 6 | 10 | 4 | 7 | | $ - 0 |
| GRAND TOTAL FOR 03/15/2025 - 03/14/2026 (BASE YEAR) | | | $ - 0 | | | | | |
OPTION YEAR 1
| Golden Gate National Recreation Area |
| Marin County Areas |
| Portable Toilet and Vauilt Toilet Services Contract |
| 3.15.26 thru 3.14.27 (BASE YEAR) |
| VAULT TOILET PUMPING COSTS | | | | | | |
| Vault Toilet Locations | No. of Vaults at location | Estimated number of pumpings for 12 month period | Total Pumpings | Cost per pump | 12 month total | 3 |
| Battery Spencer | 2 | 6 | 12 | | $ - 0 | |
| Battery Alexander | 1 | 5 | 5 | | $ - 0 | |
| Battery Wallace | 1 | 2 | 2 | | $ - 0 | |
| Blacksands Beach Parking Lot (Conzelman Rd) | 1 | 4 | 4 | | $ - 0 | |
| Conzelman Rd @ McCullough Rd Roundabout | 1 | 4 | 4 | | $ - 0 | |
| Haypress Campground | 2 | 2 | 4 | | $ - 0 | |
| Kirby Cove | 3 | 5 | 15 | | $ - 0 | |
| Muir Beach Overlook | 2 | 6 | 12 | | $ - 0 | |
| Muir Beach Parking Lot | 4 | 7 | 28 | | $ - 0 | |
| Point Bonita (Battery Mendell) | 2 | 7 | 14 | | $ - 0 | |
| Tennessee Valley Parking Lot | 2 | 5 | 10 | | $ - 0 | |
| Tennessee Valley Beach (Trail) | 1 | 3 | 3 | | $ - 0 | |
| Smith Road/Gerbode Parking Area | 1 | 2 | 2 | | $ - 0 | |
| Battery Hill (top of Conzelman) | 2 | 4 | 8 | | $ - 0 | |
| 25 | 62 | 123 | | $ - 0 | |
Total vault toilet pumping costs for 12 months $ - 0
| PORTABLE TOILET RENTAL COSTS | | | |
| Portable Toilet Locations | ADA Quantities | ADA Monthly rental | Total Cost for 12 months |
| Fort Baker Pier | 5 | | |
| Bicentennial Camp | 1 | | $ - 0 |
| Building T-1111 | 1 | | $ - 0 |
| Hawk Camp | 1 | | $ - 0 |
| Nike Site | 3 | | $ - 0 |
| Totals | 11 | | $ - 0 |
| Total rental charges for 12 months | | $ - 0 |
| PORTABLE TOILET CLEANING COSTS | | | | | |
| Frequency | No. of services over twelve month period | Total number of ADA portables at location | Cost per service | Total Cost for 12 Months |
| Fort Baker Pier | 3 x per week | 780 | 5 | | $ - 0 |
| Bicentennial Camp | Weekly | 52 | 1 | | $ - 0 |
| Building T-1111 | Weekly | 52 | 1 | | $ - 0 |
| Hawk Camp | Weekly | 52 | 1 | | $ - 0 |
| Nike Site | Weekly | 52 | 3 | | $ - 0 |
| Totals | | 988 | 11 | | $ - 0 |
Total cleaning charges for 12 months $ - 0
| SINK RENTAL COSTS | | | | | |
| Frequency | No. of services over twelve month period | Total Number of sinks at location | Cost per service | Total Cost for 12 Months |
| Nike Site | Weekly | 52 | 2 | | $ - 0 |
| Totals | | 52 | 2 | | $ - 0 |
| ANNUAL EVENTS RENTAL COSTS | | | | | | | | |
| Frequency | No. of services over Special Event period | Total number of ADA portables at location | Total number of Standard portables at location | Total number of Sinks at location | Total Days of Rental | Cost per service | Total Cost for Special Events |
| FOURTH OF JULY | Once Annually | 1 | 3 | 5 | 2 | 3 | | $ - 0 |
| FLEET WEEK | Once Annually | 1 | 3 | 5 | 2 | 5 | | $ - 0 |
| Totals | | 2 | 6 | 10 | 4 | 7 | | $ - 0 |
| GRAND TOTAL FOR 03/15/2026 - 03/14/2027 (Option Year 1) | | | $ - 0 | | | | | |
OPTION YEAR 2
| Golden Gate National Recreation Area |
| Marin County Areas |
| Portable Toilet and Vauilt Toilet Services Contract |
| 3.15.27 thru 3.14.28 (OPTION YEAR 2) |
| VAULT TOILET PUMPING COSTS | | | | | | |
| Vault Toilet Locations | No. of Vaults at location | Estimated number of pumpings for 12 month period | Total Pumpings | Cost per pump | 12 month total | 3 |
| Battery Spencer | 2 | 6 | 12 | | $ - 0 | |
| Battery Alexander | 1 | 5 | 5 | | $ - 0 | |
| Battery Wallace | 1 | 2 | 2 | | $ - 0 | |
| Blacksands Beach Parking Lot (Conzelman Rd) | 1 | 4 | 4 | | $ - 0 | |
| Conzelman Rd @ McCullough Rd Roundabout | 1 | 4 | 4 | | $ - 0 | |
| Haypress Campground | 2 | 2 | 4 | | $ - 0 | |
| Kirby Cove | 3 | 5 | 15 | | $ - 0 | |
| Muir Beach Overlook | 2 | 6 | 12 | | $ - 0 | |
| Muir Beach Parking Lot | 4 | 7 | 28 | | $ - 0 | |
| Point Bonita (Battery Mendell) | 2 | 7 | 14 | | $ - 0 | |
| Tennessee Valley Parking Lot | 2 | 5 | 10 | | $ - 0 | |
| Tennessee Valley Beach (Trail) | 1 | 3 | 3 | | $ - 0 | |
| Smith Road/Gerbode Parking Area | 2 | 4 | 4 | | $ - 0 | |
| Battery Hill (top of Conzelman) | 1 | 2 | 2 | | $ - 0 | |
| 25 | 62 | 119 | | $ - 0 | |
Total vault toilet pumping costs for 12 months $ - 0
| PORTABLE TOILET RENTAL COSTS | | | |
| Portable Toilet Locations | ADA Quantities | ADA Monthly rental | Total Cost for 12 months |
| Fort Baker Pier | 5 | | $ - 0 |
| Bicentennial Camp | 1 | | $ - 0 |
| Building T-1111 | 1 | | $ - 0 |
| Hawk Camp | 1 | | $ - 0 |
| Nike Site | 3 | | $ - 0 |
| Totals | 11 | | $ - 0 |
| Total rental charges for 12 months | | $ - 0 |
| PORTABLE TOILET CLEANING COSTS | | | | | |
| Frequency | No. of services over twelve month period | Total number of ADA portables at location | Cost per service | Total Cost for 12 Months |
| Fort Baker Pier | 3 x per week | 780 | 5 | | $ - 0 |
| Bicentennial Camp | Weekly | 52 | 1 | | $ - 0 |
| Building T-1111 | Weekly | 52 | 1 | | $ - 0 |
| Hawk Camp | Weekly | 52 | 1 | | $ - 0 |
| Nike Site | Weekly | 52 | 3 | | $ - 0 |
| Totals | | 988 | 11 | | $ - 0 |
Total cleaning charges for 12 months $ - 0
| SINK RENTAL COSTS | | | | | |
| Frequency | No. of services over twelve month period | Total Number of sinks at location | Cost per service | Total Cost for 12 Months |
| Nike Site | Weekly | 52 | 2 | | $ - 0 |
| Totals | | 52 | 2 | | $ - 0 |
| ANNUAL EVENTS RENTAL COSTS | | | | | | | | |
| Frequency | No. of services over Special Event period | Total number of ADA portables at location | Total number of Standard portables at location | Total number of Sinks at location | Total Days of Rental | Cost per service | Total Cost for Special Events |
| FOURTH OF JULY | Once Annually | 1 | 3 | 5 | 2 | 3 | | $ - 0 |
| FLEET WEEK | Once Annually | 1 | 3 | 5 | 2 | 5 | | $ - 0 |
| Totals | | 2 | 6 | 10 | 4 | 7 | | $ - 0 |
| GRAND TOTAL FOR 03/15/2027 - 03/14/2028 (Option Year 2) | | | $ - 0 | | | | | |
OPTION YEAR 3
| Golden Gate National Recreation Area |
| Marin County Areas |
| Portable Toilet and Vauilt Toilet Services Contract |
| 3.15.28 thru 3.14.29 (OPTION YEAR 3) |
| VAULT TOILET PUMPING COSTS | | | | | | |
| Vault Toilet Locations | No. of Vaults at location | Estimated number of pumpings for 12 month period | Total Pumpings | Cost per pump | 12 month total | 3 |
| Battery Spencer | 2 | 6 | 12 | | $ - 0 | |
| Battery Alexander | 1 | 5 | 5 | | $ - 0 | |
| Battery Wallace | 1 | 2 | 2 | | $ - 0 | |
| Blacksands Beach Parking Lot (Conzelman Rd) | 1 | 4 | 4 | | $ - 0 | |
| Conzelman Rd @ McCullough Rd Roundabout | 1 | 4 | 4 | | $ - 0 | |
| Haypress Campground | 2 | 2 | 4 | | $ - 0 | |
| Kirby Cove | 3 | 5 | 15 | | $ - 0 | |
| Muir Beach Overlook | 2 | 6 | 12 | | $ - 0 | |
| Muir Beach Parking Lot | 4 | 7 | 28 | | $ - 0 | |
| Point Bonita (Battery Mendell) | 2 | 7 | 14 | | $ - 0 | |
| Tennessee Valley Parking Lot | 2 | 5 | 10 | | $ - 0 | |
| Tennessee Valley Beach (Trail) | 1 | 3 | 3 | | $ - 0 | |
| Smith Road/Gerbode Parking Area | 1 | 2 | 2 | | $ - 0 | |
| Battery Hill (top of Conzelman) | 2 | 4 | 8 | | $ - 0 | |
| 25 | 62 | 123 | | $ - 0 | |
Total vault toilet pumping costs for 12 months $ - 0
| PORTABLE TOILET RENTAL COSTS | | | |
| Portable Toilet Locations | ADA Quantities | ADA Monthly rental | Total Cost for 12 months |
| Fort Baker Pier | 5 | | $ - 0 |
| Bicentennial Camp | 1 | | $ - 0 |
| Building T-1111 | 1 | | $ - 0 |
| Hawk Camp | 1 | | $ - 0 |
| Nike Site | 3 | | $ - 0 |
| Totals | 11 | | $ - 0 |
| Total rental charges for 12 months | | $ - 0 |
| PORTABLE TOILET CLEANING COSTS | | | | | |
| Frequency | No. of services over twelve month period | Total number of ADA portables at location | Cost per service | Total Cost for 12 Months |
| Fort Baker Pier | 3 x per week | 780 | 5 | | $ - 0 |
| Bicentennial Camp | Weekly | 52 | 1 | | $ - 0 |
| Building T-1111 | Weekly | 52 | 1 | | $ - 0 |
| Hawk Camp | Weekly | 52 | 1 | | $ - 0 |
| Nike Site | Weekly | 52 | 3 | | $ - 0 |
| Totals | | 988 | 11 | | $ - 0 |
Total cleaning charges for 12 months $ - 0
| SINK RENTAL COSTS | | | | | |
| Frequency | No. of services over twelve month period | Total Number of sinks at location | Cost per service | Total Cost for 12 Months |
| Nike Site | Weekly | 52 | 2 | | $ - 0 |
| Totals | | 52 | 2 | | $ - 0 |
| ANNUAL EVENTS RENTAL COSTS | | | | | | | | |
| Frequency | No. of services over Special Event period | Total number of ADA portables at location | Total number of Standard portables at location | Total number of Sinks at location | Total Days of Rental | Cost per service | Total Cost for Special Events |
| FOURTH OF JULY | Once Annually | 1 | 3 | 5 | 2 | 3 | | $ - 0 |
| FLEET WEEK | Once Annually | 1 | 3 | 5 | 2 | 5 | | $ - 0 |
| Totals | | 2 | 6 | 10 | 4 | 7 | | $ - 0 |
| GRAND TOTAL FOR 03/15/2028 - 03/14/2029 (Option Year 3) | | | $ - 0 | | | | | |
OPTION YEAR 4
| Golden Gate National Recreation Area |
| Marin County Areas |
| Portable Toilet and Vauilt Toilet Services Contract |
| 3.15.29 thru 3.14.30 (OPTION YEAR 4) |
| VAULT TOILET PUMPING COSTS | | | | | |
| Vault Toilet Locations | No. of Vaults at location | Estimated number of pumpings for 12 month period | Total Pumpings | Cost per pump | 12 month total |
| Battery Spencer | 2 | 6 | 12 | | $ - 0 |
| Battery Alexander | 1 | 5 | 5 | | $ - 0 |
| Battery Wallace | 1 | 2 | 2 | | $ - 0 |
| Blacksands Beach Parking Lot (Conzelman Rd) | 1 | 4 | 4 | | $ - 0 |
| Conzelman Rd @ McCullough Rd Roundabout | 1 | 4 | 4 | | $ - 0 |
| Haypress Campground | 2 | 2 | 4 | | $ - 0 |
| Kirby Cove | 3 | 5 | 15 | | $ - 0 |
| Muir Beach Overlook | 2 | 6 | 12 | | $ - 0 |
| Muir Beach Parking Lot | 4 | 7 | 28 | | $ - 0 |
| Point Bonita (Battery Mendell) | 2 | 7 | 14 | | $ - 0 |
| Tennessee Valley Parking Lot | 2 | 5 | 10 | | $ - 0 |
| Tennessee Valley Beach (Trail) | 1 | 3 | 3 | | $ - 0 |
| Smith Road/Gerbode Parking Area | 1 | 2 | 2 | | $ - 0 |
| Battery Hill (top of Conzelman) | 2 | 4 | 8 | | $ - 0 |
| 25 | 62 | 123 | | $ - 0 |
Total vault toilet pumping costs for 12 months $ - 0
| PORTABLE TOILET RENTAL COSTS | | | |
| Portable Toilet Locations | ADA Quantities | ADA Monthly rental | Total Cost for 12 months |
| Fort Baker Pier | 5 | | $ - 0 |
| Bicentennial Camp | 1 | | $ - 0 |
| Building T-1111 | 1 | | $ - 0 |
| Hawk Camp | 1 | | $ - 0 |
| Nike Site | 3 | | $ - 0 |
| Totals | 11 | | $ - 0 |
| Total rental charges for 12 months | | $ - 0 |
| PORTABLE TOILET CLEANING COSTS | | | | | |
| Frequency | No. of services over twelve month period | Total number of ADA portables at location | Cost per service | Total Cost for 12 Months |
| Fort Baker Pier | 3 x per week | 780 | 5 | | $ - 0 |
| Bicentennial Camp | Weekly | 52 | 1 | | $ - 0 |
| Building T-1111 | Weekly | 52 | 1 | | $ - 0 |
| Hawk Camp | Weekly | 52 | 1 | | $ - 0 |
| Nike Site | Weekly | 52 | 3 | | $ - 0 |
| Totals | | 988 | 11 | | $ - 0 |
Total cleaning charges for 12 months $ - 0
| SINK RENTAL COSTS | | | | | |
| Frequency | No. of services over twelve month period | Total Number of sinks at location | Cost per service | Total Cost for 12 Months |
| Nike Site | Weekly | 52 | 2 | | $ - 0 |
| Totals | | 52 | 2 | | $ - 0 |
| ANNUAL EVENTS RENTAL COSTS | | | | | | | | |
| Frequency | No. of services over Special Event period | Total number of ADA portables at location | Total number of Standard portables at location | Total number of Sinks at location | Total Days of Rental | Cost per service | Total Cost for Special Events |
| FOURTH OF JULY (3 days) | Once Annually | 1 | 3 | 5 | 2 | 3 | | $ - 0 |
| FLEET WEEK (5 days) | Once Annually | 1 | 3 | 5 | 2 | 5 | | $ - 0 |
| Totals | | 2 | 6 | 10 | 4 | 7 | | $ - 0 |
| GRAND TOTAL FOR 03/15/2029 - 03/14/2030 (Option Year 4) | | | $ - 0 | | | | | |
| Grand total for 12 month period 03/15/2025 - 03/14/2026 (BASE) | | $ - 0 |
| Grand total for 12 month period 03/15/2026 - 03/14/2027 (OPTION YEAR 1) | | $ - 0 |
| Grand total for 12 month period 03/15/2027 - 03/14/2028 (OPTION YEAR 2) | | $ - 0 |
| Grand total for 12 month period 03/15/2028 - 03/14/2029 (OPTION YEAR 3) | | $ - 0 |
| Grand total for 12 month period 03/15/2029 - 03/14/2030 (OPTION YEAR 4) | | $ - 0 |
| Grand total for 5 year period | $ - 0 |