This is a pricing schedule template for an Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract for the Homeland Security Cutter – Light Icebreaker (HSC-L) acquisition issued by the U.S. Coast Guard. The contract spans five ordering periods from November 2026 through November 2031, with a total evaluated price of $43,500,000 based on government-planned quantities. Offerors must complete multiple tabs within the Excel template, including unit pricing for Contract Line Item Numbers (CLINs), long lead time materials (LLTM), production labor rates and materials, and special studies activities. All pricing must be entered in $1 increments with no cents; green-highlighted cells are the only cells offerors may edit. The pricing structure includes Fixed-Price (FP), Fixed-Price with Economic Price Adjustment (FP-EPA), and Firm Fixed-Price (FFP) CLINs covering design and engineering, production of up to seven vessels, technical data submissions, crew training, deep insurance spares, operational testing, vessel transport, special studies and events (with a ceiling of $8.5–$9.5 million per period), capital expenditures, and a display model.
The template incorporates an Economic Price Adjustment (EPA) mechanism for direct material costs based on five Bureau of Labor Statistics Producer Price Index (PPI) series with a composite 3.0% annual projection and a 10% cap on adjustments. Production pricing must be calculated using the Production Pricing Matrix, which automatically pulls baseline unit prices and applies offeror-proposed escalation rates for alternate ordering years. The Evaluation Worksheet automatically calculates total contract values by CLIN and period based on government-intended ordering quantities. Special notes indicate that CLIN -0008 (Special Studies and Events) provides an anticipated ceiling amount and CLIN -0009 (Capital Expenditures) will be awarded based on contracting officer decision post-award. The estimated award date is November 6, 2026, and the EPA tab is for post-award use only.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Section J-07 Pricing Schedule |
| The Pricing Schedule shall be completed with unit prices, rates, and the Offeror's name for each Ordering Period. The Offeror is to only input prices and rates in the "Offeror_Pricing", "LLTM", "Production Pricing Matrix", "Production", and "Special Studies" tabs of the Excel file. All other calculations are embedded as formulas in the Evaluation Worksheet for purposes of calculating the total evaluated price and economic price adjustment. The information entered will be used by the Government for evaluation purposes and for purposes of inserting price information into the Schedule SF-33. |
The Offeror shall only enter values into cells highlighted in GREEN.
All values should be entered in $1 increments, no cents ($.00) shall be included.
The Offeror shall enter values into all green cells, including "$0.00" if applicable.
| Offeror Pricing Tab Instructions |
| This is for an Offeror’s input of unit prices for each Contract Line Item Number (CLIN) for each ordering period. |
Note: Pricing detailed in J-9B Technical Data Rights Tables should be included in the CLIN -0003 prices.
| LLTM Tab Instructions |
| This is for an Offeror’s input of unit prices for each long lead time material for each ordering period. |
Note: for this section, if the Offeror does not require the use of every row, the Offeror is not required to fill out the entirety of the worksheet.
| Production Pricing Matrix |
| This is for Offeror's input of annual escalation rates to calculate the adjusted Fixed-Prices (FP) for all alternate ordering years. This tab automatically pulls baseline unit prices from the "Production" tab. |
| Production Tab Instructions |
| This is for an Offeror’s input of unit prices for labor rates, materials, and subcontracted activities. |
| Special Studies Tab Instructions |
| This is for an Offeror’s input of materials and subcontracts overhead / loading rate to be applied to materials and services procured on behalf of the government, as well as composite labor rates for other activities, as required. |
| Planned Ordering Tab |
| This details the government's intended ordering quantities by ordering period. |
| Evaluation Worksheet Tab |
| This presents the total prices by CLIN and contract period, including a total evaluated price. This data is based upon the data entered by the Offeror and the USCG's intended procurement quantities. |
This value will establish maximum contract value and this information will be entered into the SF-1449 upon award.
| Notes |
| For CLIN -0008 Special Studies and Events, the provided ceiling amount is for anticipated special studies and events. |
For CLIN -0009 Capital Expenditures, the CLIN will be awarded based on Contracting Officer decision and Offeror cost benefit analyses provided post-award.
Offerors are not to edit these CLINs.
| EPA Tab (For Use Post-Award) |
| This is for an Offeror's input of Producer Price Index (PPI) values post-award. |
No entry required for proposal.
RFP No. 70Z02325XXXXXXX
| &"-,Bold"Price Schedule | |
| Instructions | Attachment 3 |
Offeror_Pricing
| {Enter Offeror Name} | |||||||||
| Ordering Period 1 | Ordering Period 2 | Ordering Period 3 | Ordering Period 4 | Ordering Period 5 | |||||
| CLIN | Description | SOW / SPEC # | Unit | CLIN Type | Nov 2026-2027 | Nov 2027-2028 | Nov 2028-2029 | Nov 2029-2030 | Nov 2030-2031 |
| -0001 | Design and Engineering | SOW 2.3 | EA | FFP | |||||
| -0002 | Production [IAW SPEC] | ||||||||
| -0002AA | Long Lead Time Materials | SOW 2.5 | EA | FP-EPA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| -0002AB | Production | SOW 2.6 | EA | FP-EPA* | $ - 0 | $ - 0 | $ - 0 | ||
| -0003 | Technical Data Submissions (TDS) | SOW 2.7 | |||||||
| -0003AA | TDS-1 | SOW 2.7.1 | EA | FFP | |||||
| -0003AB | TDS-2 | SOW 2.7.1 | EA | FFP | |||||
| -0003AC | TDS-3 | SOW 2.7.1 | EA | FFP | |||||
| -0004 | Crew Familiarization Training | SOW 2.8 | EA | FFP | |||||
| -0005 | Deep Insurance Spares | SOW 2.9 | |||||||
| -0005AA | Propellers (Port & Starboard) | SPEC 245 | Set P&S | FFP | |||||
| -0005AB | Propeller Shafting | SPEC 243 | EA | FFP | |||||
| -0005AC | Main Propulsion Engine Set | SPEC 233 | EA | FFP | |||||
| -0005AD | Reduction Gear | SPEC 241 | EA | FFP | |||||
| -0005AE | Bow Thruster | TBD | EA | FFP | |||||
| -0005AF | Bow Thruster (vari freq drive) | TBD | EA | FFP | |||||
| -0005AG | Ship Service Generator Set | SPEC 233 | EA (Engine + Generator) | FFP | |||||
| -0005AH | Key Switchboards / Breakers | SPEC 324 | EA | FFP | |||||
| -0005AI | Rudder Stock | SPEC 561 | EA | FFP | |||||
| -0005AJ | Steering Gear Motor/Pump | SPEC 561 | EA | FFP | |||||
| -0005AK | AC plant | SPEC 514 | EA | FFP | |||||
| -0005AL | Articulating Crane | SPEC 589 | EA | FFP | |||||
| -0005AM | Hydraulic Power Unit | SPEC 556 | EA | FFP | |||||
| -0005AN | Buoy Deck Winch | SPEC 573 | EA | FFP | |||||
| -0005AO | Major Maintenance Kits | SPEC 670 | EA | FFP | |||||
| -0006 | Operational Test Support | SOW 2.10 | EA | FFP | |||||
| -0007 | Vessel Transport | SOW 2.11 | EA | FFP | |||||
| -0008 | Special Studies and Events | SOW 2.12 | EA | FFP | $ 8,500,000 | $ 9,500,000 | $ 8,500,000 | $ 8,500,000 | $ 8,500,000 |
| -0009 | Capital Expenditures | SOW 2.13 | EA | FFP | $ - 0 | $ - 0 | |||
| -0010 | Display Model | SOW 2.14 | EA | FFP | |||||
| * = Materials only | |||||||||
| NOTE TO OFFERORS regarding Production CLINs (-0002AB): The Prices for Production CLINs on this tab are automatically populated from the 'Production Pricing Matrix' tab based on the government’s intended ordering quantities by order period. Actual Task Order pricing will be strictly governed by the Unit-Specific table in the 'Production Pricing Matrix'. |
LLTM
| -0002AA Long Lead Time Materials | QTY | |||||||||||||||
| (Per Vessel) | Ordering Period 1 Unit Price | Ordering Period 2 Unit Price | Ordering Period 3 Unit Price | Ordering Period 4 Unit Price | Ordering Period 5 Unit Price | Ordering Period 1 Total | Ordering Period 2 Total | Ordering Period 3 Total | Ordering Period 4 Total | Ordering Period 5 Total | Lead Time Required | In Yard Need Date | OEM | Model # | Product ID # (Other) | Ancillary Details |
Other Parts Associated
| {Enter LLTM items here} | $0 | $0 | $0 | $0 | $0 |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| $0 | $0 | $0 | $0 | $0 | |
| Total | $0 | $0 | $0 | $0 | $0 |
Production
| -0002AB Production | |||||||||||||||||||||
| Production Unit | Unit 1 | Unit 2 | Unit 3 | Unit 4 | Unit 5 | Unit 6 | Unit 7 | ||||||||||||||
| Planned Ordering Period | Ordering Period 1 | Ordering Period 1 | Ordering Period 1 | Ordering Period 1 | Ordering Period 2 | Ordering Period 3 | Ordering Period 3 | ||||||||||||||
| Estimated PoP | Nov 2026-2027 | Nov 2026-2027 | Nov 2026-2027 | Nov 2026-2027 | Nov 2027-2028 | Nov 2028-2029 | Nov 2028-2029 | ||||||||||||||
| Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | |
| Composite Labor Rate - Engineering | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||||||
| Composite Labor Rate - Non-Engineering | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||||||
| Materials | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||||||
| Subcontracts | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||||||
| Total | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
Production Pricing Matrix
| CLIN -0002AB: Unit-Specific Pricing Matrix with Escalation | |||||
| Ordering Period | Ordering Period 1 | Ordering Period 2 | Ordering Period 3 | Ordering Period 4 | Ordering Period 5 |
| Estimated PoP | Nov 2026-2027 | Nov 2027-2028 | Nov 2028-2029 | Nov 2029-2030 | Nov 2030-2031 |
| Unit 1 | $ - 0 | ||||
| Unit 2 | $ - 0 | ||||
| Unit 3 | $ - 0 | ||||
| Unit 4 | $ - 0 | ||||
| Unit 5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Unit 6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Unit 7 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Escalation
| NOTE TO OFFERORS - CELL COLOR LEGEND: |
| Yellow Cells (Baseline Prices): These cells are auto-populated from the "Production" tab based on the intended ordering by ordering period. Do not edit these cells. |
| Green Cells (Escalation Input): Offeror must manually enter their proposed annual escalation rate(s) here. |
| White Cells (Calculated Matrix): These cells automatically calculate the Fixed-Price (FP) for alternate ordering periods using the baseline price and proposed escalation rate. Do not edit or overwrite these formulas. |
Special_Studies
| -0008 Special Studies and Events | Ordering Period 1 | Ordering Period 2 | Ordering Period 3 | Ordering Period 4 | Ordering Period 5 | |
| Materials and Subcontracts Overhead / Loading Rate | Loading Rate (%) | |||||
| Composite Labor Rate - Engineering | Unit Price ($) |
Hourly Rate Composite Labor Rate - Non-Engineering Unit Price ($) Hourly Rate Travel TBD -- -- -- -- --
EPA
| SCHEDULE | SCHEDULE | SCHEDULE | ||||||||||||||||||||||||||||||||
| Table 1 | Table 2 | Table 3 | ||||||||||||||||||||||||||||||||
| ECONOMIC PRICE ADJUSTMENT FOR DIRECT MATERIAL COSTS | DIRECT MATERIAL COST INDEX | CALCULATING THE DIRECT MATERIAL COST INDEX | ||||||||||||||||||||||||||||||||
| Base (Nov 2026) = 100 | ||||||||||||||||||||||||||||||||||
| Annual Projection = 3.0% | The DIRECT MATERIAL COST INDEX is a weighted average of the following five Bureau of Labor Statistics (BLS) constituent indices: | |||||||||||||||||||||||||||||||||
| PROJECTED | ACTUAL | INDEX | ||||||||||||||||||||||||||||||||
| COMPUTATION | INDEX | TOLERANCE | INDEX | INDEX | CHANGE | ACTUAL | PERIOD | BLS PPI - (not seasonally adjusted) | Series ID | Weight | Source | Nov 2026 | Nov 2027 | Nov 2028 | Nov 2029 | Nov 2030 | Nov 2031 | |||||||||||||||||
| PERIOD | VALUE | BAND (+/- 3%) | VALUE | DIFFERENCE | (10% MAX) | SALES PRICE | ADJUSTMENT | Hot rolled steel bars, plates, and structural shapes | PCU*3311107 | 10% | http://data.bls.gov/dataViewer/view/timeseries/PCU3311103311107 | |||||||||||||||||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | Nonferrous metals | WPU102 | 5% | http://data.bls.gov/dataViewer/view/timeseries/WPU102 | |||||||||||||||||||||||
| Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Avg | General purpose machinery and equipment | WPU114 | 50% | http://data.bls.gov/dataViewer/view/timeseries/WPU114 | ||||||||||||||||||
| Ordering Period 1 | 101.4 | 98.3 | - | 104.4 | $0 | 2026 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 100.0 | 100.3 | 0.0 | Electrical machinery and equipment | WPU117 | 25% | http://data.bls.gov/dataViewer/view/timeseries/WPU117 | |||||||||||
| 2027 | 100.5 | 100.8 | 101.0 | 101.3 | 101.5 | 101.8 | 102.0 | 102.3 | 102.5 | 102.8 | 103.0 | 103.3 | 101.4 | Industrial Commodities | WPU03THRU15 | 10% | http://data.bls.gov/dataViewer/view/timeseries/WPU03THRU15 | |||||||||||||||||
| 2028 | 103.6 | 103.8 | 104.1 | 104.3 | 104.6 | 104.9 | 105.1 | 105.4 | 105.6 | 105.9 | 106.2 | 106.4 | 104.5 | |||||||||||||||||||||
| Ordering Period 2 | 104.5 | 101.3 | - | 107.6 | $0 | 2029 | 106.7 | 107.0 | 107.2 | 107.5 | 107.8 | 108.0 | 108.3 | 108.6 | 108.9 | 109.1 | 109.4 | 109.7 | 107.6 | Estimated Award Date | 11/6/26 | % Changes, year to year | ||||||||||||
| 2030 | 110.0 | 110.2 | 110.5 | 110.8 | 111.1 | 111.3 | 111.6 | 111.9 | 112.2 | 112.5 | 112.7 | 113.0 | 110.9 | Annual Projection | 3.0% | Hot rolled steel bars, plates, and structural shapes | ||||||||||||||||||
| 2031 | 113.3 | 113.6 | 113.9 | 114.1 | 114.4 | 114.7 | 115.0 | 115.3 | 115.6 | 115.9 | 116.2 | 0.0 | 114.3 | Tolerance Band | 3% | Nonferrous metals | ||||||||||||||||||
| Ordering Period 3 | 107.6 | 104.4 | - | 110.9 | $0 | 2032 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | Cap | 10% | General purpose machinery and equipment | ||||||||||||
| Electrical machinery and equipment | ||||||||||||||||||||||||||||||||||
| Industrial Commodities | ||||||||||||||||||||||||||||||||||
| Ordering Period 4 | 110.9 | 107.6 | - | 114.2 | $0 | |||||||||||||||||||||||||||||
| Composite % Change |
Ordering Period 5 114.3 110.9 - 117.7 $0 Composite Direct Material Cost Index (Actual) 100.0
| Nov 2026 | Dec 2026 | Jan 2027 | Feb 2027 | Mar 2027 | Apr 2027 | May 2027 | Jun 2027 | Jul 2027 | Aug 2027 | Sep 2027 | Oct 2027 | Nov 2027 | Dec 2027 | Jan 2028 | Feb 2028 | Mar 2028 | Apr 2028 | May 2028 | Jun 2028 | Jul 2028 | Aug 2028 | Sep 2028 | Oct 2028 | Nov 2028 | Dec 2028 | Jan 2029 | Feb 2029 | Mar 2029 | Apr 2029 | May 2029 | Jun 2029 | Jul 2029 | Aug 2029 | Sep 2029 | Oct 2029 | Nov 2029 | Dec 2029 | Jan 2030 | Feb 2030 | Mar 2030 | Apr 2030 | May 2030 | Jun 2030 | Jul 2030 | Aug 2030 | Sep 2030 | Oct 2030 | Nov 2030 | |
| Projected Values (Table 2) | 100.0 | 100.3 | 100.5 | 100.8 | 101.0 | 101.3 | 101.5 | 101.8 | 102.0 | 102.3 | 102.5 | 102.8 | 103.0 | 103.3 | 103.6 | 103.8 | 104.1 | 104.3 | 104.6 | 104.9 | 105.1 | 105.4 | 105.6 | 105.9 | 106.2 | 106.4 | 106.7 | 107.0 | 107.2 | 107.5 | 107.8 | 108.0 | 108.3 | 108.6 | 108.9 | 109.1 | 109.4 | 109.7 | 110.0 | 110.2 | 110.5 | 110.8 | 111.1 | 111.3 | 111.6 | 111.9 | 112.2 | 112.5 | 112.7 |
Planned_Ordering
| HSC-L Planned Ordering | |||||||
| Ordering Period 1 | |||||||
| CLIN | SUB-CLIN | Description | Unit | Qty | Unit Price | Total | |
| Ordering Period 1 | -0001 | -0001 | Design and Engineering | EA | 1 | $ - 0 | $ - 0 |
| Ordering Period 1 | -0002 | -0002AA | Long Lead Time Materials | EA | 4 | $ - 0 | $ - 0 |
| Ordering Period 1 | -0002 | -0002AB | Production | EA | 4 | $ - 0 | $ - 0 |
| Ordering Period 1 | -0003 | -0003AA | TDS-1 | EA | 1 | $ - 0 | $ - 0 |
| Ordering Period 1 | -0003 | -0003AB | TDS-2 | EA | 1 | $ - 0 | $ - 0 |
| Ordering Period 1 | -0008 | -0008 | Special Studies and Events | EA | 1 | $ 8,500,000 | $ 8,500,000 |
| Total | $ 8,500,000 |
| Ordering Period 2 | |||||||
| CLIN | SUB-CLIN | Description | Unit | Qty | Unit Price | Total | |
| Ordering Period 2 | -0002 | -0002AA | Long Lead Time Materials | EA | 2 | $ - 0 | $ - 0 |
| Ordering Period 2 | -0002 | -0002AB | Production | EA | 1 | $ - 0 | $ - 0 |
| Ordering Period 2 | -0003 | -0003AC | TDS-3 | EA | 1 | $ - 0 | $ - 0 |
| Ordering Period 2 | -0004 | -0004 | Crew Familiarization Training | EA | 2 | $ - 0 | $ - 0 |
| Ordering Period 2 | -0006 | -0006 | Operational Test Support | EA | 1 | $ - 0 | $ - 0 |
| Ordering Period 2 | -0007 | -0007 | Vessel Transport | EA | 2 | $ - 0 | $ - 0 |
| Ordering Period 2 | -0008 | -0008 | Special Studies and Events | EA | 1 | $ 9,500,000 | $ 9,500,000 |
| Ordering Period 2 | -0009 | -0009 | Capital Expenditures | EA | 0 | $ - 0 | $ - 0 |
| Ordering Period 2 | -0010 | -0010 | Display Model | EA | 2 | $ - 0 | $ - 0 |
| Total | $ 9,500,000 |
| Ordering Period 3 | |||||||
| CLIN | SUB-CLIN | Description | Unit | Qty | Unit Price | Total | |
| Ordering Period 3 | -0002 | -0002AA | Long Lead Time Materials | EA | 1 | $ - 0 | $ - 0 |
| Ordering Period 3 | -0002 | -0002AB | Production | EA | 2 | $ - 0 | $ - 0 |
| Ordering Period 3 | -0004 | -0004 | Crew Familiarization Training | EA | 2 | $ - 0 | $ - 0 |
| Ordering Period 3 | -0007 | -0007 | Vessel Transport | EA | 2 | $ - 0 | $ - 0 |
| Ordering Period 3 | -0008 | -0008 | Special Studies and Events | EA | 1 | $ 8,500,000 | $ 8,500,000 |
| Total | $ 8,500,000 |
| Ordering Period 4 | |||||||
| CLIN | SUB-CLIN | Description | Unit | Qty | Unit Price | Total | |
| Ordering Period 4 | -0004 | -0004 | Crew Familiarization Training | EA | 2 | $ - 0 | $ - 0 |
| Ordering Period 4 | -0005 | -0005AA | Propellers (Port & Starboard) | Set P&S | 1 | $ - 0 | $ - 0 |
| Ordering Period 4 | -0005 | -0005AB | Propeller Shafting | EA | 1 | $ - 0 | $ - 0 |
| Ordering Period 4 | -0005 | -0005AC | Main Propulsion Engine Set | EA | 1 | $ - 0 | $ - 0 |
| Ordering Period 4 | -0005 | -0005AD | Reduction Gear | EA | 1 | $ - 0 | $ - 0 |
| Ordering Period 4 | -0005 | -0005AE | Bow Thruster | EA | 1 | $ - 0 | $ - 0 |
| Ordering Period 4 | -0005 | -0005AF | Bow Thruster (vari freq drive) | EA | 1 | $ - 0 | $ - 0 |
| Ordering Period 4 | -0005 | -0005AG | Ship Service Generator Set | EA (Engine + Generator) | 1 | $ - 0 | $ - 0 |
| Ordering Period 4 | -0005 | -0005AH | Key Switchboards / Breakers | EA | 1 | $ - 0 | $ - 0 |
| Ordering Period 4 | -0005 | -0005AI | Rudder Stock | EA | 1 | $ - 0 | $ - 0 |
| Ordering Period 4 | -0005 | -0005AJ | Steering Gear Motor/Pump | EA | 1 | $ - 0 | $ - 0 |
| Ordering Period 4 | -0005 | -0005AK | AC plant | EA | 1 | $ - 0 | $ - 0 |
| Ordering Period 4 | -0005 | -0005AL | Articulating Crane | EA | 1 | $ - 0 | $ - 0 |
| Ordering Period 4 | -0005 | -0005AM | Hydraulic Power Unit | EA | 1 | $ - 0 | $ - 0 |
| Ordering Period 4 | -0005 | -0005AN | Buoy Deck Winch | EA | 1 | $ - 0 | $ - 0 |
| Ordering Period 4 | -0005 | -0005AO | Major Maintenance Kits | EA | 1 | $ - 0 | $ - 0 |
| Ordering Period 4 | -0007 | -0007 | Vessel Transport | EA | 2 | $ - 0 | $ - 0 |
| Ordering Period 4 | -0008 | -0008 | Special Studies and Events | EA | 1 | $ 8,500,000 | $ 8,500,000 |
| Total | $ 8,500,000 |
| Ordering Period 5 | |||||||
| CLIN | SUB-CLIN | Description | Unit | Qty | Unit Price | Total | |
| Ordering Period 5 | -0004 | -0004 | Crew Familiarization Training | EA | 1 | $ - 0 | $ - 0 |
| Ordering Period 5 | -0007 | -0007 | Vessel Transport | EA | 1 | $ - 0 | $ - 0 |
| Ordering Period 5 | -0008 | -0008 | Special Studies and Events | EA | 1 | $ 8,500,000 | $ 8,500,000 |
| Total | $ 8,500,000 |
Total Evaluated Price $ 43,500,000
Evaluation_Worksheet
| {Enter Offeror Name} | Estimated PoP | Nov 2026-2027 | Nov 2027-2028 | Nov 2028-2029 | Nov 2029-2030 | Nov 2030-2031 | ||
| Item # | Description | CLIN Type | Ordering Period 1 | Ordering Period 2 | Ordering Period 3 | Ordering Period 4 | Ordering Period 5 | Total |
| -0001 | Design and Engineering | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0002 | Production [IAW SPEC] | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |
| -0002AA | Long Lead Time Materials | FP-EPA | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0002AB | Production | FP-EPA* | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0003 | Technical Data Submissions (TDS) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |
| -0003AA | TDS-1 | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0003AB | TDS-2 | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0003AC | TDS-3 | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0004 | Crew Familiarization Training | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0005 | Deep Insurance Spares | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |
| -0005AA | Propellers (Port & Starboard) | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0005AB | Propeller Shafting | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0005AC | Main Propulsion Engine Set | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0005AD | Reduction Gear | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0005AE | Bow Thruster | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0005AF | Bow Thruster (vari freq drive) | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0005AG | Ship Service Generator Set | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0005AH | Key Switchboards / Breakers | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0005AI | Rudder Stock | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0005AJ | Steering Gear Motor/Pump | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0005AK | AC plant | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0005AL | Articulating Crane | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0005AM | Hydraulic Power Unit | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0005AN | Buoy Deck Winch | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0005AO | Major Maintenance Kits | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0006 | Operational Test Support | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0007 | Vessel Transport | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0008 | Special Studies and Events | FFP | $ 8,500,000 | $ 9,500,000 | $ 8,500,000 | $ 8,500,000 | $ 8,500,000 | $ 43,500,000 |
| -0009 | Capital Expenditures | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| -0010 | Display Model | FFP | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Total Evaluated Price | $ 8,500,000 | $ 9,500,000 | $ 8,500,000 | $ 8,500,000 | $ 8,500,000 | $ 43,500,000 | ||
| * = Materials only |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .