Section J-0200000.pdf
PDF 4 MB Posted
- Solicitation number
- N4008523R2898
About this file
This document is an attachment to a federal contract opportunity that provides details on the management and administration requirements for hazardous waste transportation and disposal services at Portsmouth Naval Shipyard and other areas of responsibility.
The key details include:
- Definitions and acronyms related to the contract requirements
- Wage determinations and fringe benefits for various labor categories
- Directives, instructions, and references that the contractor must follow
- Invoice form and required information
- Various required forms such as for crane and rigging gear operations, hazardous material tracking, and waste disposal
- Government-furnished property, materials, and services the contractor will receive
- Contractor-furnished containers and equipment requirements
- Portsmouth Naval Shipyard station regulations the contractor must adhere to, covering topics such as radiological controls, laser safety, fire prevention, utility interruptions, and work in occupied facilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0006.pdf | ||
| Amendment 0005.pdf | ||
| J-0200000-19-ELIN Usage Report.xlsx | XLSX spreadsheet | |
| J-0200000-10 ELINS.xlsx | XLSX spreadsheet | |
| Amendment 0004.pdf | ||
| J-0200000-18-Waste Profile Sheet.pdf | ||
| Amendment 0003.pdf | ||
| J-0200000-16 -List of Approved Disposal Facilities.pdf | ||
| J-0200000-17 -List of Approved Transportation.pdf | ||
| J-0200000-15 -Other Government Facility Distances.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| Section J-1800000.pdf | ||
| J-0200000-10 ELINs.xlsx | XLSX spreadsheet | |
| Section C Annexes.pdf | ||
| Section F Annexes.pdf | ||
| N4008523R2898.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section J – 0200000 Management and Administration
Attachment Number Attachment Title J-0200000-01 Definitions and Acronyms J-0200000-02 Wage Determinations J-0200000-03 Directives, Instructions, and References J-0200000-04 Invoice Form J-0200000-05 Forms J-0200000-06 Government-Furnished Property, Materials, and Services J-0200000-07 Contractor Furnished Containers and Equipment J-0200000-08 PNSY Station Regulations J-0200000-09 Contractor Hazardous Material Inventory Log J-0200000-10 Exhibit Line Item Numbers (ELINs) J-0200000-11 Contractor(s) Self-Performance Evaluation and Notification of Subcontracting J-0200000-12 Corporate Experience Form J-0200000-13 Past Performance Questionnaire J-0200000-14 Individual Small Business Subcontracting Plan
Definition Description Assessment A general term referring to either a survey or inspection of a facility to determine condition.
Asset A general term used to refer to an item, such as a component, system, building or facility, which is managed by an automated data management program.
Competent Person A person who has the professional experience and training necessary to identify existing and predictable hazards at a work or service environment, and who has the authority to take prompt and corrective action to eliminate or remove dangers from the environment.
One who can identify existing and predictable hazards in the working environment or working conditions that are dangerous to personnel and who has authorization to take prompt corrective measures to eliminate them.
Component Inventory Management Unit
(CIMU)
An organization of like-kind real property into manageable maintenance units. CIMU is a building component, group of components or component assemblies, serving a specific purpose in a facility that can be expected to follow a common and predictable lifecycle behavior. This class of non-equipment will include items such as exterior walls, exterior windows, interior finish, and roofs. This class of equipment will include items such as fan coil units, air handling units, lighting, and water closets. CIMUs can include one or more items of installed equipment typically subject to routine scheduled maintenance.
Confined Work Space A space that is large enough and so configured that a person may bodily enter a space (such as in tanks, vessels, silos, storage bins, hoppers, vaults, pits, and like spaces where there is limited means of entry) and is hindered or restricted from escaping during an emergency.
Construction Equipment Construction equipment refers to specialized heavy machinery that covers one industry and is specifically designed for executing construction work. Construction equipment requirements shall include a list of equipment establishing the size, quality, number of units, and unit prices. Construction equipment prices provided by the Contractor shall be the lowest price available considering the availability of equipment and the time constraints of the job. The direct equipment price shall be adjusted by all discounts and rebates that accrue to the Contractor.
All indirect cost associated with construction equipment, such as: the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; sub-contractor cost, costs for pre-expended bin materials, shipping and handling, union agreements, crew sizes, hand tools, universal equipment (excluding construction equipment), mobilization, demobilization, payroll burdens and fringes, overtime, job (field) overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance, general and administrative (home office) overhead, profit, and all other associated markups shall not be included in the construction equipment price since the cost for these items were included in the labor hour unit price bid. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements shall not be included.
Contracting Officer (KO) That individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
Contracting Officer’s Representative (COR)
The individual appointed by the KO responsible for monitoring the Contractor’s technical compliance and progress, relative to assigned contract(s)/orders(s), based on the contract requirements specified in the PWS and in accordance with the PAP. The COR performs a variety of contract administration duties that includes oversight of PA, documenting and rating Contractor performance, reviewing invoices, and acceptance of work. Assignment as a COR is a collateral duty typically performed by the FSCM or
SPAR.
Contractor That entity or its representative responsible for the delivery of the services or materials specified in this contract, as designated by contract award. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall insure that subcontractors comply with the provision of this contract.
Contractor Representative That individual appointed by the Contractor, either orally or in writing, who has been assigned responsibility for executing the requirements of this contract.
J-0200000-01
Crane, Category 1 Portal cranes, Hammerhead cranes, Locomotive cranes, Derricks, Floating cranes (YD), Tower cranes, Container cranes, Mobile cranes (except those indicated as category 4), including truck, cruiser, crawler, warehouse/industrial cranes, and cranes used for dragline, pile driving, clamshell, magnet, bucket work, and Aircraft crash cranes.
Crane, Category 2 & 3 Cranes with rated capacities of 20,000 pounds or greater are category 2. Examples are Overhead traveling cranes, Gantry cranes (rail mounted), Wall cranes, Jib cranes, Pillar cranes, Pillar jib cranes, Monorails and associated hoists, Fixed hoists including chain falls. Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities less than 2,000 pounds.
Crane, Category 4 Commercial truck mounted cranes, Truck mounted articulating boom cranes, Pedestal mounted commercial boom assemblies (fixed length, telescoping, and articulating types) attached to stake trucks, trailers, flatbeds, or railcars, or stationary mounted to piers, etc., with OEM rated capacities of 2,000 pounds and greater. Commercial truck mounted cranes and truck mounted articulating boom cranes with OEM capacities of 2,000 pounds and greater require a licensed operator even if the cranes are down rated below 2,000 pounds capacity for administrative purposes.
Direct Material Costs The actual vendor invoice charges for materials used for performance of work under this contract. Direct material costs shall include sales tax and transportation charges when such charges are included on the invoice by the vendor, as well as any discounts allowed for prompt payment and discounts or rebates for core value or salvage value that accrue to the Contractor. When questions arise concerning the cost of direct materials, direct material costs will be based on the lowest of quotes provided by the Contractor from at least three different commercial vendors for the direct material cost. The Government retains the right to obtain additional quotes in questionable situations. The lowest price will be used.
All other cost such as sub-contractor cost, costs for pre-expended bin materials, shipping and handling, union agreements, crew sizes, hand tools, universal equipment, mobilization, demobilization, time for job preparation, safety standby personnel, payroll burdens and fringes, overtime, job (field) overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance, general and administrative (home office) overhead, profit, and all other associated markups shall not be included in the direct material price since the cost for these items are included in the UPL Hour unit price bid.
Electronic Operation And Maintenance And Support Information (eOMSI)
A set of consultant-prepared data and document files that contain detailed, as-built technical information that describes the efficient, economical and safe operation, maintenance and repair of a facility, plant, equipment or system throughout its life cycle.
Generally, it is prepared during construction and submitted upon completion of a new facility or major facility upgrade. eOMSI’s typically include asset information, staffing and budgeting information, supply support including critical spare parts, operating procedures, troubleshooting and diagnostic guides, extended warranty data, maintenance task frequencies and documentation, technical data, repair procedures and manufacturer’s product data. eOMSI data and document files are provided in electronic formats.
Equipment Tangible asset that is functionally complete for its intended purpose, durable, and non-expendable.
Facility A building or structure designed and created to serve a particular function.
Fixed Burden Rate (FBR) The additional costs (expressed in percent of direct material cost) for ordering, handling, and stockpiling materials and repair parts. For example, if the offeror's Fixed Burden Rate for materials in the Base Period is 10% then:
$100,000.00 + ($100,000.00 x 10%) = $110,000.00
The Government will compensate the Contractor for the required parts and materials and not the total amount shown in Schedule of Indefinite Delivery Indefinite Quantity Work.
Frequency Of Service Annual (A). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days.
Biennial (B). Services performed once during each 24-month period of the contract at internals of 670 to 790 days.
Daily (D5). Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted.
Daily (D7). Services performed once each calendar day, seven days per week, including weekends and holidays.
Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days.
Quarterly (Q). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days.
Semiannual (SA). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days.
Semimonthly (SM). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days.
Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday.
Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or Tuesday and Friday.
Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days.
Government Furnished Property (GFP)
Property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract. Government furnished property includes, but is not limited to, spares and property furnished for repairs, maintenance, overhaul, or modification. Government furnished property also includes contractor acquired property if the contractor acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
Hazardous Material (HM) A material that because of its quality, concentration, physical, chemical or infectious nature may pose a threat to human health or the environment if released or spilled into the environment or any material designated by the Department of Transportation (DOT) or any materials that require a SDS form as posing a potential threat while being transported. Hazardous materials are listed in 49 CFR Part 172.
Hazardous Waste (HW) Any discarded solid waste (liquid, semi-solid, solid, or gaseous) that meets the definition of a hazardous waste by USEPA, state authorities, or the Navy. In accordance with RCRA, a solid waste is a listed hazardous waste if it is specifically listed, or it is a characteristic hazardous waste if it exhibits the characteristics of ignitability, corrosivity, reactivity, or toxicity.
Hazardous Waste Management Plan
In accordance with OPNAVINST 5090.1C, every Navy shore activity that generates HW shall develop and use a Hazardous Waste Management Plan or a Hazardous Waste management component in its P2 Plan and EMS. A Hazardous Waste Management Plan shall:
Identify applicable federal, state, and local regulations pertaining to the generation and management of hazardous waste.
Identify training requirements and describe procedures for obtaining training and maintaining training records.
Assign responsibilities for the generation, designation, handling, storage, treatment, disposal, and all documentation.
Describe all hazardous waste generation and management procedures.
Include or reference the hazardous waste minimization plan and goals.
Include or reference contingency plans and emergency response procedures.
The plan shall be kept up to date to include changes in hazardous waste generation and management procedures, as well as changes in applicable federal, state, and local hazardous waste regulations. The plan shall include or reference minimization procedures sufficient to achieve DOD minimization goals. Tenant activities are covered by the host CO's Hazardous Waste Management Plan.
Hazardous Waste Manifest
A hazardous waste manifest as defined in 40 CFR 260 is required for the transport of hazardous waste. The installation commanding officer (ICO) or the ICO’s designated representative shall retain signature authority for hazardous waste manifests.
Infrastructure Condition Assessment Program
(ICAP)
A Navy automated data management program that utilizes historical asset lifecycle data and a structured assessment process to evaluate the condition facilities and their components.
Inspection A rigorous, detailed assessment of the condition of a facility performed to generate a fundable scope and cost estimate for prioritization and funding of maintenance and repair.
Integrated Maintenance Program (IMP)
IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. Service orders will not be issued for accomplishment of repairs on systems and equipment maintained under IMP.
Job or Work Order An authorization for work that requires planning and estimating and has an individual line of accounting for financial and performance evaluation.
Life-Cycle Costs A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life.
Less-than-90-day Accumulation Areas or Storage Facilities
Temporary HW storage areas where HW may be stored for up to 90 days without a RCRA permit.
Maintenance and Repair The preservation or restoration of a piece of equipment, system, or facility to such condition that it may be effectively used for its designated purposes. Maintenance/repair may be adjustment, overhaul, reprocessing, or replacement of constituent parts or materials that are missing or have deteriorated by action of the elements or usage, or replacement of the entire unit or system if beyond economical repair.
Monthly On-Site Labor Report
A compilation of all Contractor and subcontractor employee-hours involved in delivering contract services on a Government property.
NAVFAC MAXIMO A specially configured software version of MAXIMO®, a commercially available computerized maintenance management system (CMMS), adopted by NAVFAC for enterprise facility asset data management. The terms “MAXIMO”, “NAVFAC MAXIMO” or “Government’s MAXIMO” shall be used interchangeably in the document.
Non-RCRA Regulated Waste
Waste that is not regulated as a hazardous waste under RCRA; however, is waste may be regulated by other federal, state or local regulations including but not limited to TSCA, Clean Air Act, Clean Water Act or other regulations and statues. Examples include Used Oil, Universal Waste, Oily Water, antifreeze, etc.
Non-RCRA regulated waste (while not meeting the definition of a Hazardous Waste) must be managed according to its applicable regulations and may not be discarded into the general trash.
Non-Regulated Solid Waste (Debris and Rubbish)
Waste not associated with an industrial process such as refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food. Non-hazardous construction and demolition wastes such as dimension and non-dimension lumber, plywood, chipboard, and hardboard are included.
Partnering The terms “partnering” and “partnership” used herein shall mean a relationship of open communication and close cooperation that involves both Government and Contractor personnel working together for the purpose of establishing a mutually beneficial, proactive, cooperative environment within which to achieve contract objectives and resolve issues and implementing actions as required.
Performance Assessment A method used by the Government to provide some measure of control over the quality of purchased goods and services received.
Performance Assessment Representative (PAR)
The individual(s) assigned as a Technical Point of Contact (TPOC) / Subject Matter Expert (SME) to the COR to perform duties as the on-site representative who assesses
Contractor performance. The PAR periodically observes Contractor performance, reviews delivered services, reviews quality management corrective actions, periodically assesses and documents Contractor performance on PAWs and the MPAS, and communicates findings as necessary with the Contractor, SPAR, and COR.
Pre-Expended Bin Materials And Supplies
The minor materials and supplies that are incidental to the job, for which the total direct cost of any one material line item shown on the material estimate is $10.00 or less.
Examples of pre-expended bin materials and supplies include, but are not limited to, solder, lead, flux, electrical connectors, electrical tape, fuses, nails, screws, bolts, nuts, washers, spacers, masking tape, sand paper, solvent, cleaners, lubricants, grease, oil, rags, mops, glue, epoxy, spackling compound, joint tape, plumbers tape and compound, clips, welding rods, and touch up paint.
Property Administrator An authorized representative of the Contracting Officer who is responsible for administering contract property requirements, terms and conditions of the contract
Property Management Program
A Government program established for the purpose of reviewing and approving the Contractor’s Property Management Plan and System through performance of a system analysis whenever government property is in the possession of the Contractor.
Quality Assurance (QA) The planned and systematic activities implemented in a quality system so that quality requirements for a product or service will be fulfilled.
Quality Control (QC) The observation techniques and activities used to fulfill requirements for quality.
R. S. Means A data collection and organization system developed by R. S. Means Company which can be used to prepare accurate, dependable construction estimates and budgets in a variety of ways. The Contractor shall use the latest edition. Material prices are based on a national average and computed labor costs are based on a 30-city national average.
An estimate prepared using this data is called a "Means estimate"; data may simply be referred to as "Means".
Real Property Land and improvements to land (i.e., facilities). It includes equipment affixed and built into the facility as an integral part of the facility (such as heating systems), but not movable equipment (e.g., plant equipment, industrial equipment, buoys).
Real Property Inventory Equipment (RPIE)
A Government owned or leased individual pieces of equipment, apparatus, or fixture that are essential to the function of the real property (i.e. plumbing, electrical, heating, cooling and elevators). It is physically attached to, integrated into, and built in or on the property.
Individual RPIE’s can be combined to make a CIMU to facilitate facilities management.
An individual RPIE can also be a CIMU if the equipment is complex enough to require its own management planning.
Regulated Waste Any hazardous, non-hazardous, industrial process waste (aka special waste), e-waste, and/or off-specification HM, which because of its physical characteristics, chemical make-up or biological nature requires either special handling procedures and permitting, or poses an unusual threat to human health, equipment, property, or the environment.
Examples include (but are not limited to) liquid sludge, pastes, and/or filter cakes, chemical compounds and/or petroleum products, fine powders or highly dusty materials, spent blast media and/or grit, demolition wastes from industrial facilities, debris and/or residues from spill cleanup work, underground storage tank remediation materials, pollution control wastes, ash from fires, furnaces, boilers or incinerators, off-specification products, other materials that have the potential to be a hazardous waste.
All RW may be used or unused excess hazardous materials. Laboratory analysis may be required to verify the waste is not a RCRA-regulated hazardous waste.
Response Time The time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work site with appropriate personnel, tools, equipment, and materials, ready to perform the work required.
Restoration Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes.
Sampling Plan Plan and procedures to conduct sampling, field testing and laboratory analysis for a defined testing objective.
Satellite Accumulation Areas
Designated approved areas, at or near the point of generation and under the control of the operator generating the waste, where no more than 55 gallons (cumulative total) of all types of HW or 1 quart of acutely HW may be accumulated. The 55-gallon limit does not include non RCRA regulated waste, universal waste and used oil etc.
Spill Prevention Control and Countermeasure (SPCC) Plan
The SPCC Plan establishes engineering controls including procedures, methods, equipment and other requirements to prevent the discharge of oil into or upon navigable waters. The Plan includes procedures for oil spill prevention, measures to contain spills and an established spill drill exercises to ensure effective countermeasures in the event of oil spill.
Sustainment Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.
System An assemblage of mechanically and/or electrically interlocked parts, equipment and/or components forming a unitary whole.
Unit Priced Labor (UPL) Hour
The fully burdened unit price bid by the Contractor to perform one hour of work-in-place. With the exception of direct material and construction equipment costs, the unit priced labor hour price shall include all indirect and direct costs associated with performing work, such as: the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; sub-contractor cost, costs for pre-expended bin materials, shipping and handling, wage determinations, union agreements, crew sizes, hand tools, equipment, universal equipment (excluding construction equipment), mobilization, demobilization, payroll burdens and fringes, overtime, job (field) overhead, clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance, general and administrative (home office) overhead, profit, and all other associated markups. Any indirect cost or additional markups not allowed in the definition of direct materials shall be included in the UPL price. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included.
Uniformat Classification A standard classification of building components established by the National Institute of Standards and Technology.
Universal Equipment Universal equipment refers to equipment that can cover two or more industries and is commercially employed in execution of operation, maintenance, and repair work, such as: Aerial Work Platforms, Backhoes, Cranes, Dump Trucks, Excavators, Generators, Graders, Lifts, Loaders, Man Lifts, Monitoring and Test Equipment, Pumps, Tractors, Trailers, etc.
Universal Waste (UW) Universal Waste (UW) (defined in 40 CFR Part 273) means batteries, fluorescent lamps, some pesticides, and mercury-containing equipment formally classified as a HW, but that are now subject to less stringent regulations, when recycled if recycling is available.
Utility Infrastructure Condition Assessment Program (UICAP)
A comprehensive assessment processes for planning, managing, and executing Navy utility infrastructure inspections.
Attachment J-0200000-01 Definitions and Acronyms
Acronym Title ACO Administrative Contracting Officer AFFF Aqueous Film Forming Foam BFR Basic Facility Requirements BW Biweekly CBMM Condition Based Maintenance Management Program CDR Contract Discrepancy Report CIA Controlled Industrial Area CIMU Component Inventory Management Unit CMMS Computerized Maintenance Management System CNSSI Committee on National Security Systems Instruction COR Contracting Officer Representative
Attachment J-0200000-01 Definitions and Acronyms
Acronym Title COR Condition of Readiness DBH Diameter at Breast Height DCR Direct Condition Rating DoD Department of Defense DoDI Department of Defense Instruction DoN Department of Navy DRMO Defense Reutilization Management Office EPA Environmental Protection Agency EPCRA Emergency Planning and Community Right-to-Know Act FAR Federal Acquisition Regulation FFP Firm Fixed Price FIFRA Federal Insecticide, Fungicide, and Rodenticide Act FSC Facility Support Contract FSCM Facility Support Contract Manager GIS Geospatial Information System GFE Government-furnished Equipment GFF Government-furnished Facilities GFM Government-furnished Materials HCA Head Contracting Agency ICAP Infrastructure Condition Assessment Program ICP Integrated Contingency Plan IDIQ Indefinite Delivery Indefinite Quantity iNFADS Internet Navy Facilities Asst Data Store IPM Integrated Pest Management IPMIS Integrated Pest Management Information System IPMP Integrated Pest Management Plan KO Contracting Officer LAN Local Area Network M Monthly MAP Maintenance Action Plan MDI Mission Dependency Index MEP Mechanical, Electrical and Plumbing MILCON Military Construction MPAS Monthly Performance Assessment Summary MRI Mission Readiness Index MSDS Material Safety Data Sheets NAVFAC Naval Facilities Engineering Command NIST National Institute of Standards and Technology NIST SP National Institute of Standards and Technology Special Publication NMCI Navy Marine Corps Intranet NOSC Navy-On-Scene Coordinator PAP Performance Assessment Plan PAR Performance Assessment Representative PAW Performance Assessment Worksheet PEO Program Executive Officer PM Project Manager PM Planned Maintenance or Preventative Maintenance POAM Plan of Action and Milestones PRCSP Permit Required Confined Space Program PWS Performance Work Statement PWO Public Works Officer Q Quarterly QC Quality Control
Attachment J-0200000-01 Definitions and Acronyms
Acronym Title RSIP Regional Shore Infrastructure Plan RPIE Real Property Inventory Equipment RSL Remaining Service Life SC Security Clearances SM Semimonthly SPAR Senior Performance Assessment Representative TE Technical Exhibit VIQ Variation in Quantity WBS Work Breakdown Structure
Attachment J-0200000-02 Wage Determinations
"REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 1996-0223
Daniel W. Simms Division of | Revision No.: 61
Director Wage Determinations| Date Of Last Revision: 12/26/2023
Note: Contracts subject to the Service Contract Act are generally required to pay at least the applicable minimum wage rate required under Executive Order
14026 or Executive Order 13658.
|If the contract is entered into on or |Executive Order 14026 generally applies to |
|after January 30, 2022, or the |the contract. |
|contract is renewed or extended (e.g., |The contractor must pay all covered workers |
|an option is exercised) on or after |at least $17.20 per hour (or the applicable |
|January 30, 2022: |wage rate listed on this wage determination,|
| |if it is higher) for all hours spent |
| |performing on the contract in 2024. |
|If the contract was awarded on or |Executive Order 13658 generally applies to |
|between January 1, 2015 and January 29,|the contract. |
|2022, and the contract is not renewed |The contractor must pay all covered workers |
|or extended on or after January 30, |at least $12.90 per hour (or the applicable |
|2022: |wage rate listed on this wage determination,|
| |if it is higher) for all hours spent |
| |performing on the contract in 2024. |
The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the Executive Orders is available at www.dol.gov/whd/govcontracts.
NATIONWIDE: Applicable in the continental U.S. and Hawaii
Regions are defined as follows:
MIDWEST REGION: Illinois, Indiana, Iowa, Kansas, Michigan, Minnesota, Missouri, Nebraska, North Dakota, Ohio, South Dakota, and Wisconsin;
NORTHEAST REGION: Connecticut, Maine, Massachusetts, New Hampshire, New
Jersey, New York, Pennsylvania, Pureto Rico, Rhode Island, Vermont and Virgin
Islands;
SOUTH REGION: Alabama, Arkansas, Delaware, District of Columbia, Florida, Georgia, Kentucky, Louisiana, Maryland, Mississippi, North Carolina, Oklahoma, South Carolina, Tennessee, Texas, Virginia, and West Virginia;
WEST REGION: Arizona, California, Colorado, Guam, Hawaii, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Washington, and Wyoming.
**Fringe Benefits Required Follow the Occupational Listing**
Employed on contracts for removal of oil spills, hazardous waste materials and related cleanup services.
OCCUPATION CODE - TITLE FOOTNOTE RATE
23440 - Heavy Equipment Operator
MIDWEST REGION 34.84
NORTHEAST REGION 33.09
SOUTH REGION 30.35
WEST REGION 34.17
23470 - Laborer
MIDWEST REGION 19.58
NORTHEAST REGION 20.08
SOUTH REGION 15.29***
WEST REGION 17.49
30090 - Environmental Technician
MIDWEST REGION 31.01
NORTHEAST REGION 33.02
SOUTH REGION 29.40
WEST REGION 31.20
31010 - Airplane Pilot 33.11
31361 - Truckdriver, Light
MIDWEST REGION 17.67
NORTHEAST REGION 22.18
SOUTH REGION 14.37***
WEST REGION 14.95***
31362 - Truckdriver, Medium
MIDWEST REGION 28.50
NORTHEAST REGION 28.57
SOUTH REGION 24.25
WEST REGION 26.78
31363 - Truckdriver, Heavy
MIDWEST REGION 29.87
NORTHEAST REGION 30.00
SOUTH REGION 25.41
WEST REGION 28.11
***Workers in this classification may be entitled to a higher minimum wage under
Executive Order 14026 ($17.20 per hour) or 13658 ($12.90 per hour). Please see the
Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 and 13658 are not currently being enforced as to contracts or contract-like instruments entered into with the federal government in connection with seasonal recreational services or seasonal recreational equipment rental for the general public on federal lands. The minimum wage requirements of Executive Order 14026 also are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal
Contractors, applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is the victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
ALL OCCUPATIONS LISTED ABOVE RECEIVE THE FOLLOWING BENEFITS:
HEALTH & WELFARE: $4.98 per hour, up to 40 hours per week, or $199.20 per week or
$863.20 per month
HEALTH & WELFARE EO 13706: $4.57 per hour, up to 40 hours per week, or $182.80 per week, or $792.13 per month*
*This rate is to be used only when compensating employees for performance on an SCA-covered contract also covered by EO 13706, Establishing Paid Sick Leave for Federal
Contractors. A contractor may not receive credit toward its SCA obligations for any paid sick leave provided pursuant to EO 13706.
VACATION: 2 weeks paid vacation after 1 year of service with a contractor or successor, 3 weeks after 5 years, and 4 weeks after 15 years. Length of service includes the whole span of continuous service with the present contractor or successor, wherever employed, and with the predecessor contractors in the performance of similar work at the same Federal facility. (Reg. 29 CFR 4.173)
HOLIDAYS: A minimum of eleven paid holidays per year: New Year's Day, Martin
Luther King Jr.'s Birthday, Washington's Birthday, Memorial Day, Juneteenth
National Independence Day, Independence Day, Labor Day, Columbus Day, Veterans'
Day, Thanksgiving Day, and Christmas Day. (A contractor may substitute for any of the named holidays another day off with pay in accordance with a plan communicated to the employees involved.) (See 29 CFR 4.174)
VACATION (Hawaii): 2 weeks paid vacation after 1 year of service with a contractor or successor; 3 weeks after 10 years, and 4 weeks after 15 years. Length of service includes the whole span of continuous service with the present contractor or successor, wherever employed, and with the predecessor contractors in the performance of similar work at the same Federal facility. (Reg. 29 CFR 4.173)
HEALTH & WELFARE (Hawaii): $2.15 per hour, up to 40 hours per week, or $86.00 per week, or $372.67 per month for all employees on whose behalf the contractor provides health care benefits pursuant to the Hawaii prepaid Health Care Act. For those employees who are not receiving health care benefits mandated by the Hawaii prepaid
Health Care Act, the new health and welfare benefit rate will be $4.98 per hour, up to 40 hours per week.
HEALTH & WELFARE (Hawaii EO 13706): $1.74 per hour, up to 40 hours per week, or $69.
60 per week, or $301.60 per month for all employees on whose behalf the contractor provides health care benefits pursuant to the Hawaii prepaid Health Care Act. For those employees who are not receiving health care benefits mandated by the Hawaii prepaid Health Care Act, the new health and welfare benefit rate will be $4.57 per hour, up to 40 hours per week. *
*This rate is to be used only when compensating employees for performance on an SCA-covered contract also covered by EO 13706, Establishing Paid Sick Leave for Federal
Contractors. A contractor may not receive credit toward its SCA obligations for any paid sick leave provided pursuant to EO 13706.
** UNIFORM ALLOWANCE **
If employees are required to wear uniforms in the performance of this contract
(either by the terms of the Government contract, by the employer, by the state or local law, etc.), the cost of furnishing such uniforms and maintaining (by laundering or dry cleaning) such uniforms is an expense that may not be borne by an employee where such cost reduces the hourly rate below that required by the wage determination. The Department of Labor will accept payment in accordance with the following standards as compliance:
The contractor or subcontractor is required to furnish all employees with an adequate number of uniforms without cost or to reimburse employees for the actual cost of the uniforms. In addition, where uniform cleaning and maintenance is made the responsibility of the employee, all contractors and subcontractors subject to this wage determination shall (in the absence of a bona fide collective bargaining agreement providing for a different amount, or the furnishing of contrary affirmative proof as to the actual cost), reimburse all employees for such cleaning and maintenance at a rate of $3.35 per week (or $.67 cents per day). However, in those instances where the uniforms furnished are made of ""wash and wear"" materials, may be routinely washed and dried with other personal garments, and do not require any special treatment such as dry cleaning, daily washing, or commercial laundering in order to meet the cleanliness or appearance standards set by the terms of the Government contract, by the contractor, by law, or by the nature of the work, there is no requirement that employees be reimbursed for uniform maintenance costs.
** SERVICE CONTRACT ACT DIRECTORY OF OCCUPATIONS **
The duties of employees under job titles listed are those described in the
""Service Contract Act Directory of Occupations"", Fifth Edition (Revision 1), dated September 2015, unless otherwise indicated.
REQUEST FOR AUTHORIZATION OF ADDITIONAL CLASSIFICATION AND WAGE RATE
Standard Form 1444 (SF-1444)
Conformance Process:
The contracting officer shall require that any class of service employee which is not listed herein and which is to be employed under the contract (i.e., the work to be performed is not performed by any classification listed in the wage determination), be classified by the contractor so as to provide a reasonable relationship (i.e., appropriate level of skill comparison) between such unlisted classifications and the classifications listed in the wage determination. Such conformed classes of employees shall be paid the monetary wages and furnished the fringe benefits as are determined (See 29 CFR 4.6(b)(2)(i)). Such conforming procedures shall be initiated by the contractor prior to the performance of contract work by such unlisted class(es) of employees (See 29 CFR 4.6(b)(2)(ii)). The Wage and Hour Division shall make a final determination of conformed classification, wage rate, and/or fringe benefits which shall be retroactive to the commencement date of the contract (See 29 CFR 4.6(b)(2)(iv)(C)(vi)). When multiple wage determinations are included in a contract, a separate SF-1444 should be prepared for each wage determination to which a class(es) is to be conformed.
The process for preparing a conformance request is as follows:
1) When preparing the bid, the contractor identifies the need for a conformed occupation(s) and computes a proposed rate(s).
2) After contract award, the contractor prepares a written report listing in order the proposed classification title(s), a Federal grade equivalency (FGE) for each proposed classification(s), job description(s), and rationale for proposed wage rate(s), including information regarding the agreement or disagreement of the authorized representative of the employees involved, or where there is no authorized representative, the employees themselves. This report should be submitted to the contracting officer no later than 30 days after such unlisted class(es) of employees performs any contract work.
3) The contracting officer reviews the proposed action and promptly submits a report of the action, together with the agency's recommendations and pertinent information including the position of the contractor and the employees, to the Wage and Hour Division, U.S. Department of Labor, for review (See 29 CFR 4.6(b)(2)(ii)).
4) Within 30 days of receipt, the Wage and Hour Division approves, modifies, or disapproves the action via transmittal to the agency contracting officer, or notifies the contracting officer that additional time will be required to process the request.
5) The contracting officer transmits the Wage and Hour decision to the contractor.
6) The contractor informs the affected employees.
Information required by the Regulations must be submitted on SF-1444 or bond paper.
When preparing a conformance request, the ""Service Contract Act Directory of
Occupations"" (the Directory) should be used to compare job definitions to ensure that duties requested are not performed by a classification already listed in the wage determination. Remember, it is not the job title, but the required tasks that determine whether a class is included in an established wage determination.
Conformances may not be used to artificially split, combine, or subdivide classifications listed in the wage determination."
Attachment J-0200000-03 Directives, Instructions, and References
Reference Title EM 385-1-1 U.S. Army Corps of Engineers Safety and Health Requirements P.L. 91-596 Occupational Safety and Health Act PL 94-580 Resource Conservation and Recovery Act of (RCRA) of 1976 Code of Federal
Regulations (CFR).
Title 18, Section 1382 U.S. Code Title 21, Section 881 U.S. Code 29 CFR 1910 OSHA General Industry Standards 40 CFR 260-65 Hazardous Waste Regulations 40 CR 266 Management of Specific Hazardous Wastes and Types of Hazardous Waste Management
Facilities 40 CFR 268 Land Disposal Restrictions 49 FR, 100-199 Transportation of Hazardous Materials and Waste Maine Department of Environmental Protection (DEP) Chapter 850-857
Solid Waste Management Rules
Attachment J-0200000-04 Invoice Form
1. CONTRACTOR'S INVOICE
From Invoice Date
Invoice Number
POC/Telephone/email for this invoice:
To: Contract Specialist:
Below is a Statement of Performance under Contract Task Order # for at
The enclosure provides breakdown of this statement of performance.
A. Total value of contract/task order through change $ B. Percentage of performance complete % % C. Value of completed performance $ D. Less total of prior payments $ E. Amount of this invoice $
Signature and Title:
Date: Signature of Authorized Representative
Taxpayer Identification No. (TIN):
Electronic funds transfer (EFT) banking information (if applicable):
2. FIRST ENDORSEMENT
From: Accountable Official To: Certifying Officer A. Amount of work completed to (date) $ B. Less:
Retention $ Other Deductions $ $
C. Subtotal $ D. Less previous payments $ E. Certified amount for payment # on TO # $ F. Elapsed contract time (if applicable)
Attach. J-0200000-04 CONTRACT Sheet __________ of __________
Period Ending
LOCATION:
TO BE COMPLETED BY CONTRACTOR GOVERNMENT USE ONLY
Cost Category
CLIN #,
SLIN #, or ACRN # Description Estimated Cost % Complete Value % Work in Place
Value Prior Report
(1) (2) (3) (4) (5) (6) (7) (8)
Totals Undistributed Charges-Material Other Grand Totals Remarks:
Signature: Date:
Signature of Authorized Representative (Contractor)
Name and Title (typed):
Phone and address:
(iaw FAR 32.905)
Attachment J-0200000-05 Forms
NAVSHIPYD-PTSMH-6240/3 NAVSHIPYD PTSMHINST
5090.1 CH-1 (121)
DATE: ____________________________________ 1 Mar 88
CONTRACT NO: N62472-____________________
EXCAVATION/DEMOLITION MATERIAL REMOVAL PASS
EXCAVATED SOIL SHALL NOT BE REMOVED FROM THE PORTSMOUTH NAVAL SHIPYARD
CONTRACTOR/HAULER: ________________________________________________________________
MATERIAL DESCRIPTION: ________________________________________________________________
SOURCE OF MATERIAL: ________________________________________________________________
APPROVED DESTINATION: ________________________________________________________________
Permit/Authorization Obtained Truck Number:___________________________________________
The signatures below verify that an onsite visual inspection of the material has been performed, and that this form is a record of the facts agreed upon:
Contractor Signature: _________________________________________________________
Contracting Officer’s Representative Signature: _____________________________Code: ___________
Gate Sentry Signature: _________________________________________________________
CODE 1700 RETURN THIS PASS TO CODE 495
Contractor Incident Report System (CIRS)
Report Type (REQUIRED)
Injured Property Injured & Property Near Miss
1. Contract Information Incident Information
Prime Contractor: Cage Code:
Contract Number: Occurred On Base:
Yes No
Task Order #:
Contractor Contact Information
Last Name First Name Phone #:
Email Address: Date Notified: Ex:
MM/DD/YYYY
2. Incident Type(REQUIRED) (Please Check All That Apply)
Assault/Violent Act Extreme Environmental Exposure Man over the side (No water entry)
Diving Falls, slip, trip, or bodily exertion Man Overboard - Water Entry
Electrical Shock/Burns Fires - All Types Material Handling Equipment
Equipment Installation/Repair Hazardous Material (any type) Ordnance-Related (Explosive)
Explosion, Non-Ordnance Industrial (Select Additional Below) Vehicle (Government or Private)
Industrial Incident Additional Information (Please Check All That Apply)
Confined Space Hand and Power Tools Work Platforms and Scaffolding
Underground Construction, Shafts, and Demolition/Renovation Rigging
Caissons
Concrete, Masonry, Steel Erection and Trenching/Entrapment Cranes and Hoisting Equipment
Residential Construction
Traffic Control Floating Plant and Marine Activities Tree Maintenance and Removal
Welding and Cutting Pressurized Equipment and System Airfield and Aircraft Operations
Control of Hazardous Energy Fall Protection
3. General Information Incident Information
Date of Incident: Ex:
MM/DD/YYYY Time of Incident: :
Describe the incident in detail in your words:
Exact Location of Incident:
Was Hazardous Material(s) Involved: Yes No
If Yes, Explain What Hazardous Materials Were Involved and Why:
Activity at Time of Incident:
Personal Protective Equipment:
Available and used Available and not used Not Required
Not related to Mishap Wrong PPE for job List PPE
List PPE Used: (required only if List PPE checked)
Who Provided Cleanup? Onsite Base Public
4. Fully Explain What Allowed or Caused the Incident Incident Information
Direct Cause:
Indirect Cause:
Additional Action Taken: (Please Include a Begin Date and Est. End Date in Description)
5. Contributing Factors
Was Visibility Restricted? Yes No Distance Visibility was restricted:
Unit of Measure: Feet Yards Meters Miles Nautical Miles
Visibility Restricted By:
Fog Smoke Rain Sleet Snow
Mist Dust Sandstorm Unknown Object Other:
Lighting Conditions at Incident Site:
Adequate Inadequate
Unknown
Was Noise Level a Factor:
Yes No
Unknown
Was Carbon Monoxide (CO) a Factor:
Yes No
If Yes, CO Alarm Manufacturer:
1. Injured Data Person (if applicable) Age: Gender:
Male Female
Subcontractor Company Name:
2. General Information
Drug or Alcohol Involved:
None Unknown Alcohol Drugs Alcohol and Drugs
Who Provided First Aid? Onsite Base Public
Was Ergonomics a Factor: Yes No
Type of Ergonomic Injury:
Lifting Equipment Placement Office Repetitive Motion Positioning
Bending Equipment Placement Industrial Impact Strain
3. Injury Illness/Fatality Information
Severity of Injury/Illness:
Fatality Lost Workday Case Involving Days Away From Work
Permanent Total Disability Light/Limited Duty or Restricted Work (No Lost Work Days)
Permanent Partial Disability Other Reportable & Medical Treatment/No Lost Time
First Aid Treatment Only/First Aid Case
Were There Days Lost: Were There Days Hospitalized: Were There Days Restricted Duty:
Yes No Yes No Yes No
Part of Body Affected:
Nature of Injury or Illness:
Event or Exposure:
Source of Injury or Illness:
Injury Activity Code:
4. License Person (if applicable)
Are Appropriate License and Certification/Medical Current:
If yes, explain:
Yes No
5. Training
Was all the contract-required training provided to the employee:
If yes, explain:
Yes No
4. License (if applicable) Property Damage
Are Appropriate License and Certification/Medical Current:
If yes, explain:
Yes No
5. Training
Was all the contract-required training provided to the employee?
If yes, explain:
Yes No
Used Oil Disposal and Recycling Summary Report Form
Name of Facility Facility Location Disposal Quantity for
Calendar Year [ ] Recycled Quantity for
Calendar Year [ ]
Total:
Attachment J-0200000-05 Forms
Solid Waste Management Report
Solid Waste Recycled
Description Amount
(lbs./tons) Cost Revenue Glass Metal (aluminum, circuit boards, steel) Paper & Paper Board Plastic Food (cooking grease & oil, discarded food) Wood (packaging, pallets, plywood) Yard/Green Waste (mulch, trees, trimmings) Concrete Asphalt
Select Waste
Description Amount
(lbs./tons) Cost Revenue Construction and Demolition Debris Used Oil Ethylene Glycol Antifreeze Lead-Acid Batteries
Other Waste
Description Amount
(lbs./tons) Cost Revenue Sewage Sludge (land applied)
Sewage Sludge (disposed) Oil Water Separator Liquids OWWO Oil OWWO Sludge Lift Station Grease Other Waste (SPECIFY)
Directions for Process Material Log Sheets
Che…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .