Section II_Schedule A_PPPL-PD-D_Fixed Price_Rev 10_Sept2022.pdf

PDF 172 KB Posted

Attached to
Internal Audit Services
Solicitation number
RFP_26_003
Issued by

About this file

This document contains the Princeton Plasma Physics Laboratory (PPPL) General Provisions for Non-Commercial Subcontracts, specifically Part D covering Fixed Price Supply or Service Subcontracts. The document outlines standard contractual terms and conditions for subcontractors, including detailed provisions for payment, changes, inspection, termination, and work stoppage. Key provisions include payment terms of net 30 days, Princeton's right to inspect and modify work, procedures for terminating contracts for convenience or default, and guidelines for stop-work orders. The document provides comprehensive rules governing the relationship between Princeton and its subcontractors, addressing scenarios such as contract modifications, supply inspections, performance issues, and potential contract terminations, with specific instructions for how each situation should be handled.

View the file

Other files

File Type Posted
Section III_Instructions for Proposal Preparation_RFP 26-003_RV1_01132026.pdf PDF
Amendment 1_RFP_26-003_01132026.pdf PDF
Section V_Attachment 3a_Labor Rates and Cost Estimate Worksheet_RFP_26-003_3aRV1.xlsx XLSX spreadsheet
Section I_Attachment 1_Statement of WorK_SOW_SCHEDULE B_ PPPL _OAC_Final_12022025.pdf PDF
Section II_Schedule A_PPPL-PD-C _Over _500K_ Rev 14_Sept2022.pdf PDF
Section II_Schedule A_PPPL-PD-T Provisions For Work Performed-Rev 5_Sept2022.pdf PDF
Section V_Attachment 3_Offeror Information and Pricing Form_RFP 26-003.pdf PDF
RFP 26-003 TABLE OF CONTENTS.pdf PDF
Acknowledgement of Receipt RFP 26-003.pdf PDF
Section I_Attachment 1_SOW_Section 12.0_ Attachments_SCHEDULE B_Statement of Work_Final.pdf PDF
Section II_Schedule A_PPPL-PD-A Common Clauses _Non-Commercial_Rev 25_Feb2024.pdf PDF
Section II_Schedule A_PPL_PD-E _Cost Reimbursement_ Rev 12_ May 2019.pdf PDF
Section II_Schedule A_PPPL-PD-F_TM_Rev 10_Feb2024.pdf PDF
Section II_Schedule E_Sample_IDIQ_TaskOrder.pdf PDF
Section III_Instructions for Proposal Preparation_RFP 26-003.pdf PDF
Section IV_SI Evaluation and Basis for Award_RFP 26-003_.pdf PDF
Section V_Attachment 4_Reps and Certs- (Booklet) PPL-PD-RC2_ Rev 11_ 09-2013.pdf PDF
Section II_Schedule C_PPPL Subcontractor Travel Guidelines-Rev21 Aug2022.pdf PDF
Section V_Attachment 3a_Labor Rates and Cost Estimate Worksheet_RFP_26-003_3a.xlsx XLSX spreadsheet
Section V_Attachment 5_Organizational Conflicts of Interest Certification Form.pdf PDF
Letter of Invitation.pdf PDF
Section II_Attachment 2_Sample IDIQ Subcontract_RFP 26-003.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PPPL General Provisions for Non-Commercial Subcontracts Part D - Fixed Price Supply or Service Subcontracts

PPPL-PD-D; Rev 10; 09-2022 Page 1 of 11

The following clauses, the full texts of which are set forth below, are hereby incorporated and made part of this Agreement.

D1. PAYMENT (OCT 1997)

D2. EXTRAS (APR 1984)

D3. CHANGES FIXED PRICE (AUG 1987) - ALTERNATE II (APR 1984)

D4. INSPECTION (APR 1984)

D5. INSPECTION OF SUPPLIES-FIXED PRICE (AUG 1996)

D6. TERMINATION FOR CONVENIENCE OF PRINCETON (FIXED-PRICE) (SHORT

FORM) (APR 1984)

D7. TERMINATION FOR CONVENIENCE OF PRINCETON (FIXED-PRICE) (APR 2012) ... 5

D8. TERMINATION FOR CONVENIENCE OF PRINCETON (SERVICES) (SHORT FORM)

(APR 1984)

D9. TERMINATION FOR DEFAULT (APR 1984)

D10. STOP-WORK ORDER (AUG 1989)

PPPL-PD-D; Rev 10; 09-2022 Page 2 of 11

D1. PAYMENT (OCT 1997)

Unless otherwise provided, terms of payment shall be net 30 days from the later of (1) receipt of the Subcontractor’s proper invoice, if required, or (2) delivery of items/completion of work. Any offered discount shall be taken if payment is made within the discount period that the Subcontractor indicates. Payments shall be made either by check or by electronic funds transfer, at the option of Princeton. Payment shall be deemed to have been made as of the date of mailing or the date on which an electronic funds transfer was made.

D2. EXTRAS (APR 1984)

Except as otherwise provided in this subcontract, no payment for extras shall be made unless such extras and the price therefore have been authorized in writing by Princeton.

D3. CHANGES FIXED PRICE (AUG 1987) - ALTERNATE II (APR 1984)

(a) Princeton may at any time, by written order, and without notice to the sureties, if any, make changes within the general scope of this subcontract in any one or more of the following:

(1) Description of services to be performed.

(2) Time of performance (i.e., hours of the day, days of the week, etc.).

(3) Place of performance of the services.

(4) Drawings, designs, or specifications when the supplies to be furnished are to be specially manufactured for Princeton in accordance with the drawings, designs, or specifications.

(5) Method of shipment or packing.

(6) Place of delivery.

(b) If any such change causes an increase or decrease in the cost of, or the time required for, performance of any part of the work under this subcontract, whether or not changed by the order, Princeton shall make an equitable adjustment in the subcontract price, the delivery schedule, or both, and shall modify the subcontract.

(c) The Subcontractor must assert its right to an adjustment under this clause within 30 days from the date of receipt of the written order. However, if Princeton decides that the facts justify it, Princeton may receive and act upon a proposal submitted before final payment of the subcontract.

(d) If the Subcontractor's proposal includes the cost of property made obsolete or excess by the change, Princeton shall have the right to prescribe the manner of the disposition of the property.

(e) Failure to agree to any adjustment shall be a dispute under the Resolution of Disputes clause.

However, nothing in this clause shall excuse the Subcontractor from proceeding with the subcontract as changed.

PPPL-PD-D; Rev 10; 09-2022 Page 3 of 11

D4. INSPECTION (APR 1984)

Princeton has the right to inspect and evaluate the work performed or being performed under the subcontract, and the premises where work is being performed, at all reasonable times and in a manner that will not unduly delay the work. If Princeton performs inspection or evaluation on the premises of the Subcontractor or lower tier subcontractor, the Subcontractor shall furnish all reasonable facilities and assistance for the safe and convenient performance of these duties.

D5. INSPECTION OF SUPPLIES-FIXED PRICE (AUG 1996)

(a) Definition. "Supplies," as used in this clause, includes but is not limited to raw materials, components, intermediate assemblies, end products, and lots of supplies.

(b) The Subcontractor shall provide and maintain an inspection system acceptable to the

Government covering supplies under this subcontract and shall tender to the Princeton and the Government for acceptance only supplies that have been inspected in accordance with the inspection system and have been found by the Subcontractor to be in conformity with subcontract requirements. As part of the system, the Subcontractor shall prepare records evidencing all inspections made under the system and the outcome. These records shall be kept complete and made available to Princeton and/or the Government during subcontract performance and for as long afterwards as the subcontract requires. Princeton and/or the Government may perform reviews and evaluations as reasonably necessary to ascertain compliance with this paragraph. These reviews and evaluations shall be conducted in a manner that will not unduly delay the contract work. The right of review, whether exercised or not, does not relieve the Subcontractor of the obligations under the subcontract.

(c) Princeton and/or the Government has the right to inspect and test all supplies called for by the subcontract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before acceptance. Princeton and/or the Government shall perform inspections and tests in a manner that will not unduly delay the work. Princeton and/or the Government assumes no contractual obligation to perform any inspection and test for the benefit of the Subcontractor unless specifically set forth elsewhere in this subcontract.

(d) If Princeton and/or the Government performs inspection or test on the premises of the

Subcontractor or a lower-tier subcontractor, the Subcontractor shall furnish, and shall require lower-tier subcontractors to furnish, at no increase in subcontract price, all reasonable facilities and assistance for the safe and convenient performance of these duties. Except as otherwise provided in the subcontract, Princeton and/or the Government shall bear the expense of Princeton or Government inspections or tests made at other than the Subcontractor’s or lower-tier subcontractor’s premises; provided, that in case of rejection, Princeton and/or the Government shall not be liable for any reduction in the value of inspection or test samples.

(e) (1) When supplies are not ready at the time specified by the Subcontractor for inspection or test, Princeton’s Procurement Specialist may charge to the Subcontractor the additional cost of inspection or test.

(2) The Procurement Specialist may also charge the Subcontractor for any additional cost of inspection or test when prior rejection makes reinspection or retest necessary.

PPPL-PD-D; Rev 10; 09-2022 Page 4 of 11

(f) Princeton and/or the Government has the right either to reject or to require correction of nonconforming supplies. Supplies are nonconforming when they are defective in material or workmanship or are otherwise not in conformity with subcontract requirements. Princeton and/or the Government may reject nonconforming supplies with or without disposition instructions.

(g) The Subcontractor shall remove supplies rejected or required to be corrected. However, Princeton’s Procurement Specialist may require or permit correction in place, promptly after notice, by and at the expense of the Subcontractor. The Subcontractor shall not tender for acceptance corrected or rejected supplies without disclosing the former rejection or requirement for correction, and, when required, shall disclose the corrective action taken.

(h) If the Subcontractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to be replaced or corrected, Princeton may either (1)by subcontract or otherwise, remove, replace, or correct the supplies and charge the cost to the Subcontractor or (2) terminate the subcontract for default. Unless the Subcontractor corrects or replaces the supplies within the delivery schedule, the Procurement Specialist may require their delivery and make an equitable price reduction. Failure to agree to a price reduction shall be a dispute.

(i) (1) If this subcontract provides for the performance of quality assurance at source, and if requested by Princeton and/or the Government, the Subcontractor shall furnish advance notification of the time-

(i) When subcontractor inspection or tests will be performed in accordance with the terms and conditions of the subcontract; and

(ii) When the supplies will be ready for Princeton and/or Government inspection.

(2) Princeton and/or the Government’s request shall specify the period and method of the advance notification and the designated representative(s) to whom it shall be furnished.

Requests shall not require more than 2 workdays of advance notification if the designated representative(s) is/are in residence in the Subcontractor’s plant, nor more than 7 workdays in other instances.

(j) The Princeton and/or the Government shall accept or reject supplies as promptly as practicable after delivery, unless otherwise provided in the subcontract. Princeton’s failure to inspect and accept or reject the supplies shall not relieve the Subcontractor from responsibility, nor impose liability on Princeton, for nonconforming supplies.

(k) Inspections and tests by Princeton and/or the Government do not relieve the Subcontractor of responsibility for defects or other failures to meet subcontract requirements discovered before acceptance. Acceptance shall be conclusive, except for latent defects, fraud, gross mistakes amounting to fraud, or as otherwise provided in the subcontract.

(l) If acceptance is not conclusive for any of the reasons in paragraph (k) hereof, Princeton, in addition to any other rights and remedies provided by law, or under other provisions of this contract, shall have the right to require the Subcontractor (1)at no increase in subcontract price, to correct or replace the defective or nonconforming supplies at the original point of delivery or at the Subcontractor’s plant at the Procurement Specialist’s election, and in

PPPL-PD-D; Rev 10; 09-2022 Page 5 of 11 accordance with a reasonable delivery schedule as may be agreed upon between the Subcontractor and the Procurement Specialist; provided, that the Procurement Specialist may require a reduction in subcontract price if the Subcontractor fails to meet such delivery schedule, or (2) within a reasonable time after receipt by the Subcontractor of notice of defects or nonconformance, to repay such portion of the subcontract as is equitable under the circumstances if the Procurement Specialist elects not to require correction or replacement. When supplies are returned to the Subcontractor, the Subcontractor shall bear the transportation cost from the original point of delivery to the Subcontractor’s plant and return to the original point when that point is not the Subcontractor’s plant. If the Subcontractor fails to perform or act as required in paragraph (l)(1) or (l)(2) of this clause and does not cure such failure within a period of 10 days (or such longer period as the Procurement Specialist may authorize in writing) after receipt of notice from the Procurement Specialist specifying such failure, Princeton shall have the right by subcontract or otherwise to replace or correct such supplies and charge to the Subcontractor the cost occasioned Princeton thereby.

D6. TERMINATION FOR CONVENIENCE OF PRINCETON (FIXED-PRICE) (SHORT FORM)

(APR 1984)

(This clause is applicable to supply subcontracts valued at the Simplified Acquisition Threshold or less)

Princeton, by written notice, may terminate this subcontract, in whole or in part, when it is in Princeton's interest. If this subcontract is terminated, the rights, duties, and obligations of the parties, including compensation to the Subcontractor, shall be in accordance with Part 49 of the Federal Acquisition Regulation in effect on the date of this subcontract.

D7. TERMINATION FOR CONVENIENCE OF PRINCETON (FIXED-PRICE) (APR 2012)

(This clause is applicable to subcontracts which exceed the Simplified Acquisition Threshold)

(a) Princeton may terminate performance of work under this subcontract in whole or, from time to time, in part if Princeton determines that a termination is in Princeton's interest. Princeton shall terminate by delivering to the Subcontractor a Notice of Termination specifying the extent of termination and the effective date.

(b) After receipt of a Notice of Termination, and except as directed by Princeton, the Subcontractor shall immediately proceed with the following obligations, regardless of any delay in determining or adjusting any amounts due under this clause:

(1) Stop work as specified in the notice.

(2) Place no further lower tier subcontracts or orders (referred to as lower tier subcontracts in this clause) for materials, services, or facilities, except as necessary to complete the continued portion of the subcontract.

(3) Terminate all lower tier subcontracts to the extent they relate to the work terminated.

PPPL-PD-D; Rev 10; 09-2022 Page 6 of 11

(4) Assign to Princeton, as directed by Princeton, all right, title, and interest of the

Subcontractor under the lower tier subcontracts terminated, in which case Princeton shall have the right to settle or to pay any termination settlement proposal arising out of those terminations.

(5) With approval or ratification to the extent required by Princeton, settle all outstanding liabilities and termination settlement proposals arising from the termination of lower tier subcontracts; the approval or ratification will be final for purposes of this clause.

(6) As directed by Princeton, transfer title and deliver to Princeton--

(i) The fabricated or unfabricated parts, work in process, completed work, supplies, and other material produced or acquired for the work terminated; and

(ii) The completed or partially completed plans, drawings, information, and other property that, if the subcontract had been completed, would be required to be furnished to Princeton.

(7) Complete performance of the work not terminated.

(8) Take any action that may be necessary, or that Princeton may direct, for the protection and preservation of the property related to this subcontract that is in the possession of the Subcontractor and in which Princeton or the Government has or may acquire an interest.

(9) Use its best efforts to sell, as directed or authorized by Princeton or the Government, any property of the types referred to in paragraph (b)(6) of this clause; provided, however, that the Subcontractor (i) is not required to extend credit to any purchaser and (ii) may acquire the property under the conditions prescribed by, and at prices approved by, Princeton. The proceeds of any transfer or disposition will be applied to reduce any payments to be made by Princeton under this subcontract, credited to the price or cost of the work, or paid in any other manner directed by Princeton.

(c) The Subcontractor shall submit complete termination inventory schedules no later than 120 days from the effective date of termination, unless extended in writing by Princeton upon written request of the Subcontractor within this 120-day period.

(d) After expiration of the plant clearance period as defined in Subpart 49.001 of the Federal Acquisition Regulation, the Subcontractor may submit to Princeton a list, certified as to quantity and quality, of termination inventory not previously disposed of, excluding items authorized for disposition by Princeton. The Subcontractor may request Princeton to remove those items or enter into an agreement for their storage. Within 15 days, Princeton will accept title to those items and remove them or enter into a storage agreement. Princeton may verify the list upon removal of the items, or if stored, within 45 days from submission of the list, and shall correct the list, as necessary, before final settlement.

(e) After termination, the Subcontractor shall submit a final termination settlement proposal to Princeton in the form and with the certification prescribed by Princeton. The Subcontractor shall submit the proposal promptly, but no later than 1 year from the effective date of termination, unless extended in writing by Princeton upon written request of the Subcontractor within this 1-year

PPPL-PD-D; Rev 10; 09-2022 Page 7 of 11 period. However, if Princeton determines that the facts justify it, a termination settlement proposal may be received and acted on after 1 year or any extension. If the Subcontractor fails to submit the proposal within the time allowed, Princeton may determine, on the basis of information available, the amount, if any, due the Subcontractor because of the termination and shall pay the amount determined.

(f) Subject to paragraph (e) of this clause, the Subcontractor and Princeton may agree upon the whole or any part of the amount to be paid or remaining to be paid because of the termination.

The amount may include a reasonable allowance for profit on work done. However, the agreed amount, whether under this paragraph (f) or paragraph (g) of this clause, exclusive of costs shown in paragraph (g)(3) of this clause, may not exceed the total Subcontract price as reduced by (1) the amount of payments previously made and (2) the Subcontract price of work not terminated.

The Subcontract shall be modified, and the Subcontractor paid the agreed amount. Paragraph

(g) of this clause shall not limit, restrict, or affect the amount that may be agreed upon to be paid under this paragraph.

(g) If the Subcontractor and Princeton fail to agree on the whole amount to be paid because of the termination of work, Princeton shall pay the Subcontractor the amounts determined by Princeton as follows, but without duplication of any amounts agreed on under paragraph (f) of this clause:

(1) The subcontract price for completed supplies or services accepted by Princeton (or sold or acquired under paragraph (b)(9) of this clause) not previously paid for, adjusted for any saving of freight and other charges.

(2) The total of--

(i) The costs incurred in the performance of the work terminated, including initial costs and preparatory expense allocable thereto, but excluding any costs attributable to supplies or services paid or to be paid under paragraph (g)(1) of this clause;

(ii) The cost of settling and paying termination settlement proposals under terminated lower tier subcontracts that are properly chargeable to the terminated portion of the Subcontract if not included in subdivision (g)(2)(i) of this clause; and

(iii) A sum, as profit on subdivision (g)(2)(i) of this clause, determined by Princeton under

49.202 of the Federal Acquisition Regulation, in effect on the date of this subcontract, to be fair and reasonable; however, if it appears that the Subcontractor would have sustained a loss on the entire Subcontract had it been completed, Princeton shall allow no profit under this subdivision (g)(2)(iii) and shall reduce the settlement to reflect the indicated rate of loss.

(3) The reasonable costs of settlement of the work terminated, including--

(i) Accounting, legal, clerical, and other expenses reasonably necessary for the preparation of termination settlement proposals and supporting data;

(ii) The termination and settlement of lower tier subcontracts (excluding the amounts of such settlements); and

PPPL-PD-D; Rev 10; 09-2022 Page 8 of 11

(iii) Storage, transportation, and other costs incurred, reasonably necessary for the preservation, protection, or disposition of the termination inventory.

(h) Except for normal spoilage, and except to the extent that Princeton expressly assumed the risk of loss, Princeton shall exclude from the amounts payable to the Subcontractor under paragraph (g) of this clause, the fair value, as determined by Princeton, for the loss of Princeton property.

(i) The cost principles and procedures of Part 31 of the Federal Acquisition Regulation, in effect on the date of this subcontract, shall govern all costs claimed, agreed to, or determined under this clause.

(j) The Subcontractor shall have the right of appeal, under the Disputes clause, from any determination made by Princeton under paragraph (e), (g), or (l) of this clause, except that if the Subcontractor failed to submit the termination settlement proposal or request for equitable adjustment within the time provided in paragraph (e) or (l), respectively, and failed to request a time extension, there is no right of appeal.

(k) In arriving at the amount due the Subcontractor under this clause, there shall be deducted--

(1) All unliquidated advance or other payments to the Subcontractor under the terminated portion of this subcontract;

(2) Any claim which Princeton has against the Subcontractor under this subcontract; and

(3) The agreed price for, or the proceeds of sale of, materials, supplies, or other things acquired by the Subcontractor or sold under the provisions of this clause and not recovered by or credited to Princeton.

(l) If the termination is partial, the Subcontractor may file a proposal with Princeton for an equitable adjustment of the price(s) of the continued portion of the Subcontract. Princeton shall make any equitable adjustment agreed upon. Any proposal by the Subcontractor for an equitable adjustment under this clause shall be requested within 90 days from the effective date of termination unless extended in writing by Princeton.

(m) (1) Princeton may, under the terms and conditions it prescribes, make partial payments and payments against costs incurred by the Subcontractor for the terminated portion of the Subcontract, if Princeton believes the total of these payments will not exceed the amount to which the Subcontractor will be entitled.

(2) If the total payments exceed the amount finally determined to be due, the Subcontractor shall repay the excess to Princeton upon demand, together with interest computed at the rate established by the Secretary of the Treasury under 50 U.S.C. App. 1215(b)(2). Interest shall be computed for the period from the date the excess payment is received by the Subcontractor to the date the excess is repaid. Interest shall not be charged on any excess payment due to a reduction in the Subcontractor's termination settlement proposal because of retention or other disposition of termination inventory until 10 days after the date of the retention or disposition, or a later date determined by Princeton because of the circumstances.

PPPL-PD-D; Rev 10; 09-2022 Page 9 of 11

(n) Unless otherwise provided in this subcontract or by statute, the Subcontractor shall maintain all records and documents relating to the terminated portion of this contract for 3 years after final settlement. This includes all books and other evidence bearing on the Subcontractor's costs and expenses under this subcontract. The Subcontractor shall make these records and documents available to Princeton or the Government, at the Subcontractor's office, at all reasonable times, without any direct charge. If approved by Princeton, photographs, microphotographs, or other authentic reproductions may be maintained instead of original records and documents.

D8. TERMINATION FOR CONVENIENCE OF PRINCETON (SERVICES) (SHORT FORM)

(APR 1984)

(This clause is applicable to service subcontracts)

Princeton, by written notice, may terminate this Subcontract, in whole or in part, when it is in Princeton's interest. If this Subcontract is terminated, Princeton shall be liable only for payment under the payment provisions of this Subcontract for services rendered before the effective date of termination.

D9. TERMINATION FOR DEFAULT (APR 1984)

(a) (1) Princeton may, subject to paragraphs (c) and (d) of this clause, by written notice of default to the Subcontractor, terminate this Subcontract in whole or in part if the Subcontractor fails to --

(i) Deliver the supplies or to perform the services within the time specified in this Subcontract or any extension;

(ii) Make progress, so as to endanger performance of this Subcontract (but see subparagraph (a)(2) of this clause); or

(iii) Perform any of the other provisions of this Subcontract (but see subparagraph (a)(2) of this clause).

(2) Princeton’s right to terminate this Subcontract under subdivisions (a)(1)(ii) and (1)(iii) of this clause, may be exercised if the Subcontractor does not cure such failure within 10 days (or more if authorized in writing by Princeton’s Administrative Representative) after receipt of the notice from Princeton specifying the failure.

(b) If Princeton terminates this Subcontract in whole or in part, it may acquire, under the terms and in the manner Princeton considers appropriate, supplies or services similar to those terminated, and the Subcontractor will be liable to Princeton for any excess costs for those supplies or services. However, the Subcontractor shall continue the work not terminated.

(c) Except for defaults of subcontractors at any tier, the Subcontractor shall not be liable for any excess costs if the failure to perform the Subcontract arises from causes beyond the control and without the fault or negligence of the Subcontractor. Examples of such causes include

(1) acts of God or of the public enemy, PPPL-PD-D; Rev 10; 09-2022 Page 10 of 11

(2) acts of the Government in either its sovereign or contractual capacity,

(3) fires,

(4) floods,

(5) epidemics,

(6) quarantine restrictions,

(7) strikes,

(8) freight embargoes, and

(9) unusually severe weather.

In each instance the failure to perform must be beyond the control and without the fault or negligence of the Subcontractor.

(d) If the failure to perform is caused by the default of a lower-tier subcontractor at any tier, and if the cause of the default is beyond the control of both the Subcontractor and the lower-tier subcontractor, and without the fault or negligence of either, the Subcontractor shall not be liable for any excess costs for failure to perform, unless the subcontracted supplies or services were obtainable from other sources in sufficient time for the Subcontractor to meet the required delivery schedule.

(e) If this Subcontract is terminated for default, Princeton may require the Subcontractor to transfer title and deliver to Princeton, as directed by Princeton, any

(1) completed supplies, and

(2) partially completed supplies and materials, parts, tools, dies, jigs, fixtures, plans, drawings, information, and contract rights (collectively referred to as “manufacturing materials” in this clause) that the Subcontractor has specifically produced or acquired for the terminated portion of this Subcontract.

Upon direction of Princeton, the Subcontractor shall also protect and preserve property in its possession in which Princeton or the Government has an interest.

(f) Princeton shall pay the Subcontract price for completed supplies delivered and accepted. The Subcontractor and Princeton shall agree on the amount of payment for manufacturing materials delivered and accepted and for the protection and preservation of the property. Princeton may withhold from these amounts any sum Princeton determines to be necessary to protect Princeton against loss because of outstanding liens or claims of former lien holders.

(g) If, after termination, it is determined that the Subcontractor was not in default, or that the default was excusable, the rights and obligations of the parties shall be the same as if the termination had been issued for the convenience of Princeton.

(h) The rights and remedies of Princeton in this clause are in addition to any other rights and remedies provided by law or under this Subcontract.

D10. STOP-WORK ORDER (AUG 1989)

(a) Princeton may, at any time, by written order to the Subcontractor, require the Subcontractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order

PPPL-PD-D; Rev 10; 09-2022 Page 11 of 11 is delivered to the Subcontractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Subcontractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work order is delivered to the Subcontractor, or within any extension of that period to which the parties shall have agreed, Princeton shall either--

(1) Cancel the stop-work order; or

(2) Terminate the work covered by the order as provided in the Termination for Default, or the

Termination for Convenience of Princeton, clauses of this Subcontract.

(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Subcontractor shall resume work. Princeton shall make an equitable adjustment in the delivery schedule or Subcontract price, or both, and the Subcontract shall be modified, in writing, accordingly, if--

(1) The stop-work order results in an increase in the time required for, or in the Subcontractor's cost properly allocable to, the performance of any part of this Subcontract;

and

(2) The Subcontractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage; provided, that, if Princeton decides the facts justify the action, Princeton may receive and act upon the claim submitted at any time before final payment under this Subcontract.

(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of Princeton, Princeton shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.

(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, Princeton shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.

D1. PAYMENT (OCT 1997)
D2. EXTRAS (APR 1984)
D3. CHANGES FIXED PRICE (AUG 1987) - ALTERNATE II (APR 1984)
D4. INSPECTION (APR 1984)
D5. INSPECTION OF SUPPLIES-FIXED PRICE (AUG 1996)
D6. TERMINATION FOR CONVENIENCE OF PRINCETON (FIXED-PRICE) (SHORT FORM) (APR 1984)
D7. TERMINATION FOR CONVENIENCE OF PRINCETON (FIXED-PRICE) (APR 2012)
D8. TERMINATION FOR CONVENIENCE OF PRINCETON (SERVICES) (SHORT FORM) (APR 1984)
D9. TERMINATION FOR DEFAULT (APR 1984)
D10. STOP-WORK ORDER (AUG 1989)

File details come from the government source that posted it. Updated .