About this file

This document contains a federal contract solicitation for maintenance and repair of railroad trackage at Naval Weapon Station Earle and other areas of responsibility. The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command and seeks maintenance, repair, and replacement services for railroad trackage. Key deliverables under the contract include work schedules, inspection reports, safety plans and certifications, and other documentation. The response deadline is not provided in this document. The incumbent contractor will be responsible for providing labor, materials, equipment and other resources to perform maintenance, repair, inspection, and replacement of railroad tracks and associated infrastructure on an as-needed basis.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section F – 0200000 Management and Administration

Section F 0200000 Deliveries or Performance

DELIVERABLES

Spec Item

Form Attachment

Number Deliverable Title Date (s) of Submission

Distribution

Frequency Original

Copies (including original)

2.2.1.2 N/A Request to Work

Outside Government’s Regular Working Hours

At least seven calendar days prior to requested day.

KO and

COR

1 As required

2.3.1 N/A Sign-in Sheets and

Minutes for Review and Comments

Within two working days

KO, COR

and all attendees

1 As Required

2.3.1 N/A Sign-in Sheets and

Minutes Final Revision

Within two working days

KO, COR

and all attendees

1 As Required

2.3.4 N/A Permits and

Licenses

Before work commences and as requested by the KO.

KO and

COR

1 As specified

2.3.5 N/A Certificate of

Insurance

Within 15 calendar days prior to contract start.

KO and

COR

1 As specified

2.3.5 N/A Written Notice of

cancellation or material change in policy coverage

At least 30 calendar days prior to cancellation or material change in policy coverage

KO and

COR

1 As required

2.6.4 N/A Scheduling and

Work Status Updates

Weekly, within 30 minutes of the inquiry during regular working hours, and by 08:00 the following work day for inquiries after regular working hours

KO and

COR

1 As Specified

Form Attachment

Number Deliverable Title Date (s) of Submission

Distribution

Frequency Original

Copies (including original)

2.6.4 N/A Work Schedules Within 15

calendar days prior to contract start, 10 days prior to the beginning of the month in which services are scheduled to be performance, and within two calendar days of changes.

COR 1 Monthly

2.6.6 N/A Status of

Deliverables

Within 30 minutes of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours

KO and

COR

1 As required

2.6.7 N/A Service

Interruptions

At least five working days in advance

KO and

COR

1 As required

2.6.8.2 N/A Asset and

Specification Data

When an asset is repaired, replaced, installed, or otherwise affected

KO or a representat ive designated by the KO

1 As required

2.6.9.1 N/A Quality

Management Plan

Within 15 calendar days prior to contract start.

KO and

COR

1 As specified

2.6.9.1 N/A Revised Quality

Management Plan

Within seven calendar days of changes.

KO and

COR

1 As specified

2.6.9.2 N/A QC Inspection File Within five

calendar days of completion/ termination of the contract.

KO and

COR

1 As specified

2.6.9.3 N/A Contractor Quality

Inspection and Surveillance Report

First work day of each month.

KO and

COR

1 Monthly

Form Attachment

Number Deliverable Title Date (s) of Submission

Distribution

Frequency Original

Copies (including original)

2.6.10 N/A Property

Management Plan

Within 45 calendar days after award.

KO and

COR

1 As specified

2.7.1 N/A List of Key

Personnel and Qualifications

Within 15 calendar days prior to contract start

KO and

COR

1 As specified

2.7.1 N/A Organizational

Chart

Within 15 calendar days prior to contract start

KO and

COR

1 As specified

2.7.2.6 N/A Proof of Legal

Residency

Prior to be admitted to site of work.

KO and

COR

1 As specified

2.7.2.6 N/A Proof of United

States of America Citizenship

Prior to be admitted to site of work.

KO and

COR

1 As specified

2.7.3 N/A Service Contract

Reporting (SCR)

No later than 31 October

KO and

COR

1 Annually for labor executed during the period of performanc e during each Governmen t fiscal year

(FY)

2.8.1 N/A Employee List Within 15

calendar days prior to contract start and within seven calendar days of changes.

KO and

COR

1 As required

2.9.2 N/A Accident

Prevention Plan

Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO and

COR

1 As specified

2.9.3 N/A Activity Hazard

Analysis

Together with the Accident Prevention Plan and within seven calendar days of and changes.

KO and

COR

1 As specified

Form Attachment

Number Deliverable Title Date (s) of Submission

Distribution

Frequency Original

Copies (including original)

2.9.4 N/A Compliance Plans, Programs, and Procedures

Together with the Accident Prevention Plan and within seven calendar days of and changes.

KO and

COR

1 As specified

2.9.4.7 N/A Control of

Hazardous Energy (lockout/tagout)

Within 30 calendar days after annual inspection.

KO and

COR

1 Annually

2.9.6 J-0200000-XX NAVFAC

Contractor Incident Reporting System

(CIRS)

Within five calendar days of accident.

KO and

COR

1 As required

2.9.6 J-0200000-05 Weight Handling

Equipment Accident Report

Within 15 working days of accident.

KO and

COR

1 As required

2.9.6 J-0200000-05 Crane and Rigging

Gear Near Miss Report

Within 15 working days of accident.

KO and

COR

1 As required

2.9.8 N/A Monthly On-Site

Labor Report

First work day of each month.

KO and

COR

1 Monthly

2.9.9 N/A OSHA Citations

and Violations Corrective Action Report

Within 48 hours after receiving a citation.

KO and

COR

1 As required

2.9.10 N/A Safety Inspection

and Monitoring Report

Upon request. KO and

COR

1 As required

2.9.11 N/A Safety

Certifications

Within 15 calendar days prior to contract start and as old certifications, expire.

KO and

COR

1 As specified

2.10.2 N/A Environmental

Protection Plan

Within 15 calendar days prior to contract start and within seven calendar days of changes.

KO and

COR

1 As specified

2.10.2.1 N/A Sampling Plan Prior to Sampling KO and

COR

1 As required

2.10.2.3 J-0200000-05 Solid Waste

Management and Recycling Reports

First work day of each month.

KO and

1 Monthly

Form Attachment

Number Deliverable Title Date (s) of Submission

Distribution

Frequency Original

Copies (including original)

2.10.2.7 N/A Fuel and hazardous

substance spill notification

As soon as possible but not more 24 hours of discovery

KO and

COR

1 As required

2.10.2.7 N/A Fuel and hazardous

substance spill report

Within 48 hours of discovery

KO and

COR

1 As required

2.10.2.8 J-0200000-14 Contractor

Hazardous Material Inventory Log

Within 15 calendar days after the end of each calendar year and at termination of the contract.

KO and

COR

1 Annually

2.10.2.12 N/A Asbestos

Containing Material (ACM)

Verbally notify the KO and COR within one hour and follow-up with written Notification within 24 hours

KO and

COR

1 As specified

2.10.2.13 N/A Hazardous Air

Pollutants Semi-annual Reports

At intervals of 160 to 200 calendar days

KO, COR,

Installation Environme ntal Division, City, State, and EPA

1 Semi-annually

2.10.2.13 N/A Hazardous Air

Pollutants Monthly Data

First workday of each month.

KO, COR,

Installation Environme ntal Division

1 Monthly

2.10.3 N/A Sustainable

Procurement and Practices Plan

Within 15 calendar days prior to contract start and within 15 calendar days after exercised option periods.

KO and

COR

1 Annually

2.10.3 N/A Sustainable

Delivery of Services Report

Within five calendar days after each contract period.

KO and

1 Annually

Form Attachment

Number Deliverable Title Date (s) of Submission

Distribution

Frequency Original

Copies (including original)

2.10.3.2 N/A Recovered

Material Certification

As specified KO and

COR

1 When a product containing recovered materials is equal to or better than the original and could be used.

2.12 N/A Technical Library

Table of Contents

Within 15 calendar days after contract start and within seven calendar days of changes

KO and

COR

1 As specified

2.14.1 Recurring Work

Proposals

Within five calendar days following receipt of request

KO and

COR

1 As required

2.14.2 N/A Notification to the

Government for Work Above the Recurring Work Limitations and Rough Order of Magnitude

Within two hours of identification

KO and

COR

1 As required

2.15.2.1 N/A Non-Recurring

Work Proposals

Within two working days following receipt of request

KO 1 As required

Deliverables Form Preparation Instructions

Deliverable Title: (Title of Report)

Form Attachment No.:

Government Approval Required: _ X Yes No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

The report shall be prepared using Microsoft Office Word software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s comments and resubmit the request via email to recipients on the distribution list. Continue this cycle until the Government notifies the Contractor of Government acceptance.

Deliverable Title: Request to Work Outside Government’s Regular Working Hours

Form Attachment No.: N/A

Government Approval Required: ___ Yes X No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

The report shall be prepared using Microsoft Office Word software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: Sign-In Sheets and Minutes

Form Attachment No.: N/A

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: Final Revision of Minutes

Form Attachment No.: N/A

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: Permits and Licenses

Form Attachment No.: N/A

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: Certificate of Insurance

Form Attachment No.: N/A

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: Work Schedule Form Attachment No.: N/A

Government Approval Required: X Yes No

Media: Hard Copy X Electronic Direct System Input

Instructions:

The schedule shall be prepared using Microsoft Office Word or Excel software.

Submit schedule for approval at least 30 days prior to commencement of services on a semiannual basis.

Submit via email to KO/FMFS PAR for Government review and comment.

Deliverable Title: Quality Management Plan

Form Attachment No.: N/A

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: QC Inspection Plan

Form Attachment No.: N/A

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: Contractor Quality Inspection and Surveillance Report

Form Attachment No.: N/A

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: Quality Inspection and Surveillance File

Form Attachment No.: N/A

Government Approval Required: X Yes No

Media: Hard Copy X Electronic Direct System Input

Instructions:

To ensure that the work performed conforms to the contract requirements, the Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results and dates and details of corrective and preventative actions. The quality inspection and surveillance file shall be property of the Government and made available during the Government’s regular working hours.

The Quality Inspection and Surveillance file shall be prepared using Microsoft Office Word software.

At the end of each year, the Contractor shall turn over the electronic files to the Government, and they shall become the property of the Government. The file shall be turned over to the KO within five calendar days of completion/termination of the contract.

Deliverable Title: List of Key Personnel and Qualifications

Form Attachment No.: N/A

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: Organizational Chart

Form Attachment No.: N/A

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: Proof of Legal Residency

Form Attachment No.: N/A

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: Contractor Labor Hours (eCRMA) Report

Form Attachment No.: N/A

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: Employee List

Form Attachment No.: N/A

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: Passes and Badges

Form Attachment No.: N/A

Government Approval Required: X Yes __ No

Media: X Hard Copy X Electronic Direct System Input

Instructions:

Coordinate with the COR or the Performance Assessment Representative (PAR) to complete the steps below:

1. Assemble the names of all your personnel that need base access.

2. If possible, assure their personnel history will not prohibit base access.

3. Gather their required information and submit it to the PAR and/or Visitor’s Control Center

(VCC) (located at the front gate)

4. Submit applications (completed form SECNAV 5512s) to the Security Department’s Visitor

Control Center and /or PAR.

Ask your COR if an additional Restricted Area Access Request Form is required

You may call the VCC if you have additional questions regarding Bass Access – (732) 866-2214

Deliverable Title: Accident Prevention Plan

Form Attachment No.: N/A

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s comments and resubmit the request via email to recipients on the distribution list. Continue this cycle until the Government notifies the Contractor of Government acceptance.

The APP shall follow the format and include all elements in Appendix A of the US Army Corps of Engineers, Safety and Health Requirements Manual EM 385-1-1. The APP shall incorporate Activity Hazard Analyses (AHAs) and Occupational Risk and Compliance Plans and Programs that are relevant to the site specific hazards and controls for each activity and type of work that may be encountered in the performance of this contract.

Submit in a tabbed binder following the format/sequence as outlined in Appendix A of EM 385-1- 1, and submit a copy via email and a hard copy to the KO/FMFS PAR for Government review and comment.

1. If the KO/FMFS PAR accepts the Accident Prevention Plan, the Government shall notify the

Contractor of Government acceptance.

2. If the KO/FMFS PAR responds to the Accident Prevention Plan with review comments, then incorporate the Government’s comments and resubmit the Accident Prevention Plan via email and hard copy to the KO/FMFS PAR. Continue this cycle until the Government notifies the Contractor of Government acceptance.

Deliverable Title: Activity Hazard Analysis

Form Attachment No.: N/A

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: Compliance Plans, Programs, and Procedures

Form Attachment No.: N/A

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: NAVFAC Contractor Incident Reporting System (CIRS)

Form Attachment No. J-0200000-05

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: Monthly On-Site Labor Report

Form Attachment No.: N/A

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: OSHA Citations and Violations Corrective Action Report

Form Attachment No.: N/A

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: Safety Certifications

Form Attachment No.: N/A

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: Hazardous Waste Disposal Reports

Form Attachment No.: N/A

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: Spill Report

Form Attachment No.: N/A

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: Emergency Planning and Community Right-To-Know Act (EPCRA) Report

Form Attachment No.: N/A

Government Approval Required: X Yes ___ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

2. Include the following:

a. EPCRA Plans and Procedures:

1) Hazardous Materials Planned for Use: Include an inventory of hazardous materials planned for use, including estimated quantities, and a copy of the corresponding material safety data sheets (MSDS) for hazardous materials expected to be used for this contract during each calendar year. The inventory shall include all information required to complete the Contractor Hazardous Material Inventory Log shown in the Form Attachment. This report shall be submitted to the KO and Environmental Compliance Office via the KO.

2) Plan for protecting personnel and property during the transport, storage, and use of the materials.

3) Emergency procedures for spill response and disposal, including a site map with approximate quantities on site at any given time. The site map, showing where the hazardous substances are stored, shall be attached to the inventory.

4) Approved labeling system to identify contents of all containers on-site.

b. Hazardous Materials Actually Used: Include an inventory of the actual hazardous materials used, including include quantities, to the KO and Environmental Compliance Office via the KO. The inventory shall include all information required to complete the Contractor Hazardous Material Inventory Log shown in the Form Attachment.

3. Submit additional information to the Government as requested to support EPCRA reporting requirements.

Deliverable Title: Contractor Hazardous Material Inventory

Form Attachment No.: J-0200000-14

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: Detailed Scope of Work and Detailed Estimate

Form Attachment No.: N/A

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s

Deliverable Title: Non-Recurring Work Proposals

Form Attachment No.: N/A

Government Approval Required: Yes __X_ No

Media: ___ Hard Copy X Electronic ___ Direct System Input

Instructions:

1. The report shall be prepared using Microsoft Office software.

Submit a copy via email to recipients on the distribution list for Government review and comment.

1. If the KO accepts the request, the Government shall notify the Contractor of Government acceptance.

2. If the KO responds to the request with review comments, then incorporate the Government’s comments and resubmit the request via email to recipients on the distribution list. Continue this cycle until the Government notifies the Contractor of Government acceptance.

Submit Detailed Work Proposal

Submit Non-recurring work proposal to the KO within 2 working days which includes:

Complete list of all tasks necessary to perform the required scope of work

Number of direct labor hours to perform each task

Projected quantity and cost of materials and equipment to perform the scope of work

Detailed Estimate The estimate shall be prepared using Microsoft Office Excelâ software.

The estimate shall include:

Separately priced labor for each laborer including management

Separately priced material

Separately priced equipment

Itemized additional other cost for consideration

The total cost.

In addition:

Clearly show the deductions for the applicable recurring work limit of liability.

The resultant proposed price shall be for the portion of the work exceeding the recurring work limit of liability

Deliverable Title: Service Program Plan Form Attachment No.: N/A

Government Approval Required: X Yes No

Media: Hard Copy X Electronic Direct System Input

Instructions:

The report shall be prepared using Microsoft Office Wordâ and shall be submitted within 30 calendar days after contract award, and annually thereafter.

Submit a copy of the report via email to KO/FMFS PAR for Government review and comment.

Deliverable Title: Service Work Schedule Form Attachment No.: N/A

Government Approval Required: X Yes No

Media: Hard Copy X Electronic Direct System Input

Instructions:

The schedule shall be prepared using Microsoft Office Wordâ or Excel software.

Submit schedule for approval at least 30 days prior to commencement of services on a semiannual basis.

Submit via email to KO/FMFS PAR for Government review and comment.

Deliverable Title: Service Report Form Attachment No.: N/A

Government Approval Required: X Yes No

Media: Hard Copy X Electronic Direct System Input

Instructions:

The report shall be prepared using Microsoft Office Wordâ or Excel or other approved software and submitted to the KO/FMFS PAR for Government review and comment.

The Service Report shall be submitted to the KO/FMFS PAR electronically via email within 5 days after the completion of services.

The Contractor shall develop a report that contains the following information (report format is subject to review and approval by the Government prior to the start of work, and shall be subject to modification by the direction of the Government):

a. Detailed description of work actually completed, problems encountered and recommended follow-up actions required.

b. Brief description of material and parts used.

c. Date and time work began.

d. Date and time work was completed.

e. Total hours of labor (by craft) expended, including travel time.

f. Name of person accepting the work.

g. Last name and first initial of the Contractor employee(s) performing the work.

Submit a copy of the report via email to KO/FSCM PAR for Government review and comment.

File details come from the government source that posted it. Updated .