Section 012300 - ABI List - FINAL.pdf
PDF 147 KB Posted
- Attached to
- 224006 Cocoa REVAMP
- Solicitation number
- ITB-15689
- Issued by
- St. Johns County, Florida
About this file
Summary of Section 01 2300 - Alternate Bid Items
This specification document, prepared by the State of Florida Department of Military Affairs/CFMO for Project 224006 (Cocoa REVAMP), outlines the administrative and procedural requirements for fifteen alternate bid items that bidders may propose as additions to or deductions from the base bid amount. The alternates encompass various facility renovation and upgrade work at the Cocoa Readiness Center, including data rack upgrades to G-6 standards (ABI #1), motor pool gate and fencing work (ABI #2-3), LED lighting upgrades (ABI #4), PA system installation (ABI #5), storage building painting (ABI #6), bollard refinishing (ABI #7), terrazzo floor refinishing (ABI #8), flooring replacements in multiple rooms (ABI #9-10), concrete base installation for lockers (ABI #11), communications room conversion with data infrastructure (ABI #12), flagpole uplighting concrete base (ABI #13), epoxy flooring systems (ABI #14), and jersey barrier relocation (ABI #15). Bidders must propose costs for each alternate as net additions or deductions from the contract sum, with accepted alternates to be executed under the same conditions as other contract work. The contractor must provide written notification of alternate status immediately following contract award and coordinate all affected adjacent work to ensure complete integration of accepted alternates into the project.
The specification requires that each alternate include all miscellaneous devices, accessory objects, and items incidental to or required for complete installation. No other adjustments to the contract sum are permitted beyond the stated alternate cost or credit. Specification sections referenced in the schedule contain detailed product and material requirements for achieving the work described under each alternate. The document establishes standardized procedures for coordinating alternates, ensuring all parties are notified of acceptance, rejection, or deferment decisions, and maintaining consistency with the overall contract terms and conditions.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THE STATE OF FLORIDA DEPARTMENT of MILITARY AFFAIRS / CFMO Project # 224006
100% BID FINAL SPECIFICATIONS
COCOA ESP RENOVATION
ALTERNATE BID ITEMS 01 2300 - 1
SECTION 01 2300 – ALTERNATE BID ITEMS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative and procedural requirements for alternates.
1.3 DEFINITIONS
A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the Bidding Requirements that may be added to or deducted from the Base Bid amount if Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.
1. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum.
1.4 PROCEDURES
A. Coordination: Modify or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.
1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.
B. Notification: Immediately following award of the Contract, notify each party involved, in writing, of the status of each alternate. Indicate if alternates have been accepted, rejected, or deferred for later consideration. Include a complete description of negotiated modifications to alternates.
C. Execute accepted alternates under the same conditions as other work of the Contract.
D. Schedule: A Schedule of Alternates is included at the end of this Section. Specification Sections referenced in schedule contain requirements for materials necessary to achieve the work described under each alternate.
COCOA ESP RENOVATION
ALTERNATE BID ITEMS 01 2300 - 2
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 SCHEDULE OF ALTERNATES
A. Alternate BID ITEM no. 1: ROOM 106 – DESIGN / UPGRADE DATA RACK TO MEET
CURRENT G-6 STANDARDS.
B. Alternate BID ITEM no. 2: MOV AREA NORTH / EAST SIDE - MOTOR POOL GATE (NORTH
SIDE) LAYING IN WEEDS PROVIDE NEW FE-7 CANTILEVERED SLIDING GATE WITH
NEW FE-7 FENCE OFFSETT 10' FROM NORTH & EAST PERIMETER FENCE LINE.
C. Alternate BID ITEM no. 3: MOV AREA EAST / SOUTH SIDE - REPAIR OR REPLACE
EXISTING MOV SWING GATE (EAST SIDE) WITH NEW FE-7 SWING GATE.
D. Alternate BID ITEM no. 4: UPGRADE ALL EXTERIOR LIGHTING TO LED INCLUDING
STORAGE BUILDING AND CANOPY LIGHTING / UNIT SIGN / FLAGPOLE / SITE AND
BUILDING MOUNTED FIXTURES.
E. ALTERNATE BID ITEM NO. 5: DRILL HALL – ROOM 125 / PROVIDE NEW PA SYSTEM.
F. ALTERNATE BID ITEM NO. 6: PAINTING - REFINISH AND REPAINT COMPLETE
STORAGE BUILDING HIGH BAY INCLUDING ROOF WITH HIGH PERFORMANCE
PAINTED FINISH.
G. ALTERNATE BID ITEM NO. 7: ALL EXTERIOR BOLLARDS - REFINISH AND REPAINT
WITH TRAFFIC YELLOW EPOXY / INCLUDING 12 BAY STORAGE BUILDING.
H. ALTERNATE BID ITEM NO. 8: DRILL HALL – ROOM 125 / REFINISH AND RESEAL
TERRAZZO FLOOR FINISH.
I. ALTERNATE BID ITEM NO. 9: VENDING ROOM - REPLACE EXISTING FLOORING WITH
LVT FLOORING SYSTEM & BASE.
J. ALTERNATE BID ITEM NO. 10: ROOM 119 - PROVIDE DRYWALL REPAIR / REPAINT.
ABI LEAVE EXTRA PAINT FOR THE UNIT TO USE AS TOUCHUP LATER. REPLACE
EXISTING FLOORING WITH LVT FLOORING.
ROOM 104, 110, 117, 118, 118A, 119, 120, 120A, 121 - REPLACE EXISTING FLOORING WITH
LVT FLOORING SYSTEM & BASE.
K. ALTERNATE BID ITEM NO. 11: WOMEN / MENS LOCKERS ROOM 101 / 110 - ADD NEW
6” H X 12” DEEP X CONTINUOUS POURED CONCRETE BASE WITH COVE TILE FINISH
TO MATCH EXISTING / ADJACENT. EXISTING LOCKERS TO BE REMOVED / STORED
AND REINSTALLED UPON COMPLETION OF REINFORCED CONCRETE BASE.
COCOA ESP RENOVATION
ALTERNATE BID ITEMS 01 2300 - 3
L. ALTERNATE BID ITEM NO. 12: VENDING ROOM 124 to BECOME NEW COMM ROOM 124
/ PROVIDE NEW DATA RACK WITH PATCH PANELS AND CAT 6 CABLING TO ALL DATA
PORT LOCATIONS. RUN NEW SERVICE TO COMPREHENSIVE BUILDING LAYOUT,
INCLUDING INCOMING D-MARK RELOCATION. ALL DATA UTILITY EQUIPMENT TO BE
RELOCATED FROM EXISTING LOCATIONS (HOMERUNS & WIRING). RELOCATE
VENDING EQUIPMENT TO TRAINING ROOM 117 EXTEND WIRING AND DEDICATED
CIRCUITS AS NEEDED. PROVIDE NEW PAINTED WALL SYSTEM WITH A SINGLE HM
DOOR AND FRAME TO SECURE NEW SPACE. PROVIDE NEW MECHANICAL MINI-SPLIT
FOR CONDITIONING OF DATA EQUIPMENT RACK AS PART OF THIS ABI.
N. ALTERNATE BID ITEM NO. 13: FLAGPOLE & UNIT SIGN - PROVIDE CONCRETE BASE
FOR UPLIGHTING INSTALLATION / 10' DIA 6" THK CONCRETE SLAB.
O. ALTERNATE BID ITEM NO. 14: VAULT ROOM 122 / 122A, SUPPY ROOM 123/ 123A,
JANITOR ROOM 111 – NEW RESINOUS EPOXY FLOOR SYSTEM.
P. ALTERNATE BID ITEM NO. 15: JERSEY BARRIER RELOCATION.
END OF SECTION 01 2300
COCOA ESP RENOVATION
ALTERNATE BID ITEMS 01 2300 - 4
THIS PAGE INTENTIONALLY LEFT BLANK
| PART 1 - GENERAL |
| 1.1 RELATED DOCUMENTS |
| A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. |
| 1.2 SUMMARY |
| A. This Section includes administrative and procedural requirements for alternates. |
| 1.3 DEFINITIONS |
| A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the Bidding Requirements that may be added to or deducted from the Base Bid amount if Owner decides to accept a corresponding change either in the amou... |
| 1. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum. |
| 1.4 PROCEDURES |
| A. Coordination: Modify or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project. |
| 1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate. |
| B. Notification: Immediately following award of the Contract, notify each party involved, in writing, of the status of each alternate. Indicate if alternates have been accepted, rejected, or deferred for later consideration. Include a complete desc... |
| C. Execute accepted alternates under the same conditions as other work of the Contract. |
| D. Schedule: A Schedule of Alternates is included at the end of this Section. Specification Sections referenced in schedule contain requirements for materials necessary to achieve the work described under each alternate. |
| PART 2 - PRODUCTS (Not Used) |
| PART 3 - EXECUTION |
| 3.1 SCHEDULE OF ALTERNATES |
| END OF SECTION 01 2300 |
| THIS PAGE INTENTIONALLY LEFT BLANK |