Exhibit 4-5 Proposal and Subcontractors List.pdf
PDF 152 KB Posted
- Attached to
- 224006 Cocoa REVAMP
- Solicitation number
- ITB-15689
- Issued by
- St. Johns County, Florida
About this file
This is a proposal form and subcontractor list document issued by the State of Florida, Department of Military Affairs, Construction & Facility Management Office for the 224006 Cocoa REVAMP project located at 308 N. Fiske Blvd, Cocoa, FL 32922. The project involves full facility sustainment work for a 16,250 square foot Readiness Center and supporting assets, including general maintenance and repairs to building envelopes, interior functional areas, latrines and showers, electrical systems, water systems, HVAC systems, and other lifecycle replacement items. The solicitation date was April 20, 2026, with an estimated construction cost of $2,800,000. Proposals must remain valid for 60 calendar days following bid opening, and the successful bidder must enter into a formal written agreement within 10 calendar days of contract award. Bidders are required to submit a certified check, cashier's check, treasurer's check, bank draft, or bid bond in an amount not less than five percent of the total bid as a guarantee. The proposal form includes a base bid section and 14 alternate bid items (ABI) covering data racks, gates, fencing, exterior lighting, PA systems, storage building, bollards, flooring, interior finishes, locker rooms, IT rooms, flagpoles, facility signage, vaults, and supply rooms.
The proposal form requires bidders to provide business information including name, address, federal ID number, telephone, facsimile, and signature on the contractor's letterhead submitted in duplicate. A separate subcontractor list is required identifying subcontractors for five primary disciplines: fencing, mechanical, plumbing, fire alarm, and electrical and low voltage work. Contract Performance Bonds and Labor and Material Payment Bonds in the amount of 100% of the accepted bid are required per Section 255.05, Florida Statutes, unless this requirement is deleted per Section C-2 of the Conditions of the Contract. All insurance must comply with Non-Technical Specifications and be obtained from insurers qualified to do business in Florida through an authorized licensed Florida Resident Agent. Bidders must acknowledge receipt of any addenda issued during the bidding period and submit the proposal in a sealed envelope marked with the project number and addressed to the Department of Military Affairs, CFMO-Contract Management Branch, 2305 State Road 207, St. Augustine, Florida 32086. Bid deposits will be forfeited as liquidated damages in the event of bidder default or breach.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FNG 4004
PROPOSAL FORM
SUBMIT ORIGINAL PROPOSAL FORM IN DUPLICATE ON CONTRACTOR'S LETTERHEAD AND
INCLUDE BUSINESS NAME, ADDRESS, FEDERAL ID NUMBER, TELEPHONE, FACSIMILE AND
SIGNATURE
Note: NO conditional, incomplete, unsigned, undated, ambiguous, or improper bids/proposals will be accepted.
DATE:
TIME:
TO: State of Florida, Department of Military Affairs Attention: Construction & Facility Management Office (Contract Management Branch) 2305 State Road 207 Saint Augustine, Florida 32086
To Whom It May Concern:
The undersigned, hereinafter called "Bidder", having for the proposed project familiarized himself with the local conditions, nature, and extent of the work, and having examined carefully any drawings or specifications, the Form of Agreement, and other Contract Documents with the Bond Requirements, therein, proposes to furnish all labor, materials, equipment, and other items, facilities, and services for the proper execution and completion of Project Number: 224006 Cocoa REVAMP, Cocoa, Florida, in full accordance with any Statement of Work and General Terms and Conditions, in full accordance with the advertisement for bids, Instruction to Bidders, Agreement, and all other documents relating thereto on file in the Construction & Facility Management Office (CFMO) and if awarded the contract, to complete the said work within the time limit specified for the following bid price:
BASE BID $
ALTERNATE BID ITEMS "ABI"
ABI #1 - DATA RACK $
ABI #2 - MOV NORTH GATE &
PERIMETER FENCING $
ABI #3 - MOV EAST GATE $
ABI #4 - EXTERIOR LIGHTING $
ABI #5 - PA SYSTEM $
ABI #6 - STORAGE BLDG HIGH
BAY $
ABI #7 - BOLLARDS $
ABI #8 - DRILL HALL FLOORING $
ABI #9 - VENDING ROOM
FLOORING $
ABI #10 - INTERIOR FINISHES $
ABI #11 - LOCKER ROOM $
ABI #12 - IT ROOM $
ABI #13 - FLAGPOLE AND
FACILITY SIGN $
ABI #14 - VAULT AND SUPPLY
ROOM $
Enclosed is certified check, cashier's check, treasurer's check, bank draft, or Bid Bond in the amount of not less than five percent of the Bid, payable to the Owner as a guarantee for the purpose set out in Instructions to Bidders.
MARK ENVELOPES: ATTN: SEALED BID for Project Number: 224006 Cocoa REVAMP
ADDRESSED TO: Department of Military Affairs, ATTN: CFMO-Contract Management Branch, 2305 State Road 207, St. Augustine, Florida 32086
The Bidder hereby agrees that:
a. The above proposal shall remain in full force and effect for a period of 60 calendar days after the time of the opening of this proposal and that the Bidder will not revoke or cancel this proposal or withdraw from the competition within the said 60 calendar days.
b. In the event the contract is awarded to this Bidder, he will abide by and fulfill all requirements as specified in the Non-Technical Specifications (General Terms and Conditions, and Supplemental Conditions) provided with the Invitation to Bid.
c. In the event the contract is awarded to this Bidder, he will enter into a formal written Agreement with the Owner in accordance with the accepted bid within 10 calendar days after said contract is submitted to him and, (if requirement is not deleted per Section C-2 of the Conditions of the Contract), will furnish to the Owner a Contract Performance Bond and a Labor and Material Payment Bond with good and sufficient sureties, satisfactory to the Owner, in the amount of 100% of the accepted bid, the form of which is shown by Exhibits 2 and 3 of the Conditions of the Contract and terms of which shall fully comply with Section 255.05, Florida Statutes. The Bidder further agrees that in the event of the Bidder's default or breach of any of the agreements of this proposal, the said bid deposit shall be forfeited as liquidated damages.
d. In the event the contract is awarded to this Bidder, he will not commence any work in connection with the contract until he has obtained all insurance as specified in the Non-Technical Specifications, and such insurance has been approved by the Owner, nor shall the contractor allow any subcontractor to commence work on his subcontract until all similar insurance required of the subcontractor has been so obtained and approved by Owner.
All insurance policies shall be with insurers qualified to do business in Florida through an authorized licensed Florida Resident Agent. The insurance requirements shall be completed in a timely manner in order not to delay the construction schedule.
e. In the event the contract is awarded to this Bidder, he will (if requested by Owner) complete and submit a preliminary and final Bid Breakout Form supplied by the Department of Military Affairs, Construction & Facility Management Office.
Acknowledgement is hereby made that this proposal includes required permit fees as directed in the Non- Technical Specifications.
Acknowledgement is hereby made of receipt of the following addenda issued during the bidding period.
Addendum No. Dated
Florida Construction Industries Licensing Board Certification.
(Name of Holder) (Certificate No.)
In witness whereof, the Bidder has hereunto set his signature and affixed his seal this day of (Month) (Year)
(SEAL)
By: Address:
Title:
Company:
Telephone No.:
Tax ID No.:
Unique Entity ID
(UEID):
LIST OF SUBCONTRACTORS
(To be submitted in duplicate on the Bidder's letterhead and attached to Contractor's proposal.)
DATE:
THIS LIST IS ATTACHED TO, AND IS AN INTEGRAL PART OF THE BID SUBMITTED BY:
FOR THE CONSTRUCTION OF: PROJECT NUMBER: 224006
PROJECT NAME & LOCATION: Cocoa REVAMP
THE UNDERSIGNED, HEREINAFTER CALLED "BIDDER", LISTS BELOW THE NAME OF EACH SUBCONTRACTOR WHO WILL PERFORM THE PHASES OF THE WORK INDICATED. FAILURE OF THE BIDDER TO SUPPLY SUFFICIENT INFORMATION TO ALLOW VERIFICATION OF THE CORPORATE AND DISCIPLINE LICENSE STATUS OF THE SUBCONTRACTOR MAY DEEM THE BID AS BEING NON-RESPONSIVE. Only one (1) copy of this list is required with your bid. You may also just list the names of subcontractors, the additional information (license #, telephone number) need not be listed until after the bid and only from the contractor awarded the project.
SUBCONTRACTOR
DISCIPLINES NAME OF SUBCONTRACTOR
1. Fencing ___________________________________________________ (Name)
(Telephone No.) (Sub License #.)
2. Mechanical ___________________________________________________ (Name)
(Telephone No.) (Sub License #.).)
3. Plumbing ___________________________________________________ (Name)
(Telephone No.) (Sub License #.).)
4. Fire Alarm ___________________________________________________ (Name)
(Telephone No.) (Sub License #.).)
5. Electrical and Low Voltage ___________________________________________________ (Name)
(Telephone No.) (Sub License #.)
By (Signature)
File details come from the government source that posted it. Updated .