SECTION 01 74 19 Construction Waste Management.docx

DOCX document 20 KB Posted

Attached to
Y1DA--NRM: 640-19-100 Replace and Modernize Elevators at Building 100 Federal contract opportunity
Solicitation number
36C26121R0044
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21

About this file

This document provides specifications for construction waste management for the Replace and Modernize Elevators at Building 100 640-19-100 project at the Palo Alto Health Care System. The specifications require the contractor to practice efficient waste management and to divert as much construction and demolition waste from landfills as possible through reuse and recycling. The contractor must develop and implement a construction and demolition debris management plan specifying how materials will be reused, recycled, or disposed of. With each payment application, the contractor must submit a report quantifying all materials generated at the work site and how they were disposed of or diverted through recycling. The federal agency involved is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--NRM: 640-19-100 Replace and Modernize Elevators at Building 100, newest first.
File Type Posted
138-18-28 Lock out Tag out.docx DOCX document
P07 Wage Determination CA20210018 03.05.21.pdf PDF
Addendum1-B100 B101_Elevator_Interior_Dwg.pdf PDF
138-17-19 WORKING ON ELECTRICAL DISTRIBUTION SYSTEMS.doc DOC document
S02 Price Breakdown by Division.docx DOCX document
014500 Quality Control.docx DOCX document
SECTION 01 33 32 Shop Drawings Product Data and Samples.docx DOCX document
SECTION 01 00 00 General Requirements Elevator Updated 03.01.21.rtf RTF text file
36C26121R0044.docx DOCX document
CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx DOCX document
S02 - RFI FORM.docx DOCX document
SECTION 02 41 00 Demolition.docx DOCX document
PAD B100 B101 Elevator Interior Finsh Spec.docx DOCX document
SECTION 01 57 19 Temporary Environmental Controls.docx DOCX document
SECTION 01 35 36 Safety Requirements.docx DOCX document
SECTION 01 32 16 15 Project Schedule.docx DOCX document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Replace and Modernize Elevators at Building 100 640-19-100 Palo Alto, Building 100, VA Palo Alto Health Care System Final Bid Document

SECTION 01 74 19

CONSTRUCTION WASTE MANAGEMENT

1.1 DESCRIPTION

This specification covers the requirements for management of non-hazardous building construction and demolition waste.

1.2 RELATED WORK

A.Section 02 41 00, DEMOLITION.
B.Demolition and removal of roads, walks, curbs, and ongrade slabs outside buildings to be demolished: Section 31 20 00, EARTH MOVING
C.Safety Requirements: Section 00 72 00, GENERAL CONDITIONS, Article, ACCIDENT PREVENTION.
D.Disconnecting utility services prior to demolition: Section 01 00 00, GENERAL REQUIREMENTS.

E. Reserved items which are to remain the property of the Government: Section 01 00 00, GENERAL REQUIREMENTS.

F.Asbestos Removal: Section 02 82 11, TRADITIONAL ASBESTOS ABATEMENT.
G.Lead Paint: Section 02 83 33.13, LEAD-BASED PAINT REMOVAL AND DISPOSAL.

1.3 GOVERNMENT POLICY

A.Contractor shall practice efficient waste management when sizing, cutting and installing building construction products.
B.Contractor shall use all reasonable means to divert construction and demolition waste from landfills and incinerators and facilitate their recycling.
C.Contractor shall be responsible for implementation of any special programs involving rebates or similar incentives related to recycling and any revenues or savings obtained from salvage or recycling shall accrue to the Contractor.
D.Contractor shall ensure that facilities used for recycling, reuse and disposal shall be permitted for the intended use to the extent required by federal, state and local regulations.

1.4 PLAN

A.Conduct a site assessment to estimate the types of materials that will be generated by demolition at the site. The Whole Building Design Guide website (http://www.wbdg.org) has a Construction Waste Management Database that contains information on companies that haul, collect, and process recyclable debris from construction projects
B.Develop and implement procedures to reuse and recycle materials to the greatest extent feasible based upon the contract, the construction and demolition debris management plan, the estimated quantities of materials, and the availability of recycling facilities.
C.Prepare and submit to the Contracting Officer’s Representative a written demolition debris management plan. The Demolition Debris Management Plan shall be submitted for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 15 calendar days prior to the date of the preconstruction conference for acceptance. Work cannot proceed without an accepted Project Schedule. The plan shall include, but not be limited to, the following information:
1.Contractor and project identification information;
2.Procedures to be used for debris management;
3.A listing of the materials to be reused, recycled, or taken to the landfill.
4.The names and locations of reuse and recycling facilities or sites.

1.5 COLLECTION

A.Provide necessary containers, bins and storage areas to facilitate effective waste management.
B.Clearly identify so that recyclable materials are separated from trash and can be transported to respective recycling facility for processing.

1.6 DISPOSAL

A.Contractor shall be responsible for transporting and disposing of materials that cannot be delivered to a source-separated or mixed materials recycling facility to a transfer station or disposal facility that can accept the materials in accordance with state law.
B.Building or demolition materials with no practical use or that cannot be recycled shall be disposed of at a landfill or incinerator.

1.7 REPORT

A. With each application for progress payment, the contractor shall submit a summary of construction and demolition debris diversion and disposal, monthly and at the end of the contract quantifying all materials generated at the work site and disposed of or diverted from disposal through recycling.

B. Any request for periodic payment shall not be processed without this report being attached.

- - - E N D - - - 10/12/2019

File details come from the government source that posted it. Updated .