Scotland Town Hall - Project Manual 2026-02-20.pdf
PDF 43 MB Posted
- Solicitation number
- JCLM26REG0012
- Issued by
- Hartford County, Connecticut
About this file
This is a comprehensive Project Manual and Bid Documents for the Renovations of Scotland Town Hall located at 9 Devotion Road in Scotland, Connecticut, prepared as of February 20, 2026. The project involves extensive renovation and restoration work on a multi-phase municipal building originally constructed in 1840 with additions in 1898 and 1980. The scope of work encompasses structural repairs, historic window restoration and replication, sheet metal flashing and trim work, interior finishes including gypsum board assemblies and tiling, wood flooring restoration, painting (both interior and exterior), site preparation and landscaping, utility drainage systems, and installation of accessibility features including a limited-use elevator. The specifications detail work across 34 technical sections covering everything from demolition and site clearing through final landscaping, with particular emphasis on historic preservation standards and procedures for handling hazardous materials including asbestos, lead-based paint, and PCB-containing materials. Bidders are required to demonstrate five years of experience in relevant trades, employ foreman-level supervisors with comparable experience, and comply with all state and federal regulations including prevailing wage requirements and Davis-Bacon rates for federal funding sources.
The contract includes requirements for multiple submittals including product data, shop drawings, samples, and quality assurance documentation at various project phases, with mock-ups required for critical work such as window restoration and painting systems. Payment terms follow standard construction practices with prevailing wage rates mandated by Connecticut State Department of Labor and applicable Davis-Bacon rates due to federal funding involvement. The project includes a targeted pre-demolition hazardous materials survey documenting the presence of asbestos in joint compound, vinyl floor tiles, mudded pipe elbows, and pipe wrap insulation, along with lead-based paint throughout the structure, PCB testing results for caulks and sealants, and elevated radon levels in the basement requiring mitigation. Contractor warranties vary by trade, ranging from three to five years, with specific performance guarantees for roofing, sealants, flooring, and other systems. The contract documents include detailed appendices with Connecticut prevailing wage rates, Davis-Bacon wage rates, the hazardous materials survey report, and specifications organized by CSI division covering all aspects of the renovation work with references to applicable ASTM standards, industry manuals, and building codes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
SHEET METAL FLASHING AND TRIM
SECTION 07 62 00
RENOVATIONS FOR SCOTLAND TOWN HALL
FEBRUARY 20, 2026 – BID DOCUMENTS SECTION 07 62 00 - 1
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes: Roof edges, copings, hung gutters, drip edges, counter flashing.
B. Related Sections:
1. Section 10 00 00 – Special Considerations and Procedures for Historic
Properties.
2. Section 07 92 00 – Joint Sealants
1.2 REFERENCES
A. Reference Standards: Latest edition as of specification date.
1. ASTM International:
a. B32: Standard Specifications for Solder Metal
b. B101: Standard Specification for Lead Coated Copper Sheet and Strip for Building Construction
c. B370: Standard Specification for Copper Sheet and Strip for Building
Construction
d. B601: Classification for Temper Designation for Copper and Copper
Alloys- Wrought and Cast
e. B749: Standard Specification for Lead and Lead Alloy Strip, Sheet, and
Plate Products
f. C920: Standard Specification for Elastomeric Joint Sealants
2. Sheet Metal Flashing and Trim Standard: Comply with SMACNA's "Architectural Sheet Metal Manual." Conform to dimensions and profiles shown unless more stringent requirements are indicated.
1.3 ADMINISTRATIVE REQUIREMENTS
A. Coordinate work to ensure that adjacent areas are not adversely affected.
Coordinate with
1. Owner’s Representative
2. With other trades to ensure that Work done by other trades is complete and ready to receive roofing.
3. With other trades to avoid or minimize work on, or in immediate vicinity of, installation Work in progress and completed new roofing.
4. With interfacing and adjoining construction to provide leak-proof, secure, and non-corrosive installation. Coordinate:
a. Counterflashing installation with base flashing installation.
b. Installation of roof-penetration flashing with installation of roofing and other items penetrating roof.
c. Installation of roof perimeter flashing.
FEBRUARY 20, 2026 – BID DOCUMENTS SECTION 07 62 00 - 2
1.4 SUBMITTALS
A. Product Data: For each product specified.
B. Samples: For each type of sheet metal flashing and trim. Construct typical lap splice or seam solder lap.
1.5 QUALITY ASSURANCE
A. Installer Qualifications: Must have installations of specified materials in local area in use for minimum of five years.
1. Employ foreman with minimum of 5-years experience as foreman on similar projects, who is fluent in English, to be on site at all times during work.
1.6 DELIVERY, STORAGE AND HANDLING
A. Sheet Metal Members: Deliver, store and handle to avoid damage.
B. Sealants, Coatings and Miscellaneous Materials:
1. Deliver materials to Project site in original packages with seals unbroken, labeled, with manufacturer’s name, product brand name and type, date of manufacture, lot number, and directions for storing.
2. Store materials in original, undamaged containers in clean, dry, protected location on raised platforms with weather-protective coverings, within temperature range required by manufacturer. Protect stored materials from direct sunlight. Waterproofing manufacturer’s standard packaging and covering is not considered adequate weather protection.
3. Handle materials to avoid damage.
4. Conspicuously mark damaged or opened containers , or containers with contaminated materials, and remove from site as soon as possible.
5. Remove and replace materials that cannot be applied within stated shelf life.
C. Limit stored material on structures to safe loading of structure at time materials are stored, and to avoid permanent deck deflation.
1.7 PROJECT CONDITIONS
A. Verify existing dimensions and details prior to installation of materials. Notify Architect / Engineer of conditions found to be different than those indicated in Contract Documents. Architect / Engineer will review situation and inform Contractor and Installer of changes, if required.
B. Comply with Owner’s limitations and restrictions for site use and accessibility.
C. Environmental Limitations: Apply sheet metal members when existing and forecast weather conditions permit sealants, coatings, and miscellaneous materials to be installed according to sealant, coating, or miscellaneous material manufacturer’s written instructions an warranty requirements.
FEBRUARY 20, 2026 – BID DOCUMENTS SECTION 07 62 00 - 3
D. Handle and install materials in strict accordance with safety requirements required by waterproofing manufacturer, Material Safety Data Sheets, and local, state and federal rules and regulations.
1.8 CHANGES IN WORK
A. During rehabilitation work, existing conditions may be encountered which are not known or are at variance with drawings and specifications. Such conditions may interfere with Work and may consist of damage or deterioration of substrate or surrounding materials or components that could jeopardize integrity or performance of new sheet metal installation.
B. Notify Architect / Engineer of conditions that may interfere with proper execution of Work or jeopardize integrity of new sheet metal installation prior to proceeding with Work
1.9 WARRANTY
A. Contractor’s Warranty:
1. Written Warranty, signed by Contractor, including:
a. The Contractor agrees to replace sheet metal work that does not comply with requirements; that has corroded surface, or coating that fails cohesively or adhesively, or other surface defects or imperfections; or that deteriorates in manner not clearly specified by material supplier’s data as inherent quality of material for application indicated.
b. Remove and replace sealant that has failed cohesively or adhesively; or that deteriorates in manner not clearly specified by material supplier’s data as inherent quality of material for application indicated.
c. Repair or replacement, to satisfaction of Owner, of other work or items which may have been displaced or damaged as consequence of defective work.
d. Warranty does not include deterioration or damage from changes in sheet metal environment from that reasonably anticipated at Substantial Completion, or physical damage to adjacent activities.
2. Warranty Period: 3 years after Substantial Completion.
PART 2 - PRODUCTS
2.1 SHEET METALS
A. For Copings and Cleats:
1. Lead Coated Copper Sheet: ASTM B101; temper H00 or H01, cold-rolled;
24 ounces per square foot.
B. For roof edge flashing; counterflashings:
1. Lead Coated Copper Sheet: ASTM B101; temper H00 or H01, cold-rolled;
20 ounces per square foot.
C. For Hung Gutter and downspouts at hung gutter:
1. Copper Sheet: ASTM B370; ASTM B601, Temper H00 or H01, cold-rolled;
20 ounces per square foot.
FEBRUARY 20, 2026 – BID DOCUMENTS SECTION 07 62 00 - 4
2.2 AUXILIARY MATERIALS
A. Spring clips for gutter attachment of new gutter shall be fabricated from brass wire.
B. Membrane Flashing: Grace Perm A Barrier Wall Flashing rubberized-asphalt and polyethylene, 40 mils, self-adhering waterproof sheets.
1. Surface conditioner / Primer: Grace Perm A Barrier Surface Conditioner
2. Termination Mastic : Grace Liquid Membrane
C. Rosin Slip Sheet : Rosin-sized paper, minimum 3 pounds per 100 square feet.
D. Miscellaneous Materials
1. General: Provide materials and types of fasteners, solder, protective coatings, separators, sealants, and other miscellaneous items required for installation.
2. Fasteners: Wood screws, annular-threaded nails, self-tapping screws, self-locking rivets and bolts, and other suitable fasteners designed to withstand design loads. Size fasteners to provide penetration into substrate of at least 1 ¼ inches for nails and ¾ inches for wood screws.
a. Use copper or hardware bronze fasteners,
b. Fasteners for Flashing and Trim: Blind fasteners or self-drilling screws, gasketed, with hex washer head.
1) Blind Fasteners: High-strength brass or stainless steel rivets.
3. Fasteners into Concrete or Masonry:
a. Tapcon, stainless steel anchors with hex head and sealing washer.
Diameter: ¼”. Embedment into substrate 1 ½” for use at downspout straps or where indicated on drawings.
4. Sealing Tape: Pressure-sensitive, 10-percent solids, polyisobutylene-compound sealing tape with release-paper backing. Provide permanently elastic, nonsag, nontoxic, non-staining tape.
5. Elastomeric Sealant: ASTM C920, elastomeric silicone sealant; of type, grade, class and use classifications required to seal joints in sheet metal flashing and trim and remain watertight.
6. Bituminous Coating: SSPC Paint Specification No, 12 (Discontinued 2005), Cold-applied asphalt mastic; compounded for 15-mil-dry-film thickness per coat.
7. Solder: ASTM B32.
2.3 FABRICATION
A. Custom fabricate to comply with recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to design, dimensions, metal, and other characteristics of item indicated. Conform to dimensions and profiles shown in SMACA’s "Architectural Sheet Metal Manual", unless requirements that are more stringent are indicated.
1. Obtain field measurements for accurate fit before fabrication.
2. Shop fabricate items where practicable.
B. Fabricate without excessive oil canning, buckling, and tool marks and true to line and levels indicated, with exposed edges folded back to form hems.
1. Fabricate nonmoving seams in accessories with flat-lock seams. Tin edges to be seamed, form seams and solder.
FEBRUARY 20, 2026 – BID DOCUMENTS SECTION 07 62 00 - 5
C. Sealed Joints: Form non-expansion but movable joints in metal to accommodate elastomeric sealant and in compliance with recommendations in SMACA’s "Architectural Sheet Metal Manual".
D. Expansion Provisions: Use lapped or bayonet-type expansion provisions where possible; otherwise, form expansion joints of intermeshing hooked flanges, not less than 1 inch deep, filled with elastomeric or sealant concealed within joints.
E. Conceal fasteners and expansion provisions, where possible, on exposed-to-view sheet metal flashing and trim, unless otherwise indicated.
F. Fabricate cleats and attachment devices from same material as accessory being anchored or from compatible, noncorrosive metal, and in thickness not less than that of metal being secured.
G. Roof Drainage Fabrications:
1. Hanging Gutters: Fabricate to cross section indicated, in minimum 8-foot long sections, complete with end pieces, outlet tubes, and other accessories required.
2. Downspouts: Fabricate round downspouts complete with mitered elbows.
Furnish with metal hangers from same material as downspouts, and anchors.
3. Accessories: Continuous, removable leaf screen with sheet metal frame and hardware cloth screen.
2.4 STEEP-SLOPE ROOF SHEET METAL FABRICATIONS
A. Apron, Step, Cricket, and Backer Flashing: Fabricate from the following material:
Copper: 16 oz./sq. ft.
B. Valley Flashing: Fabricate from the following material: Copper: 16 oz./sq. ft.
C. Drip Edges: Fabricate from the following material: Copper: 16 oz./sq. ft.
D. Eave, Rake, Ridge, and Hip Flashing: Fabricate from the following material:
Copper: 16 oz./sq. ft.
2.5 WALL SHEET METAL FABRICATIONS
A. Openings Flashing in Frame Construction: Fabricate head, sill, and similar flashings to extend 4 inches beyond wall openings. Form head and sill flashing with 2-inch- (high end dams. Fabricate from the following material: Copper: 16 oz./sq. ft.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions with Installer for compliance with requirements and other conditions affecting performance of sheet metal flashings and trim.
1. Ensure that Work done by other trades is complete and ready to receive sheet metal flashings and trim.
FEBRUARY 20, 2026 – BID DOCUMENTS SECTION 07 62 00 - 6
2. Verify that areas and conditions under which Work is to be performed permit proper and timely completion of Work.
3. Notify Architect / Engineer in writing of conditions which may adversely affect installation or performance of sheet metal flashings and trim. Do not proceed with installation of sheet metal flashings and trim until those conditions have been corrected and reviewed by Architect / Engineer.
3.2 INSTALLATION
A. General: Install sheet metal flashings and trim according to recommendations in SMACA’s ‘Architectural Sheet Metal Manual and as indicated.
B. Install sheet metal flashing and trim to fit substrates and result in watertight performance.
1. Install true to line and levels indicated.
2. Where exposed, install without excessive oil canning, buckling, or tool marks.
3. Provide uniform, neat seams with minimum exposure of solder, welds and sealant.
4. Do not torch cut sheet metal.
C. Provide for thermal expansion of exposed flashing and trim.
1. Space movement joints no more than 10 feet apart, with no joints within 24 inches of corner or intersection.
2. Where lapped or bayonet-type expansion provisions cannot be used or would not be sufficiently watertight, form expansion joints of intermeshing hooked flanges, not less than 1 inch deep, filled with elastomeric or sealant concealed within joints.
D. Metal Protection: Where dissimilar metals will contact each other or corrosive substrates, protect against galvanic action by painting contact surfaces with bituminous coating or be other permanent separation as recommended by fabricator or manufacturers of dissimilar metals.
E. Anchor sheet metal flashing and trim and other components of the Work securely in place, with provisions for thermal and structural movement. Use fasteners, solder, welding rods, protective coatings, separators, sealants, and other miscellaneous items as required to complete sheet metal flashing and trim system.
F. Seal joints with elastomeric sealant as required for watertight construction.
G. Soldered Joints: Clean surfaces to be soldered, removing oils and foreign matter.
Pre-tin edges of sheets to be soldered to width of 1 ½ inches except where pre-tinned surface would show in finished work.
H. Roof Drainage System Installation
1. Hanging Gutters:
a. Join sections with riveted and soldered joints.
b. Slope to downspouts.
c. Attach gutters at eave or fascia to firmly anchored gutter brackets spaced not more than 24” apart.
FEBRUARY 20, 2026 – BID DOCUMENTS SECTION 07 62 00 - 7
d. Provide end closures and seal watertight with sealant.
e. Install gutter screens.
2. Downspouts:
a. Join sections with 1 ½ inch telescoping joints.
b. Provide fasteners designed to hold downspouts securely 1 inch away from walls; locate fasteners at top and bottom and at approximately 60-inches on center in between.
I. Roof Flashing Installation
1. General:
a. Set units true to line and level as indicated.
b. Provide concealed fasteners where possible.
c. Install Work with laps, joints and seams that will be permanently watertight.
2. Roof Edge Flashing:
a. Anchor as shown on Drawings
b. Interlock bottom edge of roof edge flashing with continuous cleats anchored to substrate on 12-inch centers.
3. Counterflashing: Insert counterflashing in reglets or receivers and fit tightly to base flashing.
a. Extend counterflashing 4-inches over base flashing.
b. Secure in waterproof manner.
c. Lap couterflashing joints at least 4-inches and bed with elastomeric
4. Vent Flashing:
a. Turn lead flashing down inside vent piping, being careful not to block vent piping with flashing.
b. Seal with elastomeric sealant and clamp flashing to pipes penetrating roof except for lead flashing on vent piping.
J. Wall Flashing Installation
1. Install sheet metal wall flashing to intercept and exclude penetrating moisture according to SMACNA recommendations, and as indicated.
Coordinate installation of wall flashing with installation of wall opening components such as windows, doors and louvers.
2. Openings in Frame Construction: Install continuous head, sill and similar flashings to extend 4-inches beyond wall openings.
3.3 CLEANING
A. At the end of each workday, clean site and work areas and place rubbish, empty cans, rags and other discarded materials in appropriate containers.
B. After completing sheet metal work, clean spillage and soiling from adjacent surfaces using cleaning agents and procedures recommended by manufacturer of affected surface.
Exercise care to avoid scratching or damage to surfaces. Repair surfaces stained, marred, or otherwise damaged during roofing work.
C. At conclusion of roofing work, clean up debris and surplus materials and remove from site.
FEBRUARY 20, 2026 – BID DOCUMENTS SECTION 07 62 00 - 8
3.4 PROTECTION
A. Protect sheet metal flashing and trim from damage and wear during remainder of construction period.
END OF SECTION 07 62 00
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes: Roof edges, copings, hung gutters, drip edges, counter flashing.
B. Related Sections:
1. Section 10 00 00 – Special Considerations and Procedures for Historic Properties.
2. Section 07 92 00 – Joint Sealants
1.2 REFERENCES
A. Reference Standards: Latest edition as of specification date.
1. ASTM International:
a. B32: Standard Specifications for Solder Metal
b. B101: Standard Specification for Lead Coated Copper Sheet and Strip for Building Construction
c. B370: Standard Specification for Copper Sheet and Strip for Building Construction
d. B601: Classification for Temper Designation for Copper and Copper Alloys- Wrought and Cast
e. B749: Standard Specification for Lead and Lead Alloy Strip, Sheet, and Plate Products
f. C920: Standard Specification for Elastomeric Joint Sealants
2. Sheet Metal Flashing and Trim Standard: Comply with SMACNA's "Architectural Sheet Metal Manual." Conform to dimensions and profiles shown unless more stringent requirements are indicated.
1.3 ADMINISTRATIVE REQUIREMENTS
A. Coordinate work to ensure that adjacent areas are not adversely affected. Coordinate with
1. Owner’s Representative
2. With other trades to ensure that Work done by other trades is complete and ready to receive roofing.
3. With other trades to avoid or minimize work on, or in immediate vicinity of, installation Work in progress and completed new roofing.
4. With interfacing and adjoining construction to provide leak-proof, secure, and non-corrosive installation. Coordinate:
a. Counterflashing installation with base flashing installation.
b. Installation of roof-penetration flashing with installation of roofing and other items penetrating roof.
c. Installation of roof perimeter flashing.
1.4 SUBMITTALS
A. Product Data: For each product specified.
B. Samples: For each type of sheet metal flashing and trim. Construct typical lap splice or seam solder lap.
1.5 QUALITY ASSURANCE
A. Installer Qualifications: Must have installations of specified materials in local area in use for minimum of five years.
1. Employ foreman with minimum of 5-years experience as foreman on similar projects, who is fluent in English, to be on site at all times during work.
1.6 DELIVERY, STORAGE AND HANDLING
A. Sheet Metal Members: Deliver, store and handle to avoid damage.
B. Sealants, Coatings and Miscellaneous Materials:
1. Deliver materials to Project site in original packages with seals unbroken, labeled, with manufacturer’s name, product brand name and type, date of manufacture, lot number, and directions for storing.
2. Store materials in original, undamaged containers in clean, dry, protected location on raised platforms with weather-protective coverings, within temperature range required by manufacturer. Protect stored materials from direct sunlight. Waterproofi...
3. Handle materials to avoid damage.
4. Conspicuously mark damaged or opened containers , or containers with contaminated materials, and remove from site as soon as possible.
5. Remove and replace materials that cannot be applied within stated shelf life.
C. Limit stored material on structures to safe loading of structure at time materials are stored, and to avoid permanent deck deflation.
1.7 PROJECT CONDITIONS
A. Verify existing dimensions and details prior to installation of materials. Notify Architect / Engineer of conditions found to be different than those indicated in Contract Documents. Architect / Engineer will review situation and inform Contractor ...
B. Comply with Owner’s limitations and restrictions for site use and accessibility.
C. Environmental Limitations: Apply sheet metal members when existing and forecast weather conditions permit sealants, coatings, and miscellaneous materials to be installed according to sealant, coating, or miscellaneous material manufacturer’s writte...
D. Handle and install materials in strict accordance with safety requirements required by waterproofing manufacturer, Material Safety Data Sheets, and local, state and federal rules and regulations.
1.8 CHANGES IN WORK
A. During rehabilitation work, existing conditions may be encountered which are not known or are at variance with drawings and specifications. Such conditions may interfere with Work and may consist of damage or deterioration of substrate or surroundi...
B. Notify Architect / Engineer of conditions that may interfere with proper execution of Work or jeopardize integrity of new sheet metal installation prior to proceeding with Work
1.9 WARRANTY
A. Contractor’s Warranty:
1. Written Warranty, signed by Contractor, including:
a. The Contractor agrees to replace sheet metal work that does not comply with requirements; that has corroded surface, or coating that fails cohesively or adhesively, or other surface defects or imperfections; or that deteriorates in manner not clear...
b. Remove and replace sealant that has failed cohesively or adhesively; or that deteriorates in manner not clearly specified by material supplier’s data as inherent quality of material for application indicated.
c. Repair or replacement, to satisfaction of Owner, of other work or items which may have been displaced or damaged as consequence of defective work.
d. Warranty does not include deterioration or damage from changes in sheet metal environment from that reasonably anticipated at Substantial Completion, or physical damage to adjacent activities.
2. Warranty Period: 3 years after Substantial Completion.
PART 2 - PRODUCTS
2.1 SHEET METALS
A. For Copings and Cleats:
1. Lead Coated Copper Sheet: ASTM B101; temper H00 or H01, cold-rolled; 24 ounces per square foot.
B. For roof edge flashing; counterflashings:
1. Lead Coated Copper Sheet: ASTM B101; temper H00 or H01, cold-rolled; 20 ounces per square foot.
C. For Hung Gutter and downspouts at hung gutter:
1. Copper Sheet: ASTM B370; ASTM B601, Temper H00 or H01, cold-rolled; 20 ounces per square foot.
2.2 AUXILIARY MATERIALS
A. Spring clips for gutter attachment of new gutter shall be fabricated from brass wire.
B. Membrane Flashing: Grace Perm A Barrier Wall Flashing rubberized-asphalt and polyethylene, 40 mils, self-adhering waterproof sheets.
1. Surface conditioner / Primer: Grace Perm A Barrier Surface Conditioner
2. Termination Mastic : Grace Liquid Membrane
C. Rosin Slip Sheet : Rosin-sized paper, minimum 3 pounds per 100 square feet.
D. Miscellaneous Materials
1. General: Provide materials and types of fasteners, solder, protective coatings, separators, sealants, and other miscellaneous items required for installation.
2. Fasteners: Wood screws, annular-threaded nails, self-tapping screws, self-locking rivets and bolts, and other suitable fasteners designed to withstand design loads. Size fasteners to provide penetration into substrate of at least 1 ¼ inches for nai...
a. Use copper or hardware bronze fasteners,
b. Fasteners for Flashing and Trim: Blind fasteners or self-drilling screws, gasketed, with hex washer head.
1) Blind Fasteners: High-strength brass or stainless steel rivets.
3. Fasteners into Concrete or Masonry:
a. Tapcon, stainless steel anchors with hex head and sealing washer. Diameter: ¼”. Embedment into substrate 1 ½” for use at downspout straps or where indicated on drawings.
4. Sealing Tape: Pressure-sensitive, 10-percent solids, polyisobutylene-compound sealing tape with release-paper backing. Provide permanently elastic, nonsag, nontoxic, non-staining tape.
5. Elastomeric Sealant: ASTM C920, elastomeric silicone sealant; of type, grade, class and use classifications required to seal joints in sheet metal flashing and trim and remain watertight.
6. Bituminous Coating: SSPC Paint Specification No, 12 (Discontinued 2005), Cold-applied asphalt mastic; compounded for 15-mil-dry-film thickness per coat.
7. Solder: ASTM B32.
2.3 FABRICATION
A. Custom fabricate to comply with recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to design, dimensions, metal, and other characteristics of item indicated. Conform to dimensions and profiles shown in SMACA’s "Architectural ...
1. Obtain field measurements for accurate fit before fabrication.
2. Shop fabricate items where practicable.
B. Fabricate without excessive oil canning, buckling, and tool marks and true to line and levels indicated, with exposed edges folded back to form hems.
1. Fabricate nonmoving seams in accessories with flat-lock seams. Tin edges to be seamed, form seams and solder.
C. Sealed Joints: Form non-expansion but movable joints in metal to accommodate elastomeric sealant and in compliance with recommendations in SMACA’s "Architectural Sheet Metal Manual".
D. Expansion Provisions: Use lapped or bayonet-type expansion provisions where possible; otherwise, form expansion joints of intermeshing hooked flanges, not less than 1 inch deep, filled with elastomeric or sealant concealed within joints.
E. Conceal fasteners and expansion provisions, where possible, on exposed-to-view sheet metal flashing and trim, unless otherwise indicated.
F. Fabricate cleats and attachment devices from same material as accessory being anchored or from compatible, noncorrosive metal, and in thickness not less than that of metal being secured.
G. Roof Drainage Fabrications:
1. Hanging Gutters: Fabricate to cross section indicated, in minimum 8-foot long sections, complete with end pieces, outlet tubes, and other accessories required.
2. Downspouts: Fabricate round downspouts complete with mitered elbows. Furnish with metal hangers from same material as downspouts, and anchors.
3. Accessories: Continuous, removable leaf screen with sheet metal frame and hardware cloth screen.
2.4 STEEP-SLOPE ROOF SHEET METAL FABRICATIONS
A. Apron, Step, Cricket, and Backer Flashing: Fabricate from the following material: Copper: 30T16 oz./sq. ft.30T
B. Valley Flashing: Fabricate from the following material: Copper: 16 oz./sq. ft.
C. Drip Edges: Fabricate from the following material: Copper: 16 oz./sq. ft.
D. Eave, Rake, Ridge, and Hip Flashing: Fabricate from the following material: Copper: 16 oz./sq. ft.
2.5 WALL SHEET METAL FABRICATIONS
A. Openings Flashing in Frame Construction: Fabricate head, sill, and similar flashings to extend 30T4 inches30T beyond wall openings. Form head and sill flashing with 30T2-inch-30T40T (40Thigh end dams. Fabricate from the following material: Copper:...
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions with Installer for compliance with requirements and other conditions affecting performance of sheet metal flashings and trim.
1. Ensure that Work done by other trades is complete and ready to receive sheet metal flashings and trim.
2. Verify that areas and conditions under which Work is to be performed permit proper and timely completion of Work.
3. Notify Architect / Engineer in writing of conditions which may adversely affect installation or performance of sheet metal flashings and trim. Do not proceed with installation of sheet metal flashings and trim until those conditions have been corre...
3.2 INSTALLATION
A. General: Install sheet metal flashings and trim according to recommendations in SMACA’s ‘Architectural Sheet Metal Manual and as indicated.
B. Install sheet metal flashing and trim to fit substrates and result in watertight performance.
1. Install true to line and levels indicated.
2. Where exposed, install without excessive oil canning, buckling, or tool marks.
3. Provide uniform, neat seams with minimum exposure of solder, welds and sealant.
4. Do not torch cut sheet metal.
C. Provide for thermal expansion of exposed flashing and trim.
1. Space movement joints no more than 10 feet apart, with no joints within 24 inches of corner or intersection.
2. Where lapped or bayonet-type expansion provisions cannot be used or would not be sufficiently watertight, form expansion joints of intermeshing hooked flanges, not less than 1 inch deep, filled with elastomeric or sealant concealed within joints.
D. Metal Protection: Where dissimilar metals will contact each other or corrosive substrates, protect against galvanic action by painting contact surfaces with bituminous coating or be other permanent separation as recommended by fabricator or manufac...
E. Anchor sheet metal flashing and trim and other components of the Work securely in place, with provisions for thermal and structural movement. Use fasteners, solder, welding rods, protective coatings, separators, sealants, and other miscellaneous i...
F. Seal joints with elastomeric sealant as required for watertight construction.
G. Soldered Joints: Clean surfaces to be soldered, removing oils and foreign matter. Pre-tin edges of sheets to be soldered to width of 1 ½ inches except where pre-tinned surface would show in finished work.
H. Roof Drainage System Installation
1. Hanging Gutters:
a. Join sections with riveted and soldered joints.
b. Slope to downspouts.
c. Attach gutters at eave or fascia to firmly anchored gutter brackets spaced not more than 24” apart.
d. Provide end closures and seal watertight with sealant.
e. Install gutter screens.
2. Downspouts:
a. Join sections with 1 ½ inch telescoping joints.
b. Provide fasteners designed to hold downspouts securely 1 inch away from walls; locate fasteners at top and bottom and at approximately 60-inches on center in between.
I. Roof Flashing Installation
1. General:
a. Set units true to line and level as indicated.
b. Provide concealed fasteners where possible.
c. Install Work with laps, joints and seams that will be permanently watertight.
2. Roof Edge Flashing:
a. Anchor as shown on Drawings
b. Interlock bottom edge of roof edge flashing with continuous cleats anchored to substrate on 12-inch centers.
3. Counterflashing: Insert counterflashing in reglets or receivers and fit tightly to base flashing.
a. Extend counterflashing 4-inches over base flashing.
b. Secure in waterproof manner.
c. Lap couterflashing joints at least 4-inches and bed with elastomeric sealant.
4. Vent Flashing:
a. Turn lead flashing down inside vent piping, being careful not to block vent piping with flashing.
b. Seal with elastomeric sealant and clamp flashing to pipes penetrating roof except for lead flashing on vent piping.
J. Wall Flashing Installation
1. Install sheet metal wall flashing to intercept and exclude penetrating moisture according to SMACNA recommendations, and as indicated. Coordinate installation of wall flashing with installation of wall opening components such as windows, doors and ...
2. Openings in Frame Construction: Install continuous head, sill and similar flashings to extend 4-inches beyond wall openings.
THROUGH PENETRATION FIRESTOP SYSTEMS
SECTION 07 84 00
FEBRUARY 20, 2026 – BID DOCUMENTS 07 84 00 - 1
A. This Section includes through-penetration firestop systems for the following types of fire-resistance-rated assemblies:
1. Floors.
2. Walls and partitions.
1.2 PERFORMANCE REQUIREMENTS
A. F-Ratings: Provide firestop systems with F-ratings equaling or exceeding fire-resistance rating of constructions penetrated as determined per ASTM E 814.
B. T-Ratings: Provide firestop systems with T-ratings required, as well as F-ratings, determined per ASTM E 814, where systems protect penetrating items with potential to contact adjacent materials in occupiable floor areas including, but not limited, to the following:
1. Penetrations located outside wall cavities.
2. Penetrations located in construction containing fire-protection-rated openings.
3. Penetrating items larger than 4-inch-diameter nominal pipe or 16 sq. in. in overall cross-sectional area.
C. For firestop systems exposed to view, moisture, and physical damage, provide products that after curing do not deteriorate when exposed to these conditions both during and after construction.
1. For piping penetrations for plumbing provide moisture-resistant firestop systems.
2. For floor penetrations with annular spaces exceeding 4 inches in width and exposed to possible loading provide firestop systems capable of supporting floor loads involved either by installing floor plates or by other means.
3. For penetrations involving insulated piping,provide firestop systems not requiring removal of insulation.
D. For through-penetration firestop systems exposed to view, provide products with flame-spread indices of less than 25 and smoke-developed indices of less than 450, when tested per
ASTM E 84.
1.3 QUALITY ASSURANCE
A. Fire-Test-Response Characteristics: Provide rated systems identical to those tested per ASTM E 814 and with products bearing the classification marking of a qualified testing and inspecting agency acceptable to authorities having jurisdiction.
B. Coordinate sizing of sleeves, openings, core-drilled holes, or cut openings to accommodate firestop systems.
FEBRUARY 20, 2026 – BID DOCUMENTS 07 84 00 - 2
2.1 MANUFACTURERS
A. Basis-of-Design Product: The design for through-penetration firestop systems is based on products named in the Through-Penetration Firestop Schedule at the end of by design designation of a qualified testing and inspecting agency. Subject to compliance with requirements, provide the named product or a comparable product by one of the following:
1. A/D Fire Protection Systems Inc.
2. DAP Inc.
3. Firestop Systems Inc.
4. Hilti Construction Chemicals, Inc.
5. Instant Firestop Mfg. Inc.
6. International Protective Coatings Corp.
7. Isolatek International.
8. Nelson Firestop Products.
9. NUCO Industries.
10. RectorSeal Corporation (The).
11. Specified Technologies Inc.
12. 3M Fire Protection Products.
13. Tremco.
14. United States Gypsum Company.
2.2 FIRESTOP SYSTEMS
A. Compatibility: Provide firestop systems that are compatible with the substrates forming openings, and with the items, if any, penetrating firestop systems, under conditions of service and application, as demonstrated by manufacturer based on testing and field experience.
B. Accessories: Provide accessories required to install fill materials that comply with requirements of tested assemblies, are approved by qualified testing and inspecting agency that performed testing, and are specified by manufacturer of tested assemblies. Accessories include, but are not limited to, the following:
1. Permanent forming/damming/backing materials.
a. Slag-/rock-wool-fiber insulation.
b. Sealants used in combination with other forming/damming/backing materials to prevent leakage of fill materials in liquid state.
c. Fire-rated form board.
d. Fillers for sealants.
2. Temporary forming materials.
3. Substrate primers.
4. Collars.
5. Steel sleeves.
FEBRUARY 20, 2026 – BID DOCUMENTS 07 84 00 - 3
3.1 INSTALLATION
A. General: Install through-penetration firestop systems to comply with "Performance Requirements" Article and firestop system manufacturer's written installation instructions and published drawings for products and applications indicated.
B. Clean openings immediately before installing firestop systems.
1. Remove foreign materials that could interfere with adhesion of firestop systems.
2. Remove laitance and form-release agents from concrete.
3. Produce clean, sound surfaces capable of developing optimum bond with firestop systems. Remove loose particles remaining from cleaning operation.
C. Priming: Prime substrates when recommended in writing by firestop system manufacturer using that manufacturer's recommended products and methods. Confine primers to areas of bond; do not spill primers or allow them to migrate onto adjoining surfaces.
D. Masking Tape: Use masking tape where required to prevent contact of firestopping with adjoining surfaces that otherwise would be permanently stained or damaged by such contact or by cleaning methods required to remove firestopping smears. Remove tape immediately after installation without disturbing firestopping seal.
E. Accessories: Install accessories of types required to support fill materials during their application and in the position necessary to produce cross-sectional shapes and depths required to achieve fire ratings indicated.
1. After installing fill materials, remove combustible forming materials and other accessories that are not permanent components of firestop systems.
F. Install fill materials for firestop systems by proven techniques.
1. Fill voids and cavities formed by openings, forming materials, accessories, and penetrating items as required to achieve fire-resistance ratings indicated.
2. Apply materials so they contact and adhere to substrates formed by openings and penetrating items.
3. For fill materials that will remain exposed after completing Work, finish to produce smooth, uniform surfaces that are flush with adjoining finishes.
G. Identification: Identify firestop systems with pressure-sensitive, self-adhesive, preprinted vinyl labels. Attach labels permanently to surfaces of penetrated construction on both sides of each firestop system installation where labels will be visible. Include the following information on labels:
1. The words: "Warning--Through-Penetration Firestop System--Do Not Disturb. Notify Building Management of Any Damage."
2. Contractor's name, address, and phone number.
3. Through-penetration firestop system designation of applicable testing and inspecting agency.
FEBRUARY 20, 2026 – BID DOCUMENTS 07 84 00 - 4
4. Date of installation.
5. Firestop system manufacturer's name.
6. Installer's name.
H. Clean excess fill materials adjacent to openings as installation progresses by methods and with cleaning materials that are approved in writing by manufacturers and that do not damage materials in which openings occur.
3.2 FIELD QUALITY CONTROL
A. Do not cover up firestop system installations that will become concealed behind other construction until building inspector, if required by authorities having jurisdiction, have examined each installation.
B. Enclosing firestop systems with other construction only after inspection reports are issued.
C. Where deficiencies are found, repair or replace firestop systems to comply with requirements.
3.3 THROUGH-PENETRATION FIRESTOP SYSTEM SCHEDULE
A. Where UL-classified systems are indicated, they refer to the alpha-alpha-numeric designations listed in UL's "Fire Resistance Directory" under product Category XHEZ.
END OF SECTION 07 84 00
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes through-penetration firestop systems for the following types of fire-resistance-rated assemblies:
1. Floors.
2. Walls and partitions.
1.2 PERFORMANCE REQUIREMENTS
A. F-Ratings: Provide firestop systems with F-ratings equaling or exceeding fire-resistance rating of constructions penetrated as determined per ASTM E 814.
B. T-Ratings: Provide firestop systems with T-ratings required, as well as F-ratings, determined per ASTM E 814, where systems protect penetrating items with potential to contact adjacent materials in occupiable floor areas including, but not limited,...
1. Penetrations located outside wall cavities.
2. Penetrations located in construction containing fire-protection-rated openings.
3. Penetrating items larger than 4-inch-diameter nominal pipe or 16 sq. in. in overall cross-sectional area.
C. For firestop systems exposed to view, moisture, and physical damage, provide products that after curing do not deteriorate when exposed to these conditions both during and after construction.
1. For piping penetrations for plumbing provide moisture-resistant firestop systems.
2. For floor penetrations with annular spaces exceeding 4 inches in width and exposed to possible loading provide firestop systems capable of supporting floor loads involved either by installing floor plates or by other means.
3. For penetrations involving insulated piping,provide firestop systems not requiring removal of insulation.
D. For through-penetration firestop systems exposed to view, provide products with flame-spread indices of less than 25 and smoke-developed indices of less than 450, when tested per ASTM E 84.
1.3 QUALITY ASSURANCE
A. Fire-Test-Response Characteristics: Provide rated systems identical to those tested per ASTM E 814 and with products bearing the classification marking of a qualified testing and inspecting agency acceptable to authorities having jurisdiction.
B. Coordinate sizing of sleeves, openings, core-drilled holes, or cut openings to accommodate firestop systems.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Basis-of-Design Product: The design for through-penetration firestop systems is based on products named in the Through-Penetration Firestop Schedule at the end of by design designation of a qualified testing and inspecting agency. Subject to compli...
1. A/D Fire Protection Systems Inc.
2. DAP Inc.
3. Firestop Systems Inc.
4. Hilti Construction Chemicals, Inc.
5. Instant Firestop Mfg. Inc.
6. International Protective Coatings Corp.
7. Isolatek International.
8. Nelson Firestop Products.
9. NUCO Industries.
10. RectorSeal Corporation (The).
11. Specified Technologies Inc.
12. 3M Fire Protection Products.
13. Tremco.
14. United States Gypsum Company.
2.2 FIRESTOP SYSTEMS
A. Compatibility: Provide firestop systems that are compatible with the substrates forming openings, and with the items, if any, penetrating firestop systems, under conditions of service and application, as demonstrated by manufacturer based on testin...
B. Accessories: Provide accessories required to install fill materials that comply with requirements of tested assemblies, are approved by qualified testing and inspecting agency that performed testing, and are specified by manufacturer of tested asse...
1. Permanent forming/damming/backing materials.
a. Slag-/rock-wool-fiber insulation.
b. Sealants used in combination with other forming/damming/backing materials to prevent leakage of fill materials in liquid state.
c. Fire-rated form board.
d. Fillers for sealants.
2. Temporary forming materials.
3. Substrate primers.
4. Collars.
5. Steel sleeves.
PART 3 - EXECUTION
3.1 INSTALLATION
A. General: Install through-penetration firestop systems to comply with "Performance Requirements" Article and firestop system manufacturer's written installation instructions and published drawings for products and applications indicated.
B. Clean openings immediately before installing firestop systems.
1. Remove foreign materials that could interfere with adhesion of firestop systems.
2. Remove laitance and form-release agents from concrete.
3. Produce clean, sound surfaces capable of developing optimum bond with firestop systems. Remove loose particles remaining from cleaning operation.
C. Priming: Prime substrates when recommended in writing by firestop system manufacturer using that manufacturer's recommended products and methods. Confine primers to areas of bond; do not spill primers or allow them to migrate onto adjoining surfaces.
D. Masking Tape: Use masking tape where required to prevent contact of firestopping with adjoining surfaces that otherwise would be permanently stained or damaged by such contact or by cleaning methods required to remove firestopping smears. Remove t...
E. Accessories: Install accessories of types required to support fill materials during their application and in the position necessary to produce cross-sectional shapes and depths required to achieve fire ratings indicated.
1. After installing fill materials, remove combustible forming materials and other accessories that are not permanent components of firestop systems.
F. Install fill materials for firestop systems by proven techniques.
1. Fill voids and cavities formed by openings, forming materials, accessories, and penetrating items as required to achieve fire-resistance ratings indicated.
2. Apply materials so they contact and adhere to substrates formed by openings and penetrating items.
3. For fill materials that will remain exposed after completing Work, finish to produce smooth, uniform surfaces that are flush with adjoining finishes.
G. Identification: Identify firestop systems with pressure-sensitive, self-adhesive, preprinted vinyl labels. Attach labels permanently to surfaces of penetrated construction on both sides of each firestop system installation where labels will be vi...
1. The words: "Warning--Through-Penetration Firestop System--Do Not Disturb. Notify Building Management of Any Damage."
2. Contractor's name, address, and phone number.
3. Through-penetration firestop system designation of applicable testing and inspecting agency.
4. Date of installation.
5. Firestop system manufacturer's name.
6. Installer's name.
H. Clean excess fill materials adjacent to openings as installation progresses by methods and with cleaning materials that are approved in writing by manufacturers and that do not damage materials in which openings occur.
3.2 FIELD QUALITY CONTROL
A. Do not cover up firestop system installations that will become concealed behind other construction until building inspector, if required by authorities having jurisdiction, have examined each installation.
B. Enclosing firestop systems with other construction only after inspection reports are issued.
C. Where deficiencies are found, repair or replace firestop systems to comply with requirements.
3.3 THROUGH-PENETRATION FIRESTOP SYSTEM SCHEDULE
A. Where UL-classified systems are indicated, they refer to the alpha-alpha-numeric designations listed in UL's "Fire Resistance Directory" under product Category XHEZ.
JOINT SEALANTS
SECTION 07 92 00
FEBRUARY 20, 2026 – BID DOCUMENTS SECTION 07 92 00 - 1
A. This Section includes:
1. Surface preparation and installation of sealant in joints.
2. Exterior joints in vertical surfaces and horizontal non-traffic surfaces.
3. Interior joints in vertical surfaces and horizontal nontraffic surfaces.
1. See Division 8 Section “Glass Glazing” for glazing sealants.
2. See Division 32 Section "Concrete Pavement Joint Sealants" for sealing joints in pavements, walkways, and curbing.
C. Contractor is cautioned that existing joint sealants to be removed may contain asbestos.
1. See Appendix 2 ‘Targeted Pre-Demolition Hazardous Material Survey Report’.
2. Coordinate testing, removal and disposal of any hazardous material uncovered.
1.2 REFERENCES
A. Reference standards: Latest edition as of Specification date.
1. ASTM International:
a. C920: Standard Specification for Elastomeric Joint Sealants.
b. C1193: Standard Guide for Use of Sealants.
c. C1248: Standard Test Method for Staining of Porous Substrate by Joint Sealants.
d. C1521: Standard Practice for Evaluating Adhesion of Installed Waterproofing.
1.3 ADMINISTRATIVE REQUIREMENTS
A. Coordinate Work to ensure that new materials and building interior are kept continuously dry and that continuous, watertight, new sealant installation is provided. Coordinate:
1. With other trades to ensure that Work done by other trades is complete and ready to receive sealant.
2. With other trades to avoid or minimize work on, or in immediate vicinity of, installation
Work in progress and completed sealant Work. Ensure that dust from other operations will not adversely affect quality of completed sealant Work.
1.4 PERFORMANCE REQUIREMENTS
A. Provide elastomeric joint sealants that establish and maintain watertight and airtight continuous joint seals without staining or deteriorating joint substrates.
B. Provide joint sealants for interior applications that establish and maintain airtight and water-resistant continuous joint seals without staining or deteriorating joint substrates.
FEBRUARY 20, 2026 – BID DOCUMENTS SECTION 07 92 00 - 2
1.5 SUBMITTALS
A. For each joint-sealant product indicated:
1. Product Data: Sealant manufacturer’s literature including written instructions for evaluating, preparing, and treating substrate; technical data including tested physical and performance properties; and installation instructions.
2. SpecData sheet for substrate cleaner and substrate primer recommended by sealant manufacturer for specific substrate surface and conditions.
3. Samples: For each type and color of joint sealant required, provide manufacturer’s color sample card with thin sealant beads, showing range of colors available for each product exposed to view. Printed color card will not be accepted.
4. Manufacturer’s Reports and Certifications:
a. Prior to sealant installation, submit report from sealant manufacturer with results of sealant compatibility, sealant and substrate staining, and mock-up adhesion tests.
1) Report shall state that materials which come into contact with or in close proximity to sealant have been tested.
2) Report shall include sealant manufacturer’s interpretation o test results relative to material performance, potential staining of sealant and substrates, dirt accumulation of sealant, and dirt runoff from sealant.
3) Report shall include sealant manufacturer’s recommendations for substrate preparation and primer needed to obtain durable adhesion and installation procedures successfully used in mock-ups and field tests.
4) Product Certificates: For each sealant product, accessory, related products, joint type, and substrate, provide sealant manufacturer’s written approval of their product’s sue for specified conditions; based on mock-ups and field tests.
B. Installer qualifications
1. Certificate signed by sealant manufacturer, certifying that Installer complies with requirements.
C. Sample Warranty: Copy of sealant manufacturer’s warranty, stating obligations, remedies, limitations and exclusions. Submitted with Bid.
D. Following completion of Work, submit sealant manufacturer’s inspection report of completed sealant installation and completed warranty; submit completed Installer’s warranty.
1.6 QUALITY ASSURANCE
A. Installer Qualifications: Experienced firm that is approved, authorized, or licensed by Sealant manufacturer to install sealant and is eligible to receive sealant manufacturer’s warranty. Must have installations of specified materials in local area in use for minimum of five years.
1. Employ foreman with minimum of 5-years experience as foreman on similar…
This is the start of the file's text. The full file is on GovTribe.