Scope of Work Treament Plant.pdf
PDF 125 KB Posted
- Attached to
- CCI SCADA Project Emergency Repair Services
- Solicitation number
- SRC0000036022
- Issued by
- Sandusky County, Cincinnati City, Ohio
About this file
This is a Scope of Work document for the Ohio Department of Rehabilitation & Corrections at Chillicothe Correctional Institution, detailing emergency on-call repair services for the facility's Water and Wastewater Treatment Plants SCADA (System Control and Data Acquisition) system. The project is located at 16149 State Route 104 in Chillicothe, Ohio. The supplier will be responsible for correcting issues in the SCADA system that prevent plants from operating in automatic mode or displaying process data, with services including troubleshooting and repairing network equipment connected to Factory Talk Software, inspecting and repairing network switches and wiring, troubleshooting and programming variable frequency drives (VFDs), observing PID level control loops, integrating Win911 alerting software, and implementing Factory Talk WebView or similar solutions for remote pump reset capabilities. The contractor must be a Rockwell Automation Platinum System Integrator and an active Control Systems Integration Association (CSIA) member with an office location within 60 miles of the facility and the ability to provide on-call services within a reasonable timeframe.
The pricing structure is configured as time and material for each repair, with the contractor required to provide a comprehensive price list including hourly rates, travel expenses, and standard parts markup. Contractors must demonstrate relevant experience providing water treatment services to facilities similar to correctional institutions, provide notification of applicable licenses and permits, confirm understanding of project requirements, supply delivery timeframes, and provide warranty information and operation manuals. Additional deliverables include network maps and IP address lists for completed work. Payment terms are Net 30, and the contractor must affirm willingness to comply with State of Ohio Contract Terms and Conditions and Ohio Department of Rehabilitation & Corrections policies. Project contact is J. David Lehew, Water Treatment Plant Operations Manager, at 740-253-9401 or Johnathan.Lehew@drc.ohio.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OhioBuys_Bidder_Training (2).docx | DOCX document | |
| Contract_Executive_Order (1).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Name: CCI SCADA Project Emergency Repair Services Location: Chillicothe Correctional Institution 16149 St. Rt. 104, Chillicothe, OH 45601
The Ohio Department of Rehabilitation & Corrections, Chillicothe Correctional Institution, is looking for a supplier to provide emergency on-call services at the Water and Wastewater treatment plants. An essential function of the SCADA (system control and data acquisition) is to ensure proper plant operation and process control. The supplier will correct any issues in the SCADA system that would prevent the Plants from running in automatic mode or showing process data.
Contractor-specific requirements include:
1. The contractor must be a Rockwell Automation Platinum System Integrator.
2. Successful bidder should be an Active CSIA (control systems integration association) member.
3. The Contractor should have an office location within 60 miles of CCI.
4. The contractor will confirm that they can provide on-call services within a reasonable time frame.
5. Troubleshoot and repair the network equipment connected to the Factory Talk Software that is associated with the SCADA System.
6. Inspect and repair network switches and associated wiring in SCADA communication network.
7. Troubleshoot and program VFD’s
8. Observe PID level control loops and ensure proper operation.
9. Integrate Win911 software to alert the manager in the event of a control failure or overflow event.
10. Integrate Factory Talk WebView or similar to allow Managers to reset the pumps in the event of a failure.
11. Contractor must describe the experience of the firm in providing water treatment services to facilities that are the same or similar to this ODRC project.
12. Provide notification of necessary licenses and permits applicable to the provision of service.
13. Provide the delivery time of the product/service.
14. Affirm understanding of project requirements.
15. Provide information about warranty and operation manuals.
16. Provide network maps and I.P. address lists for completed work.
17. The job is configured as time and material for each repair.
18. The Contractor should provide a price list, such as hourly rates, travel expenses, standard parts markup, etc.
19. Indicate willingness to comply with State of Ohio Contract Terms and Conditions, as provided, and follow ODRC policies.
20. Payment Terms are Net 30.
Project Contact:
J. David Lehew Water Treatment Plant Operations Manager Chillicothe Correctional Institution 16149 St. Rt. 104, Chillicothe, OH 45601 Work Cell: 740-253-9401 Johnathan.Lehew@drc.ohio.gov mailto:Johnathan.Lehew@drc.ohio.gov
File details come from the government source that posted it. Updated .