This document is a Summary of Work section (Section 01110) for the Wekiva Golf Club Lift Station Improvements project, issued by Seminole County, Florida, on March 19, 2024. The project involves the abandonment of an existing drain field and construction of a new lift station at the Wekiva Golf Club, which includes installing PVC gravity sewer, manholes, a fiberglass lift station, wet well, PVC force mains, and lining of existing gravity sewer manholes. Additional scope encompasses installing new electrical panels and controls, and replacing/repairing the asphalt parking lot, concrete sidewalk, restriping, and landscaping.
The project requires the contractor to maintain continuous operation of existing facilities 24 hours per day, 7 days per week, and provide bypass pumping as needed for the sanitary sewer collection and transmission system during construction. The contractor will be responsible for coordinating work with the golf course operations and maintenance group, County Project Manager, and Inspectors, as well as coordinating with utilities for locates, testing, and potential relocations. The document emphasizes that the contractor must confine operations to permitted areas, not unreasonably encumber the site, and assume full responsibility for protecting and safekeeping of products stored on the job site.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pump Station Improvements SUMMARY OF WORK March 19, 2024
01110-1
SECTION 01110
SUMMARY OF WORK
PART 1 GENERAL
1.01 Section Includes
Summary of work, other contracts, work sequence, operation of existing facilities, use of premises, County furnished products, coordination, cutting and patching
1.02 Summary of Work
The Project consists of abandonment of existing drain field and construction of new lift station at the Wekiva Golf Club, including but not limited to PVC gravity sewer, manholes, fiberglass lift station, wet well, PVC force mains, connection, and lining of existing gravity sewer manhole. Install new electrical panels and controls and replace/repair asphalt parking lot, concrete sidewalk, restriping, and repair of landscaping.
1.03 Work Under Other Contracts – N/A
1.04 Work Sequence
The Contractor’s sequence of work may be of his choosing to complete the work in the allowed time frame while accommodating other contractors on site.
1.05 Operation of Existing Facilities
The County shall be able to operate existing facilities 24 hours per day, 7 days per week.
Provide bypass pumping as needed for operation of sanitary sewer collection and transmission system during construction.
1.06 Contractor Use of Premises
Confine operations at the site to areas permitted by applicable laws, ordinances, permits, and by the Contract Documents. Do not unreasonably encumber the site with materials or equipment. Do not load structures with weight that will endanger the structure. The Contractor shall assume full responsibility for protection and safekeeping of products stored on the job site.
1.07 County Furnished Products – N/A
1.08 Coordination
A. The Contractor shall be fully responsible for the coordination of its work and the work of its employees, subcontractors, and suppliers and to assure compliance with schedules.
Pump Station Improvements SUMMARY OF WORK March 19, 2024
01110-2
B. The Contractor shall be fully responsible for the coordination of his work with the operations and maintenance group of the golf course, as well as County Project Manager and Inspectors.
C. The coordination requirements of this Section are in addition to the requirements of the front-end bidding documents issued by the County.
D. It is the Contractor’s responsibility to coordinate with all the utilities regarding locates, testing, or relocations.
1.09 Cutting and Patching
A. The Contractor shall, at no additional expense to the County, perform cutting and patching necessary to the completion of the Project. Perform cutting and patching in a manner to prevent damage to the structure or previously completed work.
B. Refinish surfaces as necessary to provide an even finish.
PART 2 PRODUCTS - Not Used
PART 3 EXECUTION - Not Used
END OF SECTION