This is a Scope of Services document issued by the City of Detroit for the demolition and make-safe of blighted residential garages under the City's Demolition Program. The scope outlines comprehensive requirements for contractor performance, including pre-demolition due diligence, demolition execution, debris removal and disposal, backfill and grading, and site finalization. The services target residential garage structures on assigned parcels within Detroit city limits, with specific protocols for hazard identification, utility disconnection verification, occupant notification within 400 feet of demolition sites, and protection of adjacent structures. Work may be performed Monday through Friday from 7:30 a.m. to 5:30 p.m., with operations restricted to sunrise and sunset on days when these times fall within allowable hours. The term of performance is specified in a Notice to Proceed issued by the City, with the contractor required to complete demolition and debris removal within one calendar day of knock down, and backfill, grading, and seeding within seven calendar days of debris removal completion.
The contractor must provide all necessary equipment, materials, and qualified personnel, including field supervisors with current OSHA Lead Awareness Training and at least one site worker with asbestos and lead awareness credentials. All debris must be removed as asbestos-containing waste material to licensed Type II landfills unless otherwise approved. Backfill materials require pre-approval from the City and must comply with Michigan Part 201 Residential Cleanup Criteria, with specific requirements regarding clay content, organic composition, and contamination-free materials. The City reserves the right to monitor work at any time, withhold payments for incomplete work or contractor-caused damage, and adjust compensation based on documentation review. The contractor is responsible for all costs associated with corrections, repairs, dust suppression, wetting materials, utility delays, and wind-related work stoppages, with no entitlement to reimbursement for these expenses. Payment is contingent upon City approval of pricing, satisfactory completion documentation, and pre-invoice review of data substantiating completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 186780_SUPPLIER.pdf | ||
| Sign 3258 Glendale AKA BLD102 Garage only Make safe EMG letter and Photos.pdf | ||
| Price Sheet_EMG Demo_3258 Glendale AKA BLD 102 Garage Only.xlsx | XLSX spreadsheet | |
| RFP Note to Include_EMG Demo_3258 Glendale AKA BLD 102 Garage Only.docx | DOCX document | |
| EMG Professional Rate Schedule Demo 02192021.xlsx | XLSX spreadsheet | |
| EMG Professional Rate Schedule Instructions 02192021.docx | DOCX document | |
| OCP, Demolition_Signature_Page 2 25 2020.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF DETROIT DEMOLITION PROGRAM
SCOPE OF SERVICES
MAKE SAFE OF BLIGHTED RESIDENTIAL GARAGES
Date: June 4, 2024
I. INTRODUCTION
A. Intent. As directed by the City of Detroit (hereafter “Owner”), this Scope of Services (hereafter “these Services”) is intended to improve neighborhoods and improve the quality of life of residents through the demolition of blighted residential garages.
B. Revisions to this Scope of Services. The Owner reserves the right to revise these Services over time to maximize efficiency and to mitigate any potential hazards to public health and safety or disturbances to the neighborhood.
C. Clarifications to this Scope of Services. At its sole discretion, the Owner reserves the right to clarify these Services at any time. The Contractor is not entitled to any upward adjustment in price/cost or any additional fee because of any clarifications to these Services by the Owner. The Contractor may be required to deduct costs if the clarification to these Services reduces the work, material, or labor required.
II. GENERAL REQUIREMENTS & PROTOCOLS
A. Project Manager. The Contractor must assign a Project Manager who will serve as the point of contact for the Owner or any enforcement agency or regulatory authority on matters related to these Services. The Project Manager shall have the authority to act on behalf of the Contractor on all matters related to the performance and execution of these Services.
B. Qualified Personnel. The Contractor must assign qualified personnel to perform or execute all aspects of these Services. Personnel must possess all necessary accreditations, licenses, endorsements, or certifications as required by all applicable laws, regulations, rules, or industry standards. Personnel must also possess the necessary experience to execute these Services safely, efficiently, and effectively as required by all applicable laws, regulations, rules, or industry standards. The Contractor must provide the Owner with copies of the accreditations, licenses, endorsements, certifications, or work history of any person assigned to perform any aspect of these Services upon request.
C. Professional Conduct. Throughout the execution of these Services, the Contractor must maintain a friendly and professional demeanor whenever interacting with the public, the Owner, or any representative of an enforcement agency or regulatory authority.
D. Responsibility for Sub-contractors. The Contractor is responsible for the work of any sub-contractor who performs or executes any aspect of these Services.
E. Equipment and Materials. The Contractor must provide all necessary equipment and materials to execute these Services safely, efficiently, and effectively. Equipment and materials must meet or exceed the requirements set forth in all applicable laws, regulations, rules, or industry standards. The Contractor must interpret equipment and materials in the broadest sense to include vehicles, trailers, containers, tools, personal protection equipment, and all other equipment and materials necessary to perform or execute these Services. Upon request, the Contractor must provide the Owner or any enforcement agency or regulatory authority with copies of any available documentation on the equipment or materials used in the performance or execution of these Services.
F. Record/Document Creation and Retention. The Contractor must create and/or retain all necessary documents, including photographs, associated with these Services. The Contractor must keep and maintain accurate, complete, and orderly records of all documents associated with these Services for a period of seven (7) years from the date of the last payment under the associated Agreement or assignment of work. The Contractor must provide any documents associated with these Services to the Owner or any enforcement agency or regulatory authority within a reasonable time of request as determined by the requesting party at its sole discretion. The Contractor must ensure that every document is clear and/or legible. If the requesting party determines that any document is unclear or illegible, the Contractor must either provide a clear and/or legible copy of the document or provide a signed attestation of the information contained in the document within a reasonable timeframe as determined by the requesting party at its sole discretion.
G. Reporting and Requests for Inspections. As directed by the Owner, the Contractor must use the designated system to:
a. Accurately and timely report on planned and actual activities covered under these Services, and
b. Request the required inspections
The Contractor must comply with the most current version of the policy/protocols on data and document reporting or any other such policy/protocols that the Owner may implement during the term of the Agreement.
H. Cooperation, Coordination, and Communication. The Contractor must fully and openly cooperate, coordinate, and communicate with the Owner on all matters related to the performance or execution of these Services, and the Contractor must comply with any direction or guidance provided by the Owner. Communications may include but are not limited to daily or weekly schedules of any activities associated with these Services.
The Contractor must fully and openly cooperate, coordinate, and communicate with any representative of an enforcement agency or regulatory authority with jurisdiction over any aspect of these Services. Unless governed by any applicable confidentiality rules or laws, the Contractor must immediately convey in writing any communication from an enforcement agency or regulatory authority to the Owner. If the communication is governed by any applicable confidentiality rules or laws, then the Contractor must immediately convey that communication when legally permitted to do so.
I. Monitoring, Inspection, and Oversight. The Contractor must allow the Owner or any representative of an enforcement agency or regulatory authority to monitor or inspect all aspects of these Services at any time.
The Owner may stop all work at an assigned site or all assigned sites if the Contractor improperly performs, or is reasonably suspected of improperly performing, any aspect of these Services. The Owner may also stop work at an assigned site or all assigned sites in the interests of public health, safety, or welfare.
The Contractor is not entitled to reimbursement for any additional cost(s) or fee(s) resulting from a work stoppage by the Owner.
J. Compliance with all Applicable Laws, Regulations, Authorities, and Rules. The Contractor must perform or execute these Services in compliance with all applicable federal, state, and local laws, regulations, authorities, and rules. The Contractor must ensure that all assigned personnel possess working knowledge of all applicable federal, state, and local laws, regulations, authorities, and rules.
K. Discrepancies. In the case of any discrepancy between these Services and any applicable laws, regulations, authorities, or rules, the most stringent requirement(s) shall apply as determined by the Owner at its sole discretion.
The executed Agreement incorporates these Services by reference, and in the case of any discrepancy between these Services and the executed Agreement, the most stringent requirement(s) shall apply as determined by the Owner at its sole discretion.
L. Verify the Assigned Site(s) and Identify Parcel Boundaries. Prior to the execution of each aspect of these Services, the Contractor must verify the assigned site(s) and identify the parcel boundaries. The Contractor must utilize all available resources (i.e. photos, aerial images, etc.) to ensure these Services target the correct site(s). If questions arise as to which site is assigned, the Contractor must immediately contact the Owner for clarification and hold all Services for that site until the Owner provides clarification.
Requests for clarification on an assigned site shall not entitle the Contractor to any upward adjustment in price/costs or any additional fee for that site. The Contractor is not entitled to any compensation for work performed on any unassigned site(s), and the
Contractor is responsible for any damage resulting from work performed on any unassigned site(s), including all costs to repair or replace any damage.
M. Days and Hours of Operation. The Contractor may perform or execute these Services
Monday through Friday from 7:30 a.m. until 5:30 p.m. However, on days when sunrise and/or sunset fall within the allowable hours of operation, the Contractor operations are restricted to sunrise and/or sunset.
N. Limitations on Work Area. The general work area for each site is limited to the parcel boundaries while only traversing the parcel as necessary to remove the garage debris. At no time is the Contractor allowed to use an adjacent or a surrounding property to execute any aspect of these Services unless otherwise permitted in writing by the Owner. This includes but is not limited to property access, staging/storing of equipment, or stockpiling of any materials.
O. Document Site Conditions. The Contractor must document site conditions as directed by the Owner. Failure to thoroughly and adequately document conditions creates a presumption of responsibility on the part of the Contractor for any damage that occurs on or around the assigned site(s).
P. Use of Public Streets, Sidewalks, and Alleyways. The Contractor may use public streets and alleyways for the temporary parking of vehicles and equipment that are necessary to perform or execute these Services. However, the Contractor must comply with all applicable federal, state, and local laws, regulations, authorities, and rules, and the Contractor must ensure safe passage of pedestrian and vehicular traffic around the work area.
Q. Protection of Persons, Infrastructure, and Surrounding Property. In every aspect of these Services, the Contractor must exercise all necessary and appropriate care to protect all persons from harm or injury and protect infrastructure and property (both real and personal) from damage. This includes but is not limited to any structures, vehicles, improvements (i.e. fencing), appurtenances, and landscaping on surrounding properties.
The Contractor must execute these Services in a manner that avoids the creation of any hazard, undue disturbance, or nuisance to the community.
R. Cleaning. At the end of each working day, the Contractor must ensure that the sidewalks, streets, alleyways, and surrounding properties are free of dust, debris, and other potential nuisances.
S. Corrections. The Contractor is responsible for these Services through the term of the
Agreement. The Contractor is responsible for any errors, oversights, or deficiencies in the execution of these Services, and the Contractor is not entitled to reimbursement for any additional cost(s) or fee(s) for the correction of any error, oversight, or deficiency.
Acceptance or approval of any aspect of these Services by the Owner does not relieve the
Contractor of the responsibility to correct any errors, oversights, or deficiencies at the Contractor’s expense.
Furthermore, the Contractor is responsible for any damage that results from the execution of these Services, and the Contractor must repair or replace any damaged infrastructure or property at the Contractor’s expense. The Contractor must replace any damaged sidewalk, curb, street, or alley in accordance with the specifications of the jurisdiction with authority (City of Detroit, Wayne County, or State of Michigan).
Finally, the Contractor is responsible for any hazardous condition, undue disturbance, or nuisance that results from the execution of these Services, and the Contractor must correct any such hazardous condition, undue disturbance, or nuisance that may adversely affect surrounding persons or property at the Contractor’s expense.
T. Withholding Payment. The Owner reserves the right to withhold any payment amount in part or in whole until all work is completed in accordance with these Services as determined by the Owner.
Furthermore, the Owner reserves the right to withhold any payment in an amount equivalent to the costs incurred for the correction of any errors, oversights, or deficiencies on the part of the Contractor. The Owner also reserves the right to withhold any payment in an amount equivalent to costs incurred for the repair or replacement of any damage caused by the Contractor, and finally, the Owner reserves the right to withhold any payment in an amount equivalent to costs incurred for the correction of any hazardous condition, undue disturbance, or nuisance caused by the Contractor.
Upon mobilization to each assigned site for any abatement or demolition work, the Contractor must inspect the site to confirm that the electric, gas, and communication services are disconnected. If the Contractor discovers a live service line to a site, the Contractor must immediately notify the Owner and hold abatement or demolition work until notified in writing by the Owner.
If the Contractor discovers a damaged utility line (i.e. leaking gas line or fallen electric line) on or around an assigned site, the Contractor must immediately notify the appropriate utility company and then immediately notify the Owner as directed. After said notifications, the Contractor must use caution tape to close off the area around the damaged utility line and demobilize to a safe distance away from the damaged line. The Contractor must remain on site until the utility company arrives, and the Contractor must keep contact with the utility company to know when the hazard has been resolved and the Services may resume. The Contractor must immediately inform the Owner when the hazard has been resolved.
The Contractor is not entitled to reimbursement for any additional cost(s) or fee(s) due to a delay caused by a live or damaged utility line.
U. Discovery of Flooding. If the Contractor discovers flooding on an assigned site, the Contractor must immediately mobilize to the site to properly shut off and disconnect water services as directed by the Owner. Following the shut off and disconnection of the water services, the Contractor must properly pump out and discharge the water at their cost as directed by the Owner.
V. Executed Agreement and Notice to Proceed. The Contractor may not perform any aspect of these Services without an executed Agreement AND a Notice to Proceed from the Owner. If the Contractor performs any work without an executed Agreement AND a Notice to Proceed, then the Owner reserves the right to disqualify the Contractor from payment for any costs and/or fees for the work performed.
W. Poster the Assigned Structure(s). The Contractor must securely affix the Owner-provided demolition poster to the structure, and the Contractor must ensure that the poster is plainly visible from the street. If the front of the structure is not visible from the street, then the Contractor must securely affix the poster to stakes that are sunk in the ground as close as possible to the structure but clearly visible from the street. The Contractor must take a date- and time-stamped color photograph of the poster from the street. If the poster is damaged or missing, the Contractor must replace the poster as soon as possible, and the Contractor must take a new date- and time-stamped color photograph every time a new poster is placed on the assigned site(s). The Contractor is not entitled to any upward adjustment in price/cost or any additional fee for the replacement of a damaged or missing poster.
X. Term of Performance. The Contractor must complete these Services within the term of performance indicated in the table attached to the Notice to Proceed. The term of performance shall commence upon the date of the Notice to Proceed. At its sole discretion, the Owner reserves the right to extend the term of performance at any time.
III. PRE-DEMOLITION DUE DILIGENCE
A. Documentation/Information Review. The Contractor must thoroughly review all available documentation and information associated with the assigned site(s). The Contractor must immediately communicate any errors, omissions, deficiencies, or discrepancies with the documents to the Owner and the consultant who prepared the document(s) as directed.
B. Pre-Demolition Site Visit. Prior to mobilization for demolition, the Contractor must visit the assigned site(s) to:
Conduct a Pre-Demolition Inspection. Using visual observation, the Contractor must thoroughly inspect the assigned site(s).
a. Identify Impediments to the Execution/Performance of Services. The Contractor must identify any impediments to the performance or execution of these Services, and the Contractor must notify the Owner of any impediments as directed. The Contractor must work with the Owner and/or any other relevant party to resolve the impediments to the greatest extent possible. Impediments may include, but are not limited to, occupants, collapsed/collapsing structural members, parked/abandoned vehicles, flooded basements, or fallen trees. To the greatest extent possible, the Contractor must provide a date- and time- stamped color photograph of any impediments to the execution of these Services.
b. Identification of a Consistent Water Source. The Contractor must identify the hydrant(s) to be used as a consistent water source to keep all materials adequately wet throughout the demolition and debris removal process. The Contractor must ensure that the hydrant(s) function properly, and the Contractor must report any non-functioning hydrants to the Owner as directed. If the Contractor cannot locate a functioning hydrant or chooses not to use a hydrant, then the Contractor must identify an alternate water source (i.e. water truck) that can keep all materials adequately wet throughout the demolition and debris removal process.
Notify Neighbors. The Contractor must distribute Owner-provided public health and safety materials (door hangers) and conduct door-to-door notification to all occupied structures within four hundred (400) feet of the assigned site(s) within one (1) calendar day of the Notice to Proceed. The Contractor must ensure that the door hanger is securely hung from the door knob/handle or securely affixed to the door in manner that does not damage the door.
IV. DEMOLITION AND DEBRIS REMOVAL, TRANSPORT, & DISPOSAL
A. Specific Qualifications/Credentials for Demolition Personnel. The Contractor must ensure that the following personnel assigned to every demolition site possess the required qualifications/credentials:
a. Field Supervisors. The Field Supervisor for every assigned site must have completed the Occupational Safety and Health Administration Lead Awareness Training for Construction within the last twelve (12) months.
b. Operator or Laborer. No less than one person (operator or laborer) on every assigned site must possess one of the following qualifications/credentials:
i. Attended a workshop on asbestos and lead awareness presented by the
Michigan Occupational Safety and Health Administration (MIOSHA);
ii. Accreditation as an asbestos abatement contractor or supervisor from the State of Michigan;
iii. Accreditation as an asbestos abatement worker from the State of Michigan;
iv. Accreditation as an asbestos inspector from the State of Michigan.
B. Specific Protections for Occupied, Adjacent Structures Prior to Demolition. Prior to the commencement of demolition, the Contractor must visually inspect the exterior of any occupied structures immediately adjacent to the assigned site(s) for any open windows or doors. The Contractor must attempt to contact an occupant of the adjacent structure(s) and politely request that the occupant close all open windows or doors as soon as possible.
If the Contractor is unable to contact an occupant of the adjacent structure or if the occupant is unable to securely close any open window or door on the first floor of the structure which faces the assigned site, then the Contractor must make a reasonable and good faith effort to cover any open first-floor window or door on the side of the structure which faces the assigned site. The Contractor must cover the open window or door with a material that will prevent fugitive dust from entering the structure. The Contractor must exercise all necessary care to ensure that the structure is not damaged by the installation of the material. The Contractor is responsible for any damage resulting from the installation of the material, and the Contractor must repair or replace any damage at the Contractor’s expense.
For any covered openings, the Contractor must take date- and time-stamped color photographs of any open windows or doors before AND after the installation of the material
The Contractor is exempt from the requirement to cover any open windows or doors only if the Owner has informed the Contractor in writing that the occupant has opted out of this requirement.
C. Protection of Children Around the Demolition Site(s). The Contractor must make a reasonable and good faith effort to politely request that any child who appears to be under the age of twelve (12) and who appears to loiter around the demolition site stay inside during the demolition and debris removal. If any child refuses to stay inside during the demolition and load-out of all debris, then the Contractor must contact the Owner as directed.
D. Observance of Wind Conditions. The Contractor must observe wind conditions prior to the start of demolition and throughout the demolition process. When sustained wind speeds exceed twenty miles per hour (20 mph), the Contractor may not start the demolition on any assigned site(s). If the Contractor has already started demolition on an assigned site when sustained wind speeds exceed 20 mph, then the Contractor must bring the structure to the ground and then stop demolition activities until the sustained wind speed falls below 20 mph. At its sole discretion, the Owner reserves the right to stop demolition activities when sustained wind speeds exceed or are expected to exceed 20 mph. The Contractor is not entitled to reimbursement for any additional cost(s) or fee(s) resulting from a wind-related stoppage.
E. Class I Demolition Protocols. The Contractor must demolish all structures as if each structure contains class I asbestos-containing materials regardless of whether or not all class I asbestos-containing materials identified on site were abated prior to demolition.
F. Set-up of Wetting and Dust Control Equipment. Prior to the start of demolition and debris removal, the Contractor must connect two (2) intact hoses with misting nozzles to the water source(s). If the Contractor uses a hydrant, then the Contractor must use an approved backflow preventer, hydrant wrench(es), drain caps, etc., and the Contractor must properly condition every hydrant after each use as directed by the Owner.
The Contractor must use hose ramps to cover any part of the hose(s) that may come into contact with a vehicle or equipment. The Owner reserves the right to require additional ramps if there is any length of a hose that may come into contact with a vehicle or equipment.
G. Wetting Prior to Demolition. The Contractor must thoroughly wet the structure immediately prior to the start of demolition for a period of no less than five (5) minutes.
The Owner reserves the right to require additional wetting at its sole discretion, and the Contractor is not entitled to reimbursement for any additional cost(s) or fee(s) for wetting materials prior to demolition.
H. Frequency and Duration of Wetting. The Contractor must keep all structures and building materials and components adequately wet throughout the demolition process, including the debris removal, transport, and disposal. This includes the removal of both building material (i.e. “wood debris”) and “hard fill” material such as foundations/footings and concrete slabs. The Owner reserves the right to require additional wetting of any building materials or components at its sole discretion, and the Contractor is not entitled to reimbursement for any additional cost(s) or fee(s) for wetting building materials or components throughout the demolition process.
a. Complaints of Fugitive Dust. If the demolition generates excessive fugitive dust, the Contractor must immediately stop the demolition or debris removal activities and thoroughly wet the building materials or components prior to resuming activity on the site(s).
b. Exceptions to the Wetting Requirements. The Contractor may reduce the frequency and duration of wetting in either scenario below if there are minimal emissions of fugitive dust. In either scenario, the Owner reserves the right to require additional wetting at its sole discretion. The Contractor is not entitled to reimbursement for any additional cost(s) or fee(s) associated with additional wetting, and neither scenario absolves the Contractor of compliance with the “Wetting Prior to Demolition” requirements.
i. Precipitation. The Contractor may reduce the frequency and duration of wetting in the event of sustained precipitation during demolition or debris removal.
ii. Freezing Temperatures. The Contractor may reduce the frequency and duration of wetting if temperatures fall below twenty degrees Fahrenheit (20o F). During any freezing temperatures, the Contractor must keep a thermometer on site and record the ambient air temperature at the beginning, middle, and end of the work day. As necessary, the Contractor must employ an appropriate mixture of water and commercially available suppressing agents that comply with the most current version of the state “Guidelines for Selecting Dust Suppressants to Control Dust and Prevent Soil Erosion.” Furthermore, Contractors must spread adequate salt on any sidewalks, streets, or alleyways that become wet during freezing temperatures.
I. General Demolition Requirements.
a. Acceptable Methods. Except for situations in which hand wrecking is necessary to protect persons from harm or protect infrastructure or surrounding properties from damage, the Contractor must mechanically wreck structures with an excavator in a manner that avoids the free fall of building materials and components.
b. Prohibited Activities. The following activities are prohibited during demolition:
i. On-site storage or sale of materials and / or equipment earlier than forty-eight hours prior to demolition or later than forty-eight hours after the application of seed;
ii. Use of explosives;
iii. Intentional burning of any structure or debris;
iv. On-site crushing of concrete, bricks, or any other masonry materials.
c. Above-grade Building Materials and Components. Once demolition has started, the Contractor may not leave any structure in a condition or state where any portion of the structure could collapse or fall onto another property. The Contractor must safely bring all above-grade building materials and components to the ground, and the Contractor must remove and dispose of all building materials and components.
d. Asphalt, Gravel, and/or Concrete Slabs on Grade. Unless otherwise permitted to remain by the Owner, the Contractor must break up and remove asphalt, gravel, and/or concrete slabs on grade. If the Contractor encounters a shared driveway, the Contractor must immediately contact the Owner as directed for clarification and guidance as to which surfaces may remain.
e. Pests or Other Nuisance Animals. If the Contractor discovers that the demolition causes a migration of pests (i.e. rats or cockroaches) or other nuisance animals through a neighborhood, the Contractor must immediately contact the Owner as directed.
J. Property of the Contractor. All debris, including any materials illegally dumped on the site prior to or during the demolition or debris removal, becomes the property of the Contractor, and the Contractor is responsible for the proper removal, transport, and disposal of all materials.
K. Covering Debris After Twenty-four Hours of Knock Down. If the Contractor is unable to load out the building debris (not hardfill, i.e. foundations or footings) within twenty-four
(24) hours of knock down, the Contractor must ensure that all materials are adequately wet, and the Contractor must completely cover the debris with high-density polyethylene sheeting/liner until the debris is loaded off the site and transported for disposal. The Contractor must adequately secure the sheeting/liner to prevent wind interference and mitigate against dust migration.
L. Coordination of Proper Transport and Disposal. The Contractor must coordinate the transport and disposal of all debris from the assigned site(s). This includes but is not limited to all necessary approvals for such transport and disposal. The Contractor must remove, transport, and dispose of all debris as asbestos-containing waste material unless otherwise permitted in these Services. All debris must go to a licensed Type II landfill unless otherwise permitted in these Services.
The Contractor may directly transport construction brick, masonry, pavement, or broken concrete that meets the following conditions to a permitted crushing operation for recycling:
a. The material meets the definition of “inert material” per Michigan Public Act 451 of 1994, as amended;
b. Prior to transport of the materials to permitted crushing operation, the Contractor has possession of analytical results that show the material does not contain asbestos;
c. The material is thoroughly wetted prior to transport to remove residual dust from the demolition activities.
M. Time Frame for Demolition, Debris Removal, and Request for Open Hole Inspection. The Contractor must remove all debris within (1) calendar days from the start of demolition.
N. Pumping Water from the Site. The Contractor is responsible for any water accumulation on the assigned site(s) after the start of demolition. Where any significant accumulation represents a threat to public health and safety or as directed by the Owner, the Contractor must pump the water from the site at their cost in accordance with the protocols set forth by the Owner.
V. BACKFILL AND GRADING
A. General Backfill Materials Requirements. The Contractor must use backfill materials from sources approved by the Owner, and the Contractor must receive source approval prior to backfill of any assigned site(s). The materials must meet the following requirements:
a. Part 201 Residential Cleanup Criteria. For any constituent of concern, all backfill materials must fall within the state residential cleanup criteria. However, at its sole discretion, the Owner may allow materials which contain concentrations of certain metals in exceedance of the state residential cleanup criteria so long as those concentrations fall within the glacial lobe background levels and an Environmental Professional has provided a reasoned explanation for such concentrations.
b. Physical Characteristics and Composition.
i. Backfill Materials Below 12” of Grade. All backfill materials below twelve inches (12”) of grade must consist of crumbling yellow clay, sand, or loam.
However, the clay content cannot exceed 35% of the materials, and blue and grey clay are expressly prohibited as backfill. If questions arise as to the clay content of the fill material, then the Contractor must provide documentation approved by the Owner that evidences the clay content at the Contractor’s expense. Source approval by the Owner does not absolve the Contractor of compliance with these requirements.
The Contractor may use residual broken or crushed rocks, concrete, bricks, blocks, or other masonry material as fill material for any void or excavation greater than three feet (3’) in depth so long as the materials are no larger than eight inches (8”) in diameter and the materials are free from contamination (i.e. paint, stain, mastic, etc.).
ii. Backfill Materials Within 12” of Grade. All backfill materials within twelve inches (12”) of grade must consist of sand or loam (no clay), and the materials must be completely free of pulverized or crushed building materials, construction debris, brush, and any other undesirable material. Backfill materials must have an organic content greater than ten percent (10%), but less than twenty-five percent (25%).
B. Submittal of Backfill Information and Documentation. The Contractor must provide all required information and documentation to the Owner in a form and manner as directed.
The Owner reserves the right to withhold approval of or deny any proposed backfill source with incomplete information or documentation, and the Owner shall have the final determination as to the completeness of the information and documentation.
C. General Backfill Requirements. The Contractor must fill all holes or voids which result from the demolition and removal of any structure, improvement, or appurtenance on the assigned site(s), and the Contractor must apply sufficient backfill materials so that the assigned site(s) are comparably level with the adjacent property(ies). The Contractor must appropriately compact all backfill material to avoid any excessive settling, sinkholes, or other unwanted depressions.
D. Owner’s Right to Question or Reject Backfill Materials. The Owner may inspect fill materials at any time, including materials that are loaded in trailers awaiting off-loading onto an assigned site. The Owner reserves the right to direct the Contractor to sample and analyze any backfill materials that the Owner reasonably suspects violate the requirements of this Scope of Services, and the Contractor must sample and analyze those materials as directed by the Owner at the Contractor’s expense.
Furthermore, the Owner reserves the right to reject backfill materials for any violation or suspected violation of this Scope of Services, and the Contractor must remove and dispose of those materials as directed by the Owner at the Contractor’s expense.
Following removal and disposal of the unacceptable materials, the Contractor must provide new backfill materials at the Contractor’s expense.
E. General Grading Requirements. The Contractor must uniformly grade the site to conform to any adjoining sidewalks, alleys, and properties, and the Contractor must comply with any directives or guidance provided by BSEED or any other City agency. The Contractor must grade the assigned site(s) in a manner which prevents both excessive run-off and pooling/ponding of water.
F. Time Frame for Backfill, Grade, and Request for Inspection. The Contractor must backfill, grade, and request a Work Completed Inspection from the Owner (as applicable) for each and every assigned site no later than seven (7) calendar days from the debris removal being completed .
VI. SITE FINALIZATION
A. Sidewalk Replacement. At the Contractor’s expense, the Contractor must replace the entirety of any sidewalk flag that was cracked, heaved, or otherwise damaged during the course of these Services. The Contractor must replace sidewalks in accordance with the specifications of the jurisdiction with authority (City of Detroit, Wayne County or State of Michigan).
B. Seeding and the Establishment of Turf. As applicable, the Contractor must seed the entirety of the assigned site(s) with a “no mow” seed comprised of 100% dutch white clover, and the Contractor must apply the seed in accordance with the manufacturer’s specifications or recommendations. The Contractor may use an alternate seed with written approval by the Owner. The Contractor must mitigate wind interference and seed dispersion, and the Contractor must ensure that the seed holds sufficient moisture to germinate and establish turf. This may include, but is not limited to, the use of straw, seed blankets, or hydroseed.
VII. COMPENSATION
A. Pre-Invoice Review. Prior to submitting any invoice, the Contractor must submit a request to the Owner to review the associated data and documentation that evidences satisfactory completion of the Services for which a payment request will be submitted.
The Contractor must submit the request in a form and manner prescribed by the Owner.
B. Request for Payment. The Contractor must submit all requests for payment in the form and manner prescribed by the Owner. The request for payment must include all supporting documentation required or requested by the Owner. Payment for each assigned site is based upon (a) the Owner-approved prices and (b) the review and approval of all necessary data and documentation that substantiates satisfactory completion of these Services.
C. Adjustments in Price. At its sole discretion, the Owner reserves the right to adjust the price for any assigned site based upon the receipt and review of all necessary information and documentation.
The Contractor must submit a request for an adjustment to an approved price for each assigned site in the form and manner directed by the Owner. The start of any work related to the price adjustment at an assigned site prior to formal notification by the Owner may disqualify the Contractor from reimbursement/payment for those costs or fees.