EMG Professional Rate Schedule Instructions 02192021.docx
DOCX document 19 KB Posted
- Solicitation number
- 300000149798281
- Issued by
- Michigan
About this file
This document is an instruction set for completing the Emergency Professional Rate Schedule for the City of Detroit, Michigan, related to an emergency residential demolition project at 3258 Glendale (Building 102 Garage Only). Respondents must provide unit rates for two primary service categories: Demolition (which includes administration, supervisor, laborer, equipment, regulated and non-regulated material trucking, and disposal of asbestos-containing and construction/demolition materials) and Backfill, Grade, & Site Finalization (which includes administration, supervisor, laborer, equipment, and backfill and topfill materials). All rate submissions must be completed in full with no blank fields, and respondents should reference the applicable Scope of Services for clarification on service types as needed.
Respondents must provide a single mean (average) unit rate of measure for each service type, expressed in the specified unit type (such as hourly rates). The City of Detroit explicitly prohibits rate submissions expressed as ranges, supplemental notes or qualifying text, alternate unit types, or incomplete fields and reserves the right to reject submissions that do not comply with these requirements. Additionally, the City reserves the right to request clarification on any submitted unit rate within twenty-four hours, and respondents must provide such clarification within that timeframe. Completion of the Professional Rate Schedule does not constitute acceptance of the submitted rates by the City of Detroit.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 186780_SUPPLIER.pdf | ||
| Sign 3258 Glendale AKA BLD102 Garage only Make safe EMG letter and Photos.pdf | ||
| Scope of Services_Make Safe_Demo Garages_6.5.2024 (6) (3).pdf | ||
| Price Sheet_EMG Demo_3258 Glendale AKA BLD 102 Garage Only.xlsx | XLSX spreadsheet | |
| RFP Note to Include_EMG Demo_3258 Glendale AKA BLD 102 Garage Only.docx | DOCX document | |
| EMG Professional Rate Schedule Demo 02192021.xlsx | XLSX spreadsheet | |
| OCP, Demolition_Signature_Page 2 25 2020.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTIONS ON COMPLETING THE EMERGENCY PROFESSIONAL RATE SCHEDULE
02.19.2021 Respondents must complete the business and contact information at the top of the Professional Rate Schedule. For each of the following Service Types, Respondents must enter a dollar value under the “Unit Rate” which corresponds to the “Unit Type”:
I. Demolition
a. Administration
b. Supervisor
c. Laborer
d. Equipment
e. Trucking: Regulated Material
f. Trucking: Non-Regulated Material
g. Disposal: Asbestos Containing Material (ACM)
h. Disposal: Construction & Demolition Material
II. Backfill, Grade, & Site Finalization
a. Administration
b. Supervisor
c. Laborer
d. Equipment
e. Backfill Material
f. Topfill Material If Respondents need clarification on the Service Types above, they should refer to the applicable sections of the corresponding Scope of Services and/or contact the City of Detroit as directed.
Respondents must enter information into every highlighted cell. Respondents may only enter a mean (average) per unit of measure (i.e. $50 hourly).
The City of Detroit reserves the right to consider Professional Rate Sheets with the following as incomplete and/or non-responsive:
· Unit values expressed as a range (e.g. $60.00 - $90.00);
· Notes or any other text which attempts to qualify the rate(s) provided;
· Alternate Unit Types (i.e. monthly instead of hourly, or yards instead of tons);
· Any blank Unit Rate fields.
The City of Detroit reserves the right to question or request clarification on any Unit Rate for any Service Type provided on the Professional Rate Schedule, and the Respondent must provide clarification within twenty–four hours of request.
Completion of Professional Rate Schedule does not constitute acceptance by the City of Detroit of the Unit Rates contained therein.
File details come from the government source that posted it. Updated .