SCOPE OF SERVICE FOR MADDEN DISHWASHER~7.docx

DOCX document 18 KB Posted

Attached to
DMH MMHC SMALL PURCHASE DISHWASHER
Solicitation number
26-444DHS-MENTH-B-52098
Issued by
Illinois

About this file

This is a Scope of Service document for the John J. Madden Mental Health Center (MHC) in Illinois, detailing requirements for the removal of an existing dishwasher and purchase and installation of new commercial dishwashing equipment. The project scope includes removal and disposal of the non-operational Insinger 100179/TRAC 3212RPW dishwasher and installation of one Champion Pro Series 44 High Temperature Rack Conveyor Dishwasher, or approved equivalents such as Insinger Admiral 44 or Hobart 44. The vendor must conduct a pre-installation assessment, prepare the site, install the new dishwasher with a booster heater and accompanying accessories (two 4X27 tables and scrap trays), perform full operational testing and commissioning, and provide staff training on operation and maintenance. A mandatory site visit is required for bid eligibility, and a mandatory pre-bid conference is scheduled for April 24, 2026, at 10:00 a.m. at 1200 1st Avenue, Hines, Illinois 60141. Project completion is required on or before June 30, 2026.

The vendor is responsible for supplying all labor, tools, equipment, and materials necessary to complete the project in compliance with applicable codes, regulations, and safety requirements. Work scheduling should be coordinated with the facility to minimize disruption to kitchen operations, with weekend work potentially preferred. The vendor must provide all manufacturer warranty documents, maintenance manuals, installation guides, and certificates upon completion, along with documentation of utility modifications and installation details. Pricing terms, set-asides, and funding sources are not specified in the scope of service document.

View the file

Other files

File Type Posted
CL44.pdf PDF
Admiral-44-Spec-Sheet-2.25.26.pdf PDF
SPECS 44PRO~1.pdf PDF
V.23.2 standard-terms-and-conditions~31.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF SERVICE FOR MADDEN MHC

DISHWASHER PURCHASE AND INSTALLATION

26-444DHS-MENTH-B-52098

Madden Mental Health Center seeking bids to purchase one (1) Champion Pro Series 44 High Temperature Rack Conveyor Dishwasher; Insinger Admiral 44 or Hobart 44 or equivalent. This project will include removal and disposal of the existing Insinger 100179/TRAC 321‑2RPW unit, which is no longer operational, as well as complete purchase and installation of the new dishwasher.

Scope of Work for Vendor

1. Removal of Existing Dishwasher

· Disconnect all utilities (electrical, plumbing, and steam/hot water connections) from the existing Insinger dishwasher.

· Remove and properly dispose of the existing unit and any associated components.

2. Pre‑Installation Assessment

· Conduct an on‑site assessment to verify all electrical, plumbing, drainage, ventilation, and chemical dispenser requirements for the Champion Pro Series 44 machine.

· Identify any necessary upgrades or modifications for compatibility with the new dishwasher.

3. Site Preparation

· Prepare the installation area, including cleanup, leveling adjustments, and ensuring sufficient clearance for proper operation and maintenance.

· Perform any required utility modifications identified during the assessment, including but not limited to:

· Electrical service adjustments.

· Hot water/steam supply modifications.

· Wash and rinse drain alignment.

· Booster heater compatibility checks.

4. Installation of New Dishwasher and Booster Heater

· Deliver and install the Champion Pro Series 44 High Temperature Rack Conveyor Dishwasher and Booster Heater.

· Connect all utilities in accordance with manufacturer specifications, industry standards, and local codes.

· Install or integrate any required accessories (e.g., booster heater, (2) 4X27 tables 14-gauge, scrap trays).

5. Testing and Commissioning

· Perform full operational testing, including washing, rinsing, temperature verification, conveyor operation, and drain flow.

· Confirm that final rinse temperatures meet high‑temp sanitization requirements.

· Make all necessary adjustments for proper performance.

6. Training

· Provide on‑site training for facility staff on operation, cleaning, safety, and routine maintenance of the new dishwasher.

7. Cleanup and Disposal

· Remove all packaging, debris, and installation materials from the property.

· Ensure the dish room is left in clean and operational condition.

8. Warranty and Documentation

· Provide all manufacturer warranty documents, maintenance manuals, installation guides, and any certificates associated with the new equipment.

· Document all utility modifications and final installation details.

9. Scheduling

· Coordinate with Madden Mental Health Center to determine work schedule.

· Work should be planned to minimize disruption to kitchen operations. Weekend work may be preferred. Project completion date on or before June 30, 2026.

10. Vendor Responsibilities

· Vendor will supply all labor, tools, equipment, and materials required to complete the project.

· Vendor must comply with all applicable codes, regulations, and safety requirements.

11. Mandatory Site Visit

· A site visit is mandatory to be eligible to participate in the bid process.

· Mandatory Pre‑Bid Conference is scheduled for April 24, 2026, at 10:00 a.m. at 1200 1st Avenue, Hines Illinois 60141.

File details come from the government source that posted it. Updated .