This document is a Scope of Work for demolition projects issued by Escambia County, Florida, targeting residential and commercial property demolitions. The scope requires comprehensive property clearing, including disconnecting utilities, obtaining septic tank abandonment permits, removing structures, disposing of debris, clearing overgrowth, and grading lots. Contractors must complete mandatory pre-bid and final demolition inspections, secure necessary demolition permits, and ensure compliance with environmental regulations.
Commercial projects require an additional asbestos survey, with contractors responsible for submitting quotes that include demolition costs, permit fees, and survey expenses. If asbestos remediation is needed, contractors must submit a change order for approval before beginning work. The document emphasizes contractor responsibility for proper permitting, environmental compliance, and potential fines for non-compliance. Contractors are advised to confirm lot sizes using the Escambia County Property Appraisers website and are encouraged to ask questions and take notes during project-specific instructions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ESCAMBIA_COUNTY_ENVIRONMENTAL_ENFORCEMENT_SOLICITATION_FOR_BIDS.pdf | ||
| BID_FORM_BLANK.xlsx | XLSX spreadsheet | |
| W9.pdf | ||
| Insurance_Standard_for_General_&_Demolition_Contractors._PDF.pdf | ||
| OPENGOV_VERBIAGE_7-24-25.pdf | ||
| HAZARDOUS_WASTE_REMOVAL.docx | DOCX document | |
| INVITATION_TO_BID_-_7-24-25.pdf | ||
| SCOPE_LOTS-GENERAL_EXAMPLE.pdf | ||
| QUALIFIERS_DOC._PDF.pdf | ||
| VENDOR_DIRECT_DEPOSIT.pdf | ||
| WASTE_TIRE_RULE.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEMOLITION OF RESIDENTIAL/COMMERCIAL PROPERTIES)
GENERAL SCOPE:
Ensure all utilities are disconnected and inspections are completed as required. Demolition and legal disposal of all structures described in mandatory walk-through. Obtain septic tank abandonment permit from Health Department, have tank pumped and inspected. Photograph all stages of tank abandonment.
Removal and legal disposal of all nuisance conditions such as trash, debris, rubbish, items holding water or no longer being used for it’s intended purpose. Removal and legal disposal of all overgrowth. clearing along all fence rows and/or property lines. This includes all underbrush, scrub oaks, overgrowth around all trees, and perimeters of any structures. Remove and dispose of all vines on gates. Grounds to be left clean of any clippings, cuttings, sticks, or other debris, this includes walkways, sidewalks, and road way.
Any ruts, holes, or uneven areas caused by contractors equipment or due to cutting and cleaning should be left smooth and even so property can be easily maintained in the future. Grade out lot after demolition.
DEMOLITION PERMITS ARE REQUIRED UNLESS OTHERWISE ADVISED. SLABS MUST BE
REMOVED. CONTRACTORS TO CALL BUILDING INSPECTION FOR A PRE-BID INSPECTION AND
A FINAL DEMOLITION INSPECTION. DO NOT INVOICE THE PROJECT TILL YOU HAVE BEEN
NOTIFIED THAT YOUR PERMIT HAS PASSED.
COMMERCIAL PROJECTS REQUIRE ASBESTOS SURVEY TO BE COMPLETED. IF A PARCEL IS
OWNED BY ESCAMBIA COUNTY-IT IS CONSIDERED COMMERCIAL AND MUST COMPLY WITH
ASBESTOS SURVEY REQUIREMENTS. PROJECTS REQUIRING ASBESTOS SURVEYS, QUOTE
SHOULD INCLUDE 1) COST OF DEMOLITION AND ALL APPLICABLE PERMITS AND SERVICES,
AND 2) THE COST OF THE ASBESTOS SURVEY. IF ASBESTOS REMEDIATION IS REQUIRED, THE
CONTRACTOR IS RESPONSIBLE FOR SUBMITTING A CHANGE ORDER WITH THE ADDITIONAL
COST OF REMEDIATION. DO NOT BEGIN ANY WORK UNTIL YOUR COST ORDER IS APPROVED.
CONTRACTORS ARE RESPONSIBLE FOR PROPER PERMITS AND REQUIREMENTS, AND FILINGS,
WHICH ARE IN PLACE WITH FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION.
CONTRACTOR WILL BE RESPONSIBLE FOR ANY FINES OR
PENALTIES SHOULD ANY WORK BE PERFORMED WITHOUT MEETING ALL PERMITTING AND
REPORTING REQUIREMENTS.
THIS IS JUST A GENERAL SCOPE OF DEMOLITION PROJECTS. SPECIFIC INSTRUCTIONS WILL
BE PROVIDED AT EACH LOCATION. ASKING QUESTIONS AND TAKING NOTES IS ENCOURAGED.
CONTRACTOR IS RESPONSIBLE OR CONFIRMING ALL LOT SIZES. THIS CAN BE DONE WITH THE
ESCAMBIA COUNTY PROPERTY APPRAISERS WEBSITE
http://www.escpa.org/cama/Search.aspx http://www.escpa.org/cama/Search.aspx
File details come from the government source that posted it. Updated .