Architect of the Capitol
Thurgood Marshall Federal Judiciary Building
Data Center Upgrades Task 6
AOC Contract No.: AOC14C3002 Requisition/Purchase Request No.: SCA180135
AOC Project No. SC18009 Issue for Bid Specifications
Amendment 1
08 November 2019
PROPERTY OF THE UNITED STATES GOVERNMENT CONTROLLED
UNCLASSIFIED INFORMATION // LAW ENFORCEMENT SENSITIVE
COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS,
PLANS OR
SPECIFICATIONS TO UNAUTHORIZED USERS IS PROHIBITED
Do not remove this notice
Properly destroy documents when no longer needed
This Page Left Intentionally Blank
//CONTROLLED//
SECTION 000107 AOC P/N: SC18008
AO Space Realignments 28 June 2019
000107 SEALS PAGE Issue For Bid
AECOM P/N: 60593208 SECTION 000107 - 1
000107 - 1
DOCUMENT 000107 - SEALS PAGE
1.1 DESIGN PROFESSIONALS OF RECORD
A. Registered Architect
Ryan Horner
DC License No. ARC200418
Responsible for Section in Divisions 02 – 12
C. Fire Protection Engineer
Christopher Moran
DC License No. PE908336
Responsible for Sections in Divisions 21 & 28
E. Telecom Engineer
Christopher Bennett
VA License No. 049116
Responsible for Sections in Division 27
END OF DOCUMENT 000107
B. Mechanical Engineer
Troy A. Metz
DC License No. PE901218
Responsible for Sections in Divisions 22 & 23
D. Electrical Engineer
Pedro DeJesus
DC License No. PE906141
Responsible for Sections in Division 26
SECTION 000107 AOC P/N: SC18008
AO Space Realignments 28 June 2019
000107 SEALS PAGE Issue For Bid
AECOM P/N: 60593208 SECTION 000107 - 2
000107 - 2
AOC P/N: SC18009 //CONTROLLED// 28 June 2019
Data Center Upgrades
TABLE OF CONTENTS Issue for Bid
AECOM P/N: 60593208 TOC - 1
TABLE OF CONTENTS
Division Section Title
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
003119 EXISTING CONDITION INFORMATION
DIVISION 01 - GENERAL REQUIREMENTS
010000 SUMMARY OF WORK
011100 PROJECT FORMS
012350 OPTIONS
013000 CONSTRUCTION SAFETY AND HEALTH
013100 PROJECT MANAGEMENT AND COORDINATION
013200 CONSTRUCTION PROGRESS DOCUMENTATION
013233 PHOTOGRAPHIC DOCUMENTATION
013300 SUBMITTAL PROCEDURES
013553 INFORMATION SECURITY REQUIREMENTS
014200 REFERENCES
014301 QUALITY CONTROL SERVICES
015000 TEMPORARY FACILITIES AND CONTROLS
015100 SCAFFOLDING AND PROTECTION SYSTEMS
015500 SECURITY REQUIREMENTS
016000 PRODUCT REQUIREMENTS
017300 EXECUTION
017329 CUTTING AND PATCHING
017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
017700 CLOSEOUT PROCEDURES
017823 OPERATION AND MAINTENANCE DATA
017830 BONDS AND WARRANTIES
017839 PROJECT RECORD DOCUMENTS
017900 DEMONSTRATION AND TRAINING
019113 GENERAL COMMISSIONING REQUIREMENTS
DIVISION 02 - EXISTING CONDITIONS
024119 SELECTIVE DEMOLITION
028213 ASBESTOS ABATEMENT PROCEDURES
028313 LEAD REMOVAL
028401 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs AND
MERCURY
028433 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)
AECOM P/N: 60593208 TOC - 2
DIVISION 03 - CONCRETE
NOT APPLICABLE
DIVISION 04 - MASONRY
DIVISION 05 - METALS
055000 METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
061000 ROUGH CARPENTRY
064116 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
078123 INTUMESCENT FIRE PROTECTION
078413 PENETRATION FIRESTOPPING
078443 JOINT FIRESTOPPING
079200 JOINT SEALANTS
DIVISION 08 - OPENINGS
081113 HOLLOW METAL DOORS AND FRAMES
081216 ALUMINUM FRAMES
081416 FLUSH WOOD DOORS
087100 DOOR HARDWARE
DIVISION 09 - FINISHES
092116.23 GYPSUM BOARD SHAFT WALL ASSEMBLIES
092216 NON-STRUCTURAL METAL FRAMING
092900 GYPSUM BOARD
095113 ACOUSTICAL PANEL CEILINGS
096513 RESILIENT BASE AND ACCESSORIES
096519 RESILIENT TILE FLOORING
096813 TILE CARPETING
096900 ACCESS FLOORING
099123 INTERIOR PAINTING
DIVISION 10 - SPECIALTIES
101100 VISUAL DISPLAY UNITS
102213 WIRE MESH PARTITIONS
104413 FIRE EXTINGUISHERS AND CABINETS
DIVISION 11 - EQUIPMENT
AECOM P/N: 60593208 TOC - 3
DIVISION 12 - FURNISHINGS
123661.16 SOLID SURFACING COUNTERTOPS
125000 FURNITURE
125900 SYSTEMS FURNITURE
DIVISION 13 - SPECIAL CONSTRUCTION
DIVISION 14 - CONVEYING EQUIPMENT
NOT APPLICABLE
DIVISION 21 - FIRE SUPPRESSION
211313 WET-PIPE SPRINKLER SYSTEMS
DIVISION 22 - PLUMBING
220523.12 BALL VALVES FOR PLUMBING PIPING
220719 PLUMBING PIPING INSULATION
221116 DOMESTIC WATER PIPING
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
230130.51 HVAC AIR-DISTRIBUTION SYSTEM CLEANING
230513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
230523.12 BALL VALVES FOR HVAC PIPING
230529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
230548 VIBRATION AND SEISMIC CONTROLS FOR HVAC
230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC
230713 DUCT INSULATION
230719 HVAC PIPING INSULATION
230800 COMMISSIONING OF HVAC
230900 INSTRUMENTATION AND CONTROLS FOR HVAC
232113 HYDRONIC PIPING
232116 HYDRONIC PIPING SPECIALTIES
233113 METAL DUCTS
233300 AIR DUCT ACCESSORIES
233713.13 AIR DIFFUSERS
233713.23 AIR REGISTERS AND GRILLES
238123.11 SMALL CAPACITY (6 TON AND SMALLER), COMPUTER-ROOM
AIR-CONDITIONERS, FLOOR-MOUNTED UNITS
238123.12 LARGE CAPACITY (7 TONS AND LARGER), COMPUTER-ROOM
AIR-CONDITIONERS, FLOOR-MOUNTED UNITS
238219 FAN COIL UNITS
AECOM P/N: 60593208 TOC - 4
DIVISION 25 - INTEGRATED AUTOMATION
NOT APPLICABLE
DIVISION 26 - ELECTRICAL
260500 COMMON WORK RESULTS FOR ELECTRICAL
260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260523 CONTROL-VOLTAGE ELECTRICAL POWER CABLES
260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
260533 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
260544 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING
260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS
260573.13 SHORT-CIRCUIT STUDIES
260573.16 COORDINATION STUDIES
260573.19 ARC-FLASH HAZARD ANALYSIS
262213 LOW-VOLTAGE DISTRIBUTION TRANSFORMERS
262416 PANELBOARDS
262726 WIRING DEVICES
262737 FREESTANDING RACK POWER DISTRIBUTION CENTER
262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
265119 LED INTERIOR LIGHTING
265213 EMERGENCY AND EXIT LIGHTING
DIVISION 27 - COMMUNICATIONS
270526 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS
270528 PATHWAYS FOR COMMUNICATIONS SYSTEMS
270529 HANGERS AND SUPPORTS FOR COMMUNICATIONS SYSTEMS
270544 SLEEVES AND SLEEVE SEALS FOR COMMUNICATIONS PATHWAYS AND
CABLING
271513 COMMUNICATIONS COPPER HORIZONTAL CABLING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
281500 ACCESS CONTROL HARDWARE DEVICES
282000 VIDEO SURVEILLANCE
284621.11 ADDRESSABLE FIRE-ALARM SYSTEMS
END OF TABLE OF CONTENTS
SECTION 003119 EXISTING CONDITION INFORMATION Issue for Bid
AECOM P/N: 60593208 003119 - 1
SECTION 003119 - EXISTING CONDITION INFORMATION
1.1 EXISTING CONDITION INFORMATION
A. This Document with its referenced attachments is part of the Procurement and Contracting
Requirements for Project. They provide Architect's information for Bidders' convenience and are intended to supplement rather than serve in lieu of the Bidders' own investigations. They are made available for Bidders' convenience and information, but are not a warranty of existing conditions. This Document and its attachments are not part of the Contract Documents.
1. This Document and its attachments are available as a courtesy for the Contractor.
2. This Document and its attachments shall be used by the Contractor at the Contractor’s sole risk and judgment.
B. Existing drawings that include information on existing conditions, including previous construction at the project site, are available for reference within the Property Management
Office at TMFJB.
C. Existing specifications that include information on existing conditions including previous construction at the project site are available for reference within the Property Management
Office at TMFJB.
D. Survey information that includes information on existing conditions is available for reference within the Property Management Office at TMFJB. Contact Architect for access.
E. Hazardous materials surveys for asbestos, lead paint and PCBs have been conducted on portions of the building. No hazardous materials have been found in the building other than lead in yellow paint in the garage, which has been removed. See Hazardous Materials Reports appended to the section.
F. Related Requirements:
1. Federal Acquisition Regulations (FAR Clauses) and AOC52.243-1 Changes -
Supplement (June 2014) for additional requirements related to existing condition information.
2. Section 010000 Summary of Work for notification requirements if materials suspected of containing hazardous materials are encountered.
SECTION 003119 EXISTING CONDITION INFORMATION Issue for Bid
AECOM P/N: 60593208 003119 - 2
1.2 ADDITIONAL EXISTING CONDITION INFORMATION OBTAINED BY CONTRACTOR
A. The Contractor shall obtain additional Existing Conditions Information and shall perform selective exploratory investigation by making a specific written request to the Architect. The intent of any selective exploratory investigation is to eliminate unknown or discovered conditions by exploring ceiling plenums, floor plenums, mechanical systems, etc. Obtain
Architect’s written preapproval.
END OF DOCUMENT
TABLE OF CONTENTS
1.0
Introduction
2.0
Sampling Methods
3.0
Survey Results Bulk Sample Report XRF Lead Paint Readings Chemical Analysis
4.0
Conclusion
-1-
1.0 INTRODUCTION
Jenkins Environmental was retained by James Posey Associates to provide an evaluation of the presence of asbestos, and lead based paint in the upper and lower parking garage levels in Washington, D.C. It included the four floors of the parking garage which encompass 115,000 square feet below the judiciary building. It did not include inaccessible areas such as elevator equipment rooms. The purpose of this investigation was to determine the presence and condition of hazardous materials in the building prior to planned mechanical renovations. Mr. Larry Jenkins, an AHERA certified Asbestos Inspector and Management Planner, and licensed LBP Risk Assessor conducted this survey on October 4, 2012. He was assisted by Dan Lopez, P. E. of James Posey Associates.
This assessment is only designed for identification of hazardous material conditions at the time of this investigation. JEI does not assume responsibility for the discovery and elimination of potential hazards that could cause accidents, injuries, or damage. This assessment includes conditions, operations and practices as observed during the time of the site survey. Changes, procedural modifications or facility renovations made after the site assessment are not included.
-2-
2.0 SAMPLING METHODS
Asbestos
JEI was not provided with any information regarding asbestos in this building prior to the survey. Bulk samples were collected of suspect materials for asbestos with each given a unique number, placed in single whirlpak bags, sealed and sent to an accredited laboratory for analysis using Polarized Light Microscopy with dispersion staining techniques.
The facility was visually inspected to identify the locations of suspected asbestos-containing building materials (ACBM). The suspected ACBM was touched by the accredited inspector in order to determine whether the material was friable. Friable by definition means any material that can be crumbled, pulverized or reduced to powder by hand pressure.
Homogeneous areas, those areas of material that are uniform in color and texture, were identified for both friable and non-friable ACBM. Each homogeneous area was classified as one of the following three types of material as defined by EPA.
a. Surfacing Material (SM): Material that is sprayed-on, troweled on or otherwise applied to surfaces, such as acoustical plaster or other materials on surfaces for acoustical, fireproofing, or other purposes.
b. Thermal System Insulation (TSI): Material that is applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain, or water condensation, or for other purposes.
c. Miscellaneous Material (MISC): Interior building material that is on structural components, structural members or fixtures, such as floor and ceiling tiles and does not include surfacing material or thermal system insulation.
Lead Based Paint (LBP)
All lead paint was tested using a X-Ray Fluorescence Analyzer (LPA-1) manufactured by RMD, Inc. of Waltham, Massachusetts. The use of a portable, non-destructive testing device was selected due to its quick analysis and efficiency when compared to laboratory analysis. This report includes all readings, both positive and negative. Actual readings appear on an LCD display are recorded on site while a data logger can generate a final report once downloaded.
XRF results are identified as positive, negative, or inconclusive by the following rules:
“POSITIVE” refers to a sample that has a lead concentration of greater than 1.0 mg/cm² “NEGATIVE” refers to a sample that has lead concentration less than or equal to1.0 mg/cm²
-3-
3.0 SURVEY RESULTS
Asbestos
Seven (7) bulk samples were collected and analyzed for asbestos as part of this survey.
Lead-Based Paint
There were thirty-five (35) separate lead readings taken as shown on the Lead Based Paint - XRF Inspection Data. Six of these readings were calibration checks.
Lead Analysis
Due to the presence of positive readings of 0.9 mg/cm2 on several lengths of the existing sprinkler pipe, it was determined to have materials analysis performed on the pipe itself.
HOMOGENEOUS AREA
TSI = Thermal Systems SM = Surfacing Material M = Miscellaneous
FIBROUS
CELL = Cellulose FBGL = Fiberglass MNWL = Mineral Wool SYNT = Synthetic OTHR = Other NONE = None
NONFIBROUS
QRTZ = Quartz MICA = Mica GYPS = Gypsum CALC = Calcium Carbonate OTHR = Other NONE = None
ASBESTOS
ACTN = Actinolite AMOS = Amosite ANTH = Anthophyllite CHRY = Chrysotile CROC = Crocidolite TREM = Tremolite NONE = No asbestos detected
JENKINS ENVIRONMENTAL, INC.
BULK SAMPLING SURVEY REPORT
DATE: October 2, 2014
PROJECT: Thurgood Marshall Judiciary Building
JEI PROJECT NO.: 2014-194
COLLECTED BY: LDJ
SAMPLE ID
QUANTITY
HOMOGENEOUS AREA
(LOCATION)
PHOTO NO.
SAMPLE ANALYSES
SF/LF
FIBROUS
NONFIBROUS
% ASBESTOS
UPPER LEVEL
TM1 Window frame caulk – Elevator Lobby left -- 100% OTHR ND
TM2 Window frame caulk – Elevator Lobby right -- 100% OTHR ND
TM3 “Trap” insulation by Elevator Lobby 20%
WOLLASTONITE 80% OTHR ND
TM4 Window caulk North Elevator Lobby -- 100% OTHR ND
TM5 Bathroom door caulk north side -- 100% OTHR ND
TM6 Trim bead – entrance to parking garage 10% CELL 90% OTHR ND
TM7 Door caulk – east side electrical room -- 100% OTHR ND
ANALYST: Byron Stroble
Scientific Analytical Institute, Inc. (NVLAP #200664-0) ANALYTICAL PROCEDURE: Polarized Light Microscopy as per Appendix A, 40 CFR 763
-5-
-6-
-7-
-8-
LEAD BASED PAINT -- XRF INSPECTION DATA
Client: James Posey Project: Thurgood Marshall Judiciary 2014-194 Date: 10/2/14 Inspector: L. Jenkins XRF: RMD/LPA-1# 01554 Confirmed Lead Paint: >1.0 mg/cm2 BL = Below State Lead Level (1.0)
No. Photo Room/Location Substrate Condition Satis./Unsatis
Color Lead (mg/cm2)
1 Calibration check 1.0
2 Calibration check 1.0
3 Calibration check 1.0
UPPER LEVEL
4 West side Electrical door casing M S Gray 0.3
5 West side Electrical door M S Gray 0.1
6 West side concrete wall C S Gray -0.1
7 Air vent fan – west upper level M S Gray -0.1
8 Air shaft outside air concrete block C S Gray 0.2
9 Arrow on floor C S Yellow 1.6
10 Parking lines C S White -0.2
11 Support column – white C S White 0.0
12 Support column – red C S Red -0.2
13 Deck ceiling C S White 0.0
14 Lobby elevator well C S Yellow -0.1
15 Lobby curb C S Yellow -0.2
16 Elevator lobby wall C S Yellow -0.4
17 Raised bump M S Yellow 0.3
18 Wall by Lobby C S Purple -0.1
19 Bathroom door frame M S Gray -0.1
20 Bathroom door M S Gray 0.0
21 North end sprinkler pipe M S White 0.9
22 North end sprinkler bare pipe M S 0.9
23 Splice room door casing M S Gray -0.3
-9-
LEAD BASED PAINT -- XRF INSPECTION DATA
Client: James Posey Project: Thurgood Marshall Judiciary 2014-194 Date: 10/2/14 Inspector: L. Jenkins XRF: RMD/LPA-1# 01554 Confirmed Lead Paint: >1.0 mg/cm2 BL = Below State Lead Level (1.0)
No. Photo Room/Location Substrate Condition Satis./Unsatis
Color Lead (mg/cm2)
24 Splice room door M S Gray -0.1
25 North small ½” sprinkler line M S White 0.9
26 Junction box by east side Electrical M S White -0.2
27 East side transformer room concrete block
C S White -0.1
28 Floor – Electrical C S Gray -0.1
29 Yellow paint on threshold C S Yellow -0.1
30 Stairwell stand pipe M S Yellow 0.9
Lower Level
31 Fire pipe M S Red 0.9
32 Northeast Foam Room (pipe) M S Silver 0.9
33 Calibration check 1.0
34 Calibration check 1.0
35 Calibration check 1.0
Substrate
Key
Color
DW = dry wall W = wood M = metal C = concrete G = glass
P = plaster B = brick S = steel CM = ceramic
WH = white GR = gray BR = brown B = black BL = blue Y = yellow
R = red OR = orange GN = green T = tan P = pink
-10-
Chemical Analysis:
-11-
4.0 CONCLUSION
Jenkins Environmental was requested to evaluate the Thurgood Marshall Judiciary Building Garage for asbestos and lead based paint.
Asbestos
JEI’s inspectors conducted a thorough inspection of specified areas for this renovation as directed by the client. Seven (7) bulk samples were taken and submitted for analysis by an EPA certified laboratory.
Bulk samples were collected from window caulks, trim beads, trap insulation and door caulks.
The results indicate that there was no asbestos identified in any samples.
Lead Containing Paint
An X-ray fluorescent analyzer was utilized to test for the presence of lead paint. This survey consisted in testing
There were only a few sources of lead paint found in the 35 separate readings collected. The large yellow painted arrows on the concrete floor contain lead paint. No other yellow paint tested positive.
In addition, the sprinkler pipe itself was tested in 5 separate locations with all readings being 0.9 mg/cm2.
A 6” section of the sprinkler pipe was later provided to Jenkins Environmental for materials testing. It was shipped to an accredited materials testing laboratory in Hatfield, Pennsylvania. (Laboratory Testing, Inc).
The results included on page 10 of this report indicate that there is no lead in the sprinkler pipe. It is an iron based pipe.
No other surfaces showed any lead paint presence.
AOC P/N: SC18009 //CONTROLLED// 08 November 2019
Data Center Upgrades Amendment 1 to
SECTION 010000 SUMMARY OF WORK Issue for Bid
AECOM P/N: 60593208 010000 - 1
SECTION 010000 - SUMMARY OF WORK
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including requirements of Division 00
PROCUREMENT AND CONTRACTING REQUIREMENTS and Division 01 GENERAL
REQUIREMENTS, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Project information.
2. Work covered by Contract Documents.
3. Future work.
4. Purchase contracts.
5. Architect-furnished products.
6. Contractor use of premise.
7. Security requirements.
8. Coordination with occupants.
9. Work restrictions.
10. Specification and Drawing conventions.
11. Alteration project procedures.
12. Contract modification requirements.
13. Payment procedures.
14. Commissioning.
15. Miscellaneous provisions.
AECOM P/N: 60593208 010000 - 2
B. Related Requirements:
1. Section 011100 Project Forms for project administrative forms.
2. Section 012310 Alternates for administrative and procedural requirements for Alternates.
3. Section 012350 Options for administrative and procedural requirements for Options.
4. Section 015000 Temporary Facilities and Controls for limitations and procedures governing temporary use of Architect's facilities.
1.3 PROJECT INFORMATION
A. Project Identification: TMFJB Design Bundle and Conference and Hoteling Center, SC18008/18009 and SC19005.
1. Project Location: This existing facility is under the management and care of the Office of the Architect of the Capitol, Supreme Court Building and Grounds (AOC/SCBG) of the United States. The facility is located at One Columbus Circle NE, Washington DC
20002.
2. Project Description:
a. Work to include interior renovation of various spaces throughout the building.
b. Phasing of Construction will be required. Coordination with Architect prior to commencement of work.
B. Partial Architect Occupancy: The premises will be occupied during entire construction period, with the exception of areas under construction. Cooperate with Architect during construction operations to minimize conflicts and facilitate building occupancy. Perform the Work so as not to interfere with Architect's operations. Maintain existing exits unless otherwise indicated.
C. Architect of the Capitol (Architect): Architect of the Capitol, Supreme Court Building and
Grounds (AOC/SCBG).
1. Jurisdictional Representative: Christopher Hillegas
D. Architect of the Capitol (Architect):
1. Contracting Officer (CO): Brian Richardson, brian.richardson@aoc.gov
2. COTR/Construction Manager: Personnel to be assigned by Architect at the time of
Contract Award.
E. Associate Architect-Engineer (AA/E): Architect of Record.
1. AECOM, Joshua Levy, Joshua.Levy@aecom.com.
AECOM P/N: 60593208 010000 - 3
F. Access to Project Site: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section.
G. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations.
H. Buy American Act: Contractor is bound to strict compliance with the Buy American Act (41
U.S.C. 8302). Refer to Federal Acquisition Regulations (FAR) Clauses in the Bidding and
Contracting Requirements for additional information.
I. Regulatory Requirements: Comply with applicable requirements of the laws, codes, ordinances and regulations of Federal, State and Municipal authorities.
J. Architect’s Project Web Site: Project software administered by Architect will be used for purposes of managing communication and documents during the construction stage.
1. See Section 013100 Project Management and Coordination for requirements for using web-based Project software.
1.4 WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of Project is defined by the Contract Documents and consists of the following:
1. General Construction Work; including Architectural, Mechanical, Electrical, Electronic
Security, Fire Protection, Fire Alarm, IT/AV and other Work indicated in the Contract
Documents.
B. Type of Contract: Design-Bid-Build Project delivery method using a single contract for
Construction, awarded on a competitively bid basis.
C. Contract Management: Oversight of the Work will be performed by the Architect.
1.5 WORK UNDER SEPARATE CONTRACTS
A. General: The Architect will coordinate the Work of this Contract with work performed under separate contracts. Contractor is required to follow the Architect's direction regarding coordination with other projects under separate contracts so that work on all contracts may be carried out smoothly, without interfering with or delaying Work under this Contract or other contracts.
AECOM P/N: 60593208 010000 - 4
B. Preceding Work: Architect will perform the following construction operations at Project site.
Those operations are scheduled to be substantially complete before work under this Contract begins.
1. Architect will perform normal maintenance of TMFJB building systems.
2. Architect will perform necessary work in preparation of this work.
C. Concurrent Work: Architect has awarded/will award separate contract(s) for the following construction operations at Project site. Those operations will be conducted simultaneously with work under this Contract.
1. Normal maintenance of TMFJB building systems.
2. SC12009 Façade Repairs.
3. SC11008 Building Automation Systems Network (BASNet) Renovation.
4. SC120005 Elevator Controller Upgrades and Replacement.
5. SC18007 Public Restroom ADA Finish and Fixture Upgrades.
6. SC19004 Egress Stair Life Safety and Finish Replacement.
7. SC18008 AO Space Realignments.
1.6 ARCHITECT-FURNISHED PRODUCTS
A. Architect will furnish products indicated. The Work includes receiving, unloading, handling, storing, protecting, and installing Architect-furnished products and making building services connections.
B. Architect-Furnished Products:
1. Lock cylinders.
1.7 DEFINITIONS AND STANDARDS
A. General: Comply with governing regulations and the codes and standards imposed upon the work. These requirements include the obtaining of permits, licenses, inspections, releases and similar documentation, as well as payments, statements and similar requirements associated with regulations, codes and standards.
AECOM P/N: 60593208 010000 - 5
B. Definitions: A substantial amount of specification language consists of definitions for terms found in other contract documents, including the drawings. (Drawings must be recognized as diagrammatic in nature and not completely descriptive of the requirements indicated thereon).
Certain terms used in contract documents are defined in this article. Definitions and explanations contained in this section are not necessarily either complete or exclusive, but are general for the work to the extent that they are not stated more explicitly in another element of the contract documents.
C. Additional Requirements: Refer to Section 014200 References.
1.8 CONTRACTOR USE OF PREMISES
A. General: The Contractor shall limit his use of the premises to the work indicated within the limits of construction so as to allow for full occupancy and operations outside of the Project boundaries.
B. Contractor Use of the Existing Building: During the construction period the building will be occupied. Maintain the existing building in a safe and weather-tight condition throughout the construction period. Repair damage caused by construction operations. Take all precautions necessary to protect the existing building and occupants during the construction period.
Cooperate fully with the Architect.
1. Clear Passage: Keep public areas such as corridors, lobbies, etc. free from accumulation of waste material, rubbish or construction debris.
2. Smoking or open fires will not be permitted within the building enclosure or on the premises.
3. Bathrooms and Cafeteria: Contractor will be provided use of existing bathroom facilities on the Concourse Level and cafeteria during normal business hours.
C. Limitations on Use of the Site: Limitations on site usage as well as specific requirements that impact site utilization are indicated on the Drawings and by other Contract Documents.
Portions of the site beyond areas on which work is indicated are not to be disturbed. In addition to these limitations and requirements, administer allocation of available space among entities needing both access and space so as to produce the best overall efficiency in performance of the total work of the project. Schedule deliveries so as to minimize space and time requirements for storage of materials and equipment on site. Storage and staging space will be limited to the confines of the Area of Work only. Space will not be provided anywhere else in or around the building for these activities.
1. Once each Spring and once each Fall construction will be halted for four (4) business days due to twice per year building event. These events shall be indicated in the initial
CPM schedule. All construction work shall stop for these four (4) day periods at no additional cost to the Government. The Architect will provide a minimum of ten (10) business days’ notice of actual event dates.
AECOM P/N: 60593208 010000 - 6
2. Other than time periods designated for sole Contractor use, keep existing driveways and entrances serving the premises clear and available to the Architect and its employees at all times. Do not permit trucks of any kind to use existing sidewalks without prior authorization of the Architect.
3. Maintain driveways between and around combustible material storage piles at least 15' wide and free of accumulation of rubbish, equipment and materials. Maintain access for firefighting equipment.
4. Do not unreasonably encumber the site with materials or equipment. Confine stockpiling of materials to the areas specified. If additional storage is necessary, obtain and pay for such storage off-site.
5. Provide 24hr/7day access to the building by emergency vehicles and firefighting equipment.
6. Construction Parking Control: Parking space for personal and company vehicles is not available on the site. Approval of Architect is required for short term parking (max 30 minutes) of construction motor vehicles or other equipment on the site, for the delivery of tools, material, or equipment. Long term parking (exceeding 30 minutes) is not available on the site.
7. Standard Working Hours: The standard working hours of operation for the facility are as follows:
a. The Thurgood Marshall Federal Judiciary Building (TMFJB) is open 24 hours/day
7 days a week.
b. Normal business working hours for the TMFJB are 6:00 AM to 8:00 PM, Monday through Friday.
c. Contractor’s working hours for this project are between 8:00 PM to 6:00 AM, Monday through Friday.
d. See Summary of Work, Article 1.11 Work Restrictions for additional requirements.
8. Extended Work Hours and Interruptions:
a. Operations may be extended beyond normal work period or be interrupted for special events, such as social events, visits by dignitaries, or similar activities.
Contractor will be given notice of any planned event so work schedules may be adjusted. Architect will advise Contractor of events.
b. Operations may be extended beyond normal work period or be interrupted for special circumstances, such as security measures, emergency evacuation, or similar activities. Contractor is expected to participate in an event as required.
c. Contractor will not be compensated for any interruptions in the work as a result of special events and circumstances.
d. See Summary of Work, Article 1.11 Work Restrictions for additional requirements.
AECOM P/N: 60593208 010000 - 7
9. Additional Requirements: Refer to Section 013100 Project Management and
Coordination for site restrictions.
D. Architect Occupancy: The Architect reserves the right to place and install equipment as necessary in completed areas and to occupy such areas prior to final acceptance, provided that such occupancy does not substantially interfere with completion of the work. Such placing of equipment and partial occupancy shall not constitute acceptance of the work or any part of the work.
E. Blasting: The use of any kind or type of explosive in the performance of the work is prohibited, except the use of construction tools actuated by or employing powder-actuated charges which shall be permitted, provided that the tool is of the kind and design ordinarily used for such construction and that the Architect has authorized its use after determining that its use will not endanger human life or safety.
F. Mechanical/Electrical Requirements of General Work: Except as otherwise indicated, comply with applicable provisions of The National Electrical Code (NEC) and standards by National
Electrical Manufacturer's Association (NEMA) for electrical components of general work.
Where applicable, provide products listed and labeled by nationally recognized independent testing and labeling organizations.
G. Protection of TMFJB Property: Contractor is expected to take all reasonable precautions to protect TMFJB Property. In the event of damage to or theft of TMFJB Property, Contractor will be held fully responsible for actions of his personnel and any subcontractor’s personnel.
Examples of protection that may be required but is not limited to the following:
1. Protect all existing exterior pavements and interior flooring from damage during construction operations.
2. Use wood products plywood and other similar products to protect exterior and interior building surfaces from damage and maintain integrity of the building, its surfaces, and components.
3. Protection Products and Materials: Refer to Section 015000 Temporary Facilities and
Controls.
4. Repair damage caused by construction operations. Methods of repair shall be reviewed and approved by Architect prior to implementing corrective measures.
5. Contractor’s personnel are expected to clean their work clothes and footwear before entering the building. Do not track dirt and other debris into the building.
H. Traffic Management:
1. Deliveries: Keep driveways, parking, loading areas, entrances and streets serving premises clear at all times. Do not use these areas for parking or storage of materials.
a. Do not permit trucks of any kind to use existing sidewalks without prior authorization of Architect. Use only designated loading/unloading areas.
AECOM P/N: 60593208 010000 - 8
b. Protect landscaping. Restore any landscaping damaged by vehicular activity. See
Section 015300 Landscape Protection and Restoration for additional requirements.
c. Limit closure of roadways and access to driveways and entrances to minimum required to perform work. Open portions of roadway to local traffic and access to driveways and entrances as soon as possible. Provide personnel to control traffic.
d. See Summary of Work, Article 1.11 Security Requirements for additional requirements related to deliveries.
2. Traffic Control: Minimize impact of Work on traffic patterns and availability of street parking.
a. Limit closure of roadways and access to driveways and entrances to minimum required to perform work. Open portions of roadway to local traffic and access to driveways and entrances as soon as possible.
b. Provide personnel and traffic control devices to control traffic when unloading.
I. Condition of Existing Building: Maintain portions of the existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations.
J. Site Utilization Plans: Refer to Section 011100 Project Forms for additional requirements relating to site access.
1.9 SECURITY REQUIREMENTS
A. General: During the construction period, access to the Project site and buildings will be controlled by Building Security conducting a screening process of all persons, materials, equipment and other items.
1. Security Requirements:
a. All vehicles, and contents, used by the Contractor or his subcontractors, which enter or leave the TMFJB building and grounds during performance of the Work, will be subjected to clearance, inspection and identification procedures conducted by Building Security.
b. All persons entering TMFJB shall gain access to the building by passing through screening devices. In addition, all handbags and all carried items shall be screened prior to their entry into the building.
c. All personnel provided by the Contractor and employed on the Project site will be subject to a security background investigation.
d. The Contractor shall obtain all security background investigations required for its workforce.
e. Additional Security Requirements: Comply with AOC52.233-5 Special Security
Requirements (Feb 2010).
2. Personnel Screening: All workers are expected to comply with the process when entering and leaving the work area. Contractor’s personnel will be required to show a USCP
Badge and be screened before entering the work area or the building.
AECOM P/N: 60593208 010000 - 9
3. Equipment and Material Deliveries: All equipment and material deliveries will be required to a screening process as outlined herein.
a. All personnel providing deliveries will have their person, any personal tools and other items screened at the entry to the building, work area and site. Personnel will have to repeat the entry screening process each time they leave and return to the
Project site.
B. Employee Identification and Screening:
1. Site Screening:
a. Any personnel that is bringing in tools will need to be screened at the TMFJB loading dock.
b. All personnel will have their person, and any personal tools and other items screened at the entry to the building or loading dock, work area and site. Personnel will have to repeat the entry screening process each time they leave and return to the Project site.
2. Employee Identification: All persons working under contract are required to be badged.
Contractor shall obtain USCP Badges for each trades’ employee prior to starting work.
Personnel will be required to wear their badge while they are on the TMFJB grounds and in buildings.
a. Obtain Security Information forms from the Architect: Fill out and return to the
Architect who will forward the information to the Building Security.
b. Allow two (2) weeks for completion of the approval process. Once approved, Contractor’s personnel will be required to report in person to the Fairchild
Building located at the corner of South Capitol Street and E Street SW in
Washington DC.
c. All badges must be returned within two weeks of personnel who are no longer working on a project.
d. The Contractor will pay a fine of $200 per badge for lost badges or badges not returned within two (2) weeks of a project completion or person leaving the project.
e. Lost badges must be reported immediately to the Architect.
f. Badges shall only be used by the person they are issued to. Badges used by another person will be confiscated by the Architect.
3. Employee Screening by Contractor: Comply with Architect’s requirements regarding background screening of Contractor personnel working on the Project site.
a. Contractor is responsible for screening their personnel prior to submitting personnel names and information to the Architect for processing of USCP Badges.
b. Submit list of badged personnel on Project site to Architect. This list shall include the employee’s full name, dated of birth and social security number for each individual employed.
AECOM P/N: 60593208 010000 - 10
c. Maintain list current and re-submit list of badged personnel on weekly basis.
d. Personnel who have not been badged will not be allowed on Project site.
e. Arrangements may be made for limited visitor escorts with prior approval of the
Architect.
C. Wearing of Badges:
1. Contractor to provide company identification badge with company name and information associating workers with the contractor working on the Project site.
2. Contractor shall require personnel to prominently display both the USCP badge and the
Contractor’s company badge at all times.
D. Deliveries:
1. Entrances and Adjacent Street: Keep loading areas, driveways, entrances, and streets serving premises clear and available to the Architect, occupants, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Do not permit trucks of any kind to use existing sidewalks without prior authorization of Architect. Use only designated loading/unloading areas.
2. Delivery Scheduling, Screening and Locations: The delivery process, screening locations and screening times are subject to change. Coordinate with the Architect for all deliveries.
a. Schedule Deliveries: Contractor to provide minimum fourteen (14) calendar days advance notice to Architect for all deliveries.
1) Schedule deliveries to minimize the use of driveways, entrances and street.
2) Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
3) Contractor to coordinate delivery screening with Architect. Submit requests for deliveries to the Architect.
b. Delivery Process: Deliveries of material and equipment shall be scheduled with the
Architect in advance of delivery.
c. Delivery Location: Deliveries of materials and equipment to the site shall be at the
Project site within the designated work area.
E. Security: Contractor may not install locks on the existing doors as emergency responders will require access to the space at all times. This requirement applies to Contractor security in the building and work areas.
1. The Contractor shall take all necessary precautions to secure their tools, materials, equipment and other valuable items while on site. The Contractor shall take steps to minimize the possibility of loss by securing small components in locked containers such as lockable “JOBOX” units. Use combination locks and provide combination to the
Architect.
AECOM P/N: 60593208 010000 - 11
2. The Contractor shall not assume that because the Architect’s security guards are on site that they provide security for the Contractor. The Architect does not provide security for the Contractor.
3. Contractor shall secure all tools that may be used by others in their attempt to gain access to other spaces within the campus.
1.10 COORDINATION WITH OCCUPANTS
A. Full Architect Occupancy: Architect will occupy site and existing building during entire construction period. Cooperate with Architect during construction operations to minimize conflicts and facilitate Architect usage. Perform the Work so as not to interfere with Architect's day-to-day operations. Maintain existing exits unless otherwise indicated.
1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Architect and approval of authorities having jurisdiction.
2. Notify Architect not less than fourteen (14) calendar days in advance of activities that will affect the occupant’s use of the building or grounds.
1.11 WORK RESTRICTIONS
A. Work Restrictions, General: Comply with restrictions on construction operations.
1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.
2. Site Utilization Plans: Refer to Section 011100 Project Forms for site utilization plans and additional requirements relating to work restrictions.
B. On-Site Work Hours: Limit work on site to non-business working hours as indicated in section
1.8 Contractor’s Use of Premises, unless otherwise indicated.
1. Weekend Hours: Coordinate with the Architect. Notify the Architect a minimum of fourteen (14) calendar days in advance of the requested weekend.
2. Normal Business Hours Work: Coordinate with the Architect. Notify the Architect a minimum of fourteen (14) calendar days in advance of the requested off-hours work.
3. Early Morning Hours: With prior approval of the Architect, noisy or disruptive activity may be allowed to continue during the first hour of the normal working hours, 6:00 AM to 7:00 AM. Coordinate with the Architect a minimum of fourteen (14) calendar days in
AECOM P/N: 60593208 010000 - 12
advance of the requested early morning work. Include noisy and disruptive work activities in the three (3) week look ahead.
4. Hours for Utility Shutdowns: Shall take place outside of normal working hours 6:00 AM to 8:00 PM, Monday through Friday and weekends permitted for utility shutdowns.
a. Initial Notification: Notify the Architect a minimum of twenty-one (21) calendar days in advance of the requested utility shutdown.
b. Second Notification: Follow-up and notify the Architect with written confirmation a minimum of seven (7) calendar days in advance of the requested utility shutdown. Do not proceed with utility interruptions without Architect’s written permission.
5. Noisy or Disruptive Activity: Shall take place outside of normal working hours 6:00 AM to 8:00 PM, Monday through Friday. Noisy activity and activity that would be disruptive to occupants is allowed on weekends.
a. The Contractor shall provide a minimum of fourteen (14) calendar days notice to the Architect prior to the start of any noise or disruptive work.
6. Comply with the following work restrictions. Confirm specific dates with Architect.
a. March
1) Monday, Tuesday, and Wednesday during Judicial Conference (normally second week), no construction is allowed . Exceptions may be granted if the work is not is not on an office floor.
2) Weekend before Judicial Conference no work effecting building operations is allowed (loud noise, power, HVAC, water, etc.).
b. May and June
1) No work affecting operations in the Data Center and Suite 2-300 (Financial
Disclosure).
c. September
1) Monday, Tuesday, and Wednesday during Judicial Conference (normally second week), no construction is allowed. Exceptions may be granted if the work is not on an office floor.
2) Weekend before Judicial Conference no work effecting building operations is allowed (loud noise, power, HVAC, water, etc.).
d. December
1) No work allowed during Annual Holiday Party (normally 7-10 days before
Christmas).
AECOM P/N: 60593208 010000 - 13
C. Existing Utility Interruptions: Comply with requirements of Section 013100 Project
Management and Coordination.
D. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to any building occupants with Architect.
1.12 SPECIFICATION AND DRAWING CONVENTIONS
A. Contract Documents: The Drawings and Specifications are complimentary.
1. The Drawings are the graphic and pictorial portions of the Contract Documents showing the design, location and dimensions of the Work, generally including plans, elevations, sections, details, schedules and diagrams.
2. The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, equipment, systems, standards and workmanship for the
Work, and performance of related services.
B. Overlapping and Conflicting Requirements: Where there appears to be overlapping or conflicting requirements in the Drawings and Specifications, refer all such questions in writing to the Architect for interpretation. Do not proceed with that portion of the work that is under question until the Architect has replied in writing. Delays necessitated by requests for interpretation shall not form the basis for a Change to the contract. The Architect’s interpretation and decision shall be final. Procedures for resolving disagreements with the decision of the Architect are outlined in the Federal Acquisition Regulations (FAR Clauses) and
AOC52.236-10 Specifications and Drawings for Construction (Feb 2007). The order of precedence is established as follows:
1. Order of Precedence: Any inconsistency in this solicitation or Contract shall be resolved by giving precedence in the following order:
a. The Schedule (excluding the specifications).
b. Representations and other instructions.
c. Contract clauses.
d. The Specifications.
e. The Drawings. Large scale drawings take precedence over small scale drawings.
Do not scale drawings.
2. Industry Standards: Where compliance with two (2) or more industry standards or sets of requirements is specified, and overlapping of those different standards or requirements establishes different or conflicting minimums or levels of quality, the most stringent requirement is intended and will be enforced, unless specifically detailed language written into contract documents clearly indicates that a less stringent requirement is to be fulfilled. Refer apparently-equal-but-different requirements, and uncertainties as to which level of quality is more stringent, to the Architect for a decision before proceeding.
C. Drawing Symbols: Except as otherwise indicated, graphic symbols used on drawings are those symbols recognized in the construction industry for purposes indicated. Where not otherwise
AECOM P/N: 60593208 010000 - 14
noted, symbols are defined by "Architectural Graphic Standards", published by John Wiley &
Sons, Inc., Ninth edition.
1. Mechanical/Electrical Drawings: Graphic symbols used on Mechanical and Electrical
Drawings are generally aligned with symbols recommended by ASHRAE. Where appropriate, these symbols are supplemented by more specific symbols as recommended by other recognized technical associations including ASME, ASPE, IEEE and similar organizations. Refer instances of uncertainty to the Architect for clarification before proceeding.
D. Dimensions: Where, in the opinion of the Contractor, the Contract Documents lack dimensional information or contain dimensional conflicts that are critical to the formulation of a bid proposal or the execution of the Work, the Contractor shall request a clarification from the
Architect.
E. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.
These conventions are as follows:
1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.
F. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.
G. Industry Standards: Refer to Section 014200 References.
H. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:
1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.
2. Abbreviations: Materials and products are identified by abbreviations published as part of the U.S. National CAD Standard and scheduled on Drawings.
3. Keynoting: Materials and products are identified by reference keynotes referencing
Specification Section numbers found in this Project Manual.
1.13 ALTERATION PROJECT PROCEDURES
A. Survey of Existing Conditions: Record existing interior conditions that affect the Work by use of measured drawings preconstruction photographs and preconstruction videotapes.
AECOM P/N: 60593208 010000 - 15
B. Discrepancies: Notify Architect of discrepancies between existing conditions and Drawings before proceeding with removal and dismantling work.
C. Size Limitations in Existing Spaces: Materials, products, and equipment used for performing the
Work and for transporting debris, materials, and products shall be of sizes that clear surfaces within existing spaces, areas, rooms, and openings, including temporary protection, by 12 inches or more.
D. Cutting and Patching: Refer to Section 017329 Cutting and Patching.
E. Field Engineering and Surveying: Refer to Section 017300 Execution.
F. Selective…