RFI # Contractor Section/Sheet Reference Question Answer

1 Turner 23 31 13

Paragraph 2.4 E 9 states to secure duct liner between the perforated sheet metal inner duct and outer shell. There is no double wall duct section and the duct schedule in section 23 31 13, 3.10 does not state any duct is double wall. Please clarify if lined duct is to be double wall?

Lined duct is not required to be double walled duct.

2 Turner 23 31 13 Paragraph 3.10 E list fibrous, elastomeric, and natural fiber. Please clarify what type of liner is to be used?

All acceptable in accordance with paragraph 2.4 duct liner.

3 Turner MH101

Notes 8 and 9 state transfer ducts with 1” sound lining. Drawing MJ501 detail 4 notes sound lined return plenum and does not note any sound lining in the supply duct. Specification 233113 3.10 E lists liner in supply, supply plenums, and transfer ducts. Please clarify what duct is to be lined?

Sound lining is required on all transfer ducts.

Sound lining is required on the FCU return plenums and the first 15 feet of return duct.

Sound lining is not required on the FCU supply.

4 Turner MD201

Per note #2 on MD201 CAHU 1T, 2T, 3T, 4T, 5T, 11T,12T, and 20T are to be demolished. Please confirm existing controls, piping and ductwork that needs to be either disconnected and capped, or demoed.

The services to these units shall be removed back to the nearest main duct and/or pipe and capped. Any existing controls shall be removed.

5 Turner MD201

Per note #10 on MD201 there is an existing FCU to be removed. Please confirm existing controls, piping and ductwork that needs to be either disconnected and capped, or demoed.

The services to these units shall be removed back to the nearest main duct and/or pipe and capped. Any existing controls shall be removed.

7 Turner MD201

Existing CHW is shown to be demolished from units to main CHW supply and return. There are no isolation valves shown on this branch piping to be demolished. Please confirm that isolation valves are in place and are operational and can be utilized to complete a positive shut off to units so piping be demolished per drawings.

Confirmed, Contractor will have to re-verify valves operational at time of construction as part of means and methods.

8 Turner HVAC General

Please confirm if temporary cooling and or heating is required. If required please confirm what temporary power is available. Please confirm where condenser air from temporary cooling units can be discharged too. Please confirm where condensate can be ran too. Please confirm what tonnage is needed per location.

Temporary spot coolers were a required of Bid Option 2 which in not included as part of this solicitation.

Response to Questions Phase I (one) Dated 5.11.2020

9 Turner MP101 Note 2: Please confirm that risers and 2" connections are existing on the concourse level and no work inside the existing chase is needed.

This chase is new(re:AE101). Piping connects to the existing piping below the raised floor and is routed in the new chase to the ceiling plenum in order to serve the fan coil units.

10 Turner 23 05 48 Please confirm seismic ratings of existing and please confirm if any seismic controls are required.

Seismic controls are required to meet the performance requirements of paragraph 2.1.

11 Turner HVAC General Please confirm company and POC for existing building management system.

CBS (Complete Building Management Systems) Building Managament. P.O.C. is front desk -

202-502-4444

12 Turner HVAC Options

Option 3 and 4 are referenced in the RFP. There is reference of Option 4 on the contract drawings but no reference of Option 3. Please confirm mechanical scope of work that should be priced in Option 3 and Option 4.

HVAC Bid Option 3 information is referenced on sheets including (but not limited to) MH101

Keynote 6. Bid Option 3 and Bid Option 4 shall be priced as drawn in documents and identified in specifications

13 Turner HVAC General

Please confirm building engineers have operated existing valves and have confirmed positive shutoff. In addition please confirm all draining, filling and venting will be completed by AOC and contractors will be required to assist. Confirmed

14 Turner Abatement General

The Hazard Materials Survey dated October 2014 is specific for the Thurgood Marshall Judiciary Building Parking Garage. Please provide the Hazard Materials Survey for the spaces associated with the Data Center Upgrades. See Hazmat Building Survey attached.

15 Turner 01 31 00

Please advise if the Construction Contractor’s Site Specific Safety Officer may also serve as the Project Superintendent. (013000-1.07-B and 013100- 1.6-A)

Site Specific safety officer may not serve as superintendent, and vice versa.

16 Turner General Please advise the minimum required experience for the Project Manager and Project Superintendent. (013100-1.6-A)

Refer to RFP Section L, Evaluation Factor 2.1.A.3. 10 years is the minimum required experience.

17 Turner 01 33 00

The submittal review times provided in Specification 013300 appear to contradict. Section 1.5-C indicates that the processing time for the initial review is fourteen (14) calendar days and the processing time for a resubmittal review is seven (7) calendar days. Section 1.7-C indicates that the processing time for the initial review is twenty-one (21) calendar days and the processing time for a resubmittal review is twenty-one (21) calendar days. Please confirm the processing times for submittal reviews. Refer to revised 013300 issued herein.

18 Turner 01 91 13

Please confirm that the Commissioning Professional (CP) indicated in Specification 019113-1.5-A-5 is used interchangeably with the Commissioning Authority indicated in Specification 019113-1.3-C, and that this individual will be engaged by the Architect, not the Contractor. Confirmed

20 DCS - Data Centers Fire Protection

RFP states pre-action sprinkler system. Drawings indicate wet pipe system.

Which is correct?

The fire protection system in the data center is a wet pipe sprinkler system. The drawings are correct.

21 DCS - Data Centers IF101 Drawing IF101 indicated furniture deleted from scope. RFP and pre-proposal meeting agenda state furniture is included. Which is correct?

Furniture procurement will be by others. No Systems Furniture will be provided by the contractor.

22 DCS - Data Centers Security Is there a prefered security vendor? No 23 DCS - Data Centers Security What security system is installed? ARC Systems

24 DCS - Data Centers HVAC Is there a peferred vendor for HVAC controls, TAB, etc.?

Preivous companies utilized are Albeiro/EMS and Metro TAB . There are no preferred vendors.

25 DCS - Data Centers Mech Are there existing valves for new piping or are wet taps required?

There are no existing valves at the point of the new connections of the 2" piping.

Wet taps will be required.

26 DCS - Data Centers General

Is temporary wall to be taped, blocked, skimmed, finished and painted? If so, is Level 5 finished required?

Refer to 5/AI611 for details. UL rating annotated must be met. Occupied side shall be level 4 finish minimum. Prime and two finish coats of paint shall be provided. Color will be selected post-bid. Construction side must be finsihed to the extent that UL rating requires such work. Painting not required on construction side.

27 DCS - Data Centers Arch Is there a ceiling system in C-630 and C-650? Notes state to extend and match adjacent grid, but drawing does not depict new grid.

There is no ceiling in rooms c-630 and C-631. C- 650 has a ceiling as noted. Keyed note 1 about matching existing grid only applies to the corridor outside C-650 and C-630

29 Edifice Solutions RFP

The solicitation appears to request the Prime Offeror Key Personnel resumes to be duplicated. Prime Offeror Key Personnel resumes are requested in “Factor 1 – Prime Offeror Corporate Experience and Key Personnel” (A.3

pg. pg.86) and then again in “Factor 4 – Management Approach and Key Personnel (D.3 on pg. 87)” Does the Government desire the duplicated resumes in both section or are we misunderstanding the instructions?

Resumes shall only be provided under Factor 1.

Duplicate resumes are not required in Factor 4.

Key Personnel referenced in Factor 4 response shall have resumes provided under Factor 1.

30 Edifice Solutions RFP

The solicitation appears to request the Key Subcontractor Personnel resumes to be duplicated. Key Subcontractor Personnel resumes are requested in “Factor 2 – Key Subcontractor Corporate Experience and Key Personnel” (B.3 pg. pg.86) and then again in “Factor 4 – Management Approach and Key Personnel (D.3 on pg. 87)” Does the Government desire the duplicated resumes in both section or are we misunderstanding the instructions?

Resumes shall only be provided under Factor 1.

Duplicate resumes are not required in Factor 4.

Key Personnel referenced in Factor 4 response shall have resumes provided under Factor 1.

31 Edifice Solutions RFP

The Government provides preparation directions for a hard copy submission of the proposal on pg. 84. Will Government please confirm the delivery instructions (i.e. should the proposal be delivered to the address in box 7 of the SF 1442)?

Hard copy submissions can be omitted. Provide separate PDF files. One PDF for Technical

Response, one PDF for Cost Proposal.

Submissions shall be provided on USB to address in box 7 ofSF1442

32 Gilford Corporation General

Pls confirm the following Option Nos to their locations:

Option 3 Digital Forensics Lab – Room number: C653 Option 4 SOC Watch Floor – Room Number: C650

Confirmed. Additionally, C-651 (Pantry) fit out will be included as part of Option 4. Walls for C-

651 and concealed infrastructure in walls shall be base contract. Door C651 shall be part of base contract.

33 Gilford Corporation General

We would like to schedule a walk-thru for Gilford Corporation, bidding as a General Contractor and some subcontractors. If this is possible pls inform us of where and when. This is not allowed as noted in Pre-bid

Conference due to COVID-19 AOC Guidelines.

34 Gilford Corporation General Will you extend Q&A cut off time 2 weeks beyond April 20? No.

35 Hasen Global AE101 AE 101 Keynote 8 references AF 701. AF 701 not included in bid package.

Please provide.

Note referenece should be changed from AF701 to IN101.

36 Hasen Global AE101 AE 101 General Note 9 references AF 700. AF 700 not included in bid package. Please provide.

Note referenece should be changed from AF700 to IN100.

37 Hasen Global GI101 GI 101 Life Safety General Note 4 references AI 101. AI 101 not included in bid package. Please provide.

AI101 is a typo. GI101 General note 4 shall refer to AE101.

38 Hasen Global General Please provide a copy of the virtual site walk video for viewing or download.

Due to sensitive nature of the building, AOC is in the process of defining the procedures and protocols that will be implemented in order to share the video among potential offerors. Exact date the video will be TBD.

39 Hasen Global General Will the area of construction be occupied during the course of the project?

Areas within the construction limits will not be occupied. Adjacent spaces and the remainder of the building will be occupied. IT equipment as outlined in the drawings and specifications within the limits of construction must be kept operational.

40 Hasen Global General

Will the contractor be permitted to use laptop computers and/or mobile phones on the project?

Yes. Connection to the internet will be the responsibility of the contractor. Contractor will not be permitted to connect to existing AOC or

AO networks.

42 Hasen Global General Do scheduled building off days require night work to be off also. Yes.

43 Hasen Global Arch

On AE101 rm 631 shows to install a Metal fence with the Front section having a door and a side section that attaches to front and a column. Is there to be a section from the column to the back wall of room?

There is a CRAC unit between the column and the wall that closes the gap. No fencing is needed there.

44 Hasen Global Arch

Will existing white boards, bulletin boards, and office supplies be removed by facilities or contractor?

All furniture/supplies required to be saved will be removed prior to contractor mobilization.

Any items left behind will be considered abandonded, and will be disposed of by the contractor.

45 Hasen Global Arch On AE101 Does the doublr door between column lines N&O x 13&14 need to be installed prior to the start of construction?

Means and methods and sequence are at the discrestion of the contractor.

46 Hasen Global General Do options need to be included in Bid?

Yes. If bid options are excluded, the submission will be considered non responsive and will not be considered.

47 Hasen Global General Do we have a place to store access panel that are to be salvaged and stored? No.

48 Hasen Global General Will the contractor be permitted to take progress photos? Yes.

49 Hasen Global General

"RFP, pg. 6/93, Section C, bullet point 2 states that the contractor shall provide ""Construction of new Judicial Data Center including mechanical, electrical, telecommunications, furniture, furnishings and equipment (FF&E)."" Plate IF101 states that ""Furniture will NOT be part of this solicitation."" Please clarify furniture scope."

Furniture procurement will be by others. No Systems Furniture will be provided by the contractor.

50 Hasen Global HVAC What are the requirements for temporary cooling (CFM, temperature, etc.?)

Temporary spot coolers were a required of Bid Option 2 which in not included as part of this solicitation.

51 Hasen Global Arch

On AE101 rm. C-651 Pantry, Is this room to be built out with base bid or Option #4?

C-651 (Pantry) fit out will be included as part of Option 4. Walls for C-651 and concealed infrastructure in walls shall be base contract.

Door C651 shall be part of base contract.

52 Kimbal ED401

Keynotes 5&6 – Drawing ED401 shows Keynotes #5 & #6 but these keynotes are not shown on the Plan Drawings. There are symbols for Notes #3 & #4 but they are not listed in the Keynotes. Please clarify are Keynotes #3 & #4 supposed to be Keynotes #5 & #6?

Keynotes 5 and 6 are mislabeled and should be labeled as keynotes 3 and 4. However these notes are a part of bid option 2 and will not be included in this solicitation.

53 Kimbal ED401

Keynote #1 shows intercepting raceways from Panel CDPS as Bid Option 2 that is not to be included. Drawing EP401 Keynotes #6 & #7 shows intercepting these same conduits from Panel CDPS to feed (2) enclosed circuit breakers and Panel CAHUDP. Please clarify, is this work part of the Base Bid or is this work part of Option #2 and not to be included?

Intercepting conduits from Panel CDPS is a part of based bid. Work included in keynote 1 shall be included in this solicitation.

54 Kimbal ED401

Keynote #1 is crossed out but is associated with feeder between SWBD CDPS & ATS-CDPS. EJ703 indicates new feeder between SWBD CDPS & ATS-CDPS.

Please confirm crossing out Keynote #1 is a mistake or clarify.

Intercepting conduits from Panel CDPS is a part of based bid. Work included in keynote 1 shall be included in this solicitation.

55 Kimbal ED402

Switchboard EDPL – On plan drawing ED402 Switchboard EDPL is labeled Existing to Remain (ETR). Keynote #1 says to remove Switchboard EDPL. Please clarify which is correct the plan drawing or Keynote #1?

All work on drawing ED402 is part of Bid option 2 and not to be included in this solicitation.

56 Kimbal ED402

Switchboard EDPL and transformer – Please clarify if the demolition of Switchboard EDPL and the transformer shown on Drawing ED402 are part of Bid Option #2 and is not to be included in this solicitation?

All work on drawing ED402 is part of Bid option 2 and not to be included in this solicitation.

57 Kimbal EK101/EJ702

PDU-F – On Drawing EK101 it shows demoing PDUF and remove conductors back to source. The plan drawing or the riser diagram does not show where PDU-F is fed.

Where is PDU-F fed from?

Existing PDU-F has currently been abandoned in place without an existing power source.

Contractor is expected to remove PDU-F under this solicitation.

58 Kimbal EK101

Keynote #8, UPS – Keynote #8 on Drawing EK101 says to remove UPS and its feeder back to source. No UPS is indicated on Power Riser for Room C-135. What is the size of this UPS? Where is this UPS fed from?

Documentation of the size of the UPS size and where it is fed from is not available. This will need to be verify by contractor at post award walk thru.

59 Kimbal EL101

Keynote 1 indicates connect to emergency lighting circuit. On drawing EJ501, Fixture Schedule Note indicates battery pack for emergency fixtures. Do emergency fixtures connect to emergency circuit & have a battery pack? Do emergency fixtures in Data Center require motion sensors (EL 101 Keynote 2)?

1.) Emergency fixtures connect to emergency circuit and do not contain a battery pack. 2.)

Yes

60 Kimbal EL101

Fixture Types C, F, G, G1, X2 are listed on the Lighting Fixture Schedule but are not indicated on Lighting Plan. Are Types C, F, G, G1, X2 applicable to this solicitation? If so, please revise the drawings.

Fixture Types C, F, G, G1 are not applicable to this solicitation.

61 Kimbal EJ604/EJ704 Both existing PDUDP1 & DP2 panels feed PDU-1, 2 & 3. PDU-4 & 5 are not indicated. Which PDUDP feeds PDU-4 & 5? Please update schedules accordingly

PDU-4 shall be served by Panel PDUDP1 circuits 13,15,17.PDU-5 shall be served by

Panel PDUDP1 circuits 8,10,12. Provide 3-pole, 200A Trip Plug. PDU-1,2,3 shall be served by

Panel PDUDP2 as scheduled.

62 Kimbal EJ704 Riser Diagram, PDU-D – The riser diagram on Drawing EJ704 shows PDU-D to be demoed. We cannot find PDU-D on the plan drawings. Where is PDU-D located?

Existing PDU-D is located in Computer Room C-135 betweeen columns 17 and 18.

63 Kimbal EJ703/EJ704

Floor plans indicate Data Center (C111 & C135) on concourse Level. Riser diagram suggests a Mezzanine Level. New feeders are to be installed. No elevations provided.

What are the elevations at Upper Parking, Concourse, Room C111 & C135 and Ground Floor?

There is no mezzanine level shown on this riser diagram. What is shown on the right side of the concourse level of the rise is equipment on a RAF. The height of the RAF is NTS on the riser. It is shown artificially large to allow room to show the feeders running beneath it.

64 Kimbal EP100

Keynotes #1 through #4 – Is the work shown on Drawing EP100 and as listed in Keynotes 1 through 4 part of Bid Option 2 and is not to be included in this solicitation?

All work on drawing EP100 is part of Bid option 2 and not to be included in this solicitation.

65 Kimbal EP100

Keynote #3 coordinates do not agree with EP401 Keynote #10. EJ705 deletes all work associated with EP100. Please clarify routing coordinates between Keynotes #3 & #10.

All work on drawing EP100 is part of Bid option 2 and not to be included in this solicitation.

66 Kimbal EP100

We assumed that drawing EP100, Upper Level Garage, was issued so that conduit paths could be determined between the Concourse Level UPS/Electric Room to the concourse level Data Room. Is EMT conduit an approved installation method on the Upper Level Garage? Yes

67 Kimbal EP101

Keynote #2 – Keynote #2 says to provide power connection to the furniture.

We cannot find Keynote #2 on the plan drawing. Please indicate where Keynote #2 applies?

Keynote 2 applies to floor (square) and wall mounted (circle) junction boxes with whip. See E-001 for Wall mounted systems furniture box symbol.

68 Kimbal EP101

Keynote #13 – Keynote #13 says work in this area is part of Bid Option #3.

We cannot find Keynote #13 on the plan drawing. Please indicate where Keynote #13 applies?

Keynote 13 applies to all work within Digital Forensics C-653 with the exception of general receptacles for warm lit shell requirements of base bid.

69 Kimbal EP101

Keynote #15 – Keynote #15 says connection of FCU is part of Bid Option #3. We cannot find Keynote #15 on the plan drawing. Please indicate where Keynote #15 applies?

Keynote #15 applies to FCU-3 serving Digital Forensics C-653.

70 Kimbal EP101

CAHU-5 – Computer room Air Handling Unit (CAHU-5) is in room C-660.

Please clarify, Is CAHU-5 part of the Base Bid or one of the Option pricing? Base Bid.

71 Kimbal EP101

Detail #2 Data Center, Data Rack Receptacles – The Data Rack receptacles are shown as flush mounted floor receptacles. Flush mounted raised floor boxes come in many different styles and configurations. Can additional information or additional detail be provided as to what is required for these flush mounted floor boxes? Mounted below the raised floor? Mounted to the Data racks? Racks generally plug in under the raised floor or overhead. Is the correct symbol indicated? Can quad receptacles be installed in lieu of 2-duplex receptacles?

Data rack receptales shall be surface mounted to the floor below the raised access flooring.

Outlet in the floor boxes are NEMA type and shall be coordinated with with selected Data

Rack manufacturer requirements. The correct symbol is shown on the drawings. Data rack requirements will dictact whether quad receptacles can be used in lieu of duplex receptacles.

72 Kimbal FA101

Keynote #6, Smoke Damper – The Fire Alarm Plan, Drawing FA101 Keynote #6, shows a control module to initiate the operation of a smoke damper. This Smoke Damper is not shown on the electrical power plans. Does this smoke damper require an electrical power connection? If so, where is this smoke damper fed from?

Smoke damper shall be powered by an available circuit in emergency Panel ELD1 located in

Electrical Room CB84.

73 Kimbal EJ703/EJ704/EJ601

Panel CAHUDP – The Riser Diagram on Drawings EJ703 and EJ704 shows Panel CAHUDP feeding the Computer Room Air Handling Units CAHU 1 through 5. The Panel Schedule for CAHUDP only shows CAHU-2, CAHU-3 and CAHU-4. Please clarify, Is CAHU-1 and CAHU-5 fed from Panel CAHUDP or are these CAHUs fed from another location?

CAHU-1 and CAHU-5 are also served by

CAHUDP.

74 Kimbal Riser Diagrams and

Floor Plans

Key Plan with electrical room locations does not have a scale nor does it seem to reflect floor plans. Please provide overall floor plan(s) (scale-able) indicating Rooms C13, C84, C611, C613, PB11.

A drawing showing the relative locations of these rooms will be provided. C13 and PB11 are part of bid option 2 and not part of this bid

75 Kimbal 26 05 19 MC cable is not listed in the Specifications. Is the use of MC cable an approved wiring method for this project? Follow specifications for wiring methodology

77 Blanco General I was unable to attend the vendor meeting on the 13th. Is it possible to get a compy of the attendees and the Q+A? See attached

78 Blanco General

I understand that you had a vendor information session on the April 13 regarding--Data Center Upgrades Task 6, Thurgood Marshall Federal Judiciary Building (TMFJB) RFPAOCACB20R0046. I was wondering if I could get a copy of the vendor attendee list. Is that possible? See attached

79 Kinsely General Confirm the solicitation is NOT a SET ASIDE Confirmed, not a set aside.

80 Kinsely General Identify if security clearances are required for workers on the project and if so where in the RFP can the requirement be found?

Formal security clearnaces (i.e. Top Secret, etc.)

are not required. Workers must submit for badging through the AOC as outlined in the specifications.

81 Kinsely General Identify BID DATE Per RFP, Bid due Date is May 29,2020.

82 Kinsely General Will the building be safe from exposure to COVID19 for the 4/10 site visit? No site visits will be conducted.

83 Overwatch General

Thank you for the information. Will this session be recorded and put out to the group for reference? If not, would there be any opposition to doing so?

Due to sensitive nature of the building, AOC is in the process of defining the procedures and protocols that will be implemented in order to share the video among potential offerors. No the virtual pre-proposal conference will not be recorded. Pre-recorded site visit has been scheduled for Monday May 18th, 2020 at 10:00am EST.

84 Grimberg

The SF 1442 says an original and 1 copy are required. Section L, page 84 of the RFP, says an original and 3 copies of Technical and an original and 1 copy of Price are required. Please clarify.

Per question 31 all solicitations shall be submitted electronically providing a USB drive therefore only one SF1442 is needed

85 Grimberg

Are the Technical and Price proposals to be submitted on the same CD, or on separate CDs? If both must be provided on the same CD, should it be submitted with the Technical or Price Proposal package?

please refer to question 31, all proposals shall be submitted on USB.

86 Grimberg

In Factor 1, does the five page limit listed in 2.1(A) on page 85 apply to the factor as a whole, or all the projects, or each individual project? Section 2.1 (A.3) states that each resume is limited to four pages; please confirm that resumes do not count toward the five-page limit.

Page limitation per factor has been removed.

Total overall proposal count shall not exceed

100 pages.

87 Grimberg

In Factor 2, do all requirements apply to each subcontractor? I.e. are we to provide three projects per subcontractor, and two resumes per subcontractor? Or are we limited to three projects total, to demonstrate the experience of four subcontractors (mechanical, electrical, life safety, and telecommunications)? Requirement is "per subcontractor".

88 Grimberg

In Factor 2, does the five page limit listed in 2.1(B.1) on page 86 apply to the factor as a whole, or all the projects, or each individual project? Section 2.1 (B.3) states that each resume is limited to four pages; please confirm that resumes do not count toward the five-page limit. Also, does the limit apply to each key subcontractor? Please refer to question 87

89 Grimberg

Would the government allow submission of an existing CPARS in lieu of a Past Performance Questionnaire? Offeror POCs are often reluctant to complete new evaluations if they have already completed a CPARS, and are often unavailable or unable to complete additional new evaluations. No

91 Grimberg

Per RFP section 2.0, the Technical Proposal shall not exceed 30 pages. However, if the five-page limits in Factor 1 and Factor 2 apply to project information only and if Factor 2 information is to be provided for multiple subcontractors, the individual factor page limits add up to well over 30 pages. Please increase the proposal page limit.

Negative, page limit proposal shall remain as inidacted in soliciation.

93 Grimberg Factors 1 and 2: Is each requested resume limited to four pages, or are all resumes combined limited to four pages? The limit shall be 4 pages per resume.

94 Grimberg

Factor 3: Would the government consider allowing offerors to present existing CPARS and/or PPQ evaluations? POCs are often reluctant to provide new evaluations if existing evaluations are available—or POCs are often no longer available for projects going back up to ten years. With consideration for these circumstances, we feel that existing evaluations on official government forms can often best demonstrate past performance on relevant work and are often the only available means for doing so; and therefore, we feel that allowing them would provide the government with an opportunity to better assess offeror qualifications no

99 Grimberg Please provide more definition, preferably by room number, as which rooms under Phase 2 are in Bid Option 3 and which rooms are in Bid Option 4.

Option 3 - C653. Option 4 - C650,C651.

Under base contract, these rooms will be left as shell space. Finishes will be under the bid options.

100 Grimberg Please confirm that the demolition of the Phase 2 area is to be included in the base bid pricing. Confirmed.

101 Grimberg Please confirm that the specification sections for furniture are no longer applicable since Option 1 has been removed from the project. Confirmed