RFI # Contractor Section/Sheet Reference Question Answer

6 Turner HVAC General

Please provide pictures of existing CAHU's that show all surrounding areas,existing duct, piping, wiring controls, and etc. above ceiling and below and raised floor included. Please refer to amendment 003

19 Turner 01 91 13 Please advise if the Commissioning Coordination Supervisor may also serve as the Project Superintendent. (019113-1.5-B)

019113 -1.5.B refers to equipment submittals. Superintendent may serve as GC's designated representative in 1.3.E.3.

28 DCS - Data Centers General

Is there a central location to obtain the forms required such as DC Forms RF- 500 and OTR-553, AOC Past Performance Questionnaire, SF-3881, etc.? DC Forms RF-500 and OTR-553 are not applicable to this procurement. Please see attached SF-3881

41 Hasen Global Arch/Logistics Access Flooring: Does the facility have a stock of RAF panels that can be used if there are insufficient salvaged panels from demolition? The facilities does not havea stock of RAF Panels

76 Kimbal General

Please provide photos of the following electrical equipment for pricing:

• PDU-DP1 – include pictures of the PDU label, Circuit Breakers and circuit breaker labels if possible

• PDU-DP2 – include pictures of the PDU label, Circuit Breakers and circuit breaker labels if possible

• Panel LDS – include pictures of the Panel LDS label, Circuit Breakers and circuit breaker labels if possible

• Panel LDSA – include pictures of the Panel LDSA label, Circuit Breakers and circuit breaker labels if possible

• Panel HDS – include pictures of the Panel HDS label, Circuit Breakers and circuit breaker labels if possible

• UPS in Computer Room C-135

See attached

90 Grimberg

Page 87 of the RFP, Section 2.1(D), includes requirements for Factor 4:

Management Approach and Key Personnel. This factor is not included in the list of proposal subsections in paragraph 2.0 and is not included in Section M. The requirements of this factor are extremely redundant with the other factors (key personnel resumes, management and safety information, etc.). Please advise whether submission of this factor is required. see attached revised section L and M

92 Grimberg Section M includes only Factors 1-3. Please provide evaluation criteria for Factors 4 and 5

93 Grimberg Factors 1 and 2: Is each requested resume limited to four pages, or are all resumes combined limited to four pages?

Please refer to question 86. Proposal submission shall not exceed

Response to Questions Phase II (two) Dated 5.20.2020

95 Grimberg

Factor 4 appears to require many of the same resumes as those submitted in Factors 1 and 2. Can the government confirm that it would like to see the same resumes submitted a second time in Factor 4? If so, can the government confirm that these resumes are excluded from the 10-page limitation associated with Factor 4?

Please refer to question 86. Proposal submission shall not exceed

96 Grimberg

Factor 4, D.2: For the subcontractor key personnel requirement, is the government looking for one resume (Supervisor/Superintendent/Foreman) or two (Supervisor/Superintendent AND Foreman)? The assumption is one, as the nearly identical Factor 2 requirement/language does not include a possible second position. If two are intended in Factor 4, D.2, would the government consider allowing subcontractors to provide only one resume for its principal on-site person? Subcontractors often combine these positions (supervisor/superintendent/foreman). Yes, the government wants the main on-site person resume.

97 Grimberg

Factor 5, E.1: Can the government confirm that it is not looking for the actual names of subcontractor firms that will perform each work activity? Subcontractor selection is usually made moments before proposal submission, as subcontractors are often reluctant to provide pricing and scope information until moments before the proposal submission deadline. Moreover, formal subcontractor reviews and selections often continue post-submission. These circumstances would make provision of actual subcontractor names for E.1, especially in light of an on-site delivery requirement, difficult or impossible unless offerors were to select subcontractors early and omit from consideration any subcontractors submitting materials close to the proposal submission deadline.

Doing so, however, often means that best value and lowest price subcontractors will be unavailable for a proposal, with the result often being higher pricing, incomplete subcontractor materials, and lesser value for the government.

Speicifc contractor names are not required for this factor. The intent is that the trade assocaited with the tasks are identified (i.e.

mechanical, electrical, etc). The specific company performing the action is not required.

98 Grimberg

Would the government consider allowing offerors to provide proposals via electronic delivery only, in lieu of on-site hard-copy and CD submissions? Because pricing often does not conclude until shortly before the submission deadline, it is difficult to complete hard copy pricing materials, update price proposal PDFs, and burn CDs on-site, close to the submission deadline. Our experience has been that electronic submission of proposals is a more streamlined process, especially for price submissions, and still provides the owner with all materials necessary for proposal evaluation.

please refer to question 31, all proposals shall be submitted on

USB.

99 Grimberg Please provide more definition, preferably by room number, as which rooms under Phase 2 are in Bid Option 3 and which rooms are in Bid Option 4.

Option 3 - C653. Option 4 - C650,C651. Under base contract, these rooms will be left as shell space. Finishes will be under the bid options.

100 Grimberg Please confirm that the demolition of the Phase 2 area is to be included in the base bid pricing. Confirmed.

101 Grimberg Please confirm that the specification sections for furniture are no longer applicable since Option 1 has been removed from the project. Confirmed