Architect of the Capitol
Thurgood Marshall Federal Judiciary Building
AO Space Realignments Tasks 2 & 4
AOC Contract No.: AOC14C3002 Requisition/Purchase Request No.: SCA180135
AOC Project Nos. SC18008 Issued for Bid Specifications
08 April 2020
PROPERTY OF THE UNITED STATES GOVERNMENT CONTROLLED
UNCLASSIFIED INFORMATION // LAW ENFORCEMENT SENSITIVE
COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS,
PLANS OR
SPECIFICATIONS TO UNAUTHORIZED USERS IS PROHIBITED
Do not remove this notice
Properly destroy documents when no longer needed
This Page Left Intentionally Blank
AOC P/N: SC18008 //CONTROLLED// 08 April 2020
AO Space Realignments
TABLE OF CONTENTS Issued for Bid
AECOM P/N: 60593208 TOC - 1
//CONTROLLED//
TABLE OF CONTENTS
Division Section Title
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
000107 PROFESSIONAL SEALS
006000 PROJECT FORMS
DIVISION 01 - GENERAL REQUIREMENTS
010000 GENERAL REQUIREMENTS
011000 SUMMARY
012350 OPTIONS
012500 SUBSTITUTION PROCEDURES
012600 CONTRACT MODIFICATION PROCEDURES
013000 CONSTRUCTION SAFETY AND HEALTH
013100 PROJECT MANAGEMENT AND COORDINATION
013115 PROJECT MANAGEMENT COMMUNICATIONS
013200 CONSTRUCTION PROGRESS DOCUMENTATION
013233 PHOTOGRAPHIC DOCUMENTATION
013300 SUBMITTAL PROCEDURES
014200 REFERENCES
014302 QUALITY CONTROL SERVICES
015000 TEMPORARY FACILITIES AND CONTROLS
015010 SCAFFOLDING
015500 SECURITY REQUIREMENTS
016000 PRODUCT REQUIREMENTS
017300 EXECUTION
017329 CUTTING AND PATCHING
017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
017420 MANAGEMENT OF HAZARDOUS WASTE
017700 CLOSEOUT PROCEDURES
017823 OPERATION AND MAINTENANCE DATA
017830 BONDS AND WARRANTIES
017839 PROJECT RECORD DOCUMENTS
017900 DEMONSTRATION AND TRAINING
019113 GENERAL COMMISSIONING REQUIREMENTS
DIVISION 02 - EXISTING CONDITIONS
024119 SELECTIVE DEMOLITION
028213 ASBESTOS ABATEMENT PROCEDURES
028313 LEAD REMOVAL
028401 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs AND
MERCURY
AECOM P/N: 60593208 TOC - 2
028433 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)
DIVISION 03 - CONCRETE
033053 MISCELLANEOUS CAST-IN-PLACE
DIVISION 04 - MASONRY
NOT APPLICABLE
DIVISION 05 - METALS
055000 METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
061000 ROUGH CARPENTRY
064023 INTERIOR ARCHITECTURAL WOODWORK
064116 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
078413 PENETRATION FIRESTOPPING
078443 JOINT FIRESTOPPING
079200 JOINT SEALANTS
079219 ACOUSTICAL JOINT SEALANTS
DIVISION 08 - OPENINGS
081113 HOLLOW METAL DOORS AND FRAMES
081216 ALUMINUM FRAMES
081416 FLUSH WOOD DOORS
081433 STILE AND RAIL WOOD DOORS
084126 ALL-GLASS ENTRANCES AND STOREFRONTS
087100 DOOR HARDWARE
088000 GLAZING
DIVISION 09 - FINISHES
092216 NON-STRUCTURAL METAL FRAMING
092900 GYPSUM BOARD
093013 CERAMIC TILING
095113 ACOUSTICAL PANEL CEILINGS
096513 RESILIENT BASE AND ACCESSORIES
096519 RESILIENT TILE FLOORING
096813 TILE CARPETING
097200 WALL COVERINGS
099123 INTERIOR PAINTING
099300 STAINING AND TRANSPARENT FINISHING
AECOM P/N: 60593208 TOC - 3
DIVISION 10 - SPECIALTIES
101100 VISUAL DISPLAY UNITS
104413 FIRE EXTINGUISHERS AND CABINETS
DIVISION 11 - EQUIPMENT
NOT APPLICABLE
DIVISION 12 - FURNISHINGS
123661.16 SOLID SURFACING COUNTERTOPS
125000 FURNITURE
125900 SYSTEMS FURNITURE
DIVISION 13 - SPECIAL CONSTRUCTION
NOT APPLICABLE
DIVISION 14 - CONVEYING EQUIPMENT
NOT APPLICABLE
DIVISION 21 - FIRE SUPPRESSION
211313 WET-PIPE SPRINKLER SYSTEMS
DIVISION 22 - PLUMBING
220518 ESCUTCHEONS FOR PLUMBING PIPING
220523.12 BALL VALVES FOR PLUMBING PIPING
220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
220553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
220719 PLUMBING PIPING INSULATION
221116 DOMESTIC WATER PIPING
221119 DOMESTIC WATER PIPING SPECIALTIES
221316 SANITARY WASTE AND VENT PIPING
221319 SANITARY WASTE PIPING SPECIALTIES
221319.13 SANITARY DRAINS
224100 RESIDENTIAL PLUMBING FIXTURES
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
230130.51 HVAC AIR-DISTRIBUTION SYSTEM CLEANING
230513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT
230523.12 BALL VALVES FOR HVAC PIPING
230529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC
230713 DUCT INSULATION
230719 HVAC PIPING INSULATION
AECOM P/N: 60593208 TOC - 4
230800 COMMISSIONING OF HVAC
230900 INSTRUMENTATION AND CONTROLS FOR HVAC
232113 HYDRONIC PIPING
232116 HYDRONIC PIPING SPECIALTIES
233113 METAL DUCTS
233300 AIR DUCT ACCESSORIES
233713.13 AIR DIFFUSERS
233713.23 AIR REGISTERS AND GRILLES
238219 FAN COIL UNITS
DIVISION 25 - INTEGRATED AUTOMATION
NOT APPLICABLE
DIVISION 26 - ELECTRICAL
260500 COMMON WORK RESULTS FOR ELECTRICAL
260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260523 CONTROL-VOLTAGE ELECTRICAL POWER CABLES
260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
260533 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
260544 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING
260548.16 SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS
260923 LIGHTING CONTROL DEVICES
262726 WIRING DEVICES
262733 POWER DISTRIBUTION SYSTEMS
262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
265119 LED INTERIOR LIGHTING
265213 EMERGENCY AND EXIT LIGHTING
DIVISION 27 - COMMUNICATIONS
270526 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS
270528 PATHWAYS FOR COMMUNICATIONS SYSTEMS
270529 HANGERS AND SUPPORTS FOR COMMUNICATIONS SYSTEMS
270544 SLEEVES AND SLEEVE SEALS FOR COMMUNICATIONS PATHWAYS AND
CABLING
271513 COMMUNICATIONS COPPER HORIZONTAL CABLING
275119 SOUND MASKING SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
284621.11 ADDRESSABLE FIRE-ALARM SYSTEMS
END OF TABLE OF CONTENTS
SECTION 000107 AOC P/N: SC18008
AO Space Realignments 08 April 2020
000107 SEALS PAGE Issue For Bid
AECOM P/N: 60593208 SECTION 000107 - 1
000107 - 1
DOCUMENT 000107 - SEALS PAGE
1.1 DESIGN PROFESSIONALS OF RECORD
A. Registered Architect
Ryan Horner
DC License No. ARC200418
Responsible for Section in Divisions 02 – 12
C. Fire Protection Engineer
Christopher Moran
DC License No. PE908336
Responsible for Sections in Divisions 21 & 28
E. Telecom Engineer
Christopher Bennett
DC License No. PE907413
Responsible for Sections in Division 27
END OF DOCUMENT 000107
B. Mechanical Engineer
Troy A. Metz
DC License No. PE901218
Responsible for Sections in Divisions 22 & 23
D. Electrical Engineer
Enrique Rodriguez
DC License No. PE907478
Responsible for Sections in Division 26
SECTION 000107 AOC P/N: SC18008
000107 SEALS PAGE Issue For Bid
AECOM P/N: 60593208 SECTION 000107 - 2
000107 - 2
AOC P/N: SC18008 //CONTROLLED//
AO Space Alignments 08 April 2020
006000 PROJECT FORMS Issue for Bid
AECOM P/N: 60593208 006000-1 of 3 Version Date:6/14/2019
SECTION 00 60 00 – PROJECT FORMS
PART 1 - GENERAL
1.01 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.02 SUMMARY
A. Section includes contractual and administrative forms and associated instructions.
B. Related Sections:
1. Division 01 Section "General Requirements" for execution of work.
2. Division 01 Section "Summary of Work" for execution of work.
3. Division 01 Section "Product Requirements and Substitutions" for requirements for submitting comparable product submittals for products by listed manufacturers.
4. Divisions 02 through 49 Sections for specific requirements and limitations for substitutions.
1.03 DEFINITIONS
A. Forms: Paper and/or electronic versions of forms to be used in the execution of the work.
Explanation of form use is contained within the Division 01 Sections.
1.04 ADMINISTRATIVE FORMS
A. Administrative Forms: Administrative forms are identified in Division 00 and 01 sections.
1. Hot Work Permit:
a. Required for any work involving high heat, open flame or flame generating equipment.
b. Refer to Division 01, General Requirements.
2. Out of Service Request Form:
a. Required to schedule interruptions in services to the building.
b. Refer to Division 01, General Requirements.
3. Work Authorization Permit:
a. Required to schedule work within the building. Provide updated forms when information changes.
b. Refer to Division 01, General Requirements.
AECOM P/N: 60593208 006000-2 of 3 Version Date:6/14/2019
4. CP-491 – USCP Request for Check of Criminal History Record:
a. Required to obtain a campus ID badge.
b. Refer to Division 01, Summary of Work.
5. Look Ahead Schedule:
a. Shows the expected format for the two week look ahead schedule. Follow the following guidelines when completing the schedule.
1) Header information shall show on every page of the schedule
2) Fill out the following fields in the Header: AOC Project Name, AOC Project
Number, Contractor’s Project Number.
3) Format the Report Date so that Year (YY), Month (MM) and the Sunday of
Week 1 of the report (WB) are in the following format (YY/MM/WB). For example, for a report presented at a meeting on a Wednesday January 25th, 2017, the Report date would be 17/01/22.
4) Include the legend on all pages. Highlight the cells with green for those tasks that are ahead or on schedule, and red for those tasks that are behind schedule.
5) In the Footer, enter the Name and Title of the person responsible for preparing the report.
6) Each page of the report should indicate the page number and the total number of pages.
7) Indicate a Line number for each activity and task. Once a number has been given to the activity the number shall not be changed. Create a numbering system using the format of the report date above (YY/MM/WB). For example, an activity entered into the Look Ahead Schedule during the week beginning 25 Jan 2017 will use the number “170122-3” (yymmwb-activity number). Do not provide a Line Number for each trade or category.
8) For Schedule Number, provide the identifying code from the Progress schedule.
9) For Trade, enter a uniformat code for the trade performing the work.
a) Code examples: CE-Civil Excavation, Earth Work; L-Landscape, SS-
Structural Steel, SF-Structural Framing; M-Masonry; CC-Concrete; H-
Heating; V- Ventilating; AC-Air Conditioning; E- Electrical, F-Fire
Protection; P-Plumbing
10) Enter a short description of the work to be completed
11) For each day on the schedule (past week, week 1, week 2), enter the percentage of work to be performed during that day. The Status columns required are Past Week, Week 1 and Week 2. The Past Week Percentage is required to gauge the amount of work that was performed during the previous week and the potential impact on the work on future weeks. Week 1 and
Week 2 Percentages are required to determine the anticipation work to be completed during the next two week. This itemization of work alerts the AOC to the work being performed and the impacts on the operation of the Building and the site. Percentages may not change from day to day, week to week or month to month based on the extent of work to be performed within the activity. Enter a red highlight to the cell if the activity is behind schedule.
Enter a green highlight to the cell if the activity is on or ahead of schedule.
12) Indicate the Estimated Date of Completion (EDOC) for each activity. Do not provide an Estimated Date of Completion for Trades or Categories.
13) Indicate whether the activity is on the critical path of the overall progress schedule.
AECOM P/N: 60593208 006000-3 of 3 Version Date:6/14/2019
14) Insert comments regarding the critical issues that affect the progress of the work. Make reference to Requests for Information (RFI), Proposed Change
Orders (PCO), Change Order (CO), etc. that need to be addressed by the AOC.
b. Refer to Division 01, Summary of Work.
6. Substitution Request Form:
a. Required to request product substitution.
b. Refer to Division 01, Product Requirements and Substitution.
7. Non-Disclosure Agreement for Contract Employees
a. Required to access CUI/LES information related to project.
b. Refer to Division 01, General Requirements
8. Fire Alarm/Fire Protection Impairment Form
a. Required to be submitted prior to any impacts to Fire Alarm or Fire Protection systems
9. Vehicle Delivery Access List
a. Required for all delivery vehicles entering the project site/building
B. Copies of forms are available from the Architect of the Capitol.
C. Architect of the Capitol reserves the right to modify the forms. Any proposed changes to the forms must be approved by the Architect of the Capitol.
1.05 PAYMENT FORMS
A. Schedule of Values Form:
1. Coordinate with 01 29 00 Payment Procedures.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 00 6000
Out of Service Request Form
AOUSC:
AOC:
Prop. Man.:
S ec ti o n C
HVAC ~ BASNet
HVAC ~ Chilled Water or Steam
Detailed description of WHAT System(s) are to be impaired:
Company Name:
TMA Work Order or Work Request No.
(To be completed by Requestor --- attach a sketch if necessary)"WHAT" INFORMATION
S ec ti o n B
S ec ti o n A
Address:
Contact Name:
Contact Cell Number:
System Description Detailed Description of system(s) to be impaired
Domestic Sanitary Waste System
Electrical ~ Power Distribution (Other)
HVAC ~ O/A or Exhaust System
Cable TV
CONTRACTOR CONTACT INFORMATION (To be completed by requesting contractor)
Electrical ~ UPS
Security Infrastructure
Domestic Water System
Electrical ~ Lighting
Electrical ~ Generator
Complete below for Project Work:
Project Name:
Project Number:
Project Manager:
Contract COTR:
Contact Email Address:
Jurisdictional Representative:
(VTE) Elevator System
Requestor:
This Out of Service Request Form is to be utilized for ALL scheduled impairments of all building systems EXCEPT Life
Safety Systems. The Life Safety System Notification of Temporary Impairment form shall be utilized for all impairments of
Life Safety Systems. Life Safety Systems are defined as:
Atrium Smoke and Exhaust system; Clean-Agent Fire extinguishing systems; Elevator Hoistway Pressurization System;
Stair Pressurization System; Fire Alarm and Detection Systems; and, Fire Supression Systems.
(To be completed by requesting agency, contractor, or AOC Property
Management Contractor)
REQUEST INITIATION
Request Date:
Responsible Party:
Responsible Party:
Responsible Party:
Rev #1: 06/20/17 Architect of the Capitol Supreme Court Building and Grounds
Out of Service Request Form
AOC:
Reason for disapproval
S ec ti o n E
DISTRIBUTION LIST
Signed:
Title
"WHEN" INFORMATION
Precisely describe when the proposed Outage(s) are to occur:
Property Management Contractor
End Date + Time
S ec ti o n D
JURISDICTIONAL REVIEW AND APPROVAL
AOUSC/ADM
S ec ti o n F
NORMAL HOURS OF OPERATION ARE 6:00AM - 8:00PM Monday - Friday
AFTER HOURS ARE ANYTIME NOT DEFINED AS NORMAL HOURS
Requestor
Activity
S ec ti o n G
IMPACT
Section G shall be completed by the AOC/SCBG Approver or Property Management Contractor. Provide narrative, if necessary, describing in detail the impact the proposed Service Outage poses upon the facility considering operations, tenants, resources, and other affected systems.
Security
Start Date + TimeRoom Name, Location
Approved by: Disapproved by: Date:
Rev #1: 06/20/17 Architect of the Capitol Supreme Court Building and Grounds
Work Authorization Permit
Rev. #3: 7/20/2016 Architect of the Capitol, Supreme Court Building and Grounds
REQUEST INITIATION (To be completed by requesting agency or AOC Property Management Contractor) Work Sponsor: Request Date:
AOUSC:
AOC:
CBS:
Se ct io n
C
Work Authorization Permit #
Company Name:
Last name First, First name Last Cellular Telephone Number
We request parking for the following vehicles:
CONTRACTOR "WHAT" INFORMATION
(To be completed by requesting contractor. Attach a sketch if necessary) Detailed description of WHAT Work or Services to are provided:
Se ct io n
A
Address:
Contact Name:
Contact Cell Number:
Valid AOC Badge?
(Y/N)
We request access for the individuals named below: (attach separate sheet if necessary)
Se ct io n
B
Supervisor's Name
CONTRACTOR CONTACT INFORMATION (To be completed by requesting contractor)
Vehicle Make & Model Tag State Tag Number Vehicle Color
Complete below for Project Work:
Project Name:
Project Number:
Project Manager:
Contract COTR:
(To be assigned by the Customer Service Center)
Contact Email Address:
Responsible Party:
Responsible Party:
Responsible Party:
Yes No Yes No Yes No Yes No Yes No Yes No
Rev. #3: 7/20/2016 Architect of the Capitol, Supreme Court Building and Grounds
Work Authorization Permit # (To be assigned by the Customer Service Center)
Work producing vibrations?
Work producing odors?
Confined Space Entry?
Impact to occupant ingress or egress? Noisy Work?
CONTRACTOR "WHERE" INFORMATION
(To be completed by requesting contractor) Detailed description of WHERE Work or Services are to be provided:
Escort Required?
Areas or location to be visited including room numbers and room names Room Name, Location Room Number Work to be performed
Any other Tenant occupied space (specify):
CONTRACTOR "WHEN" INFORMATION
Precisely describe when activities are proposed to occur:
End Date + Time
Do you require access to any of the following areas?
Supreme Court Retired Justice Chambers:
6th Floor Roof:
AFTER HOURS ARE ANYTIME NOT DEFINED AS NORMAL HOURS
Start Date + TimeRoom Name, Location Activity
Se ct io n
E
NORMAL HOURS OF OPERATION ARE 6:00AM - 8:00PM Monday - Friday
Se ct io n
D
Penthouse Roof:
If you answered YES to any question above, additional explanation is necessary below:
Description:
Tellecommunications Closets:
Hot Work Permit?
Fire Protection Impairment required?
Yes No
Yes No Yes No Yes No Yes No
Yes No Yes No Yes No Yes No
Yes No Yes No
Rev. #3: 7/20/2016 Architect of the Capitol, Supreme Court Building and Grounds
Work Authorization Permit # (To be assigned by the Customer Service Center)
AOUSC:
CBS:
AOC:
Se ct io n
F
SPECIAL INSTRUCTIONS
SECURITY:
(Enter date forwarded to Building Security)
WORK AUTHORIZATION AND DISTRIBUTION
Report to Property Management Office, C-260, Extension 4444.
Se ct io n
G
Approved by:
Approved by:
Approved by:
Disapproved by:
Disapproved by:
Disapproved by:
Date:
Date:
CP-491
(05/18) UNITED STATES CAPITOL POLICE
REQUEST FOR CHECK OF CRIMINAL HISTORY RECORDS
(Please Type or Print Legibly)
INSTRUCTIONS
• APPLICANT – Complete Sections 1- 17 of this form.
• APPLICANT’S AGENCY – Complete sections 18-24 of this form.
• Bring this form along with a valid (non-expired) government-issued photo identification that officially establishes your identity to the
United States Capitol Police Badge & Fingerprinting Office located in the Fairchild Building, 499 South Capitol Street, SW, Room 127, Washington, DC 20003.
1. NAME (Last, First, Middle)
2. ADDRESS (Complete Address)
3. EMPLOYER
4. OTHER NAMES EVER USED (e.g. maiden name, nickname, etc.). If you have never used another name write “None”
5. TELEPHONE
NUMBER
6. DATE OF
BIRTH (mm/dd/yyyy)
7. BIRTHPLACE
(City /State/ Country)
8. SOCIAL
SECURITY #
9. COUNTRY OR
CITIZENSHIP
10. GENDER IDENTITY 11. RACE 12. HEIGHT 13. WEIGHT 14. EYE COLOR 15. HAIR COLOR
SIGNATURE AND RELEASE OF INFORMATION: READ THE FOLLOWING CAREFULLY BEFORE SIGNING
• I understand that the information provided above will be used to check the criminal history records of the Federal Bureau of
Investigation.
• I consent to the use of the information provided above in making a security determination concerning me.
• I certify that I am authorized to work in the United States and if requested can provide legal documents supporting my certifications.
• I acknowledge by my signature below that any falsification of the information provided and or the use, possession, or representation of any false identification by me is subject to prosecution and penalties.
• I certify that to the best of my knowledge and belief, all the information provided above is true, correct, complete, and made in good faith.
16. APPLICANT SIGNATURE 17. DATE (mm/dd/yyyy)
AUTHORIZED REQUESTOR
To be filled out by the individual Authorized to Request that the Applicant submit to a Criminal History Records check.
18. NAME (Last, First, Middle) please print 19. AGENCY
20. POSITION/TITLE 21. TELEPHONE NUMBER 22. DATE OF REQUEST
I request that the applicant/employee indicated above be fingerprinted by the United States Capitol Police and that these fingerprints be submitted for a check of the criminal history records of the Federal Bureau of Investigation. This check will be used in making a security determination concerning this applicant/employee. I have verified that the applicant is authorized to legally work within the United States in accordance with the federal government hiring provisions of the Immigration Reform and Control Act of 1986 (Pub. L. 603), as amended, applicable Form I-9 requirements, and any executed Memorandum of Understanding with the United States Capitol Police regarding Requests for Criminal History Record Information by Congressional Employing Offices.
23. SIGNATURE 24. DATE (mm/dd/yyyy)
IDENTIFICATION SECTION
25. INDIVIDUAL CONDUCTING
RECORDS CHECK
26. DATE CHECK
CONDUCTED
27. FBI # (If one, write none”)
28. DOCUMENT
ESTABLISHING IDENTITY
AOC Project Name:
AOC Project Number:
Contractor's Project Number:
Report Date:
LOOK AHEAD SCHEDULE (LAS) - Two Week Duration Super: S Project: B
Past Week Week 1 Week 2 Sun M T W Th F SAT Sun M T W Th F SAT Sun M T W Th F SAT
Date:
A B C D E1 E2 E3 E4 E5 E6 E7 F1 F2 F3 F4 F5 F6 F7 G1 G2 G3 G4 G5 G6 G7 H I J
CP CommentsActivity Description
Legend Scheduled Behind Schedule
EDOCLine No.
Sch No.
Trade
Job #:
Dates:
Prepared By: 1 of 1
Page Left Intentionally Blank
ID # Last First Organization/Company Name Telephone Organization Call POC (Y/N)
Location Begin (MM/DD/YY)
End
(MM/DD/YY)
Begin
(HH:MM)
End
(HH:MM)
Weekend Access (Y/N)
1 Sawyer Thomas Turner Construction Co Kevin Salvador 202-594-6940 AOC Y C-170 Cafeteria, 3rd Floor, 4-400 DPS-CSO AO Library 10/21/2019 10/30/2019 N 2 Hall Travis Turner Construction Co Kevin Salvador 202-594-6940 AOC Y C-170 Cafeteria, 3rd Floor, 4-400 DPS-CSO AO Library 10/21/2019 10/30/2019 N 3 Haley Praneet Turner Construction Co Kevin Salvador 202-594-6940 AOC Y C-170 Cafeteria, 3rd Floor, 4-400 DPS-CSO AO Library 10/21/2019 10/30/2019 N 4 Kevin Salvador 202-594-6940 AOC Y C-170 Cafeteria, 3rd Floor, 4-400 DPS-CSO AO Library 10/21/2019 10/30/2019 N 5 Kevin Salvador 202-594-6940 AOC Y C-170 Cafeteria, 3rd Floor, 4-400 DPS-CSO AO Library 10/21/2019 10/30/2019 N
TMFJB BUILDING ACCESS LIST (Version #1) - 10/21/2019
Time (Blank=No Limit)
Effective DatesPOC (Government Staff)Name
Thurgood Marshall AO Space Realignment Tasks 1,3,5
Page Left Intentionally Blank
SUBSTITUTION
REQUEST
(After the Bidding Phase) Project:
To:
Re:
Substitution Request Number:
From:
A/E Project Number:
Contract For:
Specification Title:
Description:
Section:
Page:
Article/Paragraph:
Proposed Substitution:
Manufacturer:
Address:
Phone:
Trade Name:
Model No.:
Installer:
Phone:
History: New product 2-5 years old 5-10 yrs old More than 10 years old
Differences between proposed substitution and specified product:
Point-by-point comparative data attached - REQUIRED BY A/E
Reason for not providing specified item:
Similar Installation:
Project:
Architect:
Owner:
Date Installed:
Proposed substitution affects other parts of Work: No Yes; explain
Savings to Owner for accepting substitution:
Proposed substitution changes Contract Time: No Yes [Add] [Deduct] days.
Supporting Data Attached: Drawings Product Data Samples Tests Reports
Copyright 1996, Construction Specification Institute, 601 Madison Street, Alexandria, VA 22314-1791
Page of
September 1996 CSI Form 13.1A
SUBSTITUTION
REQUEST
(Continued)
The Undersigned certifies:
• Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product.
• Same warranty will be furnished for proposed substitution as for specified product.
• Same maintenance service and source of replacement parts, as applicable, is available.
• Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule.
• Cost data as stated above is complete. Claims for additional costs related to accepted substitution which may subsequently become apparent are to be waived.
• Proposed substitution does not affect dimensions and functional clearances.
• Payment will be made for changes to building design, including A/E design, detailing, and construction costs caused by the substitution.
• Coordination, installation, and changes in the Work as necessary for accepted substitution will be complete in all respects.
Submitted by:
Signed by:
Firm:
Telephone:
Attachments:
A/E's REVIEW AND ACTION
Substitution approved - Make submittals in accordance with Specification Section 01330.
Substitution approved as noted - Make submittals in accordance with Specification Section 01330.
Substitution rejected - Use specified materials.
Substitution Request received too late - Use specified materials.
Signed by:
Additional Comments: Contractor Subcontractor Supplier Manufacturer A/E
Copyright 1996, Construction Specification Institute, 601 Madison Street, Alexandria, VA 22314-1791
Page of
September 1996 CSI Form 13.1A
AOC P/N: SC18008
//CONTROLLED//
08 April 2020
Non-Disclosure Agreement for Contract Employees Issued for Bid
AECOM P/N: 60593208 011100 - 1 24 October 2019
Non-Disclosure Agreement for Contract Employees Conditional Access to Controlled Unclassified Information/Law Enforce-ment Sensitive for The Architect of the Capitol (AOC)
I, hereby consent to the terms in this
Non-Disclosure Agreement (NDA) in consideration of my being granted conditional access to certain United
States Government documents, material containing sensitive but unclassified information, or “Source selection information” as defined in the Federal Acquisition Regulations (hereafter defined as “Sensitive
Information”).
I understand and agree to the following terms and conditions:
1. By being granted conditional access to Sensitive Information, the United States Government has placed special confidence and trust in me and I am obligated to protect this information from unauthorized disclosure, in accordance with the terms of this Agreement.
2. As used in this Agreement, Sensitive Information is any information, the loss, misuse, or unauthorized access to or modification of which could adversely affect the national interest or the conduct of Federal programs, or the privacy to which individuals are entitled under Title 5 U.S.C. § 552a, but which has not been specifically authorized under criteria established by an Act of Congress to be kept secret in the interest of national defense or foreign policy.
3. I am being granted conditional access upon my execution of this Agreement for the sole purpose of contracting support under a Federal agency procurement conducted by the Architect of the Capitol. This approval will permit me conditional access to certain Sensitive Information and/or to attend meetings in which such Sensitive Information is discussed or otherwise made available to me. This Agreement will not allow me access to materials which the Architect of the Capitol has predetermined, in its sole discretion, are inappropriate for disclosure pursuant to this Agreement. This may include Sensitive Information provided to the Architect of the Capitol by other agencies of the United States Government.
4. I will never divulge any Sensitive Information which is provided to me pursuant to this Agreement to anyone, unless I have been advised in writing by the Architect of the Capitol that the individual is authorized to receive it. Should I desire to make use of any Sensitive Information, I will do so in accordance with paragraph 6 of this Agreement. I will submit to the Architect of the Capitol for security review, prior to any submission for publication, any book, article, column or other written work for general publication that is based upon any knowledge I obtained during the course of my work on this contract in order for the Architect of the Capitol to ensure that no Sensitive Information is disclosed.
5. I hereby assign to the United States Government all royalties, remuneration, and emoluments that have resulted will result or may result from any disclosure, publication, or revelation of Sensitive Information not consistent with the terms of this Agreement.
6. If I am permitted, at the sole discretion of the Architect of the Capitol, to review any official documents containing Sensitive Information, such review will be conducted at a secure facility or under circumstances which will maintain the security protection of such material. I will not be permitted to and will not make any copies of documents or parts of documents to which conditional access is granted to me. Any notes taken during the course of such access will remain at the Architect of the Capitol (AOC) to be placed in secure storage unless it is determined by AOC officials that the notes contain Sensitive Information. If I wish to have the notes released to me, AOC officials will review the notes for the
//CONTROLLED//
08 April 2020
Non-Disclosure Agreement for Contract Employees Issued for Bid
AECOM P/N: 60593208 011100 - 2 24 October 2019 purposes of deleting any Sensitive Information to create a redacted copy of the notes. If I do not wish a review of any notes that I make, those notes will remain sealed in secure storage at the Architect of the
Capitol.
7. If I violate the terms and conditions of this Agreement, I understand that the unauthorized disclosure of
Sensitive Information could compromise the security and/or the mission of the Architect of the Capitol.
8. If I violate the terms and conditions of this Agreement, such violation may result in the cancellation of my conditional access to Sensitive Information. This may serve as a basis for denying me conditional access to AOC information, both classified and controlled unclassified, in the future. If I violate the terms and conditions of this Agreement, the United States may institute a civil action for damages or any other appropriate relief. The willful disclosure of information to which I have agreed therein not to divulge may constitute a criminal offence.
9. Unless and until I am provided a written release by the Architect of the Capitol from this Agreement or any portions of it, all conditions and obligations contained in this Agreement apply both during my period of conditional access, which shall terminate at the conclusion of my work on this contract, and at all times thereafter.
10. Each provision of this Agreement is severable. If a court should find any provision of this Agreement to be unenforceable, all other provisions shall remain in full force and effect.
11. I understand that the United States Government may seek any remedy available to it to enforce this
Agreement, including, but not limited to, application for a court order prohibiting disclosure of information in breach of this Agreement.
12. By granting me conditional access to information in this context, the United States Government does not waive any statutory or common law evidentiary privileges or protections that it may assert in any administrative or court proceeding to protect any Sensitive Information to which I have been given conditional access under the terms of this Agreement.
13. These restrictions are consistent with and do not supersede, conflict with or otherwise alter the employee obligations, rights or liabilities created by Section 7211 of Title 5, United States Code (governing disclosures to Congress); Section 2302(b)(8) of Title 5, United States Code, as amended by the
Whistleblower Protection Act (governing disclosures of illegality, waste, fraud, abuse or public health or safety threats); the Intelligence Identities Protection Act of 1982 (50 U.S.C. 421 et seq.)(governing disclosures that could expose confidential Government agents), and the statutes which protect against disclosure that may compromise the national security, including Sections 641, 793, 798, and 952 of Title
18, United States Code, and Section 4(b) of the Subversive Activities Act of 1950 (50 U.S.C. Section 783
(b)). The definitions, requirements, obligations, rights, sanctions and liabilities created by listed statutes are incorporated into this Agreement and are controlling.
14. My execution of this Agreement shall not nullify or effect in any manner any other secrecy or nondisclosure Agreement which I have executed or may execute with the United States Government.
15. I make this Agreement in good faith, without mental reservation or purpose of evasion.
//CONTROLLED//
08 April 2020
Non-Disclosure Agreement for Contract Employees Issued for Bid
AECOM P/N: 60593208 011100 - 3 24 October 2019
Signature of Contractor Employee or Date
Corporate Representative/Officer, Title and Company Name
This Agreement was accepted by the undersigned on behalf of the Architect of the Capitol as a prior con-dition of conditional access to Controlled Unclassified Information/Law Enforcement Sensitive.
//CONTROLLED//
08 April 2020
Non-Disclosure Agreement for Contract Employees Issued for Bid
AECOM P/N: 60593208 011100 - 4 24 October 2019
Notification of Fire Alarm / Fire Protection System Temporary Impairment
IMPAIRMENT TYPE:
SYSTEM IMPAIRED:
Water-Based Fire Suppression Systems: - (Specify Below the Zone Impaired, Floor, Area, Other)
Se ct io n
A Se ct io n B
Clean-Agent Fire Extinguishing System (USCP Radio Room)
Elevator Hoist way Pressurization System - (Check Elevator Bank Systems to be Impaired.)
(Check One Item.)
Emergency Impairment: Any situation in which an accident creates an unintentional fire system impairment. Emergency impairments may affect only one system or in a rare instances an impairment may affect the entire site. (An example of this is a site wide power outage or a loss of the water supply system to the site.
Hidden Impairment:
Any situation in which the fire system is found to be impaired, and the impairment is unknown to the group authorized to impair the system. (Note:
Upon discovery, the person finding the impairment reports it though the Facilities Service Desk, which treat the request as an emergency impairment.)
Atrium Smoke Exhaust System
Floor Pressurization - (Check Floor Level System(s) to be Impaired.)
Stairway Pressurization System - (Check Stairway Systems to be Impaired.)
Planned Impairment: Any situation in which all or part of an active fire system is turned off, deliberately activated for test or drill purposes, or otherwise temporarily rendered inoperable by the group authorized to perform such an activity.
Fire Alarm & Detection System
(Check All That Apply.)
Passenger Elevators
GPE - #1 & 2: (SF #55)
GPE - #3 & 4: (SF #66)
PE - #1, #2, & #3: (SF #53)SE - #1 (SF #54)
GPE - #5 - RJC: (SF #65)
PE - #4, #5, & #6: (SF #52)
PE - #7, #8, & #9: (SF #44)
PE - #10, #11, & #12: (SF #45)
Service ElevatorGarage Passenger
Concourse
Mezzanine Second Floor Third Floor
Fourth Floor
Sixth Floor
Fifth Floor
Seventh Floor
Stairway A
Stairway B
Stairway C
Stairway D
Stairway E
Stairway F
Stairway G
Stairway H
Ground
Revision #2, 4/02/2014 e-mail:
Date of Impairment
Address:
End Time of Impairment
Total Time of Impairment
Company Name:
ON SITE CONTACTS:
(To be completed by individual preparing form.)
Individual
Contact Name:
Representing Contact Number
Se ct io n
D
Contact Cell Number:
e-mail:
DATE & TIME OF IMPAIRMENT OF SYSTEM(S):
(To be completed by individual preparing form.)
Se ct io n
E Se ct io n F
Se ct io n
C
(Date)
Address:
Contact Name:
Contact Cell Number:
REQUEST PREPARED BY: (To be completed by individual completing form.)
Company Name:
Signature of Preparer:
COORDINATED BY:
(To be completed by individual preparing form.)
Start Time of Impairment
Se ct io n
G
ON SITE CONTROLS
REASON FOR IMPAIRMENT
Se ct io n
H
3101 Wilson Boulevard, Suite 900 Arlington, VA 22201
Project:___________________
Delivery Access List #xxx – xx/xx/xx
ID
Company Driver’s Name Vehicle Type, Make, Model, Color State License Plate
1 Include identifying markings/lettering in description as applicable
010000 GENERAL REQUIREMENTS Issued for Bid
AECOM P/N: 60593208 SECTION 010000-1 of 9 Version Date: 6/14/2019
SECTION 010000 – GENERAL REQUIREMENTS
GENERAL
SUMMARY
A. The provisions of the Division 01 specifications apply to the entire work of the Contract.
B. This Section describes the following in general:
1. Definitions and terms.
2. Background information.
3. Summary of the Work.
4. Supervision and construction procedures.
5. Project Schedule.
6. Tax-Exempt work.
7. Examination of existing site conditions
8. Conflicting requirements.
9. Contract documents maintained on project site.
10. Confidentiality and security of documents.
11. Advertising and promotional materials.
12. Specification and Drawing conventions.
13. References.
C. Related Requirements include, but are not limited to the following:
1. Section 011000 “Summary” for project information, general scope of work, site restrictions, work restrictions, and coordination with occupants.
2. Section 013100 “Project Management and Coordination” for key staff, meetings, administrative submittals, PMIS, and Requests for Information (RFIs).
3. Section 013200 "Construction Progress Documentation" for construction progress schedule, progress reporting, field reports, and requests for extension of time.
DEFINITIONS AND TERMS
A. The term “Government” means the United States of America and shall be represented by the Architect of the Capitol (AOC), who is the Contracting Officer (AOC52.202-2).
B. The term “Architect” as used in the Contract Documents shall mean the Architect of the
Capitol, the Contracting Officer, or the Contracting Officer’s Technical Representative
(AOC52.202-2).
C. The term “Associate Architect” shall mean the design professional(s) retained by the
Architect to prepare designated portions of the Contract Documents.
D. The term “Contracting Officer” (CO) as used in the Contract Documents means the
Architect of the Capitol or his duly authorized representative (AOC52.202-2).
E. The term “Contracting Officer’s Technical Representative” (COTR) as used in the
Contract Documents means the duly authorized representative the Architect of the
Capitol.
F. The term “Contract Documents” includes, collectively, the Project Manual, the contract drawings and the addenda and modifications thereto, if any (AOC52.202-2). These documents are not to be used separately for bid or construction as they represent the entirety of the project. The Contractor is responsible for insuring that the documents are used together.
G. The term “Work” includes, but is not limited to, materials, labor, and manufacturer and fabrication of components (AOC52.202-2).
AECOM P/N: 60593208 SECTION 010000-2 of 9 Version Date: 6/14/2019
H. The term “Specifications” means the portion of the Contract Documents that consist of the written requirements for materials, equipment, construction systems, standards and workmanship for the Work, and performance of related services (AOC52.202-2).
I. The term “Drawings” means the graphic and pictorial portions of the Contract Documents, wherever located and whenever issued, that show the design, location and dimensions of the Work, and generally includes plans, elevations, sections, details, schedules and diagrams (AOC52.202-2).
J. “Informational Documents” include documents that are included for convenience with the
Contract Documents but are not Contract Documents. They are indicated “For
Information Only” and may include drawings, hazardous material reports, photographs, historic documents, and the Preservation Policy. The Contractor is expected to independently verify all information shown in informational drawings and to provide the
Contractor’s own surveys, testing, and verification of conditions shown therein.
K. “Notice of Award” is the Architect’s written confirmation of an award of a contract to the successful bidder, stating the award, award date, and including the COTR letter.
L. “Notice to Proceed” is the formal authorization to the Contractor to begin the Work. Unless specifically authorized in writing, any steps taken in connection with the performance of, or the preparation to perform, the Contract, prior to issuance of the Notice to Proceed, will be the responsibility of and at the risk of the Contractor, and without any cost whatsoever to the Architect (AOC52.211-6).
M. “Substantial Completion” is defined in Section 017700 “Closeout Procedures.”
N. “Beneficial Occupancy” is defined in Section 017700 “Closeout Procedures.”
O. “Conditions for Final Acceptance” are specified in Section 017700 “Closeout Procedures.”
P. The “Project Management Information System” (PMIS) is defined in Section 013115
“Project Management Communications.”
Q. The terms “Must” and “Shall” are used interchangeably and denote the imperative. “May” denotes the permissive. However, the words “no person may…” mean that no person is required, authorized, or permitted to do the act described.
R. Unless noted otherwise, all number of days indicated are in calendar days.
BACKGROUND INFORMATION
A. AOC’s purview: The Architect of the Capitol (AOC) is responsible for the maintenance, operation, development, and preservation of over 17,400,000 square feet of building space and over 530 acres of land within the United States Capitol Complex and outlying sites. AOC facilities are organized by Jurisdictions which include the United States
Capitol, the House Office Buildings, and the Senate Office Buildings, the Library of
Congress Buildings and Grounds, the United States Supreme Court, the United States
Botanic Garden, the United States Capitol Power Plant, the Capitol Grounds, and the
Capitol Police Buildings, Grounds and Security. AOC maintains off-site facilities in the
District of Columbia and in Virginia and Maryland. Some off-site facilities include climate control book storage facilities, data centers, Security training facilities, child care centers and mail facilities.
B. Higher standard of care: Compared to a typical commercial project, an AOC project requires on the part of the Contractor a higher level of attentiveness and detail, a greater amount of look-ahead and pre-planning, and a rigorous regard for security restrictions.
AOC projects seek to preserve the character and history of the Capitol, other Capitol
Complex Buildings, or the United States Capitol Grounds. AOC’s design guidelines emphasize building longevity, security and safety, and historic preservation. The
AECOM P/N: 60593208 SECTION 010000-3 of 9 Version Date: 6/14/2019
Contractor shall accord with these precepts by anticipating greater attention to detail and tighter coordination with stakeholders.
C. Coordination with Other Work: Contractor should anticipate and plan for concurrent projects with overlapping schedules and work areas. The Contractor shall fully inform himself as to conditions relating to construction and labor under work by others that may affect the Project. The Contractor shall cooperate in every way with other parties doing work and provide, to the extent their work is affected by his work, all information necessary for the proper execution of their work, without delay (AOC52.236-2).
D. Irregularity of Capitol Complex operations: Capitol Complex operations are, at irregular and unanticipated times, interrupted due to events that can occur on the Capitol
Complex, e.g. funerals in the Rotunda, closure of Congressional buildings due to unusual activities, etc. These events can impact AOC contractor operations. Any AOC contractor that becomes aware of an event that may affect its operations on the Capitol Complex may go to www.aoc.gov/business/contractors to receive current information of the operational status of the Capitol Complex. Before ceasing or limiting its operations, the
Contractor must obtain written approval from the COTR (AOC52.204-6).
SUMMARY OF THE WORK
A. Project/Work Identification
1. General: Project name is AO Space Realignments, Thurgood Marshall Federal
Judiciary Building 1 Columbus Circle, Washington, D.C., as shown on Contract
Documents prepared by the Architect of the Capitol (AOC). Drawings and specifications are dated February 19, 2020.
2. Summary by Reference: Work of the Contract can be summarized by references to the SCHEDULE, GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS, Official Procedure for Making Changes in Contracts, Specification Sections, Drawings, Amendments and Modifications to the contract documents issued subsequent to the initial printing of this Project Manual and including, but not necessarily limited to, printed material referenced by any of these.
3. General scope of work and other project information are described in Section 011000
“Summary.”
SUPERVISION AND CONSTRUCTION PROCEDURES
A. The Contractor shall supervise and direct the Work and be responsible for construction means and methods. Contractor is responsible for coordinating all portions of the Work and for jobsite safety.
B. Comply with governing regulations and the codes and standards imposed upon the work.
These requirements include the obtaining of permits, licenses, inspections, releases and similar documentation, as well as payments, statements and similar requirements associated with regulations, codes and standards.
PROJECT SCHEDULE
A. Overall project schedule narrative
1. The construction of the Task 2 Spaces (2nd and 5th floors) shall be phased as indicated on the construction documents.
2. Phasing requirements, Task 2:
Four phases of the work will be required. Phasing boundaries are indicated in the construction documents.
Notice shall be provided by the contractor a minimum of twenty-eight (28) calendar days prior to mobilization to site of Phase 1 of construction.
AECOM P/N: 60593208 SECTION 010000-4 of 9 Version Date: 6/14/2019
Submission and acceptance of the CPM schedule will not constitute notice as required in this section.
Notice shall be provided by the contractor twenty-eight (28) calendar days prior to substantial completion of each individual phase.
Twenty eight (28) calendar days will be required to facilitate tenant relocations between each phase of work. This twenty-eight (28) calendar day period will begin upon substantial completion of the prior phase.
TAX-EXEMPT WORK
A. Reference AOC52.229-1.
EXAMINATION OF EXISTING SITE CONDITIONS
A. Execution of the Contract by the Contractor is a representation that the Contractor has visited the Project site, become generally familiar with local conditions, and correlated personal observations with the requirements of the Contract Documents.
B. Contractor shall, before starting each portion of the Work, carefully review the relevant
Contract Documents as well as information provided by Architect, shall take any necessary field measurements of existing conditions, and shall observe any conditions at the site affecting the Work.
CONFLICTING REQUIREMENTS
A. Contractor shall promptly inform Architect, in writing, of any discovered errors, omissions, discrepancies, conflicts, or ambiguities in the Contract Documents before proceeding with any work affected by such factors. Failure to do so will be at the risk of the
Contractor (AOC52.311-3).
B. Anything mentioned in the specifications and not shown on the drawings, or shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. In case of difference between drawings and specifications, promptly submit a Request for Information (RFI) to the Architect, who shall promptly make a determination in writing. Any adjustment by the Contractor without such a determination shall be at the Contractor’s own risk and expense (AOC52.236-10).
Delays necessitated by requests for interpretation shall not form the basis for a Change to the contract. The Architect’s interpretation and decision shall be final.
C. Omissions from the drawings and specifications or the mis description of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or mis described details of the Work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications
(AOC52.236-10).
D. Industry Standards: Where compliance with two (2) or more industry standards or sets of requirements is specified, and overlapping of those different standards or requirements establishes different or conflicting minimums or levels of quality, the most stringent requirement is intended and will be enforced, unless specifically detailed language written into Contract Documents clearly indicates that a less stringent requirement is to be fulfilled. Refer apparently-equal-but-different requirements, and uncertainties as to which level of quality is more stringent, to the Architect for a decision before proceeding.
CONTRACT DOCUMENTS MAINTAINED ON PROJECT SITE
AECOM P/N: 60593208 SECTION 010000-5 of 9 Version Date: 6/14/2019
A. Contractor shall keep on the Project site a copy of the full-sized drawings and specifications, approved shop drawings, product data and samples, and shall at all times give the Architect access thereto (AOC52.236-10).
B. As specified in Section 017839 “Project Record Documents,” store record documents and samples in the field office apart from the Contract Documents used for construction.
CONFIDENTIALITY AND SECURITY OF DOCUMENTS
A. Before dissemination to subcontractors or other personnel, all Architect drawings and electronic copies thereof shall be considered at minimum to be Sensitive but Unclassified
(SBU) (AOC52.223-3).
1. The following statement shall be imprinted on each page of drawings: “PROPERTY
OF THE UNITED STATES GOVERNMENT. COPYING, DISSEMINATING, OR
DISTRIBUTING THESE DRAWINGS, PLANS OR SPECIFICATIONS TO
UNAUTHORIZED USERS IS PROHIBITED.”
2. Do not remove this notice.
3. Properly destroy documents when no longer needed.
B. Contractor is strictly prohibited from placing or transmitting drawings and specifications on the Internet or modem without express permission from the Architect (AOC52.223-
4). Use of e-Builder as specified in Specification 013115 is permitted.
C. Any information supplied to the Contractor by the Architect shall be considered confidential and/or proprietary. Contractor shall not disclose such information to a third party without prior written consent of Architect (AOC52.203-5).
ADVERTISING AND PROMOTIONAL MATERIALS