About this file

This is a Direct Labor Burden Calculation form issued by the Colorado Office of the State Architect, State Buildings Program, for the Department of Military and Veterans Affairs (DMVA) related to Project 082411, the Montrose Indoor Firing Range Lead Dust Mitigation project. The form is required to be submitted for review prior to execution of a construction agreement and must be completed by the prime contractor and each major subcontractor (including electricians, plumbers, mechanical contractors, excavators, millwork, and concrete specialists). One Labor Burden Calculation Sheet must be provided per contractor and subcontractor, with the agreed-upon labor burden percentage to be incorporated into the contract as part of Exhibit A and utilized in any future Change Order Proposals per SC-6.312.

The form requires contractors and subcontractors to itemize their labor overhead as a percentage of total labor costs, including payroll taxes, pension costs, health insurance, dental insurance, life insurance, and other benefits provided to employees. The calculated Total Labor Burden Percentage must be mutually agreed upon by both the contractor and the Principal Representative. The State reserves the right to require backup confirmation of all information included in the calculation. The document version is State Form SBP-6.18, issued August 2023, and includes supporting attachments (image1.jpg, image2.emf, and Microsoft_Excel_Worksheet.xlsx).

View the file

Other files

File Type Posted
Appendix C Montrose Lead Specification 2024.pdf PDF
IPD_Appendix A 2025 R1.pdf PDF
ADDENDUM 1.pdf PDF
SC8.1 DB LS GC_2026.pdf PDF
SC8.0 DBLS A_2026_1.pdf PDF
Signin Sheets 11-5-26.pdf PDF
082411 Montrose IFR RFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF COLORADO

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAM

DIRECT LABOR BURDEN CALCULATION

Institution/Agency:
Department of Military and Veterans Affairs (DMVA)
Project No./Name:
082411 Montrose Indoor Firing Range Lead Dust Mitigation

This form is required to be submitted for review prior to execution of a construction agreement.

List items below by the percentage of what makes up the total labor overhead; Items include benefits that a contractor pays to employees on their payroll. Examples include taxes, pension cost, health and dental insurance etc. The Labor Burden percentage must be agreed to by both the contractor and Principal Representative and will be included in the contract as part of Exhibit A and will be used in the calculation of any future Change Order Proposals (SC-6.312) Line 2.

Major sub-contractors defined as electricians, plumbers, mechanical contractors, excavators, millwork, concrete, block layers etc. Please provide one (1) Labor Burden Calculation Sheet per contractor and for each sub-contractor. These labor burdens shall be used in the calculation of any future Change Order Proposals (SC-6.312) Line 10.

State reserves the right to require back-up confirmation of all information included in this calculation.

State Form SBP–6.18 Issued 8/2023 image1.jpg image2.emf

Microsoft_Excel_Worksheet.xlsx Sheet1

Contractor/Subcontractor Name:

Percent of Salary Paid

Payroll Taxes

Pension Costs

Health Insurance

Dental Insurance

Life Insurance

Other (Specify) Description: _________________________

Other (Specify) Description: _________________________

Total Labor Burden Percentage: 0%