Appendix C Montrose Lead Specification 2024.pdf
PDF 6 MB Posted
- Solicitation number
- RFP OAAA 2027000078 2
- Issued by
- Morgan County, Colorado
About this file
This is a Lead-Containing Dust Remediation Specification prepared by Atlas Technical Consultants LLC for the Colorado Army National Guard Montrose Readiness Center located at 12147 6390 Road in Montrose, Colorado. The specification was prepared for the Department of Military and Veterans Affairs to address lead dust exposure hazards resulting from past operation of an indoor firing range at the facility. The project scope includes environmental cleaning and component removal activities, including demolition and disposal of two exhaust fans, two evaporative coolers, all HVAC units and associated ductwork, suspended ceiling systems (approximately 7,220 square feet), drywall ceilings in six rooms (approximately 1,560 square feet), carpet in office areas (approximately 3,465 square feet), vinyl cove base (approximately 830 linear feet), and pipe insulation where present. Additional work includes roof surface cleaning (approximately 25,000 square feet), light fixture cleaning and removal, and comprehensive surface cleaning of all metal ceiling joists and electrical conduit. The specification was dated May 7, 2024, and prepared by Atlas Technical Consultants LLC as Project Number Z035CNG002.
A lead dust survey was conducted from November 6–8, 2018, with 163 wipe samples collected throughout the building. Eighty samples contained lead concentrations at or above the Army National Guard acceptable surface lead dust level standard of 10 micrograms per square foot, with the majority found above ceiling surfaces and on HVAC equipment. The Remediation Contractor must comply with all applicable federal regulations including OSHA Lead in Construction Standard (29 CFR 1926.62), respiratory protection standards (29 CFR 1910.134), EPA regulations (40 CFR Part 745), and Colorado Department of Public Health and Environment Regulation Number 19. The contractor must submit a written lead compliance program prior to work commencement and is fully responsible for worker protection, proper disposal of all lead-contaminated waste in compliance with Department of Transportation regulations, and achievement of clearance standards through visual inspection and wipe sampling below 10 micrograms per square foot. The Consultant will provide project surveillance, air monitoring, and clearance testing throughout the remediation process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IPD_Appendix A 2025 R1.pdf | ||
| ADDENDUM 1.pdf | ||
| SC8.1 DB LS GC_2026.pdf | ||
| SBP6.18 Labor Burden Calc R8-2023.docx | DOCX document | |
| SC8.0 DBLS A_2026_1.pdf | ||
| Signin Sheets 11-5-26.pdf | ||
| 082411 Montrose IFR RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEAD-CONTAINING DUST REMEDIATION SPECIFICATION
MONTROSE READINESS CENTER
12147 6390 Road
Montrose, Colorado 81401
Project Number Z035CNG002
May 7, 2024
PREPARED FOR:
Mr. Sam Vanzant Department of Military and Veterans Affairs 6848 South Revere Parkway Centennial, Colorado 80112
PREPARED BY:
Atlas Technical Consultants LLC 5050 South Syracuse Street, Suite 1150 Denver, Colorado 80237
Atlas Project No. Z035CNG002 Page | i
COVER LETTER
May 7, 2024
Mr. Sam Vanzant Project Manager – G9 Installations and Environment (CFMO) Department of Military and Veterans Affairs 6848 South Revere Parkway Centennial, Colorado 80112
Re: Lead-Containing Dust Remediation Specification Montrose Readiness Center 12147 6390 Road
Montrose, Colorado 81401 Atlas Project Number: Z035CNG002
Dear Mr. Vanzant, Atlas Technical Consultants LLC (Atlas) is pleased to present this Lead-Containing Dust
Remediation Specification for the Colorado Army National Guard Montrose Readiness Center building located at 12147 6390 Road in Montrose, Colorado.
Atlas has drafted the following Lead-Containing Dust Remediation Specification to remove lead dust exposure hazards resulting from past operation of the indoor firing range at this building.
This specification includes requirements for environmental cleaning and component removal activities within the building.
This remediation specification has been prepared in accordance with generally accepted industry practices for lead dust remediation. Atlas makes no determinations or warrants no conclusions beyond those stated herein. Further, Atlas submits this remediation specification to the
Department of Military and Veterans Affairs for their exclusive use.
ATLAS TECHNICAL CONSULTANTS
Specification by:
Reviewed by:
Todd Anderson Project Manager Direct Line: +1 303-799-6100 Email: todd.anderson@oneatlas.com
Alex Peck, CIH, MBA Technical Practice Director Direct Line: +1 425-273-3858 Email: alex.peck@oneatlas.com
Page | ii
CONTENTS
COVER LETTER ........................................................................................................................ I
1.0 PROJECT OVERVIEW
1.1 PROJECT INFORMATION
2.0 LEAD REMEDIATION SCOPE OF WORK
3.0 PROJECT APPROACH
3.1 DEFINITIONS
3.2 WORK HOURS
3.3 REMEDIATION CONTRACTOR RESPONSIBILITITY
3.4 MATERIALS
3.5 EQUIPMENT
3.6 PROJECT SURVEILLANCE
3.7 SCHEDULE
4.0 PROJECT EXECUTION
4.1 SEQUENCE OF WORK
4.2 TEMPORARY FACILITIES
4.3 PREPARATION OF THE WORK AREA
4.4 WORKER PROTECTION
4.5 RESPIRATORY PROTECTION
4.6 DEMOLITION OF LEAD DUST CONTAMINATED COMPONENTS
4.7 CLEANING REQUIREMENTS FOR LEAD-CONTAINING SURFACE DUST
4.8 DISPOSAL
4.9 WORK AREA CLEARANCE
APPENDICES
Appendix I Table II: Lead Dust Sampling Results
Appendix II Wipe Sample Location Drawings
Appendix III Mechanical (HVAC) and Lighting Plan Drawings
Appendix IV Lead Dust Remediation Drawings
Page | 1
1.0 PROJECT OVERVIEW
1.1 PROJECT INFORMATION
At the request of the Department of Military and Veterans Affairs (Client), ATC Group Services LLC (ATC) performed a limited lead dust survey in the building located at 12147 6390 Road in Montrose, Colorado on November 6 through 8, 2018. The purpose of this survey was to determine the presence of lead dust on various surfaces at the above-referenced property.
The Readiness Center is a one-story concrete block and steel frame structure with a concrete foundation. The building is approximately 25,000 square feet (SF), containing an 1,870 SF Indoor Firing Range (IFR) and 300 SF Arms Vault. The IFR was decommissioned approximately 15 years ago and is now being used for storage. The building also contains offices, restrooms, an assembly hall, kitchen, vehicle maintenance area, and gym. There are various heating, ventilation, and air conditioning (HVAC) systems throughout the facility. The interior finishes include concrete and concrete masonry unit (CMU), metal, drywall, ceiling tile, carpet, and ceramic tile.
ATC collected a total of 163 lead dust wipe samples throughout the building and on the roof. As of October 1, 2023, the Army National Guard (ARNG) acceptable surface lead dust level standard is less than 10 micrograms per square foot (µg/ft2). A total of eighty (80) lead dust wipe samples contained lead concentrations at or above 10 µg/ft2.
The sample results are summarized in Table II in Appendix I. Lead dust wipe samples with concentrations at or above the ARNG standard of 10 µg/ft2 are denoted in bold.
The majority of the samples above the screening criteria were collected from above ceiling surfaces and HVAC equipment.
2.0 LEAD REMEDIATION SCOPE OF WORK
Clean and remove furnishings from each Work Area.
Demolition and disposal of two exhaust fans (EF-1 and EF-2) from the roof above the
IFR. Demolish and dispose of the associated ductwork.
Demolition and disposal of two evaporative coolers from the roof above the IFR.
Demolish and dispose of the associated ductwork.
Demolition and disposal of all HVAC units. Demolish and dispose of all ductwork components associated with the HVAC units, including the supply and return air vents.
Clean the entire roof surface (approximately 25,000 square feet).
Demolition and disposal of the suspended ceiling systems including the grid and ceiling tile (approximately 7,220 square feet). Demolition and disposal of the drywall ceiling system from rooms 110, 125, 131, 132, 148, and the maintenance bay hallway (approximately 1,560 square feet).
Remove and dispose of carpet in the office areas (approximately 3,465 square feet).
Remove and dispose of vinyl cove base on walls (approximately 830 linear feet) to facilitate removal of the carpet.
Clean light fixtures throughout the building. The four-foot florescent light fixtures shall be disconnected and removed from the suspended ceiling grid for cleaning.
Remove and dispose of pipe insulation where present.
Page | 2
Clean all surfaces of the metal ceiling joists throughout the building.
Clean all electrical conduit above ceiling height throughout the building.
Clean all surfaces throughout the building starting at the ceiling deck.
3.0 PROJECT APPROACH
3.1 DEFINITIONS
Action Level - is defined as an airborne concentration of lead of 30 µg/m3 in air calculated as an 8-hour time weighted average. Periodic exposure monitoring, biologic monitoring, and initial and annual employee training is triggered whenever exposure measurements reach or exceed the action level.
Air Monitoring - The process of measuring the lead content of a specific volume of air.
Authorized Visitor - Owner's Representative, testing lab personnel, the Cleaning Contractor, emergency personnel or a representative of any federal, state and local regulatory or other agency having authority over the project.
Breathing Zone - A hemisphere forward of the shoulders with a radius of approximately 6 to 9 inches.
Consultant – Owner’s Representative and Certified Risk Assessor.
Critical Barrier – Single layer of 6-mil polyethylene sheeting installed initially over all doors, windows, ventilation openings, drains, wall penetrations, etc., as an additional measure to prevent contaminated air from escaping the Work Area.
Demolition - The dismantling and removal of any building component, system, finish or assembly of a facility together with any related handling operations.
Disposal Bag - A properly labeled 6-mil thick leak tight plastic bag used for transporting lead contaminated waste from Work Area and to disposal site.
Exposure Monitoring - Sampling of lead concentrations within the breathing zone of an employee.
HEPA Filter - A High Efficiency Particulate Air (HEPA) filter capable of trapping and retaining 99.97% of particles greater than 0.3 microns in diameter.
HEPA Vacuum - Vacuum collection equipment equipped with a HEPA filter system for exhausted air.
Lead Dust - Dust that contains lead equal to or greater than 40 µg/ft2.
Negative Pressure Respirator - A respirator in which the air pressure inside the respiratory inlet covering is positive during exhalation in relation to the air pressure of the outside atmosphere and negative during inhalation in relation to the air pressure of the outside atmosphere.
Permissible Exposure Limit - The OSHA Lead In Construction Standard 29 CFR
1926.62 sets a permissible exposure limit (PEL) of 50 micrograms of lead per cubic meter of air (50 µg/m3) averaged over an 8-hour workday which is referred to as a time weighted average (TWA).
Protection Factor - The ratio of the ambient concentration of an airborne substance to the concentration of the substance inside the respirator at the breathing zone of the wearer. The protection factor is a measure of the degree of protection provided by a respirator to the wearer.
Page | 3
Remediation - The reduction of a lead dust hazard through wet cleaning and HEPA vacuuming.
Remediation Contractor - Any business entity or person performing the actual remediation for a lead remediation project.
Time Weighted Average (TWA) - The average concentration of a contaminant in air during a specific time period.
Visible Emissions - Any emissions containing particulate material that are visually detectable without the aid of instruments. This does not include condensed uncombined water vapor.
Wet Cleaning - The process of eliminating lead contamination from building surfaces and objects by using cloths, mops, or other cleaning implements which have been dampened with water containing detergent.
Work Area - The area where lead remediation work is performed which is defined and/or isolated to prevent the spread of lead dust or debris, and entry by unauthorized personnel.
3.2 WORK HOURS
The Work Areas will be unoccupied during remediation activities. Other areas of the facility may be occupied. Hours for all Work Areas shall be coordinated with the Owner.
Weekend and evening work is not anticipated, unless specifically authorized by the Owner.
3.3 REMEDIATION CONTRACTOR RESPONSIBILITITY
The Remediation Contractor shall assume full responsibility and liability for compliance with all applicable federal, state, and local regulations pertaining to work practices, transport, disposal, and protection of workers, visitors to the site and persons occupying areas adjacent to the site. The Remediation Contractor shall hold the Owner and Consultant harmless for failure to comply on the part of himself, his employees or his subcontractors. Federal, state and local regulations include, but are not limited to, the following:
1.1.1 U.S. Department of Labor, Occupational Safety and Health Administration, (OSHA), including but not limited to:
1.1.1.1 Lead in Construction Standard: Title 29, Part 1926.62 of the Code of Federal Regulations
1.1.1.2 Respiratory Protection: Title 29, Part 1910.134 of the Code of Federal Regulations
1.1.1.3 Construction Industry: Title 29, Part 1926 of the Code of Federal Regulations
1.1.1.4 Access to Employee Exposure and Medical Records: Title 29, Part
1910.1020 of the Code of Federal Regulations
1.1.1.5 Hazard Communication: Title 29, Part 1910.1200 of the Code of Federal Regulations
1.1.1.6 Specifications for Accident Prevention Signs and Tags: Title 29, Part
1910.145 of the Code of Federal Regulations
Page | 4
1.1.2 U.S. Department of Transportation (DOT), including, but not limited to:
1.1.2.1 Hazardous Materials: Title 49, Part 171 and 172 of the Code of Federal
Regulations
1.1.3 U.S. Environmental Protection Agency (EPA), including but not limited to:
1.1.3.1 Title 40 Part 745 of the Code of Federal Regulations.
1.1.4 Colorado Department of Public Health and Environment (CDPHE) Regulation Number 19.
The Remediation Contractor shall provide a written lead compliance program that outlines details for this remediation as required to fully comply with the OSHA Lead Standard, 29 CFR 1926.62(e)(2). The plan must be submitted to the Owner’s Consultant for review prior to starting work.
3.4 MATERIALS
Provide fire retardant polyethylene sheeting of 6-mil thickness and of a size to minimize the frequency of joints.
Provide polyethylene disposable bags labeled in accordance with contents and federal, state and local regulations.
Provide waste disposal containers acceptable to the waste disposal facility.
Provide tape or adhesive spray capable of sealing joints in adjacent polyethylene sheets to finished or unfinished surfaces of dissimilar materials and capable of adhering while wet.
Provide string mop and buckets.
Provide cleaning rags.
Provide clean room sticky-mats.
Provide cleaning solution designed for removal of metals from surfaces. Cleaners must be water-based, non-flammable, non-corrosive, and not harmful to workers, finishes or substrates. Proposed cleaners must be made available for review by the Owner’s Consultant prior to use.
3.5 EQUIPMENT
Provide approved respirators that comply with 29 CFR 1910.134 (b), (d), (e) and (f) and 29 CFR 1926.62 (f).
Provide full-body disposable coveralls, head covering, and foot coverings that comply with 29 CFR 1926.62 (g).
Provide all necessary dumpsters and certified hauling vehicles necessary for the proper disposal of all hazardous and solid waste generated by the remediation work.
Provide ground fault circuit interrupters (GFCI) installed at the source for all equipment in the Work Area.
Provide a hand and face wash facility.
Provide a clean change area for workers to don disposable coveralls and other personal protective equipment and to store street clothes.
Page | 5
Provide lavatory facilities at the work site. Maintain a clean and orderly lavatory facility at all times throughout the Work. On site facilities may be available for use, but this must be coordinated and approved by the Owner.
Provide suitable hand tools for demolition of components.
Provide HEPA vacuums.
Provide electrical powered scissor lifts or similar lifts to allow access to ceiling areas.
Workers must be trained appropriately prior to lift operation.
Provide appropriate fall protection for employees while working at heights.
Provide ladders of various sizes and configurations that will allow complete access to ceiling areas. Ladders must be the appropriate strength for expected loading and must be undamaged and in good working condition.
Provide scaffolding as needed to allow complete access to ceiling areas.
3.6 PROJECT SURVEILLANCE
The Consultant will provide project surveillance and air monitoring services during lead dust remediation. The Consultant will ensure that the Remediation Contractor follows the specifications including, but not limited to: review of worker certifications and medical records, interpreting and enforcing the scope of work, observing work practices, performing visual inspections of remediation Work Areas and clearance wipe sampling, and performing air monitoring.
3.7 SCHEDULE
The remediation schedule is to be performed and completed according to the schedule set by the Owner. Any deviations from this schedule shall be determined by the Owner.
4.0 PROJECT EXECUTION
4.1 SEQUENCE OF WORK
The general sequence of work will occur as follows. Changes in the sequence must be approved by the Owner and Owner’s Consultant.
1.1.1 Work Area identification and delineation
1.1.2 Work Area isolation
1.1.3 Installation of critical barriers
1.1.4 Placement and activation of negative air pressure machines
1.1.5 Cleaning, protection, and removal of movable goods
1.1.6 Installation of two-stage chamber at entrance to containment
1.1.7 Cleaning and protection of non-movable goods
1.1.8 Pre-cleaning of floors
1.1.9 Installation of 6-mil polyethylene sheeting on walls and floors
1.1.10 Removal of ceiling tiles
1.1.11 Removal of supply and return vents
1.1.12 Removal of light fixtures associated with suspended ceiling grid
1.1.13 Removal of metal ceiling grid
1.1.14 Removal of HVAC units and ductwork
1.1.15 Temporary repair of roof penetrations
Page | 6
1.1.16 If insulated pipes in the Work Area, remove pipe insulation, then clean bare pipes
1.1.17 Cleaning of all surfaces in Work Area, starting from roof deck and working down
1.1.18 Final cleaning
1.1.19 Visual clearance inspection of Work Area
1.1.20 Clearance wipe sampling of surfaces in Work Area
1.1.21 Removal of critical barriers in Work Area
1.1.22 Repeat sequence for each subsequent Work Area
4.2 TEMPORARY FACILITIES
Water Service:
1.1.1 The Remediation Contractor may use existing water service, if available, at the project site. The Remediation Contractor will confirm the availability of water service with the Owner or Consultant prior to project commencement. All connections to the Owner's water system shall include backflow protection. Valves shall be temperature- and pressure-rated for operation of the temperatures and pressures encountered. The Owner will pay all service costs for water used from existing facilities. When domestic water service is unavailable, the Remediation Contractor shall be responsible for providing water at the job site. After completion of use, connections and fittings shall be removed without damage or alteration to the existing water piping and equipment. Leaking or dripping valves shall be repaired or replaced immediately. The Remediation Contractor is responsible for all damage to existing finishes or equipment due to leaking or dripping valves.
Electrical Service:
1.2.1 The Remediation Contractor may use existing electrical service, if available, at the project site. The Remediation Contractor will confirm the availability of electrical service with the Owner or Consultant prior to commencement of the project. The Contractor will also provide electrical services to the consultant at the job-site for air sampling at no cost to the consultant. Electrical service may be affected by the removal of ceiling and lighting components.
1.2.2 Ground Fault Protection: Provide receptacle outlets equipped with ground fault circuit interrupters, a re-set button and a pilot light, for plug-in connection of power tools and equipment.
1.2.3 Electrical Power Cords: Use only grounded extension cords. Use "hard-service" cords in areas where the cords will be exposed to abrasion and traffic. Use single lengths or, in areas where single cords will not reach Work Areas, use waterproof connectors to connect separate lengths of electric cords.
1.2.4 Lamps and Light Fixtures: Provide general service lamps for all areas of work when natural light is not adequate. Protect lamps with guard cages or tempered glass enclosures where fixtures are exposed to breakage by remediation operations.
Sanitary Facilities:
1.3.1 Existing toilet facilities in the building may be used by the Remediation Contractor's personnel during performance of the work (if available for use and approved by the
Page | 7
Owner), provided that the toilet facilities are maintained daily in a clean state of hygiene as determined by the Consultant. However, the Remediation Contractor is responsible for providing their own portable toilet facilities at the project site at the Contractor’s expense.
Temporary Storage:
1.4.1 Where necessary, and pre-approved by the Owner, provide and maintain in a neat, orderly appearance, weatherproof trailers. Coordinate location of placement with the Owner.
Site Access:
1.5.1 Site access will be limited to areas necessary to accommodate remediation.
Coordinate location of placement of such items as the decontamination unit, disposal trailer, parking, etc. with the Owner’s Representative.
4.3 PREPARATION OF THE WORK AREA
Posting of Warning Signs: The Remediation Contractor shall post all appropriate warning signs as required by regulations. Warning signs shall be posted at the entrance to the Work Area. The Remediation Contractor shall provide area isolation with appropriate warning signs. Clearly post all documentation as required by law.
Furnish and install readily visible caution signs in accordance with 29 CFR 1926.62
(m) outside each Work Area that read:
DANGER
LEAD WORK AREA
MAY DAMAGE FERTILITY OR THE UNBORN CHILD
CAUSES DAMAGE TO THE CENTRAL NERVOUS SYSTEM
DO NOT EAT, DRINK OR SMOKE IN THIS AREA
The Work Area is the location where lead remediation work occurs. It is a variable of the extent of the work of the contract. It may be a portion of a room, a single room, or a complex of rooms. A "Work Area" is considered potentially contaminated during the work, and must be isolated from the balance of the building, and decontaminated at the completion of the lead remediation work. The Remediation Contractor shall prep the entire Work Area and remove lead-containing dust from areas identified.
Visual Barrier: Where the Work Area is immediately adjacent to or within view of occupied areas, provide a visual barrier so that the work procedures are not visible to building occupants.
Required Documents to be on site: The Remediation Contractor shall maintain on-site all appropriate documentation as required by OSHA, EPA, and CDPHE. These documents must be made readily available to the Consultant or any authorized visitor at all times.
Preparation for Contained Work Area(s) prior to remediation activities:
1.6.1 Removal of the lead-containing dust shall be executed in a "Contained" Work Area.
1.6.2 Contractor shall contain the Work Area for the duration of the Project, by installing critical barriers to prevent air migration out of the Work Area with 6-mil polyethylene
Page | 8 taped securely to a clean surface. Spray adhesive, used on finished surfaces, should be avoided where possible.
1.6.3 Pre-clean visible potentially lead-containing dust from the Work Area.
1.6.4 Clean and cover fixed and movable objects that can remain in the Work Area with
6-mil polyethylene sheeting taped securely in place.
1.6.5 All fixed and movable objects requiring cleaning shall be cleaned with a HEPA vacuum and wet cleaned.
1.6.6 All objects removed shall be adequately marked and charted on a plan to ensure proper reinstallation upon completion of the decontamination of the Work Area.
The objects shall be stored in a location designated by the Owner, and in a manner that will prevent contamination or damage to the objects. Damaged and missing objects will be replaced by the Remediation Contractor at his own expense and to the satisfaction of the Owner.
1.6.7 Cover entire floor with a minimum of two (2) layers of 6-mil polyethylene sheeting.
Cover wall and column surfaces with a minimum of two (2) layers of 6-mil polyethylene sheeting. Floor coverings shall extend a minimum of 12" up vertical surfaces and behind wall covers. All seams shall be staggered and securely taped.
1.6.8 Install observation window(s) at strategic location(s) in the "Containment" barrier to allow observation of work from outside the Work Area.
1.6.9 The Remediation Contractor shall check regularly (at beginning, middle and end of each shift as a minimum) all polyethylene isolation and containment (protective) barriers for punctures, loose seals, contact with heat-generating devices, etc.
Problem areas shall be repaired or mended immediately.
1.6.10 Maintain existing emergency exits from the building. Maintain a minimum of two
(2) exits from Work Areas where possible. Exits, where possible, shall be on opposite ends of the Work Area. All exits shall be labeled in bright letters or signage. Establish alternative exits satisfactory to fire officials where existing building or Work Area emergency exits are unavoidably blocked by activities of this project.
1.6.11 Provide and maintain appropriate fire extinguisher inside and outside the Work Area.
1.6.12 Work Areas are expected to be lit with temporary lighting. Provide temporary power and lighting when necessary, and ensure safe installation of temporary power sources and equipment per applicable electrical code requirements including appropriate Ground Fault protection. Remediation Contractor shall take all precautions necessary, including inspections and testing, to insure the safety of his employees and other building occupants from electrical hazards during the course of the Project. Existing fire, smoke detection and other life safety systems shall be kept in operation at all times.
1.6.13 The Remediation Contractor shall install and maintain Negative Air Pressure Equipment during the remediation and decontamination phases of the project until the Clearance Test has passed. A sufficient amount of air shall be exhausted by the unit(s) to create a pressure of -0.02 inches of water within the Work Area with respect to the area outside the Work Area. If only one unit is necessary to provide the specified negative air pressure in a Work Area, the Remediation Contractor shall have a backup unit in place should the first unit fail, and for filter changes.
Page | 9
1.6.14 Install and maintain a manometer from the time remediation begins until the Clearance Test has passed.
Preparation of the containment, the following activities apply:
1.7.1 Clean and remove any furnishings from the remediation Work Area.
1.7.2 Clean, cover, and seal non movable objects remaining in the remediation Work
Area with one layer of 6-mil polyethylene sheeting.
1.7.3 Isolate remediation Work Area from other portions of the building. Seal penetrations with 6-mil polyethylene sheeting, mechanically fastened in place and sealed with duct tape or spray glue.
1.7.4 Install a two-stage chamber with self-closing triple flaps on either side of the chamber, at entrance to the containment.
1.7.5 No flammable materials shall be stored inside the remediation Work Area containment.
1.7.6 Install two layers of 6-mil polyethylene sheeting over walls and floors.
1.7.7 Provide wash facility.
1.7.8 Install negative pressure units utilizing HEPA filters and ensure units are located on opposite end of containment from decontamination unit.
1.7.9 Install recording manometer to monitor differential pressure between inside and outside the remediation Work Area. The minimum differential pressure shall be -
0.02 inches of water.
1.7.10 Maintain Sign In/Out log in entrance to remediation Work Area.
1.7.11 The Remediation Contractor shall install a clear plastic viewing port (e.g., Plexiglas) to allow visibility into the Work Area.
1.7.12 Install scaffolding as necessary for access to remediation work.
4.4 WORKER PROTECTION
This section describes the equipment and procedures required for protecting workers against lead dust contamination and other workplace hazards except for respiratory protection (See section 4.5).
Coveralls: Provide disposable full-body coveralls with integral head and foot covers and require that they be worn by all workers in the Work Area. Provide a sufficient number for all required changes, for all workers in the Work Area.
Boots: Provide boots with non-skid soles and, where required, OSHA-approved foot protection, for all workers. Boots shall not be worn out of the Work Area. Boots shall be decontaminated, bagged, and carried from on Work Area to another.
Personal Protective Equipment: As required by OSHA for all workers including but not limited to hard hat, eye protection, gloves, and safety foot ware.
4.5 RESPIRATORY PROTECTION
Instruct and train each worker involved in lead dust remediation in proper respiratory use and require that each worker always wear a respirator, properly fitted on the face, in the Work Area from the start of any operation that may cause airborne lead dust until the Work Area passes final clearance or the Contractor can show exposure monitoring data adequate to prove that employees are no being exposed to lead above the OSHA action level or permissible exposure limit.
Page | 10
Comply with ANSI Z88.2 - 1980 "Practices for Respiratory Protection" and OSHA 29 CFR 1910 and 1926. The Remediation Contractor shall ensure use of the appropriate respiratory protection for the work being performed and recognizes that these requirements are only minimum acceptable standards.
Fit Testing: Provide current fit test documentation.
Minimum Requirements: Respiratory protective equipment shall be OSHA/NIOSH approved in accordance with the provisions of 30 CFR Part 11 unless superseded by local regulations with more stringent requirements. Determine, in accordance with 29 CFR 1926.26 regulations, the 8-hour time-weighted average (TWA) concentration of lead dust to which employees will be exposed in each Work Area. When the exposure levels are established the appropriate level of respiratory protection can be determined.
Workers shall always wear a respirator, properly fitted on the face, in the Work Area, from the initiation of preparation work until all areas have been given written clearance by the Consultant.
Store respirators and filters at the job site in the clean change room.
4.6 DEMOLITION OF LEAD DUST CONTAMINATED COMPONENTS
HVAC Rooftop Units/Evaporative Coolers/Exhaust Vents: Clean metal shafts (intake and exhaust). Fill roof shafts with fiberglass insulation. Seal roof shafts with either metal or plywood from inside, utilizing silicone caulk to seal cover to ceiling or metal shaft frame. Seal top of roof exhaust shroud and roof intake shaft by covering with prefabricated metal cover. Use silicone caulk between the top of the roof curb and cover to make air and moisture-tight seal.
HVAC Duct Work: Prior to demolition, remove excess dust with HEPA vacuum and wet clean. Cut or open ducts to create manageable lengths based on Work Area and conditions. Seal open ends with 6-mil polyethylene sheeting, remove sealed lengths of ductwork from Work Area, and dispose of properly. The Remediation Contractor shall be aware that lead-containing dust exists inside the metal ducts and conduct activities to minimize dust generation. Cutting should be conducted using manual shears, not power saws.
Suspended Ceiling System: Remove ceiling tiles, light fixtures, supply and return vents, and metal grid. Place ceiling tiles, metal grid, and supply and return vents into proper waste containers and seal to prevent dust from escaping during handling and transport to larger waste containers. Remove materials from work area, and dispose of properly. Use methods to minimize the spread of dust throughout Work Area.
Light Fixtures: Prior to disconnection, remove excess dust with a HEPA vacuum.
Thoroughly wet clean and HEPA vacuum each light fixture, then cover and seal with 6-mil polyethylene sheeting and store in an uncontaminated location for future re-installation.
Drywall Ceiling System: Demolish drywall ceilings where present. Use methods to minimize the spread of dust throughout Work Area. Place into proper waste containers, remove from work area, and dispose of properly.
Carpet Removal: HEPA vacuum carpets to remove dust. Mist, carefully roll up, and seal with 6-mil polyethylene sheeting to prevent the release of dust.
Page | 11
Vinyl Cove Base Removal: Remove vinyl cove base to facilitate removal of carpet.
Place into proper waste containers, remove from work area, and dispose of properly.
4.7 CLEANING REQUIREMENTS FOR LEAD-CONTAINING SURFACE DUST
Pre-cleaning – After critical barriers have been installed, remove any visible lead-containing dust from the Work Area floors prior to installing polyethylene sheeting.
Cleanup - All surfaces in the Work Area and all adjacent areas used as a pathway to the Work Area shall be cleaned by HEPA vacuuming, wet cleaning, and HEPA vacuuming. Repeat as necessary to achieve ARNG clearance standard of less than 10 µg/ft2.
Final Cleaning - All surfaces in the Work Area shall be cleaned by HEPA vacuuming, followed by wet cleaning, followed by a second HEPA vacuuming.
HEPA vacuuming shall occur only after the surfaces are dry.
Wet cleaning shall use clean water mixed with a cleaning agent. At a minimum, open-dipped cleaning mixtures shall be changed after use in each room or hallway to avoid re-contaminating an area.
The Remediation Contractor shall visually inspect each cleaned surface to ensure that visible dust and residues have been adequately removed. This can be accomplished by using the “white cloth” test. Wipe a clean white cloth on a cleaned surface. Little to no visible residue should be present on the cloth.
Following final cleaning and inspection procedures, notify Consultant for visual inspection of cleanliness of the containment and clearance wipe sampling.
4.8 DISPOSAL
Metal components may be recycled (i.e. metal grid and HVAC duct work) if approved by the Owner and in compliance with applicable waste management regulations.
All other waste shall be considered lead contaminated waste. Provide securable area pre-approved by Owner for the temporary storage of all solid, hazardous or contaminated wastes generated. Place all hazardous and potentially hazardous waste in containers lined with two layers of 6-mil polyethylene sheeting. Each container shall be clearly labeled with regard to specific contents, including the date the container was sealed. Store all solid and hazardous waste in full compliance with federal, state, and local requirements and do not allow hazardous waste generated to be stored on site for more than 90 days.
Package and label all waste for transport in accordance with the United States DOT regulations on packaging.
4.9 WORK AREA CLEARANCE
Visual inspections and final lead in dust wipe sampling will be conducted in the Work
Area. If any portion of the Work Area fails the visual inspection or clearance dust standards, it is the responsibility of the Remediation Contractor to re-clean and re-sample failed surfaces (utilizing the Owner’s Consultant).
Following the completion of cleanup, the Remediation Contractor shall ensure that there is no evidence of settled dust or debris.
Page | 12
Settled dust or debris present in the Work Area following completion of cleanup shall constitute sufficient evidence that Remediation Contractor cleanup procedures were inadequate.
Consultant will inspect and approve the Work Area for settled dust or debris. As part of the visual examination, the Consultant will ensure that settled dust or debris is not present on any surface in the Work Area. If such conditions are observed, the Remediation Contractor shall repeat cleaning procedures, followed by a second visual inspection.
These procedures will continue until the Consultant has inspected and approved the Work Area after final cleaning.
Dust wipe samples will be collected from all representative surfaces within visually cleared work areas at the Owner’s discretion, including but not limited to floors, walls, ceilings, other horizontal surfaces and movable and non-movable items. Clearance shall be achieved when all lead dust samples are below 10 µg/ft2.
Work Areas are not cleared for removal of critical barriers and put-back until both visual and wipe sample criteria have been passed.
APPENDIX I
TABLE II: LEAD DUST SAMPLING RESULTS
LEAD DUST SURFACE WIPE SAMPLING RESULTS
Colorado Army National Guard (COARNG) Montrose Readiness Center 12147 6390 Road
Montrose, Colorado 81401
Sample Number
Surface Sampled Location of Sample Sample Result
(µg/ft2)
119-1 Cabinet Office 119 <10
119-2 Ceiling Office 119 <10
119-3 Window Sill Office 119 <10
119-4 Wall Office 119 <10
120-5 Window Sill Office 120 11
103-6 Cabinet Forms 103 <10
103-7 Ceiling Forms 103 <10
118-8 Top of Light Fixture Office 118 210
114-9 Top of HVAC Duct Office 114 1,000
114-10 Cabinet Office 114 <10
114-11 Wall Office 114 <10
117-12 Desk Office 117 <10
117-13 Wall Office 117 <10
116-14 Supply Vent Office 116 51
112-15 Top of Locker Office 112 <10
112-16 Top of HVAC Duct Office 112 17
113-17 Top of Locker Below Supply
Vent Office 113 110
113-18 Metal Deck above Ceiling Tiles Office 113 <10
109-19 Floor Office 109 <10
111-20 Shelf Office 111 <10
111-21 Wall Office 111 <10
Montrose, Colorado 81401
Sample Number
Surface Sampled Location of Sample Sample Result
(µg/ft2)
104-22 Wall Conference Room 104 <10
104-23 Supply Vent Conference Room 104 35
104-24 Back of Ceiling Tile Conference Room 104 <10
104-25 Wall Conference Room 104 <10
121-26 Top of Refrigerator Administration Room 121 <10
121-27 Metal Deck above Ceiling Tiles Administration Room 121 <10
**11618-FB Field Blank N/A <10
124-28 Window Sill Administration Room 124 <10
121-29 Wall Administration Room 121 <10
*121-30 Spike #1 121-007 240
128-30 Podium Classroom 128 <10
128-31 Top of HVAC Flex Duct Classroom 128 34
128-32 Window Sill Classroom 128 <10
128-33 Wall Classroom 128 <10
128-2-34 Cabinet Office 128-2 <10
127-35 Top of HVAC Duct Office 127 110
130-36 Wall Office 130 <10
129-37 Metal Truss Office 129 17
HLWAY-38 Floor North/South Office Hallway <10
HLWAY-39 Floor East/West Office Hallway <10
HLWAY-40 Floor Main Office Hallway <10
Montrose, Colorado 81401
Sample Number
Surface Sampled Location of Sample Sample Result
(µg/ft2)
HLWAY-41 Floor Main Office Hallway <10
HLWY-42 Supply Vent Main Office Hallway 48
HLWY-43 Supply Vent Main Office Hallway 35
139-44 Floor Assembly Room 139 <10
139-45 Floor Assembly Room 139 <10
139-46 Floor Assembly Room 139 <10
139-47 Floor Assembly Room 139 <10
139-48 Floor Assembly Room 139 <10
139-49 Wall Assembly Room 139 <10
139-50 Wall Assembly Room 139 <10
139-51 Wall Assembly Room 139 <10
139-52 Wall Assembly Room 139 21
139-53 Ceiling Joist Assembly Room 139 130
139-54 Ceiling Joist Assembly Room 139 89
139-55 Ceiling Joist Assembly Room 139 240
139-56 Top of Light Fixture Assembly Room 139 180
139-57 Top of Light Fixture Assembly Room 139 72
139-58 Top of Light Fixture Assembly Room 139 66
139-59 Windowsill Assembly Room 139 <10
139-60 Windowsill Assembly Room 139 24
139-61 Inside HVAC Duct Assembly Room 139 150
Montrose, Colorado 81401
Sample Number
Surface Sampled Location of Sample Sample Result
(µg/ft2)
139-62 Inside HVAC Duct Assembly Room 139 570
139-63 Inside HVAC Duct Assembly Room 139 610
139-64 Inside HVAC Duct Assembly Room 139 120
152-65 Floor Unit Storage Room 152
(Inside Vault)
152-66 Floor Unit Storage Room 152 21
152-67 Floor Unit Storage Room 152 16
152-68 Wall Unit Storage Room 152 <10
152-69 Wall Unit Storage Room 152 <10
152-70 Ceiling Joist Unit Storage Room 152 33
152-71 Ceiling Joist Unit Storage Room 152 22
152-72 Top of Light Fixture Unit Storage Room 152 100
152-73 Top of Light Fixture Unit Storage Room 152 30
152-74 Shelf Unit Storage Room 152 13
152-75 Countertop Unit Storage Room 152 <10
152-76 Ceiling Unit Storage Room 152 <10
152-77 Top of Gun Vault Unit Storage Room 152 47
152-78 Supply Vent Unit Storage Room 152 41
152-79 Supply Vent Unit Storage Room 152 99
152-80 Top of HVAC Duct Unit Storage Room 152 41
152-81 Top of HVAC Duct Unit Storage Room 152 38
Montrose, Colorado 81401
Sample Number
Surface Sampled Location of Sample Sample Result
(µg/ft2)
149-82 Floor Maintenance Room 149 <10
149-83 Floor Maintenance Room 149 <10
149-84 Wall Maintenance Room 149 <10
149-85 Wall Maintenance Room 149 <10
149-86 Ceiling Joist Maintenance Room 149 68
149-87 Ceiling Joist Maintenance Room 149 53
149-88 Top of Light Fixture Maintenance Room 149 170
149-89 Top of Light Fixture Maintenance Room 149 120
149-90 Windowsill Maintenance Room 149 19
149-91 Windowsill Maintenance Room 149 15
148-92 Cabinet Hazmat Room 148 12
147-93 Shelf Supply Room 147 <10
145-94 Desk Office 145 <10
141-95 Wall Kitchen Room 141 <10
141-96 Wall Kitchen Room 141 <10
140-97 Back of Ceiling Tile Scullery Room 140 <10
142-98 Floor Food Storage Room 142 <10
140-99 Serving Window Sill Scullery Room 140 <10
141-100 Serving Window Sill Kitchen Room 141 <10
UTL-101 Floor Utility Room 138A 47
UTL-102 Wall Utility Room 138A <10
Montrose, Colorado 81401
Sample Number
Surface Sampled Location of Sample Sample Result
(µg/ft2)
UTL-103 Top of Metal Box Utility Room 138A 34
UTL-104 Ceiling Joist Utility Room 138A 47
131-105 Floor Restroom 131 <10
132-106 Floor Restroom 132 <10
131-107 Wall Restroom 131 <10
132-108 Wall Restroom 132 <10
131-109 Supply Vent Restroom 131 22
132-110 Supply Vent Restroom 132 32
134-111 Floor IFR Room 134 14
134-112 Floor IFR Room 134 200
134-113 Wall IFR Room 134 <10
134-114 Wall IFR Room 134 <10
134-115 Top of Heat Shield IFR Room 134 360
134-116 Ceiling IFR Room 134 <10
134-117 Ceiling IFR Room 134 83
134-118 Ceiling IFR Room 134 <10
134-119 Top of Locker IFR Room 134 26
134-120 Top of Locker IFR Room 134 88
134-121 Top of Locker IFR Room 134 12
134-122 Top of Locker IFR Room 134 40
134-123 Top of Light Fixture IFR Room 134 <10
Montrose, Colorado 81401
Sample Number
Surface Sampled Location of Sample Sample Result
(µg/ft2)
134-124 Top of Light Fixture IFR Room 134 <10
134-125 Top of Light Fixture IFR Room 134 <10
134-126 Ceiling IFR Room 134 <10
134-127 Inside Exhaust Duct IFR Room 134 2,800
134-128 Inside Exhaust Duct IFR Room 134 530
134-129 Inside Evaporative Cooler Duct IFR Room 134 11,000
134-130 Inside Evaporative Cooler Duct IFR Room 134 3,100
133-131 Floor Gym Room 133 <10
133-132 Floor Gym Room 133 <10
133-133 Wall Gym Room 133 <10
133-134 Wall Gym Room 133 <10
133-135 Ceiling Joist Gym Room 133 23
133-136 Ceiling Joist Gym Room 133 39
133-137 Top of Light Fixture Gym Room 133 66
133-138 Top of Light Fixture Gym Room 133 45
133-139 Mat Gym Room 133 <10
133-140 Mat Gym Room 133 <10
133-141 Supply Vent Gym Room 133 55
133-142 Supply Vent Gym Room 133 29
133-143 Top of HVAC Duct Gym Room 133 16
133-144 Top of HVAC Duct Gym Room 133 19
Montrose, Colorado 81401
Sample Number
Surface Sampled Location of Sample Sample Result
(µg/ft2)
ROOF-145
Roof Membrane above East Office
Hallway Roof <10
ROOF-146 Roof Membrane above Gym Roof 21
*ROOF-147 Spike #2 N/A 230
ROOF-148 Roof Membrane South Area of IFR Roof <10
ROOF-149
Roof Membrane between IFR
Exhaust Vents Roof 530
ROOF-150 Roof Membrane above Scullery Roof 18
ROOF-151
Metal Roof above Vehicle
Maintenance Bay Roof <10
ROOF-152
Roof Membrane above Supply
Room Roof 11
*ROOF-153 Spike #3 N/A 220
**11/7/18-FB1 Field Blank N/A <10
ROOF-155 Inside HVAC Equipment (RU-2) Roof 50
ROOF-156 Inside HVAC Equipment (RU-1) Roof <10
ROOF-157 Inside HVAC Equipment (RU-4) Roof 39
ROOF-158 Inside HVAC Equipment (RU-5) Roof 85
ROOF-159 Inside HVAC Equipment (RU-3) Roof 20
ROOF-160 Inside Exhaust Fan (EF-1) Roof Above IFR 15,000
ROOF-161 Inside Exhaust Fan (EF-2) Roof Above IFR 21,000
ROOF-162 Exhaust Vent Roof Above Kitchen <10
ROOF-163 Inside HVAC Equipment (MA-3) Roof 28
Montrose, Colorado 81401
Sample Number
Surface Sampled Location of Sample Sample Result
(µg/ft2)
ROOF-164 Roof Vent Roof Near Kitchen <10
102-165 Cabinet Office Room 102 <10
102-166 Above Ceiling Office Room 102 <10
*MISC-167 Spike #4 N/A 200
**MISC-168 Field Blank N/A <10
* Denotes Sample Spike ** Denotes Field Blank
APPENDIX II
WIPE SAMPLE LOCATION DRAWINGS
A P
P R
O V
E D
B
Y
P R
O J E
C T
N
U M
B E
R
F I G
U R
E
D R
A W
N
B
Y
D A
T E
E
N i c h o l s
A v e
S t e
C e n t e n n i a l
C o l o r a d o
P h
F a x
L E
S
T
W
I P
E
S
A M
P L
E
L
O C
A T
I O
N
M
A P
M O
N T
R O
S E
C
O
R
O A
D
C O
L O
R A
O
R M
Y
N
A T
I O
N A
L
G
U A
M
N
T R
O S
E
R
E A
D I N
E S
S
C
E N
T E
R
Z
C N
G
K Y
B K
NOTE: ALL LOCATIONS ARE APPROXIMATE
LEGEND
NOT TO SCALE
HLWY-40
129-37 130-36
128-2-34
128-33
128-30
128-31
113-17
113-18
112-15
112-16
HLWY-39
HLWY-38
116-14
117-12
117-13
114-11
114-10
114-9
118-8
111-20
111-21
109-19
128-32
127-35
HLWY-42
121-29
121-27
124-28
121-26
104-24
104-25
104-22
104-23
102-165
102-166
103-7
103-6
HLWY-41
HLWY-43
119-1
119-2
119-4
119-3
120-5
<10 µg/ft²
³10 µg/ft²
SAMPLE LOCATIONS:
OFFICE AREAS
S P r o j e c t s B
S T
D
E P
T
M
I L
I T
A R
Y
V
E T
E R
A N
S
A
F F
A I R
S Z
C
N G
S
A M
P L
O C
S
A d w g
AutoCAD SHX Text
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text 138B
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text 138A
AutoCAD SHX Text
SCULLERY
AutoCAD SHX Text
AutoCAD SHX Text
FOOD PREP
AutoCAD SHX Text
AutoCAD SHX Text
FOOD STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
SUPPLY
AutoCAD SHX Text
AutoCAD SHX Text
BATTERY
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
MAINTENANCE BAY
AutoCAD SHX Text
AutoCAD SHX Text
STATE CREW
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
CHAIR
AutoCAD SHX Text
VAULT
AutoCAD SHX Text
AutoCAD SHX Text
UNIT STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
DRILL HALL
AutoCAD SHX Text
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
STOR
AutoCAD SHX Text
AutoCAD SHX Text
STOR
AutoCAD SHX Text
AutoCAD SHX Text
LIBRARY
AutoCAD SHX Text
AutoCAD SHX Text
LIBRARY
AutoCAD SHX Text
AutoCAD SHX Text
MAINT
AutoCAD SHX Text
AutoCAD SHX Text
FAC
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
AutoCAD SHX Text
WOMEN
AutoCAD SHX Text
AutoCAD SHX Text
MEN
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
STOR
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
CAP
AutoCAD SHX Text
AutoCAD SHX Text
RECRUITING
AutoCAD SHX Text
AutoCAD SHX Text
RECRUITING
AutoCAD SHX Text
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text
AutoCAD SHX Text
RECEPT
AutoCAD SHX Text
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
ADMIN
AutoCAD SHX Text
AutoCAD SHX Text
UNIT
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
HALL
AutoCAD SHX Text
AutoCAD SHX Text
FITNESS
AutoCAD SHX Text
AutoCAD SHX Text
HALL
AutoCAD SHX Text
AutoCAD SHX Text
HALL
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
P R
O V
P R
O J E
M
B E
R
F I G
U R
E
D R
A W
N
B
Y
D A
T E j c f kd sl ;a a s
E
N i c h o l s
A v e
S t e
C e n t e n n i a l
C o l o r a
P h x
L E
S
T
W
I P
E
S
A M
P L
E
L
O C
A T
I O
N
M
A P
M O
N T
R O
S E
C
O
R
O A
D
C O
L O
R A
M
Y
N
A T
I O
N A
L
G
U A
N
T R
O S
E
R
E A
D I N
E S
S
C
E N
T E
R
Z
C N
G
K Y
B K
NOTE: ALL LOCATIONS ARE APPROXIMATE
LEGEND
NOT TO SCALE
134-123
134-119
134-118
134-127
134-128
134-112
134-114
134-117
134-120
134-121
134-124
134-113
134-126
134-111
134-115
134-116
134-125
134-122
134-130
134-129
133-144
133-131
133-141
133-133
133-136
133-139
133-137
133-142
133-132
133-138
133-140
133-134
133-135
133-143
132-108
132-106
131-105
131-109
131-107
132-110
139-60
139-62
139-55
139-56
139-59
149-89
149-87
149-90
149-91 149-88
149-86
139-54
139-63
139-58
139-64
139-53
139-61
139-57
<10 µg/ft²
³10 µg/ft²
149-84
149-83
142-98
141-96
141-95
140-97
UTL-101
UTL-103
UTL-104
UTL-102
149-82
149-85
152-69
148-92
147-93
141-100
139-44
139-50
140-99
145-94
139-45
152-73
152-72
152-79
152-74
152-71
152-66
152-80
139-51
139-47
139-46
152-65
152-76
152-77
152-81
152-70
152-67
152-75
152-68
152-78
139-49
139-48
139-52
SAMPLE LOCATIONS:
ASSEMBLY
SUPPLY
VEHICLE MAINTENANCE (OFFICE & STORAGE ROOMS)
KITCHEN AREAS
IFR STORAGE LOCKERS
GYM
UTILITY
RESTROOMS
S P r o j e c t s B
S T
D
E P
T
M
I L
I T
A R
Y
V
E T
E R
A N
S
A
F F
A I R
S Z
C
N G
S
A M
P L
O C
S
A d w g
AutoCAD SHX Text
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text 138B
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text 138A
AutoCAD SHX Text
SCULLERY
AutoCAD SHX Text
AutoCAD SHX Text
FOOD PREP
AutoCAD SHX Text
AutoCAD SHX Text
FOOD STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
SUPPLY
AutoCAD SHX Text
AutoCAD SHX Text
BATTERY
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
MAINTENANCE BAY
AutoCAD SHX Text
AutoCAD SHX Text
STATE CREW
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
CHAIR
AutoCAD SHX Text
VAULT
AutoCAD SHX Text
AutoCAD SHX Text
UNIT STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
DRILL HALL
AutoCAD SHX Text
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
STOR
AutoCAD SHX Text
AutoCAD SHX Text
STOR
AutoCAD SHX Text
AutoCAD SHX Text
LIBRARY
AutoCAD SHX Text
AutoCAD SHX Text
LIBRARY
AutoCAD SHX Text
AutoCAD SHX Text
MAINT
AutoCAD SHX Text
AutoCAD SHX Text
FAC
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
AutoCAD SHX Text
AutoCAD SHX Text
WOMEN
AutoCAD SHX Text
AutoCAD SHX Text
MEN
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
EXAM
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
STOR
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
CAP
AutoCAD SHX Text
AutoCAD SHX Text
RECRUITING
AutoCAD SHX Text
AutoCAD SHX Text
RECRUITING
AutoCAD SHX Text
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text
AutoCAD SHX Text
RECEPT
AutoCAD SHX Text
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
ADMIN
AutoCAD SHX Text
AutoCAD SHX Text
UNIT
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
HALL
AutoCAD SHX Text
AutoCAD SHX Text
FITNESS
AutoCAD SHX Text
AutoCAD SHX Text
HALL
AutoCAD SHX Text
AutoCAD SHX Text
HALL
AutoCAD SHX Text
AutoCAD SHX Text
TOILET
P R
O V
P R
O J E
M
B E
R
F I G
U R
E
D R
A W
N
B
Y
D A
T E
E
N i c h o l s
A v e
S t e
C e n t e n n i a l
C o l o r a
P h x
R
O O
F
L E
S
T
W
I P
E
S
A M
P L
E
L
O C
A T
I O
N
M
A P
M O
N T
R O
S E
C
O
R
O A
D
C O
L O
R A
M
Y
N
A T
I O
N A
L
G
U A
N
T R
O S
E
R
E A
D I N
E S
S
C
E N
T E
R
Z
C N
G
K Y
B K
ALL LOCATIONS ARE APPROXIMATE
LEGEND
NOT TO SCALE
ROOF-163
ROOF-164
ROOF-162
ROOF-161
ROOF-149
ROOF-160
ROOF-151
ROOF-152
ROOF-148
ROOF-146
ROOF-158
ROOF-159
ROOF-157
ROOF-155
ROOF-156
ROOF-145
<10 µg/ft²
ROOF-150
³10 µg/ft²
SAMPLE LOCATIONS:
ROOF
NOTE:
SAMPLE NUMBERS: ROOF-147, ROOF-153
ARE SPIKES AND 154 IS A FIELD BLANK
S P r o j e c t s B
S T
D
E P
T
M
I L
I T
A R
Y
V
E T
E R
A N
S
A
F F
A I R
S Z
C
N G
S
M P
L O
C
R O
O F d w g
AutoCAD SHX Text
AutoCAD SHX Text
FD
AutoCAD SHX Text
FD
AutoCAD SHX Text
MECHANICAL
AutoCAD SHX Text 138B
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text 138A
AutoCAD SHX Text
SCULLERY
AutoCAD SHX Text
AutoCAD SHX Text
FOOD PREP
AutoCAD SHX Text
AutoCAD SHX Text
FOOD STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
SUPPLY
AutoCAD SHX Text
AutoCAD SHX Text
BATTERY
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
MAINTENANCE BAY
AutoCAD SHX Text
AutoCAD SHX Text
STATE CREW
AutoCAD SHX Text
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
CHAIR
AutoCAD SHX Text
VAULT
AutoCAD SHX Text
AutoCAD SHX Text
UNIT STORAGE
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
DRILL HALL
AutoCAD SHX Text
AutoCAD SHX Text
CLASSROOM
AutoCAD SHX Text
AutoCAD SHX Text
STOR
AutoCAD SHX Text
AutoCAD SHX Text
STOR
AutoCAD SHX Text
AutoCAD SHX Text
LIBRARY
AutoCAD SHX Text
AutoCAD SHX Text
LIBRARY
AutoCAD SHX Text
AutoCAD SHX Text
MAINT
AutoCAD SHX Text
AutoCAD SHX Text
FAC
Au…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .