SOW_Att_5_-_215_Humidifier_Bar_Drawings.pdf

PDF 6 MB Posted

Attached to
Heating, Ventilation, and Air Conditioning Construction
Solicitation number
SB134118RP0004
Issued by

About this file

SOW Att 5 - 215 Humidifier Bar Drawings

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pl ott ed B y:

NI

TE

SH

S

HA

H P lot D ate : 6

/12 /20

8:

:43

A M

Sa ve d B y:

NI

TE

SH

.S

HA

H

F ile

: V :\2

6\S

AI

G1

.04 \23

-S

AI

G1

.04

_M \21

5-

3.d wg

S av e D ate

: 0 6/1

2/2

7 0 6:0

7 A M ed B y:

NI

TE

SH

S

HA

H P lot D ate : 6

/12 /20

8:

:45

A M

Sa ve d B y:

NI

TE

SH

.S

HA

H

F ile

: V :\2

6\S

AI

G1

.04 \23

-S

AI

G1

.04

_M \21

5-

4.d wg

S av e D ate

: 0 6/1

2/2

7 0 5:1

2 A M ed B y:

NI

TE

SH

S

HA

H P lot D ate : 6

/12 /20

8:

:46

A M

Sa ve d B y:

NI

TE

SH

.S

HA

H

F ile

: V :\2

6\S

AI

G1

.04 \23

-S

AI

G1

.04

_M \21

5-

5.d wg

S av e D ate

: 0 6/1

2/2

7 0 5:1

9 A M ed B y:

NI

TE

SH

S

HA

H P lot D ate : 6

/12 /20

8:

:49

A M

Sa ve d B y:

NI

TE

SH

.S

HA

H

F ile

: V :\2

6\S

AI

G1

.04 \23

-S

AI

G1

.04

_M \21

5-

6.d wg

S av e D ate

: 0 6/1

2/2

7 0 8:3

3 A M ed B y:

NI

TE

SH

S

HA

H P lot D ate : 6

/12 /20

8:

:55

A M

Sa ve d B y:

NI

TE

SH

.S

HA

H

F ile

: V :\2

6\S

AI

G1

.04 \23

-S

AI

G1

.04

_M \21

5-

7.d wg

S av e D ate

: 0 6/1

2/2

7 0 8:2

4 A M ed B y:

NI

TE

SH

S

HA

H P lot D ate : 6

/12 /20

8:

:57

A M

Sa ve d B y:

JU

LIS

AN

.W

IJA

YA

F ile

: V :\2

6\S

AI

G1

.04 \23

-S

AI

G1

.04

_M \21

5-

8.d wg

S av e D ate

: 0 6/1

2/2

7 0 8:2

7 A M

DWG.SH.NO. OF

PLANT DIVISION

U.S. DEPARTMENT OF COMMERCE

NORTH

DESIGN PROJ. #PROJECT/W.O.DATEDRAWN BYPROJECT ENGRPLANNING & ENGR. OFF.O.H. & S. DIV.FIRE PROTECTION SVS.SPONSORAPPROVED BY DATEDATEDATEDATEDATEDATE

DP#

DAN GILMOREJAMIE MCALLISTERJAMIE MCALLISTERJOHN FILANOCLYDE MESSERLY ASHWIN R. PATEL 215-45806 09JULISAN.WIJAYA 06-12-2017 15W2668

MD-3

100% CONSTRUCTION DOCUMENTS

ed B y:

NI

TE

SH

S

HA

H P lot D ate : 6

/12 /20

8:

:00

A M

Sa ve d B y:

JU

LIS

AN

.W

IJA

YA

F ile

: V :\2

6\S

AI

G1

.04 \23

-S

AI

G1

.04

_M \21

5-

9.d wg

S av e D ate

: 0 6/1

2/2

7 0 6:3

9 A M ed B y:

NI

TE

SH

S

HA

H P lot D ate : 6

/12 /20

8:

:07

A M

Sa ve d B y:

JU

LIS

AN

.W

IJA

YA

F ile

: V :\2

6\S

AI

G1

.04 \23

-S

AI

G1

.04

_M \21

5-

0.d wg

S av e D ate

: 0 6/1

2/2

7 0 6:2

0 A M

CONTROL VALVE SCHEDULE

VALVE

TAG

BODY VALVE PLUG BONNET ACTUATOR POSISITONER

BASIS OF

DESIGN

DESIGN

PRESSURE

(PSIG)

STYLE CV MATERIAL GUIDING BALANCE

SHUTOFF

CLASS

PORT SIZE

CHARACTERISTIC MATERIAL PACKING STYLE STYLE

TRAVEL

SUPPLY

INPUT

SIGNAL

(PSIG)

ACTION

INCH INCH

CV-104 15 GLOBE 78 CF3M SST PORT UNBALANCED ANSI CL IV 2.76

EQUAL

PERCENT

S31603 SST

LIVE LOADED

PTFE

STANDARD

SPRING

AND

DIAPHRAGM

1.57 AIR 3 TO 15 DIRECT

FISHER

NOTE:

1. PROVIDE A MINIMUM OF GRADE 304 STAINLESS STEEL FOR ALL WETTED PART.

2. STEAM SUPPLY AT 15 PSIG.

mm mm

Pl ott ed B y:

NI

TE

SH

S

HA

H P lot D ate : 6

/12 /20

8:

:10

A M

Sa ve d B y:

JU

LIS

AN

.W

IJA

YA

F ile

: V :\2

6\S

AI

G1

.04 \23

-S

AI

G1

.04

_M \21

5-

1.d wg

S av e D ate

: 0 6/1

2/2

7 0 6:2

1 A M

File details come from the government source that posted it.